Loading...
HomeMy WebLinkAbout0213 OCEAN STREET (2) F"Y- L i I • l I I I I 5 M E A No. 10339 smead.com Made in USA► CYCLED 1 TIM Town of Barnstable Building � <�. �;'✓ �Y.,'.t �w"e., :�.�� ,. ,�`>pN+;.. -�z .�� z:, �,:.. t.:. ���-,��� �.�ns'� "'�r�a �' �� ��%�,: � ''` .��ez�"� ;ice; _�'ew. `. Po'st�T.hrs°Card�So�That rt�is�VisibleFrom the;Street A roved�PlansMust�be�Reta�ned�on<J;ob�,andthisdCard Must be Ke t� �"£ .� 6A83Qf3GBld:. ��� ;nt P,oeclUihePermit rtrficate of Occupancyyis Required,such Buildmg shall Not,be Occupietl untrl a Final Inspectron;has been made Permit No. B-18-219 Applicant Name: John Heyes Approvals Date Issued: 02/16/2018 Current Use: Structure Permit Type: Building-Addition/Alteration-Commercial Expiration Date: 08/16/2018 Foundation: Location: 213 OCEAN STREET, HYANNIS Map/Lot 326-035 OEH Zoning District: HD Sheathing: Owner on Record: HARBORVIEW HOTEL INVESTORS LLC �, dConfractor Nam' JOHN Z HAYES Framing: 1 Address: 28 JACOME WAY Contractor License; CS 074682 2 MIDDLETOWN, RI 02842 a AKEs' ProjK. ect Cost: $ 140,000.00 Chimney: §'. y: Description: Replacing the existing fabric with new fabric„8uiIding a wrap Permit Fee: $ 1,374.00 around 6"x 6" post and beam frame with 4"x 6" rafters and purlins 3' Insulation: Fee Paid: and fabric roof match new roof on existing building replacing r S 1,374.00 Final: existing door with new fir exterior doors , Date ,;. 2/16/2018 Plumbing/Gas ll a : ✓v+ Z_- � a%lid... .... .. . Rough Plumbing. Project Review Req: MINIMUM HEIGHT 7'6" OR GREATER 4 � Building Official Final Plumbing: Rough Gas: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. g All work authorized by this permit shall conform to the approved application�Srid the approved construction documents for which'th this permit has been granted. r Final Gas: All construction,alterations and changes of use of any building and structures shall be in with the local zomng:by llaws and codes. This permit shall be displayed in a location.clearly visible from access streetlor roadand shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Electrical , 01 s Service: The Certificate of Occupancy will not be issued until all applicable signatures by`tne euilaing and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work: k Rough: 1.Foundation or Footing . .. ,., 2.Sheathing Inspection Final: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Health Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT D�c� E