HomeMy WebLinkAbout0213 OCEAN STREET (13) 02/� �CErtA 7 ;Ile,Ll
'
61/�l!✓S tlArpoL 11��L: -
, ' 1
STABLE
] r fv r ti, a
BROWN LINDQUIST FENUCCIQ & RABER ARCHITECTS, INC.
iatrr �thiY LJ ] ]`E ] ,iq
22 January 2007
Mr. Thomas Perry
Building Commissioner
Town of Barnstable
200 Main St.
Hyannis, MA 02601
RE: Progress Report No. 1
Additions &Alterations to the Hyannis Harbor Hotel
213_0cean St.;Hyannis
Dear Mr. Perry:
Per the requirements of Section 116 of the State Building Code, I am pleased to forward this
progress report as related to construction progress at the subject project.
As of this date the following work has been completed or is currently in progress:
1. Interior, demolitioi ofthe4obby-area to be renovated
2. Rough-framing;:plumbing'arid electrical work at the lobby
3. Excavation and foundation work for the new entry tower
4 'cGerieral�site,excavation, installation of drainage piping and importing of fill material for
the proposed masonry terraces
Due to high ground water encountered at the bottom of the tower footing elevations, we had our
geotechnical engineer on site during the preparation of the sub-base and compaction of stone
material necessary for the placement of the footings.
The work completed to date has been completed in general conformance with the construction
documents issued by this office.
Please feel free to contact me if you have any questions.
Sincerel
Richard.P.'Fenuccio. .,
CC::' Chris;Raye (Builders Systems Inc.) . 0
Fran;Chaves-(Newport-Hotel Group)
RPF/ak
203 WILLOW STREET SUITE A PH 508-362-8382
YARMOUTHPORT MA 02675 FAX 508-362-2828
WWW.CAPEARCHITECTS.COM
f
R
ARCHITECT CONSTRUCTION CONTROL AFFIDAVIT
Project Number: C-0026-06 Project Name: Hyannis Harbor Hotel
Project Title: Additions &Alterations to Hyannis Harbor Hotel
Project Location: 213 Ocean St. Hyannis MA 02601
Scope of Project: New entry tower addition handicapped accessible entry& lift renovation of existing
lobby area, new drop-off area new stone retaining walls terraces and site lighting
Architect: Brown Lindquist Fenuccio & Raber Architects, Inc
In accordance with paragraph 116.0 of 780 CMR, the Massachusetts State Building Code, I,
Richard P. Fenuccio Massachusetts Registration Number 7789
being a registered professional Architect hereby certify that all plans, computations and specifications, and changes
thereto, involving subject project will be prepared by or under the direct supervision of a Massachusetts registered
architect or Massachusetts registered professional engineer and bear his or her original signature and seal or by
the legally recognized professional performing the work, as defined by Massachusetts General Law(M.G.L.) c. 112,
§81 R.
For the above named project I, or a registered professional architect/engineer under my cognizance, will review the
design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance
with the requirements of the construction documents.
I will review and approve the quality control procedures for all code-required controlled materials.
I further certify that I will be present on the construction site at intervals appropriate to the stage of construction to
become generally familiar with the progress and quality of the work and to determine, in general, if the work is
being performed in a manner consistent with the construction documents.
Pursuant to 780 CMR 116.2.3 1 will provide the results of structural tests and inspections to the building official and
owner.
I will submit, periodically, a progress report with IS mments of the site visits and compliance of all
pertinent items to the building official. I will s the satisfactory completion and the readiness of the
project for occupancy.
i o
` cc
No.7789 Janua 8 2007
Arc itect YARmOun*ORT ate
wu
Subscribed and Sworn oore rrla this 0 r day �t✓�� 20�the undersigned notary public,
personally appeared /G Iv &UcL, p provide to me through satisfactory evidence of identification,
which is l(AAA If to be the person whose name is signed on the preceding or attached
documerit, and acknowledged to me that he signed it voluntarily for its stated purpose.
`G� � • Z• ZacS � y W _.
Notary Pu lic Date Notary Commission Expires'
Notary Pubfic
.tr6
r• �
Barnstable County MA
My Commission&*ree 4-2-2010 �-
1i� i
ARCHITECT CONSTRUCTION CONTROL AFFIDAVIT
Project Number: C-0026-06 Project Name: Hyannis Harbor Hotel
Project Title: Additions &Alterations to Hyannis Harbor Hotel
Project Location: 213 Ocean St. Hyannis MA 02601
Scope of Project: New entry tower addition handicapped accessible entry& lift renovation of existing
lobby area, new drop-off area new stone retaining walls terraces and site lighting
Architect: Brown Lindauist Fenuccio & Raber Architects, Inc
In accordance with paragraph 116.0 of 780 CMR, the Massachusetts State Building Code, I,
Richard P. Fenuccio Massachusetts Registration Number 7789
being a registered professional Architect hereby certify that all plans, computations and specifications, and changes
thereto, involving subject project will be prepared by or under the direct supervision of a Massachusetts registered
architect or Massachusetts registered professional engineer and bear his or her
9 p 9 e original signature and seal or by
the legally recognized professional performing the work, as defined by Massachusetts General Law(M.G.L.) c. 112,
§81 R.
For the above named project I, or a registered professional architect/engineer under my cognizance, will review the
design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance
with the requirements of the construction documents.
I will review and approve the quality control procedures for all code-required controlled materials.
I further certify that I will be present on the construction site at intervals appropriate to the stage of construction to
become generally familiar with the progress and quality of the work and to determine, in general, if the work is
being performed in a manner consistent with the construction documents.
Pursuant to 780 CMR 116.2.3 1 will provide the results of structural tests and inspections to the building official and
owner.
I will submit, periodically, a progress report with all pe omments of the site visits and compliance of all
pertinent items to the building official. I will sub h the satisfactory completion and the readiness of the
project for occupancy. uFfi
Q�QO NG�Fp�
IL o
+ tr P January 8 2007
Archi ct YNo.7789to
MA
Subscribed and Swor to, before m ,this d 2007,, the undersigned notary public,
personally appeared �Gnvc to provide to me through satisfactory evidence of identification,
which is au , to be the person whose name is signed on the preceding or attached
documen , and acknowledged to met at he signed it voluntarily for its stated purpose. 4
Z-6
Notary Publil
AITNota�ryPWke Date Notary Commission Expires`,
Barnstable County KA
' >>
My Commission Bxpiree 42-2010
a+ a
ARCHITECT CONSTRUCTION CONTROL AFFIDAVIT
Project Number: C-0026-06 Project Name: Hyannis Harbor Hotel
Project Title: Additions&Alterations to Hyannis Harbor Hotel
Project Location: 213 Ocean St. Hyannis MA 02601
Scope of Project: New entry tower addition, handicapped accessible entry& lift renovation of existing
lobby area, new drop-off area new stone retaining walls terraces and site lighting
Architect: Brown Lindquist Fenuccio & Raber Architects, Inc
In accordance with paragraph 116.0 of 780 CMR, the Massachusetts State Building Code, I,
Richard P. Fenuccio Massachusetts Registration Number 7789
being a registered professional Architect hereby certify that all plans, computations and specifications, and changes
thereto, involving subject project will be prepared by or under the direct supervision of a Massachusetts registered
architect or Massachusetts registered professional engineer and bear his or her original signature and seal or by
the legally recognized professional performing the work, as defined by Massachusetts General Law(M.G.L.)c. 112,
§81 R.
For the above named project I, or a registered professional architect/engineer under my cognizance, will review the
design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance
with the requirements of the construction documents.
I will review and approve the quality control procedures for all code-required controlled materials.
I further certify that I will be present on the construction site at intervals appropriate to the stage of construction to
become generally familiar with the progress and quality of the work and to determine, in general, if the work is
being performed in a manner consistent.with the construction documents.
Pursuant to 780 CMR 116.2.3 1 will provide the results of structural tests and inspections to the building official and
owner.
will submit, periodically, a progress report with I ents of the site visits and compliance of all
pertinent items to the building official. I will su �'eo �� satisfactory completion and the readiness of the
project for ccupancy.
U � I
cc X
Z -
YAR No. am, Janua 8 2007
Architect MA ate
� TM
Subscribed and SwornJQ, before m this Q day of 20V, the undersigned notary public,
personally appeared FY It✓/vCt_,L provide 1:6 me through satisfactory evidence of identification,
which is to be the person whose name is signed on the preceding o,attached
documeri, and acknowledged to me that he signed it voluntarily for its stated purpose.
Z-6 /0-
Notary Public NdMPubbc Date Notary Commission Expires
Barngtable County MA
My Commieemn Fsgires 4-2-2020