HomeMy WebLinkAbout0115 THIRD AVENUE (HYANNIS) f a 4s - Sao � - -- - �
Town of Barnstable
_ n.�.. � Building
s aA$!9rAWZ ; Post This Card So That it is Visible From the Street-Approved,Plans Must be Retained o"n,Job and this Card.Must;be Kept i
* Posted Until Final Inspection Has Been-Made:
�bs� . • q g p -_ p Permit
Final Inspection has been made.
" Where a Certificate;of Occupancyis Re Required,such Bull shall Not Occu ied�until a Fi �n
Permit No. B-19-3537 Applicant Name: James Curley TM Approvals
Date Issued: 10/22/2019 Current Use: Structure
Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 04/22/2020 Foundation:
Location: 115 THIRD AVENUE(HYANNIS), HYANNIS Map/Lot245-120- Zoning District: RB Sheathing:
Owner on Record: MUNROE,GEARY H &LISA P ; Contractor Name�•JAMES P CURLEY Framing: 1
Address: 7 MCKENZIE LANE Contractor.License CSSL-099138 2 „
FOXBORO, MA 02035m' X Est. Project Cost: $9,000.00 Chimney:
Description: Strip and re-roof approximately 15 square of asphalt roof shingles. Permit Fee: $45.90
? Insulation:
Fee Paid, $45.90
Project Review Req:
i� f' Final:
Date:- ,fi` 10/22/2019
Plumbing/Gas
Al
Rough Plumbing:
vBuilding Official Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Final Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for_public inspection for the entire duration of the
work until the completion of the same. g' c
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this,permit.
Service:
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT �t,P✓""