Loading...
HomeMy WebLinkAbout0058 STERLING ROAD t o 'YAcl ? in nib 01 27A7 Ndf ' 0 riumeWorks FrTrn Energy, Inc Insulation Affidavit HomeWorks Energy has installed insulation at the following address that meets or exceeds Massachusetts building code and IIC requirements. Project Address: Permit Number: B-20-3_ 58 STERLING RD, HYANNIS Name with Ver 58 Sterling Road Barnstable Massachusetts 02601 Location Material Addt'I Thickness Final Assembly R-value Attic Floor Green Fiber Cellulose 11" 49 Basement Rim Joist 6"Owens Corning Fiberglass Battini 6" 19 Sincerely, Scott Veggeberg HomeWorks Energy Inc. CSL#103832 HERS Certification#3081658 HomeWorks Energy 101 Station Landing,Suite 110 Medford,MA 02155 wxpermitting@homeworksenergy.com . Town of Barnstable .� c� - � _ , ­­ � � ing s;�xweu Post7his Card So That rt is Visible From the Stree"t Approved Rlans Must be Retained on J4ob and this Card Must be Kept 2 MASS. Posted Until�Final lnspect�on�Has Been Made fi 5Permit Where a.Certficate of OccupaMncy is ed Required,such Building,shall Not be Occupi untilra Final Inspection'has�be.'en made Permit NO. B-20-3 Applicant Name: Elvis Verdezoto Approvals Date Issued: 01/13/2020 Current Use: Structure Permit Type: Building.-Insulation -Residential Expiration Date: 07/13/2020 Foundation: Location: 58 STERLING ROAD, HYANNIS Map/Lot: 268-171 Zoning District: .RB Sheathing: Owner on Record: GURNEY, RICHARD Contractor Name: . HOME WORKS ENERGY INC. Framing: 1 Address: 58 STERLING ROAD Contractor License: 181138 2 HYANNIS, MA 02601 Est Project Cost: $3,988.00 Chimney : Description: Residential weatherization/air sealing. No structural changes. Permit Fee: $85.00 Insulation: Fee Paid:' $85.00 Project Review Req: - Final: 1 2 20 1 3 0 Date: / / Plumbing/Gas l Rough Plumbing: yA Building Official g l _ Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after-.issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by llaws;and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures bytheBuilding and Fire Officials are provided on this:permit. Minimum of Five Call Inspections Required for All Construction Work i f , Service: 1.Foundation or Footing ' F 2.Sheathing Inspection ,„ �� Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: