Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0119 CASTLEWOOD CIRCLE
� j � C�S�'I e �c.�r©� C t r�� � Town of BarnstableBuilding }Post This Card So That rt is Visible'From the Street Approved Plans Must be Ill, on Joband this Card Must,be Kept RAJAUN ewer� i MAW `�$ ;Posted Uritil Final Inspection Has Been Made kAIrermit • ,Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a FinalJ,spection has been made .� .w r> m, Permit No. B-19-3629 Applicant Name: William Callahan Approvals Date Issued: 10/29/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 04/29/2020 Foundation: Location: 119 CASTLEWOOD CIRCLE,HYANNIS Map/Lot: 273-051 Zoning.District: RC-1 Sheathing: Owner on Record: TOMKUNAS-SPONZO,MARY A, ET-AL Contractor Name:': EFFICIENT BUILDINGS LLC Framing: 1 Address. 45 MEADOW FARMS ROADContractor License'. 169944 2 - T HARTFORD CT 06107r ct Cost: 3 600.00 WEST Est. P o e J $ Chimney: Description: Insulation Permit Fee: $85.00 Insulation: Project Review Req: Fee Paid:' $85.00 Date. 10/29/2019 Final: Plumbing/Gas 41 Rough Plumbing: Building Official ' Final Plumbing: This permit shall be deemed abandoned and invalid unless the work author�zed'by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and theFapproved construction documents for which;this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and st,dctures shall be in compliance with the local zoning.by laws and codes. This permit shall be displayed in a location clearly visible from access street or road.and shall be maintained open for public.inspection for the entire duration of the Final Gas work until the completion of the same. n Electrical The Certificate of Occupancy will not be issued until all applicable signatu es by the Building andIFIrd Officials are p ovided on this;p�ermit. Minimum of Five Call Inspections Required for All Construction Work:; Service. 1.Foundation or Footing Rough: 2.Sheathing Inspection I g 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site �? All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: