HomeMy WebLinkAbout0024 SILVER LANE V&r
Town of Barnstable Building
<;
BARWJrA
tro �, R ostteThis Calr"dF:"S,oP`T Ihsat it tiso�/�sH�ble B=From Mthed eSt reet Approved Plans Must be Retaine o
mA i639, P n Job and_".t'h is Caerrad` M�ux�s a be Kept
Permit
Permit NO. B-19-504 Applicant Name: William McCluskey Approvals
Date Issued: 02/19/2019 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 08/19/2019 Foundation:
Location: 24 SILVER LANE,HYANNIS Map/Lots 268 153 Zoning District: RB Sheathing:
Owner on Record: DESOUZA,JOHN P&ROZA,JOANN ;
Contractor Name WILLIAM J MCCLUSKEY Framing: 1
Address: 24 SILVER LANE Contractor License: CSSL-102776 2
g
HYANNIS, MA 02601 _ Est Project Cost: $4,200.00 Chimney:
Description: Add R-38 cellulose to the attic.Air seal the attic plane.with Permit Fe°e: $85.00
Insulation:
expanding foam.General weatherization :
Fee Paid $85.00
Project Review Re r Date 2/19/2019 Final:
J p
Plumbing/Gas
�. Rough Plumbing:
_ t .. � Official
This permit shall be deemed abandoned and invalid unless the work aukthonzed bythis permit is commenced within sixmonths afte 9MFWe. Final Plumbing:
All work authorized by this permit shall conform to the approved application a d' he§approved construction documents for whichxthis permit has been granted.
;:;
All construction,alterations and changes of use of-any building and structureslshall be in compliance with the local zonimg;by laws�and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the.
work until the completion of the same. f Final Gas:
The Certificate of Occupancy will not be issued until all applicable signatures bythe Building and Fire Officials are;provided on this permit. Electrical
Minimum of Five Call Inspections Required for All Construction Work s. 5 s
1.Foundation or Footing Service:
2.Sheathing Inspection Rough:
3.All Fireplaces must be inspected at the throat level before firestflue:-li irg.is installed,
4.Wiring&Plumbing Inspectionsto be completed priorto Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Final:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Rough:
Low Voltage Final:Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
S
A = Iz /6 3 _
P��FTHEtp�` TOWN of iJ C1�1 NST AlYL1J
•
339HBSTAMM i !
"6 9
� BULDINGe. INSPECTOR
YPY a'
• APPLICATION FOR PERMIT,TO .....O.W.4.7.......Q&L=................KY............................ ................................
TYPE OF CONSTRUCTION ......... ....... !S., ��..................................
..... ............................................
1,/l! . ...... ...............19.7
TO THE INSPECTOR OF BUILDINGS: -
The undersigned hereby applies for a permit according to the following information: i
Location ...4.d.. / 7 S..l..?r 1���K fj!�l4....... //..
ProposedUse Q n(C �l�.M.J..4,Y....... ..............................................................................................
Zoning District ......r .. j .................Fire District
.... ....................................................
Name of Owner ..... .�5.�?<� l`1.....Address &M..Y0.........5...��...
FKig MiN6Mq1"l
Name of Builder C !.{.... orl...Address ......... ..:...... K I
Nameof Architect ........ . Address:.n ....................................... .................. .................................. ........................
� ..,(s .....:.............
Number of Rooms ....... Foundation 14V.!P.P. .Q.d..GS.ff.7
Exterior ... ...e.�..C..:......5!`. .... GLc . ........................Roofing ... .
1 r(
Floors �5.4.4 .C. r..... .!a.!5..........................................Interior .....�s ........Stf.L ... . ?. .K...........................
Heating ..E.W, ..:........ .Y.......G. s........................Plumbin ®!JL �/IT'
Fireplace .......7..4�:. ...................................................................Approximate Cost .. a:�. ...� .. '
9�
Definitive Plan Approved by Planning Board ---------------_---------------19________.
Diagram of Lot and Building with Dimensions of
SUBJECT TO APPROVAL OF BO RD OF HEALTH -
®. � C
SE PTIC SYSTEM MUST 13E
INSTALLED IN COMPLIANCE
`W TI-I ARTICLE II STATE L
SANITARY CODE ,NNE-1 TOWNe�SS Po o
' �.:CiaL..A�'I rt•�S=
C3AL, SL`PTI[.,
l -
-3
r fi
I hereby agree to conform to all the Rules and Regulations of the T n of Barnstable regarding the above
construction.
Name .. .. .. . .. ........................................ 1................
De Souza, Fernando
No ....16009 Perm it for ........one,.4pF7........
.single family dwelling.................
............ .................family...............
Location� .......Si..l.......ver...Lane.................................
.. ........
......................
...........................................
Owner .........Fer. nando..De.Souza........................ ............. .... ..........
Type of Construction frame
rame...........
................................................................................
Plot ............................ Lot .........#17.................
Permit Granted
d ....... March 20 . 19 73
.......... ... ....
Date of Inspection ..... .... .......
Pate Completed ........... .................19
PERMIT .REFUSED
....................................... ........................ 19
................................................................................
...............................................................................
......................................I.........................................
...............................................................................
Approved ................................................ 19
...............................................................................
........... .............................................................