Loading...
HomeMy WebLinkAbout0111 OCEAN STREET (9) September 2, 2009 Tom Perry Building Commissioner Town of Barnstable 200 Main Street Hyannis, MA 02601 RE: Ruth Rusher Hostel 111 Ocean St. Hyannis, MA 02601 Mr. Perry, I hereby certify that there is no gas service to either Building C or D on the above referenced property. I further certify that the water service to Building C will be cut and capped to Building C before any demolition or moving of the structure takes place. Thank You, r C U4 Jared Wilbur Wilbur Plumbing&Heating, Inc. License No. September 2, 2009 Tom Perry Building Commissioner Town of Barnstable 200 Main Street Hyannis, MA 02601 RE: Ruth Rusher Hostel 111 Ocean St. Hyannis,MA 02601 Mr. Perry, I hereby certify that there the electric service to Buildings C and D on the above referenced property will be shut off before any demolition or moving of the structures takes place. Thank You, Paul Tallmadge Tallmadge Electric License No. ;2,j ���✓ l I jY + ARCHITECTS B3eWs eMMa o2fi3, (Rt. 6A) Residential Commercial 508.896.0051 phone 508.896.6199 fax Sustainable Design www.capecoddesigner.com February 25, 2009 Thomas Perry Building Division of the Regulatory Services Department- Town of Barnstable 200 Main Street Hyannis, MA 02601 RE: Hostel, 111 Ocean Street Shut off letters for permit applications Dear Mr. Perry: The schedule for utility shutoffs will be as follows: _M ay 1 Electric BEY T' Disconnect Bldgs. A, B, C Reconnect Temporary Construction service , ft' 15 Gas SEPT- Disconnect Bldg.B - Reconnect after rough-in inspection :71�M_15 Sewer - f Disconnect Bldgs. A, B, C Reconnect in October 1 Water OCT Disconnect Bldgs I've also enclosed my contacts with the appropriate departments and utility companies. If and when any of these schedules change I will notify you in writing. Thanks for your help in this matter Sincerely, Robert D.Evans Principal Project Construction Manager ain Street + 'ARC H ITE C T S Brewster�MA 02631 (Rt. 6A) Residential Commercial 508.896.0051 phone 508.896.6199 fax Sustainable Design www.capecoddesigneF.com February 25, 2009 Hyannis Hostel Utility shutoff schedule Electric NStar Hyannis Engineer—Justin Reihl 781-441-3334 Work Orders: Bldg. A. 1703476 Bldg. B. 1703483 W_ ate_r Barnstable Water Supply Division R.W. "Bud"Breault, Asst. Director Lines must be cut and capped Fax schedule to 508-790-1313 Gas National Grid Construction Manager Steve Eber (732)584-0631 fax:. (732)764-6609 `Sewer ..Barnstable Engineering Division Town Engineer: Bob Burgmann 508-862-4070 Utility Contractor to pull Trenching permit Disconnect permit Connection permit Dave Andersen Inspector Coordinate with Hyannis Traffic Police Sgt Andrew McKenna 508-778-3847 If there is an existing septic—will need a Title V Abandoning permit Board of Health