Loading...
HomeMy WebLinkAbout0316 SEA STREET (8) 1CP S80- i Town of Barnstable Building Post This Card. That it is_Visible From the Street-`Approved Plans Must be Retained on Job=and This Card Mustbe Kept SMAMSM MAA&I I Posted Until Final Inspection Has Been r %634 e i i a Where a Certificate of Occupancy is Required,such Building shall Not be"Occupied until a Final Inspection has been made Permit No. B-20-789 Applicant Name: Douglas Mullen Approvals Date Issued: 03/16/2020 Current Use: Structure Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 09/16/202G Foundation: Location: 316 BLDG 2 UNIT J SEA STREET, HYANNIS Map/Lot: 306-241_OOJ Zoning District: RB Sheathing: Owner on Record: TANG, PIN F&COCKERILL,THOMAS J JR ;,." Contra,ctor5Name--,DOUGLAS W MULLEN Framing: 1 Address: 16216 S 35TH WAY ' Contractor License: 081995 2 PHOENIX,AZ 85048 � Est Project Cost: $30,000.00 Chimney: Description: Replace windows like for like Permit Fee: $ 153.00 Insulation: Project Review Re : NEW.WINDOWS INSTALLED IN HAZARDOUS LOCATIONS AS Fee Paid: 5 153.00 1 q � Final: DEFINED IN 780 CMR MUST BE TEMPERED OR EQUAL. Date: 3/16/2020 . ,� '� J��' ✓ �. Plumbing/Gas Rough Plumbing: Rifliffing Official This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within,six months after,issuance. Final Plumbing:. All work authorized by this permit shall conform to the approved application and theapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures"shall be in compliance with the local zoning:by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. �. � ire The Certificate of Occupancy will not be issued until all applicable signatures by the Build g an ind F Officials are provided on this:permit. Electrical Minimum of Five Call Inspections Required for All Construction Work:[" ork: Service:.. 1.Foundation or Footing 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: