Loading...
HomeMy WebLinkAbout1166, 1180, 1186, 1194, 1200 IYANNOUGH ROAD/RTE132 ,S'i 7�' i°G��✓ ��ie cy s'�a� �__��.©ram - Town of Barnstable yoFt"E' 200 Main Street,Hyannis,Massachusetts 0260.1 o� BARNSTABLE• ' Regulatory Services 'Thomas F. Geiler,Director. 1°rFc 39. a`� Building Division Tom Perry, Building Commissioner Phone(508)862-4679 Fax(508)862-4725 www.town.barnstable.ma.us May 26, 2011 Atlantis Development,.LLC/ Stop& Shop c/o Attorney Michael D. Ford VIA REGULAR MAIL AND FAX: 508-430-9979 72 Main Street P. O. Box 485 /. M West Harwich, MA 02671 L. 11J"d Reference: Atlantis Development,LLC &LStop& Shop, SP 044-018 -Modified Post Modification of CCC DRI Decision - Option B which Aligns with Entrance Drive of Existing BJs WholesaleClub Store !o' Iyannough Road,Hyannis 5 Map 274,Parcels 004-BOO,HOO. 008-BOO,HOO; 026 BOO,HOO; A). 040-9D% 006,007; 009-B ,HOO; 028s% Proposal: Construct a 69,950 s.f. Stop &Shop Supermarket 7. Project includes: demolition of existing`structures, redevelopment of the site with supermarket,associated parking, landscaping, connector road, drainage system and transportation improvements. SPR Plan review of Option B- Per CCC DRI Minor Modification,November 1,2010. Dear Attorney Ford: Please be advised that the-above Option B proposal as approved on November.1,2010.by the CCC Regulatory Committee as a Minor Modification to Atlantis Development DRI Decision #JR20035,has been approved subject to the following conditions: • Approval is based upon and construction must substantially comply with plans entitled "Proposed Retail Development, Iyannough Road, Barnstable, MA", scale 1"=40'; prepared for Atlantis Development, LLC, Sheets C-1 through C-9 dated June 29, 2010 with final revisions to Sheet C-2 Layout and Materials; Sheet C-3 Grading and Drainage; C-4 Utility Plan; and Sheet C-5 Landscape Plan on October 15, 2010; Site Lighting& Photometric Plan Sheet SL-1 dated June 25, 2010 r All plans were prepared by Vanasse Hangen Brustlin,Inc.; Watertown,MA. • Final revised plans of the above,when submitted for construction;must reflect the following outstanding requested revisions and considerations: Attention needs to be focused on adequate signage and pavement marking for yielding at the area in the intersection where the southbound free right lane enters Bearse's Lane from Route 132: • a x Sheet C-4 Utility Plan,west hydrant must be moved southward to the northern corner of the rear entrance of Dunkin Donuts. Road needs to be named: Final plan must reflect that the formula for sight distance not stopping sight distance has been applied. Trees must be moved if they interfere with sight distance. Drainage overflow from Pond 2 to Pond 1 needs;to be added to drainage calculations. Striping on Sheet SL-1 Lighting=Photometric Plan must coincide with striping contained in other plans. • Subject to all conditions of the Cape Cod Commission Development of Regional Impact Decision(DRI)#JR20035 dated June 12, 2008 unless modified by DRI Minor Modification which was approved on November 1, 2010 by the Commission's Regulatory Committee. t • Letter from the Regional Transit Authority will need to be provided confirming that the proposed bus shelter.location coordinates with bus_scheduling. • Opticom upgrade must be provided at the Attucks Lane and Phinney's Lane intersection. • All underground utilities must comply with Subdivision Rules,and Regulations for underground utilities in the roadway and must also include future conduit on the plan. • Applicant must obtain all other applicable permits, licenses and approvals required. • Applicant must comply with all Barnstable Fire Department requirements including, but not limited to: lock box number and locations, 911 addressing,hydrant locations,water service design, and confirmation of all turn radii using Hyannis ladder truck templates. • Upon completion,of all work, a registered engineer or land surveyor shall submit a letter , of