Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0615 MAIN STREET (HYANNIS) (5)
,� ,� -- - - �{ 7. 07/29/2005 17:46 6176950808 CH00&C0. PAGE e4 ArchftectIs Arthur Choy Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451.6153 Fax (617)695-0808 Project: 615 MAIN STR9ET Field Report No. 25. (fin4i'; HYANNIS, MASS,A,CBUSrrTS Contract: Architects Project No: Date. 7-19-05 Time. 9.30 am Weather: Temp. Range- Present At Site: Jack H. Mike OBSERVATIONS; 1. All areas finished except for tenant fit out at left restaurant space. 2. Right side restaurant in operation. 3. Landscaping, driveways, curb cuts, in progress. ARTHUR CHOP ASSOCIATES, INC. P Ronald•S. Wong, project Manager paw ©� Re art$y: Mes 07/29/2005 17:46 6176950808 CH00&C0. PAGE 05 FINAL AFFIDAVIT a iO nM SU1° UNTEMEW W INSPECTIONAL SERVICES CF THE CITE'OP HYr",P NIS I CERTIFY PURSUANT TO 780 CMR ARTICLE I SECTION 127.9 CW THE NIMSAaWSM78 STALE BUILDING CODE,THAT I HAVE OBSERVED THE WORK ASSOCIATM WITH RMAW NO, DATED FOR PROMRTY LOCATED AT 615 muN g , TO THE BEST OF MY KNOWLEDGE,INFORMATION AND BELIEF,THE WORTS HAS BEEN DONE IN MKFORMA1NCE WITH THE APPROVED PLANS,AND WITH THE PROVISIONS OF T MASSACHUSETTS STATE BUILDING CODE AND ALL OTIMP,PERTINENT LAWS,RULES AND R EGUI..ATIONS OF TI M CITY OF._.gXZZjj&. ,THE COMMON dWEALrd OF MASSACI IUSET?S. AND WHERE APPLICABLE,THE VNrM STATES. #� 13566AMM.�,�;H ' NGIWEIrR MASS.RE Uk SIGNAL Arthur Choo Associates, Inc. CNOD 116 South St., Boston, Ma. 0 i Nm 13608 y ADDP M5 �srf Fc �� IAA - � R ��� I MRT",PURSUANT TO 7W CW ARTICLE ON 127.3 OF 11HE MASSACHUSE'ITS ST'AT9 BUIMPI`G CODE,THAT I HAVE OBSERVED'tM WORM ASSOCIATED WITH FRU&T NO, DATED FOR PROPMTY 1.OI,ATED AT TO THE FJEST OF MY KNOWLEDGE.INFORMATION AND BELO,THE WORk HAS BEEN DONE 1N CONFORMANCE WITH THE APPROVED PLANS.AND WTI THE PROVISIONS OF TIVI-E MASSACHUSETTS STATE BUILDING CODE AND ALL OTHER PERTMEW LAWS.RULES AND REOULAT'IONS OF THE CITY OF ,M COMMOIS AIA—H OF MASSACHUSETTS,AND WHERE APPLICABLE,'1'IlE UNITED STAIW. GENERAL CONTRACTOR LICENSE NO. SIGNATURE - - ADDRESS DATE I • 01/26/2005 14:52 6176950808 CH00&C0. PAGE 02 Architect's Arthur Choo Associates, Inc., Consulting Engineers Field.deport 116 South Street, Boston, Massachusetts 0211.1 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET ' Field Report No: 7- kIYANNIS, MASSACHUSETTB Contract: Architects Projcct No: pate:11-30-04 Time:9:40 am Weather: Temp,Range: Present At Site: Gus-super. Mike M. Jack Hynes Norm-framer Greg-framer OBSERVATIONS: 1. 611. cmu wall erected with #5 reinforcing bars at 32" o.c. r n cells filled with grout. 2. End wall posts(t.s. columns) in place. 3. (3)-16" lvl beam replaced with (4) 14" lvl beam plus C15 channel �c at last span. 4. second floor sheathing completed, in place. 5. Ceiling headers at attic framing replaced with "strong-backshr with ceiling joists attached below. 6. Third floor joist framing in place at main portion of building. with bearing partitions in place, some posts to be installed. i ARTHUR CEOO ASSOCIATES, INC. Report gy: Ronald„s. , pxoj eot Manager Pale of pig 01/26/2005 14:52 6176950808 CHOOKO. PAGE 03 Architect's ,A►rthur Choo Associates, Inc., Consulting Engineers Field.Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451 fi 153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 8 1iYANNIS, MASSACHUSETTS Contract: Architects Project No: Datc: 12-15-04 Time: 9.30 am Weather: Temp_Range: Present At Site: Gus-super Mike M. OBSERVATIONS: 1. ' Third floor framing in progress, A-line to gable end wall. 2 Proposed to start shed dormer framing between existing truss lines. 3. Demolition proceeding at front building (part A.) for Verification of existing conditions. 1" ARTHUR CHOO ASSOCIATES, INC. Report By. Ronald..S. Wong, Avro.ect Manager page 41' pages 01/26/2005 14:52 6176950808 CHO0KO. PAGE 04 Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0308 Project: 615 MAIN STREET Field Repott No: 9. HYANNIS, MASS,ACHUSETTS Contract: Architects Project No: Date:12-22-04 Time: 9:15 am Weather Temp. Range: Present At Site: Gus-super Mike M. OBSERVATIONS: 1. Demolition in progress at front section. Partial review of existing framing sizes and conditions. 2. Shed dormer £xaming proceeding at right side. 3. Third floor framing complete to gable and wall. 4. Ceiling joists, collar ties, and lateral bracing to be installed A-line to gable end wall. i ARTHUR CHOO ASSOCIATES, INC. Report$y: Ronald •S. WoP?rlroject Manager page of 3 01/26/2005 14:52 6176950808 CHOOKO. PAGE 05 Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston,. Massachusetts 02 a I I Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 k1AIN STREET Field Report No: HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 12-30-04 Time: 2.30 pm Weather: 'Temp.Range: Present At Site: Gus-super Jack Hynes OBSERVATIONS: - I., Third floor framing in progress, continuing towards and wall. 2. Third floor sheathing installed from lines A-G. 3. Left side of building, upper and lower shed dormers being installed sequentially, between existing truss lines. 4. At right side, 2-bays, roofing removed to prepare for shed dormer installation. 5. Lateral bracing has been installed at upper roof existing roof rafters. 6. Third flktor' frami,ng and sheathing to be installed prior to proceeding with work on shed roof framing. ARTHUR C900 ASSOCIATES, INC. Report]_Sy: Ro ala.S. tw ject Manager page of pages i 9 01/26/2005 14:52 6176950808 CH00&C0. PAGE 06 Architect's Arthur Choo Associates, Inc., Consulting Engineers Ffeld,Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 .(617)451.6153 Fax (617)695-0909 Project: 615 MAIN STREET Field Report No: 11. HYANNIS, MA,SSACHUSETTS Contract. Architects Project.No: Date: 1-05-05 Time: 9.45 am Weather: Temp. Range: Present At Site: Gus -super OBSERVATIONS: 1. Rear area (A-line to gable end) beams being installed. 2. Main area, shed dormer framing in progress, almost complete. 3. Hangers to be installed at channel framing members. 4. Exterior sheathing at shed dormer .walls to be completed. 5. Metal cross bridging to be installed at joists spans. 6. "Strong-Back beams installed at attic/ceiling framing. f' ARTHUR CHOO ASSOCIATES, INC. ReportY Ronald S. Wong r j ect Manager page of pages ' 01/26/2005 14:52 6176950808 CH00&CO. PAGE 07 Architect's Arthur Choo ,associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Pax (617)695-0808 Project: 615 MAIN STREET Field Report No: 12. . HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 1-11-05 Time: 9:10 am Weather: Temp.Range: Present At Site: Gus—super. Mike M. George-Malatos. Iron Works, OESERVATIONS- 1. Demolition at front building completed. 2. Fxaming sizes verified. 3. Exploratory faits excavated to confirm existing foundations atposts/column locations, at all .exposed locations, continuous foundation walls exposed (± 18" wide) . 4. Framing for r front buildingto be revised and coordinated with architects drawings and retail spaces at ground floor level. 1' ARTHUR CHOO ASSOCIATES, INC. Report1$y: Ronald,S. Wong ro' ct Manager pap Of fie$ Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 17 HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 3-08-05 Time: 9:45 am Weather: Temp. Range: Present At Site: J. Hynes, Mike, Chad-framer OBSERVATIONS: 1. Framing of part "A" in progress. 2. Second floor framing complete. 3. Second floor partitions in place. 4. Third floor joists being placed near elevator/stair location. 5. At rear parking area, stel beam to be added at connection. 6. At truss base, rotted portion removed, steel base column to be added and spliced to wood column. i ARTHUR CHOO ASSOCIATES, INC. Report By: Ronald- S. Wong, project Manager page of pages i Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 18 HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 3-15-05 Time: 9:15 am Weather: Temp. Range: Present At Site: Jack Hynes Mike George-Malatos Ironworks. OBSERVATIONS: 1. Framing proceeding at third floor, near elevator/stair area. 2. Beams for columns up to third in place. Columns being erected at front building. 3. Lobby at elevator, location being adjusted. Footings to be placed for bearing, up to .second floor lobby joist framing. 4. Trenched footing installed along kitchen and lobby wall. 5. At front beam line, existing post to be reinforced with channels; or, column to be installed in front up to steel beam. ARTHUR CHOO ASSOCIATES, INC. Report 8y: Ronald. S. Wong, project Manager page of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 19. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 3-29-05 Time: 9:10 am Weather: Temp. Range: Present At Site: Jack Hynes Mike OBSERVATIONS; 1. Reviewed agble wall conditions at front building, columns to be installed at beam bearing locations. 2. Left gable end wall to be reinforced with 2x6 framing. 3. Third floor framing being installed. at front building. 4. Beams in place, front right side floor joists in place. 5. Left side of third floor to be revised. 6. Second floor units in part"B" being sheetrocked. 7. Firestopping is installed in the demising walls at the units. B. At corridor walls, firestopping has been installed. 9. Some units in process of skimcoat plastering. 10. Ceiling areas have been sheetrocked with firestopping in place. 11. Third floor framing at front building should be complete with ceiling framing to be installed. i ARTHUR CH00 ASSOCIATES, INC. Report ley: Ronald..$. Wong, roject Manager page of pages A Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 1. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 9-02-04 Time: 3:00 pm Weather: Temp. Range: Present At Site: Jack Hynes Demo.crew OBSERVATIONS: 1. Demolition in progress. 2. Some footing excavations completed for new column locations at garage drive-thru. 3. Some footings in place as required. 4. Reinforcement in place at excavated footings. 5. Coordinated work for dimensions and elevations of floors. i ARTHUR CHOO ASSOCIATES, INC. Ro a1d,,.S. Wo Report) y: roject Manager page l of pages I : , I Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 2. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 10-13-04 Time: 9:30 am Weather: Temp. Range: Present At Site: Jack Hynes Norm:framing contractor George: Steel contractor OBSERVATIONS: 1. Footings at garage drive-thru complete. 2. Additional footing excavations in progress at each side of garage parking area, for new columns. 3. Footings at basement area in place for columns up to ground level slab . 4. Steel beams delivered, some in place at first floor framing over garage drive-thru. 5. Ground floor framing steel beams loosely places over basement area. 6. Coordination meeting for steel and wood framing elevations. ARTHUR CH0O ASSOCIATES, INC. Report fly: Ronald..S. Won oject Manager page of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 3- HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 11-03-04 Time: 9:15 am. Weather: Temp. Range: Present At Site: Jack Hynes Greg: framing super. George: Malatos Iron Works. OBSERVATIONS: 1. Steel decking and beams in place over basement area. 2. Main steel beams in place over garage drive-thru area. 3. Beams and plates being welded as required. 4. Elevator pit area has been excavated for new elevator, mat foundation in place. 5. Footings at 1-story area excavated for new column/post locations. Reinforcement in place. 6. Existing exterior stud wall has been reinforced with 2x4 addEd. 1m on the flat to the face of existing studs, forming T-section. 7. Demolition in progress at front of building, existing framing to .be exposed by next week. 8. Front area framing to be coordinated with existing conditions. ARTHUR CH0O ASSOCIATES, INC. Reportlgy: Ronald..S. Won project Manager page l of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No. 4. HYANNIS? MASSACHUSETTS Contract: Architects Project No: Date: 11-09-04 Time:9.15 am Weather: Temp. Range: Present At Site: Gus : super. Greg: foreman, framing crew Mike M. : owner's rep. OBSERVATIONS: 1. Temporary wall installed to support one story roof framing. 2. Cmu wall installed along exterior wall of abutter. 3. Ground floor slab placed on metal deck/steel framing over basement area. 4. LVL beams installed at rear span to exterior wall, T.S. columns 4"x4"x$, to be installed, down to foundation. 5. At main portion of second floor framing (first floor-units) wood joists have been installed. 6. Demolition at front portion of building proceeding to expose existing framing conditions. i ARTHUR CHOO ASSOCIATES, INC. Report Rona1. . S. Wong, o ' ct Manager p _y� =� _ page of pages f Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 5. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 11-16-04 Time: 9:30 am Weather: Temp. Range: Present At Site: Gus: super. Greg: framing foreman Jack Hynes George: Malatos Iron Works. OBSERVATIONS: 1. Columns and beams beingg installed at end spans, near basement area. 2. At one story roof, cross beams being installed, columns to be installed after location of beams fixed. 3. Front portion of building still being exposed for review and coordination. 4. Elevator foundation in place, 8" cmu wallsreinforced, all cells filled solid. ( Revised to wood shaft walls above-to be reviewed) i ARTHUR CH00 ASSOCIATES, INC. Reportl X Ronald..S. Wong pr ject Manager page of pages I Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 6 HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 11-23-04 Time:9:25 am Weather Temp. Range: Present At Site: Gus: super. Greg: framing foreman Mike M. Steel erectors, Malatos Iron Works. OBSERVATIONS: 1. Second floor framing proceeding at rear over basement end. 2. Sheathing has been installed over second floor joist framing. 3. Steel beams being installed along corridor bearing wall lines at rear area. 4. Rear wall at unit egress stairs being replaced with 6" cmu wall, reinforced, with cells filled solid at vertical bars. 5. Elevator shaft wall framed with 2"x8" studs at 16" o.c. , ground to second floor framing level. 6. Beams and columns have been installed at one story roof area. 7. At exterior garage doors, beams and headers have been installed. 8. Bearing partition at second level up to third has been installed at main portion of building. 9. Floor joist elevation to be adjusted. 10. Front building area has been documented for coordination, framing of front area to be worked on. i ARTHUR CHOO ASSOCIATES, INC. Report Ronald..S. Wong, p oject Manager p _y: ,. page of pages s� 1 Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 13. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 1-28-05 Time: 9:30 am Weather: Temp. Range: Present At Site: J. Hynes Mike Gus- OBSERVATIONS: 1. Second floor framing to be revised over kitchen to coordinate with existing foundation/column line at alley side. 2. Existing wood beam at walk-in box side to be reinforced with steel channel and columns on the existing foundation. 3. Stair framing at second down to first to be determined. 4. Framing of second floor areas of raised floor anticipated to proceed next week. 3 r i ARTHUR CH00 ASSOCIATES, INC. Ronald..S. Wo , project Manager page of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 14. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 2-04-05 Time: 1:30 pm Weather: Temp. Range: Present At Site: J. Hynes Gus Chad-framer OBSERVATIONS: 1. Reviewed with framer infill framing conditions around old stairs and above kitchen areas. 2. New framing at raised second floor to be erected with temporary shoring in place, final arrangement of beams and columns to be installed by steel fabricator. 