Loading...
HomeMy WebLinkAbout57G RIDGEWOOD AVENUE Town of BarnstableBuilding snEL�srwete Post This.Card So That it is Visible From the Street Approved Plans_Must be Retained on;Job and this Card Must be Kept I' MassL �Posted Until Final,Inspection Has Been Made. r l Permit � �� 'Where a Certificate of Occupancy is Required;such Building shall Not be Occupied until a final Inspection has been made. Permit NO. B-19-2760 Applicant Name: DONALD K.TROTT Approvals Date Issued: 10/16/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 04/16/2020 Foundation: Location: 57 RIDGEWOOD AVENUE,HYANNIS Map/Lot- 328-091 a Zoning District: SF Sheathing: Owner on Record: HOUSING ASSISTANCE CORPORATION Contractor Name`., - DONALD K.TROTT Framing: 1 Address: 460 WEST MAIN STREET Contractor License:-.182134 2 HYANNIS, MA 02601 Est. Project Cost: $0.00 Chimney: Description: BUILDING C TENANT FIT OUT FOR UNIT F 1 BEDROOMS AND 1 AND Permit Fee: $25.00 1/2 BATH . ' r° Insulation: ADDRESS 57G k Fee Paid: $25.00 �• _ § ' t Date: ,` 10/16/2019 Final: Project Review Req: r Plumbing/Gas Rough Plumbing:. ,Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and the'approved construction documents for.which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and st'uctures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. r t- ---�- �- Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:" ` Service: 1.Foundation or Footing " ° Rough: 2.Sheathing Inspection - 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for,Electrical,Plumbing,and Mechanical Installations. Health , Work shall not proceed until the Inspector has approved the various stages of construction. Final: "P rsons contrac ' with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c,142A). �� fire Department Building plans are to be available on site Final All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT IKE Application Number.......... ..6.0........ ..................... BA STABLE, MASS. Permit Fee.......................................Other Fee..... ...... TotalFee Paid.......................... ..................................... ...... TOWN OF BARNSTABLE Permit Approval by....... ....... BUILDING PERMIT Map........ ................. ................Parcel............a J........... APPLICATION Section 1 — Owner's Information and Project Location Project Address 57 Ridgewood Ave G 4% Village Hyannis _J Owners Name Housing Assistance Corp Owners Legal Address 460 West Main St City Hyannis State ma Zip 02601 Owners Cell # 508-364-9301 E-mail Wphinny@haconc ecod.org Section 2 —Use of Structure Use Group_R F] Commercial Structure over 35,000 cubic feet ❑ Commercial Structure under 35,060 cubic f6et Single/Two Family Dwelling -Section 3 —'hype of Permit New Construction Move/Relocate FlAccessory Structure ❑ Change of use ❑ Demo/(entire structure) Finish Basement []Farnily/Amnesty Fire Alarm Rebuild Deck Apartment Sprinkler System F-]Addition Retaining wall F] Solar FIRenovation ❑ Pool ❑ Insulation Other—Specify Section 4 Work Description Crane Set F 27.6 X 60.4 1/2 Triplex Modular Unit G is 1100.0 sq ft and is 2 floors and consist of 1 bedroom and 1 and 1/2 bath Address assigned by engineering and 911 for this unit is 57 G Application Number.................................................... Section 5—Detail Cost of Proposed Construction wsmw5 Square Footage of Project 1667.04 Age of Structure Dig Safe Number 2019-1308436 #Of Bedrooms Existing Total#Of Bedrooms (proposed) 110 MPH Wind Zone Compliance Method ❑MA Checklist❑WFCM Checklist Design Section 6—Project Specifics Wiring ❑Oil Tank Storage Smoke Detectors F-VIPlumbing ❑✓ Gas ✓❑ Fire Suppression ❑✓ Heating System' ❑Masonry Chimney ❑Add/relocate bedroom Water Supply Public ❑Private. Sewage Disposal 0 Municipal ❑ On Site Historic District, ❑ Hyannis Historic District ❑ Old Kings Highway Debris Disposal Facility: PINA DISPOSAL I am using a crane ❑Yes ❑No Section 7—Flood Zone Flood Zone Designation Within or adjacent to a wetland,coastal bank? Yes ❑ No R Section 8—Zoning Information ' Zoning District.SF " Proposed Use R Lot Area Sq. Ft. 31,106.0 Total Frontage 189.0 Percentage of Lot Coverage 1667.04 #of Dwelling Units (on site) 8 Setbacks Front Yard Required 20 Proposed 20 Rear Yard Required 10 Proposed 21 Side Yard Required 10 Proposed 12.6 Has this property had relief from the Zoning Board in the past? 11 Yes ❑✓ No Application Number........................................... Section 9 e Construction Supervisor Name Donald Keith Trott Telephone Number 508-367-2048 Address 906 West Yarmouth rd City yarmouthport State Ma Zip 02675 License Number CS-075174 License Type unrestricted Expiration Date 11/7/20 Contractors Email ktrott@haconcapecod.org Cell # 508-367-2048 I understand my responsibilities under the rules and regulations for Licensed Construction Supervisor in accordance with 780. CMR the Massachusetts S. t Buil g C de. I understand the construction inspection procedures,specific inspections and documentation require y 80 d T of Barnstable.Attach a copy of your license. Signature Date 08/21/19 Section 10—Home Improvement Contractor Name Donald Keith Trott Telephone Number 508-367-2048 Address 906 West Yarmouth Rd City Yarmouthport State Ma Zip 02675 Registration Number 182134 Expiration Date 08/08/21 I understand my responsib' '' s under the rule and regulations for Home Improvement Contractors in accordance with 780 CMR the Massachusetts t Bui C de I derstand the construction inspection procedures,specific inspections and documentation requir y 8 d of Barns ch a copy of your H.I.C... Signature Date 08/21/19 Section 11 —Home Owners License Exemption Home Owners Name: Telephone Number Cell or Work Number I understand my responsibilities under the rules and regulations for Licensed Construction Supervisor in accordance with 780 CMR the Massachusetts State Building Code. I understand the construction inspection procedures,specific inspections and documentation required by 780 CMR and the Town of Barnstable. Date APPLICANT SIGNATURE Signature Date 08/21/19 Print Name Walter Phinney Telephone Number 508-771-5400 E-mail permit to: Ktrott@haconcapecod.org Section 12—Department Sign-Offs Health Department ❑' Zoning Board(if required) ❑ Historic District ❑ Site Plan Review(if required) ❑ Fire Department ❑ Conservation ❑ For commercial work,please take your plans directly to the fire department for approval Section 13—Owner's Authorization Walter Phinney I� , as Owner of the subject property hereby authorize DonaldKeithrott to act on my behalf, in all ! mt � relative to work authorized by this building permit application for: i gewood Ave Hyannis MA C/U�ZG � (Address of job) 08/21/19 SaturPe�of Owner date ' a ter inney Print Name a