Loading...
HomeMy WebLinkAbout0715 WEST MAIN STREET 1 , �a t r. '�_ =---�__ �J _q2,r�c�J 1 1 i i t I j t 1 f ,I i M i 1 + Town of Barnstable Building Post This Card SoT:hat�t:is,Uisible From the Street Approved PlanssMustbe Retained an�Job andthis Card Must be Ke't • �ARTiSCABLG. • .,d 3 .. � Permit M1639 ^ dpe a�Fina�tnspen hates been made Permit No. B-19-2478 Applicant Name: Robert Johnson Approvals Date Issued: 08/02/2019 Current Use: Structure Permit Type: Building-Sheet Metal-Commercial Expiration Date:, 02/02/2020 Foundation: Location: 715 WEST MAIN STREET,HYANNIS Map/Lot: 249-155 Zoning District: HB Sheathing: Owner on Record: Santander Bank Contractor Name, ROBERT J JOHNSON Framing: 1 Address: 715 Main St Contractor€icense6429 2 Hyannis, Ma 02601 EstProject Cost: $9,596.00 Chimney: Description: Remove Three air handlers and related duct connect lons�Furnish Permlt Fee: $ 160.00 Insulation: and install new supply and return adapting fittings as tequired for Fee Pald $ 160.00 three new air handlers. I x z Final: Date ' 8/2/2019 Project Review Req: " w4 Plumbing/Gas Rough Plumbing: 77 Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized"by this permit is commenced within six miiriths after,issuance. All work authorized by this permit shall conform to the approved application a d the'approved construction documentsforrm, [ch;this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and ste.&tures shall be in compliance with the local zoningby�laws and,codes. ^. Final Gas: This permit shall be displayed in a location clearly visible from access street�or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signat Gres by theild"'Buing and4Fire Officials"are:provfi e nl his"permit. Minimum of Five Call Inspections Required for All Construction Work. Service: 1.Foundation or Footing Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Perso contractin ith unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). cam- Fire Department Building plans are to be available on site � I)Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: C TOWN OF BARNSTABLE • SIGN PERMIT i PARCEL ID 249 155 GEOBASE ID 15901 i ADDRESS 715 WEST MAIN STREET PHONE HYANNIS ZIP - LOT 1 & 2 BLOCK LOT SIZE DBA DEVELOPMENT DISTRICT HY PERMIT 78901 DESCRIPTION 66.77 SQ FT TOTAL SOVEREIGN BANK PERMIT TYPE BSIGN TITLE SIGN PERMIT CONTRACTORS: Department of ARCHITECTS: h Regulatory Services TOTAL FEES: $125.00 BOND $.00 �1HE CONSTRUCTION COSTS $.00 753 MISC. NOT CODED ELSEWHERE 1 PRIVATE • ■ARNSTABLE, 039. ED MP'� BUIL NG ISION DATE ISSUED 08/21/2004 EXPIRATION DATE Y v 4" i Town of Barnstable r Ft"Ea`tio Regulatory Services r • Thomas F.Geiler,Director + RAMSTABLE. • 9 MASS. g Building Division .i63q �m ptFo 39 Tom Perry, Building Commissioner 200 Main Street, Hyannis,MA 02601 Office: 508-862-4038 Fax: 508-790-6230 Tax Collector Treasurer Application for Sign Permit Applicant: Irv, /,?(/5 6P� �, o.��- Assessors No. Doing Business As: 6G _t- Telephone No.l�-" a e"R 3 3 Sign Location Street/Road: 2Z S-- GJ � •� T�- Zoning District: Old Kings Highway? Ye Flo Hyannis Historic District? Yes/No Property Owner Name: Telephone: e5r"O 6 lr j PG41,"3 —� / Address: !l S Z) O �,�f/��i ne / Village: ✓���� ` f f' zi Sign Contractor Name:Contractor Telephone: 3-21 P'Jr �t�1777 Address: Jv�� Description Please draw a diagram of lot showing location of buildings and existing signs with dimensions,location and size of the new sign. This should be drawn on the reverse side of this application. Is the sign to be electrified? Yes/No (Note:If yes, a wiring permit is required) I hereby certify that I am the owner or that I have the authority of the owner to make this application,that the information is correct and that the use and construction shall conform to the provisions of Section 4-3 of tbe Town of Barnstable Zoning Ordinance. 516 V Lz.P — 11,; G f Y T S igna ture of Owner/Authorizedent: Date: Agent: Permit Fee: Sign Permit was approved: V O S Disapproved: Signature of Building Official:�� i /Z Date: C- 27 " Signl.doc I rev.122801l THE Assessor's map and lot number-..� C�.r.� Y............ . �QF rQ�♦ r Sewage Permit number. .........................:..............................r. L , Z ISA"STADLE, i House. number .......................: ._................ MA :..... NAM p 1639. 9� TOWN 1. 0F BARNSTABLE BUILDING ." INSPECTOR o� ''. .. APPLICATION FOR ;PERMIT TO ..:..............................1�l�J ............................................................................. TYPEOF' CONSTRUCTION ................................................:.........................................................................•.................. ..............Cl .......J�.....................19z_ . TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according,to.the following informations Location/t__�.,l../":S, ..... .......................................................................... ................. ......:.......... . .............. ProposedUse ..............................:................................................................................ ................... .................................. Zoning District ....................................Fire District Name.of Owner .... Q174-6.61Z.1.............Address .:/��...l...C.� i��l�: -'L..... c? i O> ...................... Name of Builder ......1.. D.�l.. . %C� -'1. .....Co.l�.f....Address .... .,��lU....FV l...3&.�...� .... �1►l l� PP. �_. Name of Architect ..................................................................Address Number of Rooms .......... ....Foundation ...........................................°.......... Exterior .........::.........................................................................Roofing .................................................................................... Floors ....................................................................:..........:......Interior ................................. Heating .......................................................................... ....Plumbing ............................................................................... Fireplace ..................................................................................Approximate Cost ... ................................................................. Definitive Plan.Approved by Planning"Board ____:__,___-_"_______________19________. Area ' ............ ............................. , l Diagram.of Lot.and Building with Dimensions Fee � ...... SUBJECT TO APPROVAL OF BOARD OF HEALTH OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. -.Name ...... ...... ........ .. --................................ Construction Supervisor's License . 3 7�.:.`�........... ' F. CORP. ' f • 'p 24814 permit for • DEMOLLSH BUILDING No ..... ............... .� Frame r F .................. .......... ............ ........................... < 715 West Main Street Location i r Hyannis............................................ w. �C Owner NBC Realty Corp. . ' ................... s Type of Construction ...Frame i •Plot ............................ Lot: ............................ - �`� February 25, 83 r-`• Permit Granted ....................:: ................i9 Date of Inspection .................. .................19 "Date Completed '............../ .............19J-3 oz 1" •fi y r'' _ ,. .• i r• ! •,t• a ./•t Assessor's map and lot number Sewage Permit number ........................................................ 33A"ST&BLE. House number ........................................................................ . P 16 AZ& 39. TOWN - OF BARNSTABLE BUILDING INSPECTOR APPLICATIONFOR PERMIT TO ................................. ............................................................................... TYPEOF CONSTRUCTION ..................................................................................................................................... ...... . ;2 _!�...................19 .................. .... TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: Location ....................................................................................................................................... ProposedUse ............................................................................................................................................................................. ZoningDistrict ........................................................................Fire District .............................................................................. _Fk1 136 Name of Owner ... .....................qeAUY...6�:� ...............Address ../�A. . ............................4............................. Builder tl��V.j.....C.,Qk�7' Name of B .. .........COJ�f....Address ...... '%� ... ..................... ............ Nameof Architect ..................................................................Address ..................................................................................... Numberof Rooms ..................................................................Foundation .............................................................................. Exierior ....................................................................................Roofing .................................................................................... Floors ......................................................................................Interior .................................................................................... Heating ...................................................................................Plumbing .................................................................................. Fireplace irep ace ..................................................................................Approximate Cost .................................................................... Definitive Plan Approved by Planning Board --------------------------------19--------- Area ........... ............................. Diagram of Lot and Building with Dimensions Fee ....... A). .................. SUBJECT TO APPROVAL OF BOARD OF HEALTH OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name . ....... ........................................ ................... Construction 'Supervisor's License ... ell... B C. REALTY CORP. A=2 9/15 5 4D.„� 24814Demolish Building No ................. Permit for .................................... Frame ............................................................................... Location ...�15•••West Main Street .. ................................................. .................. Hyannis........................................... Owner F. N. B. C. REALTY CORP. �. Type of Construction Frame ................................................................................ Plot ............................ Lot ................................ February 25, 83 Permit Granted 19 r Date of Inspection ....................................19 • Date Completed 19 i i TOWN OF BARNSTABLE BAR-W � , .---- Ordinance or Regulation WARNING NOTICE . Name of Offender/Manager Address of Offender MV/MB Reg.# Village/State/Zip Business Name 40 W�--- t3A.f1 14. ; /f;�ta�m/pin; on - 20 f(� Business Address '1 5*- 64"A iPI �! Signature .of'Enforcing Officer Village/State/Zip f4 *1A 60 f t .S Location of Offense Enforcing Dept/Division Offense 14 Facts This will serve only as a warning. At this time no legal action has been taken. It is the goal of Town agencies to achieve voluntary compliance of Town Ordinances, Rules and Regulations. . Education efforts and warning notices are attempts to gain voluntary compliance. Subsequent violations will result in appropriate legal action by the Town. WHITE-OFFENDER CANARY-ORD./REG.-PROG. PINK-ENFORCING OFFICEfi GOLD-ENFORCING DEPT. r �4�+•l ,+t r r 1rti V 1 .•� yM1 3 n4 � .:- �� Y 1d I + �k ., ,' y � '.>rfi61"��e� � t'. r �,� a _. ira. � '. .. ",:`+,d •"� k Y • � c , • . y r �Ar . µ car up ` w IN AN 1`5 D "s:':.a 9lAS1N�S�lt rv,n,wrra � >« off ,++rexwear.w"�;'R��trrrr tar'c�r�rl 1 ., w;M • wrerii trruer `.... •carol,. I v ry M - I , r , ,M a ■ y 7,1r 5 e,is:t-a M ar i n . t ° " n n s 9/27` 0 „ yq, � � h MICHAEL D. FORD, ESQUIRE ATTORNEY AT LAW 72 MAIN STREET,P. O. BOX 665 WEST HARWICH,MA. 02671 TEL. (508)430-1900 FAX(508)430-9979 mdfesq 1 @verizon.net April 25, 2007 TO: Mr. Dale Harger, Esq. Sovereign Bank RE: Purchase Financing. C—_751 West Mam,Stfeet;:Hyannis—_-_Z1 Dear Attorney Harger: Please be advised that I represent Sal Couto, who personally or by his nominee, ("Purchaser") has entered into an Agreement to purchase the above-referenced property ("Property"). The Purchaser has requested that I provide an opinion ("Opinion") related to your purchase financing of the Property, specifically, concerning whether recently ©� acquired building permits to.remodel the site building remain valid. J � The Property is currently improved with a building and accessory, paved parking, constituting the restaurant use currently operated on-site. The Purchaser intends to use the Property in the same way. .The,purchase of the Property was contingent upon receiving local building permits to allow for remodeling of the existing restaurant building. Building permits have recently been acquired to accomplish the same. You have asked whether, if eight (8) parking spaces might now be unavailable for use by - the Purchaser in its proposed restaurant operation, the building permits secured are still valid. It is my opinion, that because there are sufficient off-street parking spaces,at the r Property in keeping with the applicable requirements of the current Barnstable Z'ning Ordinance (`.'Ordinance"), exclusive of the eight parking spaces potentially unavailable, o ���_ (�► the building permits do not appear to be invalidated by the potential unavailability of V such spaces. w o Under the Ordinance, restaurant/take-out restaurant uses require minimum off- et parking spaces as follow: one (1) space per three(3) patron seats, plus five (5) s for take-out area, plus one (1) space per two (2) employees . Twenty-four (24) patron eats are currently provided on-site, and the plans submitted for the building permits do of w rn propose,to,al:ter this number. There are proposed five (5) employees per.maximum. hilt. As existing, there are twenty-one.(21) parking spaces (plus one [1] handicapped- accessible) proposed; exclusive the eight (8) spaces.which may be unavailable.for use It is,understood that""per employee"refers to em to ees" er maximum shift. PP Y P 1 in the proposed operation. The parking plan on which this opinion is based is attached hereto as Exhibit"A." Based on the foregoing, sixteen (16) spaces are required under the Ordinance for the purchaser's proposed use of the Property, and at least twenty-one (21) exist on-site, plus one handicapped space. The required figure is liberally calculated, as it includes the five (5) spaces required for a take-out area though this requirement may only apply to a restaurant where take-out is accessory unlike the proposed operation which is principally a take-out restaurant. As the existing number of parking spaces at the Property will continue to at least meet the number required under the Ordinance for restaurant/-take-out restaurant use, exclusive of the eight (8) which might be unavailable for the proposed operation, it is my opinion that the aforementioned eight parking spaces do not affect the validity of the building permits which have recently been secured to remodel the restaurant building on-site. This Opinion is rendered to the addressee hereof only,for the transaction herein described and may not be relied upon by any other person or used for any other transaction. I render no opinion on matters except as specifically herein stated. Without limiting the generality of the preceding sentence, I wish to point out that I express no opinion concerning title to the Property, including as to how use of the Property may be affected by title issues. I have spoken with the Town of Barnstable Building Commissioner and Chief Zoning Officer Tom Perry, and he concurs with the conclusions reached herein. Should you have any further questions, please do not hesitate to contact me. Very truly yours, Michael D. Ford CC: Tom Perry �u�5-� mow. a d o a ���-- eeOoeeers'r Inc -. 1223 Mineral Spring Avenue North Providence,Rhode Island 02904 �`S l U` March 3 1999 Ralph Crossen Building Commissioner Hyannis Town Hall 367 Main Street Hyannis,MA 02601 RE: Compass Bank; Hyannis,*MA Dear Mr. Crossen, This office has performed a structural investigation of the settlement cracking of the foundation walls of the above referenced building. Based on the inspection, this office has redesigned the existing, failed foundation section. A new structural foundation plan will be submitted under separate cover. This office will also perform field inspections during construction to ensure conformance with our drawings. -° Please do.not hesitate to call this office if you have any questions or require any other information. Sincerely, C- A David Odeh, P. E. Principal MDO/gmc - : _. :. -- Phone: 401.724.1771 Fax 401.724..1981 03iO4/99 THLI 08:57 FAX 401 724 1981 ODEH ENGINEERS INC Z 002/002 Ir-�ttl ORQING®P:p Inc 223 Mineral Spring Avenue North Providence,Rhode Island 02904 March 3, 1999 Ralph Crossen Building Cot7unissioner Hyannis Town Fall 367 Main Street Hyannis,MA 02601 RE: Compass Bank,Hyannis,MA. Bear Mr. Crossen, This office has performed a structural investigation of the settlement cracking of the foundation walls of the above referenced building. Based on the inspection,this office has redesigned the existing,failed foundation section. A new structural foundation plan will be submitted under separate cover. This office will also perform field inspections during construction to ensure conformance with our drawings. Please do not hesitate to call this office if you have any questions or require any other information. Sincerely, M.David®deh,P.E. Principal MD®Igmc ?hone: 401.724,1771 Fax 401.724.1901 03/04/99 THU 08:57 FAX 401 724 1981 ODEH ENGINEERS INC 1,'002 en��n®ersp mc 1223 Mineral Spring Avenue North Providence, Rhode Island 02904 FAX TRANSMISSION DATE- TO: FROM: COMPANY:or - ODEH ENGMERS,1NC. PHONE: PHONE; (401)72A-1771 FAX: 7 9® -G wDL3 Fes: (401)7?.4-1981 PE30jEC'f: PAGES: (including cover sheet) �. Q.0� l�c�o � �iv.