MARK R R4ARINACQO ARQdIT€G7:
ARCHITECT :PLANNER CONSiXTANT
- 19'KbMET:CMUL '.SANDW", NA 02583: :.5W8 420 0822
August 9,2007
Thomas Perry
Building Commissioner
200 Main Street
Hyannis, Massachusetts 02601
Re: Steven Street Residential Condominium Project
Buildings: A, B, C
`6
Dear Mr. Perry:
Attached please find field reports for the residential condominium buildings A, B, & C, Stevens Street, Hyannis,
Massachusetts.
The work completed appears to have been done in conformance with the construction documents.
If you have any questions or comments please feel free to contact me at 508420-0822.
Sincerely
C�
i
N
Marc Marinaccio r
-q'
MARK R. MARINACCIO; :ARCHITECT
ARCHITECT;S OWNER o
ARCHITECT ARCHITECT + PLANNER + .CONSULTANT
FIELD REPORT CON , TANT ; : ,,:MA 02583 .508.42o 0827
AIA DOCUMENT C717 FIELD
PROJECT: BYa'kaWondguiinium 1ITnits,G4 C2,C3;Stevens StrCD REPORT NO ' 1
Permit Cl"B20071122;C2=B20071403;C3=B200714
CONTRACT: ARCHITECTS PROJECT NO 304005
DATE . 8-1-07 TIME 9:00 A1VI WEATHER Wit in/SuA TEMP.RANGE 80?s
EST.'/o OF COMPLETLON C.QNFORMANCE WITH SCHEDULE(.+,-) .
Pl m m HVA ''Elect : i
u b C .M Tina c o David S 1 Sill Kell a c
WORK* N�PROGRESS . � � � .O. i P O g. PRESENT AT. SITE. . g� .. Y�,
3be tambojoU
Plumbing,Electrical,HVAC work 95%complete
Na insulation woik has been started
OBSERVATIONS
General.
Structural Rough Frame is Complete;fire.blocking;is installed'.at stairs and.unit:walls.:Ceiling:strappm :is
complete,exterior,siding has.been installed,roofing installed,windows:,and doors installed.
Fire rated:assembly has.beeninstalled around the:TJ1 floor joists where they sit on top bf the:fire rated bearing.
wa
Insulation and:.sheet.rock worlds,scheduled for.next week.
UL.wall assembly details were:given to the project supervisor;:.Through plate and sill penetrations to be fire
caulked in accordaniciyith the_plans
Project upervisorstated that all vertical load.-have been carried.down 464he foundation to comply with
:requirements.of structural engineers field:report:
ITEMS TO.VERIFY
1. omp ete ire Caulk at t roux penetrations o . 18rg
rx
INFORMATION�OR ACTION.REQUIRED
1 Notification to the architect of the expected date of sheet insulation installation
ATTACHMENTS
MARK R�MARINA�WO, ARCHITECT
ARCHITECT'S OWNER
ARCHITECT 7n ARCHTECT PLANNER CONSULTANT
FIELD (REPORT, CONSULTANT IJ 19 SCMM.p _ IM563 a03.420 082)
AfA .DOCUMENT CM FIELD,
PRO}ECT Hyannis Condominiam:><Tnrts Cl.Cl,G3;Stevens St LD REPE}RT NO .2
Permit C1=B20071.122;C2—B20071403;C3.=B200714
.:.CONTRACT: ARCHITECTS PR9JECT NO 34-2405
DATE .8-8-07 TIME. & 00 AM :. WEATHER Warm/Humid:.. tw'? RANGE 70's.
EST: %OF COMPLETION CONFORMANCE WITH SCHEDULE
WORK IN.PROGRESS.. Insulation& Al .e Caulkin�ESENT AT SITE. MarkMarinacclo,:David Sigl,Bill.Kelly.
Insulation was installed in units Cl &C2 Insulation work was started in unit C3 but not complete
OBSERVATIONS .. ..
General
1. .3M_fire caulking is_being installed at: through top and bottom plate penetrations:�n fire separation:
risen}lilies b�twe�;a units
The following locations still regwre installation'of fire.caulking
}a: Uni lisfFloor
2.; Plastie electric.boxes have been installed in the fire separation assemblies-between:units: Fire rated
ellectric boxes are available.71t has_been requested-ma-Me e ec rcian submit suppor g . a 09ta s owing
that ahe installer) hnxes comply with the UL,As-, lv
:.:The;following locations need additional work.
4. :,5./8 type X;firecode sheet rock was observed i .m umt Cl,waiting for installation.
\S�ERED AR�y�
ITEMS TO.VERIFY
omp e e re a at first floor unit ;,ta t't3�8
2. Vilir
ICafioilr of UL rated electric box installation.av�
INFORMATION OR-ACTION.REQUIRED
.1 Notification to the architect of the expected date of sheet rock installation
A'iTACMMEN?`S .
MARK R. MARINACGO," ARCHITECT
ARCHITECT'S OWNER" ❑
ARCHITECT G� ARCHITKT i PLANNER + CONSULTANT
FIELQ .REPORT CONSULTANT ,9 h1A oz563, sos.420"0822
AIA DOCUMENT C711 FIEi4
PROJECT yannis:Cgnda units A1,A2 A39,At AS FIELD 1REPORT NO 1
I. Steyens,Street
CONTRACT: ARCHITECT'S"PROJECT NO 30-2005
DATE $-1-07 TIME. "9 00 ^AM WEATHER` Warm"fSun TEMP,RANGE $4's.
" EST::% OF COMPLETION : : ," .:CONFORMANCE WITH:SCHEDULE
wORK IN PROGRESS Rough Frame 95%o.Complete PRESENT AT sITE.MarkMarinaccio;David_:Sigl,"Bill Kelly;
J.oe o
No insulation work has been started
OBSERVATIONS `..
General:
1.:Structural Rough Frame.is 95%0;exterior siding and triiihas been installed,roofing installed,:windows and,
doors installed.
1." Ut wall assembly details were given tor the project supervisor; Through plate and sill penetrations to be Are.
caulked in accordance.—W—ii e.p.ans
RED�Ar
ITEMS TO VERIFY
ci. s
w.
Aw
A.:
INFORMATION OR ACTION.REQUIRED 9�T�ofPsgP
1. Obtain:structural engineers.frame inspection report
ATTACHMENTS
MARK R..:MARINACCIO: :ARCHITECT .
ARCH ITECT'S OWNER
Ca
ARCHITECT ARCHIW- ..,PLANNER- .j:CONSULTANT
FIELD REPORT CONSUL ;� ie SCONW,aeaF; .sMovuibi, MA, 025e3. .aos ago 0822
A►A .DOCUMENT C77i FIELD7 .
Q
PROJECT- 4 RYann�s..Ggnda iTnits Ill,B2,13, FIELD REPORT NO 1
Stevens,Street.'..
CONTRACT ARCHITECT'S PROJECT NO: 30-2005
DATE 8 -47 TIME :04 AM WEATHER Warm'/Sun TEMP;RANGE $4's.
EST::% OF COMPLETION.: CONFORMANCE N/ITH;SCHEDULE(+ )
WORK IN PROGRESS_Rough Frame 95%o.Complete .pRESEnIT nT.51TE.Mark.lyMarmaccio;David_.Sigl,Bill Kelly;
o oo _
No insulation work has.been started
OBSERVATIONS
General:
1. Structural Rough Frame.is 95°/0,exterior siding.and trim has been installed`,roofing installed;_windows and
doors installed.
1. UL wall assembly details were given to the project supervisor; Through,plate and sill penetrations:to be fire
cau e inaccor.ance with-the plans
b.
ITEMS TO .VERIFY 4��.� ��R/y�A/Y
F,�L�AOUTH. w
INFORMATION NO
FOR H OF,MFSSP
t Obtain structural engineers.frame.inspection report
ATTACHMENTS
Structural Engineering
STRUCTURAL AFFIDAVIT FOR CONSTRUCTION CONTROL
TO: Flagship Estates LLC
Two Adams Place, Suite 100
Quincy, MA 02169
RE: Hyannis Condominium Development
Stevens Street
Hyannis, MA
FC PROJECT No.: 0569
DATE: January 12, 2007
In accordance with the Massachusetts State Building Code Section 116.0,the engineer's
authorized representative will make periodic field visits during the construction period for the
above project and make observations of work in progress. Observations shall.be recorded per the
CSI (Constructions Specification I i ute) standard format and furnished promptly to the Building
Department and the Owner. OF
sir
r'. Lic. #42868
4 sTiRuc7uw� ST CY .FLOOD MASS. REG. NO.
aON 16���E��►°��� STRUCTURAL .
Subscribed and sworn to me this lc�k day of , 2007.
26a."X, �Qo-tcw
N Y PUBLIC
My Commission expires
JOAN M.WORDELL
- 2 NIMM Public 00 v, i 20 )_9
-� COMMONINEAUH OF MASSACHMM
MY pommission Expires
Nat rdw 1,2013
56 Laurel Drive • Hudson, MA 01749 • TEL: (978) 562-6499 FAX: (978) 562-6246