HomeMy WebLinkAbout0054 SHADY LANE Coq - 13)
Town of Barnstable Building
t o Post This Card So That itis'Visible Fiom the Street 'Approved Plans Must be Retained on Job and this Card Must be Kept
a
MAS
sb� �9. ` Posted Until Finalrinspection;Has Been Madee-
:: , Permit
Where a Certificate of'Occupancy is-Required,such,Buildingshall Not be OccupiedYantil a,-Final,Inspection5'has been made. 1 i� i
Permit No. B-20-101 Applicant Name: Michael Maher Approvals
Date Issued: 01/13/2020 Current Use: Structure
Permit Type: Building-Insulation- Residential Expiration Date: 07/13/2020 foundation:
Location: S4 SHADY LANE, HYANNIS Map/Lot: 269-131 Zoning District: RB Sheathing:
Owner on Record: GOLLIFF,SHAUNA L&MARCY LYNN Contractor Name: ,MICHAEL MAHER Framing: 1
Address 54 SHADY LANE Contractor License; CS,09089 2
HYANNIS, MA 02601 '
Est Protect Cost: $4,700.00 Chimney:
Description: Air seal and insulate the-attic,vent bathroom fan to thesoutside,air = Permit'Fee: $85.00
P Insulation:
seal and insulate the basement sill,install vapor barrier in crawl
,Fee Paid., $85.00
space, insulate crawl space walls x' Final:
Date. 1/13/2020
Project Review Req: g~ � Plumbing/Gas
- Rough Plumbing:
-�� Building Official Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced with six months afterissuance.
All work authorized by this permit shall conform to the approved application and the"approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by laws and codes.
R - ._.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the FinalGas:
work until the completion of the same. C
� Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Buldmgand Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing Rough:
2.Sheathing Inspection ,
3.All Fireplaces must be inspected at the throat level before firest flue+lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT pw� E