Loading...
HomeMy WebLinkAbout0108 MIDWAY DRIVE �s� - os� . To o Town f Barnstable ..w.� _ .�. ....._, w ._-_ _,.. __ _ _ M _ , wilding MBLK Post This Card So That it is Visible From the Street-.Approved Plans Must be Retained on Job and this Card Must be Kept M^` Posted Until Final'Inspection Has Been Made. Permit Q7a ♦ eo, Where a Certificate of Occupancy is Required,such Building shall,Not be Occupied until a-Final Inspection has been made. Permit NO. 6=19-796 Applicant Name: Wojciech Piwowarczyk Approvals Date Issued: 03/15/2019 Current Use: Structure Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 09/15/2019 Foundation: Location: 108 MIDWAY DRIVE, HYANNIS Map/Lot: 252-055 Zoning District: RC-1 Sheathing: Owner on Record: BARNSTABLE HOUSING AUTHORITY Contractor Name:'."-,WOJCIECH J PIWOWARCZYK Framing: 1 Address: 146 SOUTH STREET i Contractor License: CS-076146 2 HYANNIS, MA 02601 Est. Project Cost: $ 15,500.00 Chimney: Description: Roof replacement at Scattered sites Permit Fee: $79.05 l Insulation: F Project Review Req: t Fee Paid $79.05 I Date 3/15/2019 Final Plumbing/Gas t Rough Plumbing: g m- vBuilding Official Final Plumbing: ,This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after'issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street.or road and shall be maintained open for�public inspection for the entire duration of the Final Gas: work until the completion of the same. ( �' i Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this•permit. . Minimum of Five Call Inspections Required for All Construction Work: Service: 1.Foundation or Footing Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before fire`st flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5..Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health .Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT