Loading...
HomeMy WebLinkAbout0085 CASTLEWOOD CIRCLE a 173 -asy � r Town of Barnstable Building Post This Card So That it.is:U�sFblexFrom the Street Approved Plans Must be I2etam'ed onSJ6 and this Card Must"be Kept wttvst'east r v 6' �$ Postecl Until'.Final Inspe ct ion Ha`s B°een Made 5 (£ r Permit �'� °`� 1NFierea Certficate'af Occupancy,is Required;such Bwldmgshall Not be Occu,pie4d until a Final In pection has been made _, r, Permit No. 13-19-3170 Applicant Name: William McCluskey Ap provals Date Issued: 09/26/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 03/26/2020 Foundation: Location: 85 CASTLEWOOD CIRCLE, HYANNIS Map/Lot: 273=054 Zoning District: RC-1 Sheathing: Owner on Record: CREIGHTON,WILLIAM J Contractor Name:` William J McCluskley Framing: 1 Address: 85-CASTLEWOOD CIRCLE Contractor License; 102776 2 " HYANNIS,MA 02601 Est. Project Cost: $5,000.00 Chimney: Description: Add R-30 cellulose,and R-38 fiberglass to theiattic:Add R-19 Permit Fee: $85.00 fiberglass to the basement. Dense pack the walls with R 13 Insulation: cellulose.Air seal the attic plane and basement with,expanding Fee Paid:` $85.00 foam. General weatherization. Date, 9/26/2019 Final: Project Review Re Plumbing/Gas J q .s Rough Plumbing: { ,. Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authonzed,by`thi's permit is commenced within six months after`issuance. s r c All work authorized by this permit shall conform to the approved application and the'approved construction documents for whichthis permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zor ing bylaws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public hspeetion for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this,,ermit. Minimum of five Call Inspections Required for All Construction Work Y Service: S 1.Foundation or Footing Rough: ., 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: Cape Save Inc. 7-D Huntington Avenue South Yarmouth, MA 02664 - Tel: 508-398-0398 Fag: 508-398-0399 10/24/19 -+ Brian Florence CBO Town of Barnstable _ Building Division .; 200 Main St. -- Hyannis,MA 02601 RE: Insulation Permit B-19-3170 Dear Mr. Florence: This affidavit is to certify that all work completed for 85 Castlewood Circle,Hyannis has been inspected by a third party Certified Building Performance Institute(BPI)Inspector. All work performed meets or exceeds Federal and State Requirements. Sincerely, William McCloskey