�Gc�CdLTP�V Go!c.%�r_al W _ - �%fib �.,cS�� —�� � c�a _ 1l_o a a_:_�a� _ _.--� i� f 3 _ ���.'S� 9'4 0.14 tL �l'�� _-SO4e�R q �."4 .. rc-.d. ue. - Y" W. _� iM. •r-T:c —_ --� � �-- - - �, .-,. ` � � .. � -.-v-- �-t� � ;,_�.. 'ram .��q z���`F, �. b40 eneinee"o COPY February 12, 1999 RECEIVED 5*� 81. 7 1999 Jim Collins Collins Construction COLLINS CONSTRUCTION CO.,INC. 33 Swindel Street P. O. Bog 2569 Fall River,MA RE: Compass Bank Wall Crack Investigation-Hyannis,MA Dear Jim: On Thursday, February 11, 1999, Field Engineer Paul Wilkinson proceeded from this Office to the aforementioned project site in Hyannis, MA. The purpose of the visit was to investigate a large'crack in a masonry block wall at the northeast corner of the Bank. Upon arrival at the site, the Field Engineer met with Collins Construction representative, Ms. Sue Coble. Ms. Coble removed the exterior sheathing materials that were partially obscuring the wall crack. The wall crack was initially observed on the north wall of the northeast corner of the Bank. This wall is a gable end wall and supports minimal roof loads. As the exterior sheathing was removed,it was found that the crack continued, and extends the full length of the east wall at the northeast corner of the Bank. This east wall is a load-bearing wall, supporting the eastern end of the full span roof trusses. The crack then continues, for a short distance, onto the north wall of the Bank foyer. The north foyer wall supports a point load located some distance away from where the crack was observed. Closer inspection of the north masonry wall at the northeast corner of the Bank showed that the wall contained one-major crack and several smaller cracks. The major crack was observed by the Field Engineer to emanate from a crack in the concrete foundation. The wall crack steps diagonally upward, toward and beyond the window masonry opening in this wall. The wall crack increases in size from approximately 1/16" wide near the foundation to V/a"wide near the roofline. The smaller cracks in the north wall included a continuous, horizontal crack, at the top of the eastern end of the foundation wall and the bottom of the first course of masonry block. Also noted at the north wall was a 1/16" to 1/8" wide crack in the foundation wall at the western end of the wall,adjacent to the return wall at this location. The crack in the east wall of the northeast corner of the Bank extends the full length of the wall. This crack is located in the masonry block joint one course below the roofline. The crack is a hairline crack at the southern end of the east wall. The crack widens as it extends north. The crack eventually measures approximately 1" wide where it meets the return wall and connects with the crack in the north wall. Also noted were two significant diagonal cracks at the top of the east foundation wall. i The small crack in the north wall of the foyer is a continuation of the crack in the east wall and extends upward one course and over one block before terminating at the roofline. The crack is a hairline crack. The Field Engineer also observed a significant crack in the floor slab of the room at the northeast corner of the Bank that is enclosed by the referenced walls. This floor slab crack runs in a north-south direction, measuring from hairline to 1/8" in width, and located adjacent and parallel to the west interior wall of this room. Based on all of the above observations,it is the conclusion of Odeh Engineers, Inc. that the wall and foundation failures are most likely the result of settlement of the foundation system. Odeh Engineers recommends that test pits be excavated adjacent to the failing foundation walls in order to document the existing soil conditions at these locations. Odeh Engineers further recommends the removal and reconstruction of the foundation walls and the exterior walls located at the northeast corner of the Bank. Soil