certification, made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan(Zoning Section 240-105 (G)). This document shall be submitted prior to the issuance of the final certificate of occupancy. Sincerely, Ellen M. Swiniarski Site Plan/Regulatory Review Coordinator CC: Tom Perry,Building Commissioner SPR file Health Dept. Barnstable FD ` .r Town of Barnstable I"E'Ohh�, 200 Main Street;Hyannis,Massachusetts 02601 9B" MASS. � Regulatory Services. Thomas F. Geiler, Director �p 1639. �0 rEor,\,�p Building Division Tom,Perry,,Building Commissioner Phone(508)862-4679 Fax(508)862-4725 www.town.barnstable.ma.us August 27, 2010 4b Atlantis Development, LLC/ Stop'& Shop c/o Attorney Michael D. Ford. _VIA REGULAR MAIL AND FAX: 508-430-9979 72 Main Street P. O. Box 485 West Harwich, MA 02671 Deference: Atlantis Development,LLC & Stop & Shop SPR#044-08 POST CCC DID yannough Road,Hyanni y Map 274, Parcels 004-BOO,HOO; 008-BOO,HOO;'026-BOO, HOO 027; 040-005,006,007; 009-11009.ItOO; 028 Proposal: Construct a 69,950 s.£ Stop & Shop Supermarket Project includes: demolition of existing structures, redevelopment of the site with supermarket, associated parking, landscaping, connector road;drainage- system and transportation improvements. Dear Attorney Ford: Please be advised that subsequent to formal site plan review of the above proposal'on November 13, 2008,the revisedsubmittal dated February.13,2009 received an administrative:approval subject to the following conditions: o Approval is based upon plans entitled"Proposed Retail Development, lyannough Road, Barnstable, MA", scale F'=40% prepared for Atlantis Development, LLC Sheets C-1 through C-10 dated November 30, 2006 with final revisions to Sheet C-3 Layout and Materials, Sheet C-5 Utility Plan,Sheet C-9 & C-10 Site Details on February 13,2009. Final revisions were made to Sheet C-4 Grading and Drainage,March 18, 2008 and Sheet C-6 Landscape Plan,April 6, 2068. Site Lighting &Photometric Plans Sheets SL- 1 &SL-1A dated December 27,2007 and all plans were prepared by Vanasse Hangen Brustlin,Inc., Watertown, MA. e Subject to all conditions of the Cape Cod Commission Development of Regional Impact Decision(DRI)#JR20035 dated June 12,2008.1 `r 1 o The new layout for Attucks Way with relocation of the access to Stop& Shop site and drainage easement which ties in concurrently with this plan will need to be submitted and approved. a Proposed conditions of the intersection design will-need to be reviewed and.approved. Traffic signal plans for the Attucks Lane end of the connecting road which ties in concurrently with this plan must be submitted and approved. ® Draft agreement for drainage relocation will need to be provided... - - ® Letter from the Regional Transit Authoritywilt need to be provided confirming that the proposed bus shelter location coordinates with bus scheduling. o Opticom upgrade must be provided at the Attucks Lane and Phinney's Lane intersection. o All underground utilities must comply with Subdivision Rules and Regulations for underground utilities in the roadway and must also include future conduit on the plan. Y Applicant must obtain all other applicable permits, licenses andapprovals required. o Applicant must comply with all Barnstable Fire Department requirements including, but not limited to: lock box number and locations, 911 addressing, hydrant locations,water service design, and confirmation of all turn radii using Hyannis ladder truck templates. a Upon completion of all.work, a registered engineer or land surveyor shall submit a letter of certification,made upon knowledge and belief in accordance with professional standards that all work has been done in substantial compliance with the approved site plan (Zoning Section 240-104 (G). This document shall be submitted prior to the issuance of the final certificate of occupancy. Sincerely, Ellen M. Swiniarski Site Plan/Regulatory Review Coordinator CC: Tom Perry,Bt it"ding`Commissioner--� SPR file Health Dept. Barnstable FD I