Loading...
HomeMy WebLinkAbout0155 BRISTOL AVENUE IDS '731 s 4-o I l v e, r ��il -- Ial L Town of Barnstable Buildink 1Post This CardSoThat�t�sVisible:Fromgthe Street Approved Plans"Mustbe Retained on Job and this CatdMust be Kept R M^ Postetl UntilFin"af Inspection Has Been Mader ' Permiti6396 � � _ . R Where a-Certificate ofOccui anc IsRe uired •such Buildm"g shall.Not be Ocewpied�unt�l a"Final Inspectionhas�been 'made Permit NO. B-19-393 Applicant Name: Lloyd R Smith Vivint Solar LLC Approvals Date Issued: 02/07/2019 Current Use: Structure Permit Type: Building-Solar Panel-Residential Expiration Date: 08/07/2019 Foundation: Location: 115 BRISTOL AVENUE, HYANNIS Map/L ot: 291 101 Zoning District: RB Sheathing: Owner on Record: SANTOS, ELIZABETH C Contractor Name BRIEN LANGILL Framing: 1 Address: 115 BRISTOL AVENUE CoV ractor-"License; CS106675 2 .� '. HYANNIS, MA 02601gg FEst�Project Cost: $21,142.00 Chimney : Description: Installation of roof mounted photovoltaic solar�s"Stern 9 61 kw 31 Pe,r hit Fee: $ 157.82 Insulation: Panels Fee Paid $ 157.82 Project Review Req: f e� Date 2/7/2019 Final: �i0ls��Crn Plumbing/Gas ' Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit iscommencfficial ed with siz`months after issuan Final Plumbing: All work authorized by this permit shall conform to the approved applicatn a d the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and st uctu�es.shall be in compliance with the local zoning by laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible-from access street or road abd shall be maintained open for public mspecti for the entire duration of the work until the completion of the same. `" Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and re�Officials are-. rovided on this,permit. Electrical re Minimum of Five Call Inspections_Required for All Construction Work ,i 1.Foundation or Footing Service: . � 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before fir est flue£aimng is installed " lwl 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Final: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Rough: Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: