HomeMy WebLinkAbout0002 IRVING AVENUE (15) rsa� - c��oZO �lcynr ispo C_.C_
Town of Barnstable Building
.� I„ 3.0`.:a ?.�', a+.' ' ;: 3`s ;...� r; i s*,'?„� ��' ,✓ 'x°'� ,..�. W ., .3, � ✓�, .., ': ''��"� .: �,�.
Post This Card So That rt is Visible°;FromthexStreet Approved Plans Must,be-Retained on Job,and this Card Mustbe Kept m
-* WLNSYAriLL; � v� � �r � ��.0 �'.,3f � � t,. x
>..` °.. GY,.'. Ar 'T* �°`° " `:'" wt a '�' fi;' a Sq
M" Posted UntwlFinal Inspection=Hs�Been Made '� £, r ` ,.x 9 °
' Where a Certificate ofO,ccu anc 3sRe urred,'such Buildm shal,I�Not beaOccu ,ied unto)a Final Inspection,has-been',mad.e €_ Permit
�..,,.� :u:-.r,.�.:,zn+-.>.,�, .,. '�,..ca :.» r..� F.. y:a,,.�.,.p,..<. •'enz, ., ._�,s',;�t'n*; g'�.�,.�..: me.✓..� 4%.,..�,..�.:.%.pe...�.�< .... <„£...,>„� �' ..�. ...� „�:: .ta- !? �„ .u.��_,'z'.:.�;&
Permit No. B-20-755 Applicant Name: Gary Souza
- Approvals
Date Issued: 03/18/2020 Current Use: Structure
Permit Type: Building-Addition/Alteration=Commercial Expiration Date: 09/18/2020 Foundation:
Location: 2 IRVING AVENUE, HYANNIS Map/Lot: 266 031 Zoning District: SPLIT Sheathing:
Owner on Record: HYANNISPORT'CLUB Contractor Name:" .ROGERS AND MARNEY INC. Framing: 1
Contractor-License . 164688
Address: 2 IRVING AVE 2
HYANNIS PORT, MA 02647a Est Protect Cost: $32,500.00 Chimney:
Z ,
Description: New Roof, New Siding, Misc Trim Replacement and w ra neilings '`Permit Fee: $395.75
Insulation:
Project Review Req: Fee Paid $395.75
} E Final:
Date ,= 3/18/2020
d
1.6
. -- Plumbing/Gas
Rough Plumbing:
, u. � � 2 � BuildingOfficial
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authonzed.bythis permit is commenced within six months afterissuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning'by laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same. � �
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Bwld�ng and'Fire Officials are provided on thispermit.
Minimum of Five Call Inspections Required for All Construction Work:. Service:
1.Foundation or Footing 2" Rough:
2.Sheathing Inspection f'„ emu, ,
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
• .Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site Fire Department
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT