September 13,2000.
Mr.Robert Sydney
106 Athelstane Rd.
Newton Center,MA 02159
Dear Mr. Sydney:
In response to your inquiry it is my determination that Pawnee Court may remain a dirt road with a width
of 16 feet. You should be aware that you are mandated to comply with all requirements issued by the
utilities companies.
Sinc ly, _
Ralph M.Crosse ��
Building Commissioner
a �
VS,�t
The. Town of Barnstable
• ram. �IJ _ _ _
. epa, ent of Heal
Safety and Environmental al Services
Building Division
367 Main Suet,Hyannis MA 02601
Office: 508-862-4038 Ralph Crossen
Fax: 508-790-6230 Building Commissioner
May 17, 2000
Mr. Robert Sydney
106 Athelstaue Road
Newton Center, Ma. 02165
Re: Pawnee Court, Hyannis,Ma.
Dear Mr. Sydney,,
U
V
In response to your inq is my detern imtion that Pawnee Court may
remain a dirt road Nvith a width of You should be aware that you are mandated to
comply with all requirements ed by the utility companies. 1& ,
Mae-
s- ii
-
Sincerely,
Ralph Crosser
Building Commissioner
1
°
3 �
COMPLETE BITUMINUS ASPHALT MAINTENANCE
CAPE COD SEALKOTE, INC. t
�1 ESTABLISHED 1970
DONALD D.CROCKER -
P.O.BOX 214
HYANNISPORT. MA 02647 771-2740
C
I � I Il it
II I � _ I �
ai l � ) � � U �d
� � ' �> � r
� � lip I � , �'
i
i ', i i I�
�� ' I �I Ii l ' _ I � I �I
106 Athelstane Road
Newton Centre, MA 02459
December 2, 1999
Hand Delivery
Ralph M. Crossen
Building Commissioner
Town of Barnstable
367 Main Street
Hyannis,iMA 02601
Dear Commissioner Crossen:
On August 13 of this year we met in your office to discuss the necessity of paving
a road, Pawnee Court, in Hyannis. Following that meeting, as we agreed, I sent to you a
letter clarifying the questions at issue and sought your reply. On September 24 you
responded to that letter. 4
After considering the matter, and discussing it.with my family, I have decided to
petition the Board of Zoning Appeal regarding your opinion that Pawnee Court should
have asphalt paving (item#4 of your letter). However, the Board requires that an
application must be filed within thirty days of the date of issuance of your letter.
Given that your letter was dated September 24, I respectfully request that you
reissue the letter with the current date so that I might then file my application with the
Board of Zoning Appeal. I am attaching a copy of your letter for reference. I apologize
for this inconvenience, and thank you for your continued cooperation. If you have any
questions,please call me at (617) 727-4732.
Sincerely,
Robert Sydney
Enclosure
The Town Barnstable
Del U ent of Health Safety and Environmental Services
Building Division
367 Main Street,Hyannis MA 02601
Office: 508-862-4038 Ralph Crossen
Fax: 508-790-6230 Building Commissioner
May 17, 2000
Mr. Robert Sydney
106 Athelstane Road
Newton Center, Ma. 021 S
Re: Pawnee Court, Hyannis,Ma.
Dear Mr. Sydney;
I was very pleased to receive your le er informing tme�ofthe preservation of this
property. In response to.your inq is my determination that Pawnee Court may
remain a dirt road with a width of You should be aware that you are mandated to
comply with all requirements i ed by the utility companies. In addition to this, be
advised that no work skull commence until the successful conveyance of the property on
or before Oct. I st, 2000 as indicated in the documentation you submitted. You are
advised to provide this office with a copy of the title transfer in order to expedite the
permitting process.
Sincerely,
Ralph Crossen
Building Commissioner •
z
r
#1HE t
The Town of Barnstable
BAMSTABLE,
9 MAAS& Department of Health Safety and Environmental Services
�A i63q. ��
TEn,39 Building Division
367 Main Street,Hyannis MA 02601
Office: 508-862-4038 Ralph Crossen
Fax: 508-790-6230 Building Commissioner
February 22,2000
Donald D. Crocker
PO Box 214
Hyannisport,MA 02647
Dear Mr. Crocker:
� _ .
In order for your two lots on_�Pawnee Cou-rt;�nTHyRannrs to be buildable,the following must be completed:
1.) We recommend that you pave Pawnee Court 16' wide,with Cape Cod birms. The
cleared width should be a total of 22';3' of cleared width on each side of the
asphalted surface. Paving should consist of a 2"binder and a 1"topcoat layer.
2.) A drainage basin must be installed within the asphalted area at the lowest
elevation possible to catch surface run off and leach it into the ground. The size and
method of installation should be pre-approved by Steve Seymour in the Engineering
Dept.
3.) A sound road base of 12"of gravel or 6"of dense graded stone,meeting town
specifications,must be placed and compacted onto non-fro9t susceptible material to at
least 95 percent standard proctor density.
4.) Utilities to the lots need to be designed and installed in accordance with utility company
requirements.
5.) A plan"as built"should be submitted upon completion of the way,to the town
Engineering Dept.
Building permit will be issued for both lots for the foundations first. After all road clearing is complete
and prepared for asphalt,the building permits for construction will be released. No certificates of
occupancy will be issued until all the above work is completed.
Best of luck and call if you have any questions..
Sincerely,
Ralph M.Crossen