HomeMy WebLinkAbout0324 CRAIGVILLE BEACH ROAD Town of
Barnstable
s a st ThisYCard So,Tat it isVis�ble_Fro the Stret B aPlarnsn Msusttba�e�bReltaeined on Job and this Card Must b illl�
g
Po � pe KKse
. Posted UntihFinalnlnspection.Has Been Made j w; °
� n� � ermit
rw ere a Certificate`of Occupancy is Required,such Building shall Not.be Occupied until a;Final Inspection has Been made t
Permit No. B-20-256 Applicant Name: W. Ray Colwell Approvals
Date Issued: 02/24/2020 Current Use: Structure
Permit Type: Building-Insulation—Residential Expiration Date: 08/24/2020 Foundation:
Location: 324 CRAIGVILLE BEACH ROAD, HYANNIS Map/Lot: 267-171 Zoning District: RB Sheathing:
Owner on Record: LINEHAN,JUDITH&WILLIAM Contractor:Name ° ;5C Energy Framing: 1
Address: 128 G STREET Contractor License: 194390 2
SOUTH BOSTON, MA 02127 ..� w ;� _ '
Est. Project Cost: $5,299.00 Chimney:
Description: Insualtion;See Contract r Permit Fee: $85.00 -
Insulation:
Project Review Req: Fee Paidk; $85:00
Date: 2/24/2020 Final:
Y'*7 Plumbing/Gas
Rough Plumbing:
i ---- •-- -. -_ a Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after'issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same. Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this.permit.
Minimum of five Call Inspections Required for All Construction Work: , Service:
1.Foundation or Footing Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
r-
5.Prior to Covering Structural Members(Frame Inspection)
Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
.Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
-
Building plans are to be available on site Fire Department
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT
Page 1 of 1
A
r (�i
K #
�11 �
X c9HIF� 1 5 Yak - -aa y l ' J� ft
as x e ,'
P � t z x a t nA
.. a.x �h out
AN
To"M-TIT
As c
'
- t £ _ h d S ,��s .,a lak
1 �
-
T, r atl R S
S }
„
lip
77
% r
41
<.a
S
4`
e;
,4a
one" " 4.7
n
}y
•�'d71//�i�.�, 4� Jkrf � W4 'A' �Y +� t S
file://\\isvisions\images\00\05\24\47.jpg /'ram �F �R 2/27/2014
,• �;.. � '�' '�a. a�§.a'�t�._. ` .,. +�, I t�s^.�, �. t sw�'a f �"� ,.�;, ,�� a,�� "� °va'=�H k°.''`
pT �. �3, + .f� � `p �'0��� ' "'�� �� •i �r�� 7f Jp�.,�.�Y�fw�fui °
�.�''i5 x'i,w. {��,rrl�.�,"`.•�`.� ��u+` •ti� I*�.,.:a-,. ¢.�R'k�a+� it"y ti.�
�.' '• � � F r .'"gar t�!'T '1yn,� '� v{y.
,r
I i Ai
°`?"ET°�° TOWN OF BARNSTABLE
ii
i BA"STLELE, i
9 ,e0� BUILDIn INSPE TOR
�FQ Yp'�p'• /
v I 1 � D 4 e ✓ e— r
APPLICATION FOR PERMIT TO ...........T.!. .�Z/lJ....�,�...... 2:d.c, !v �-
TYPE OF CONSTRUCTION .......................
TO THE INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a permit according to the following information.-
Location ...... � .�..�!Xf � ...........................................
ProposedUse ................... e.......................................................................................................................................
ZoningDistrict .............. ..... ..�.....................................Fire District ........�1.. ........................................................
Name of Owner ..�-��!..Rt........P.l2ro ..............Address �14......F.;.47......
Name of Builder PUTIVIL ...............Address Q!�.... .. ..........a nr.n?� !s...........
Name of Architect ..C.A.AW 0 P 45;P.04J/41... Address ........... • B„yf/�
Number of Rooms .................*J.'A......................................Foundation .......:....F.P.evw.t.......4:..
e
Exterior ............! .V..�X.......... �... ./.h1�fi..................Roofing .......... ... .Kf' .......St. .�.hr .� l............
Floors ..4'd. ..............................................Interior ..............:.... lQ. ..f!! ./$.LL...........................
Heating ............ .�+:5.A.............................................Plumbing ................ .... .�::.A:4....................................
Fireplace ...................P.V..:'...............................................Approximate Cost ..........�ox. ...................................
Definitive Plan Approved by Planning Board ,1_V l ____ _______19 /gyo
Diagram of Lot and Building with Dimensions S
SUBJECT TO APPROVAL OF BOARD OF HEALTH
w �
o
0 a-
r o z
w N tr LU
fi y < l�'+� o O .
a.
0 V)
LL 0o N
D >: Co
> N < g �
oa av � a � ° ° w
ED
Lj Ld
let to, " 0d
Q p
o ) N,
U ,
� . .2, Qa � ^
rn Q
vl)
I hereby agree to conform to all the Rules and Regulations of the Town of.Barnstab)O—Nardingl the above
construction.
Name ..... ...................
Proctor, D. A.
15264 Permit for one story
No ............... ....................................
single family duelling t
...............................................................................
Location .......324 Craigville Beach Road
... ...................................................
West.Hyannisport
...............................................................................
D. A. Proctor
Owner ....................................... ......................... C�
Type of Construction ..................frame........................ S
Plot ............................ Lot ................................
Permit Granted ........July .17.. ..............19 72,
Date of Inspection L�"'T '�"r
... .........
Date Completed ....... . ... ......19
eec#T pceETZE
PERMIT_REFUSED }
................................................................ 19
............................................................................... '
................................................................................
...............................................................................
...............................................................................
Approved
...............................................................................