3. Materials on site for infill of former stairs and raising of second floor. i ARTHUR CHOO ASSOCIATES, INC. Report> y: Ronald. S. W g, project Manager page of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 15. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 2-16-05 Time: 9:45 am Weather: Temp. Range: Present At Site: J. Hynes Gus Chad-framer OBSERVATIONS: 1. Part of second floor framing in place over old stairs. 2. Framing over kitchen to be started. Bearing line established. 3. Beam at walk-in box side reinforced with channel. Columns in place. Additional steel plates and gussets to be added. ARTHUR CHOO ASSOCIATES, INC. R nald..S. Wong, project Manager Report ley: 9 �, page of pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)645-0808 Project: 615 MAIN STREET Field Report No: 16 HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 3-01-05 Time: 12:30 pm Weather: Temp. Range: Present At Site: J. Hynes Mike Chad—framer George-Malatos Ironworks. OBSERVATIONS: 1. Second floor framing proceeding. 2. Stairs framed in at elevator lobby area. 3. Raised floor at second almost completed. 4. Bearing lines established along post locations. 5. Steel transfer beams being installed at second floor to received new column locations up to third. 6. Some second floor partitions in place. 7. Anticipate framing of third floor next week. ARTHUR CHOO ASSOCIATES, INC. Report) ROna1d..S. or�g, project Manager page of pages f Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 1. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 9-02-04 Time: 3:00 pm Weather: Temp. Range: Present At Site: Jack Hynes Demo.crew OBSERVATIONS: 1. Demolition in progress. 2. Some footing excavations completed for new column locations . at-garage-drive-thru. 3. Some footings in place as required. 4. Reinforcement in place at excavated footings. 5. Coordinated work for dimensions and elevations of floors. i ARTHUR CHOO ASSOCIATES, INC. Report> y: Ro ald_S. Wo roject Manager page l of / pages Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 2. HYANNIS, MASSACHUSETTS Contract: Architects Project No: Date: 10-13-04 Time: 9:30 am Weather: Temp. Range: Present At Site: Jack Hynes Norm:framing contractor George: Steel contractor OBSERVATIONS: 1. Footings at garage drive-thru complete. 2. Additional footing excavations in progress at each side of garage parking area, for nQ_w columns. 3. Footings at basement area in place for columns up to ground level slab . 4. Steel beams delivered, some in place at first floor framing over garage drive-thru. 5. Ground floor framing steel beams loosely places over basement area. 6. Coordination meeting for steel and wood framing elevations. ARTHUR CHOO ASSOCIATES, INC. Report Ronald. S. Won oject Manager p _y: page l of Pages O.�G Architect's Arthur Choo Associates, Inc., Consulting Engineers Field Report 116 South Street, Boston, Massachusetts 02111 Ph. (617)451-5466 (617)451-6153 Fax (617)695-0808 Project: 615 MAIN STREET Field Report No: 3 HYANNIS? MASSACHUSETTS Contract: Architects Project No: Date: 11-03-04 Time: 9:15 am. Weather: Temp. Range: Present At Site: Jack Hynes Greg: framing super. George: Malatos Iron Works. OBSERVATIONS: 1. Steel decking and beams in place over basement area. 2. Main steel beams in place over garage drive-thru area. 3. Beams and platen being welded as required: 4. Elevator pit area has been excavated for new elevator, mat foundation in place. 5. Footings at 1-story area excavated for new column/post locations g Y w - Reinforcement in place. 6. Existing exterior stud wall has been reinforced with 2x4 addrd. :im on the flat to the face of existing studs, forming T-section. 7. Demolition in progress at front of building, existing framing to be exposed by next week. 8. Front area framing to be coordinated with existing conditions. i ARTHUR CH0O ASSOCIATES, INC. Report y: Ronald..S. won project Manager page l of / pages d'