HomeMy WebLinkAbout0213 OCEAN STREET (2) F"Y-
L
i
I •
l
I
I
I
I
5 M E A
No. 10339
smead.com Made in USA►
CYCLED
1
TIM
Town of Barnstable Building
� <�. �;'✓ �Y.,'.t �w"e., :�.�� ,. ,�`>pN+;.. -�z .�� z:, �,:.. t.:. ���-,��� �.�ns'� "'�r�a �' �� ��%�,: � ''` .��ez�"� ;ice; _�'ew.
`. Po'st�T.hrs°Card�So�That rt�is�VisibleFrom the;Street A roved�PlansMust�be�Reta�ned�on<J;ob�,andthisdCard Must be Ke t� �"£
.� 6A83Qf3GBld:. ��� ;nt
P,oeclUihePermit
rtrficate of Occupancyyis Required,such Buildmg shall Not,be Occupietl untrl a Final Inspectron;has been made
Permit No. B-18-219 Applicant Name: John Heyes
Approvals
Date Issued: 02/16/2018 Current Use: Structure
Permit Type: Building-Addition/Alteration-Commercial Expiration Date: 08/16/2018 Foundation:
Location: 213 OCEAN STREET, HYANNIS Map/Lot 326-035 OEH Zoning District: HD Sheathing:
Owner on Record: HARBORVIEW HOTEL INVESTORS LLC �, dConfractor Nam' JOHN Z HAYES Framing: 1
Address: 28 JACOME WAY Contractor License; CS 074682 2
MIDDLETOWN, RI 02842 a AKEs' ProjK. ect Cost: $ 140,000.00 Chimney:
§'. y:
Description: Replacing the existing fabric with new fabric„8uiIding a wrap Permit Fee: $ 1,374.00
around 6"x 6" post and beam frame with 4"x 6" rafters and purlins 3' Insulation:
Fee Paid:
and fabric roof match new roof on existing building replacing r S 1,374.00
Final:
existing door with new fir exterior doors , Date ,;. 2/16/2018
Plumbing/Gas ll
a : ✓v+ Z_- � a%lid... .... .. .
Rough Plumbing.
Project Review Req: MINIMUM HEIGHT 7'6" OR GREATER 4 � Building Official
Final Plumbing:
Rough Gas:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. g
All work authorized by this permit shall conform to the approved application�Srid the approved construction documents for which'th this permit has been granted.
r Final Gas:
All construction,alterations and changes of use of any building and structures shall be in with the local zomng:by llaws and codes.
This permit shall be displayed in a location.clearly visible from access streetlor roadand shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. Electrical
,
01
s Service:
The Certificate of Occupancy will not be issued until all applicable signatures by`tne euilaing and Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: k Rough:
1.Foundation or Footing . .. ,.,
2.Sheathing Inspection Final:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough:
5.Prior to Covering Structural Members(Frame Inspection)
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Health
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department
Building plans are to be available on site Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT D�c� E