improvement under the new foundation system will likely be required prior to reconstruction. Sincerely, A , Paul Wilkinson Field Engineer BROWN & LINDQUIST, INC., ARCHITECTS 926 MAIN STREET, P.O. BOX 120 YARMOUTH PORT, MA 02675-0120 [5081 362-2727 - [5081 362-9171 FAX MEMORANDUM OF MEETING PROJECT: Compass Bank - West Main Street, Hyannis DATE: 22 March 1999 PRESENT: R. Cozzone, Compass Bank; R. Crossen�T. Perry,.Barnstable Bldg. Dept.; J. Collins, M. DaCosta, Collins Construction; D. Odeh, Odeh Engineering; D. Geisser, Briggs Engineering; P. Brown, B&L DISCUSSION: 1. R. Crossen presented letter declaring building to be unsafe in accordance with 780 CMR, Section 121.0 (copy enclosed). 2. Reviewed procedures of exploration which have taken place; removal of northeast corner wall, foundation and footing and excavation of material down to 1 F-0"; existing demolished foundation and building debris was encountered from a level of 2'-0" below footing to the 11'-0" depth; debris included wood lumber, plumbing pipes, electrical debris, concrete and brick. - q 3. The nature-of-the' cracking.and settlement of the building indicates that the construction debris may not extend under the entire building, therefore, request was made to conduct certain exploratory measures in an attempt to determine if debris described above is localized, or indeed wide spread. 4. Exploratory measures will consist of test pits excavated around the perimeter of the building; these will be performed on Tuesday, 23 March 1999; Collins will perform excavations; soil analysis will be made by D. Geisser; all excavations will be inspected by R. Crossen and T. Perry prior to backfilling. 5. If the test pits described above, indicate generally satisfactory soil conditions, it is proposed to take a series of approximately 7 soil borings inside the building; these are intended to determine the extent of the unsuitable material under the building, and to indicate the feasibility of it's removal; R. Crossen, D. Odeh and D-. Geisser determined, in the field, the locations for the borings; Collins will do the preparatory work necessary to provide clearance for the drilling; D. Geisser will provide soil analysis; copies of boring logs will be given to all parties. 6. If the.,above procedures;prove that soil conditions are satisfactory for remediation, Briggs Engineering/Odeh Engineering will prepare designs to restore the building to it's usable status; all designs will be submitted to the Town of Barnstable Building Department for. review and approval prior to implementation. Compass Bank - West Main Street, Hyannis 22 March 1999, Page 2 7. All fees and expenses required for the above procedures must be reviewed by Compass Bank prior to commencement. 8. Please respond to this memo within seven (7) calendar days of it's writing with any revisions and/or addenda; if none are received, it shall be considered a correct record of the meeting. Submitted by: BROW & LINDQUIST, INC. �k Peter G. Brown President PGB:phs Enclosure cc,enc.: R. Cozzone, R. Crossen, T. Perry, J. Collins, M. DaCosta, D. Odeh, D. Geisser, P. Lindquist, K. Raber f °F tME r ti � �.tARNSTAB The Town of Barnstable ' LE, 9� MASS.; ON Department of Health Safety and Environmental Services Building Division 367 Main Street, Hyannis MA 02601 Office: 508-862-4038 Ralph Crossen Fax: 508-790-6230 Building Commissioner March 19, 1999 Mr. Robert Cozzone c/o Compass Bank 791 Purchase Street New Bedford, MA 02744 RE: 715 West Main Street, Hyannis,MA Map 249/Parcel 15 Dear Sir: I regret to inform you that your bank building under renovation at 715 west Main Street in Barnstable is being declared an unsafe structure under 780 CMR section 121.0. As you know, major settling under the footing was discovered under the front right corner of the building a week ago. Since then, I met with your engineer and a decision was made to investigate under the footing by removing that portion of the foundation and footing. Today that excavation was completed and the results show major deposits of construction debris under the footing area as well as under the slab and interior sections of the building. A truck load of old debris was already removed from that hole and trucked away. The debris which is.also under the building as described before, is unstable and must be removed completely. As I see it you have two options: 1) to move the building in order to clean out all old construction debris from under the structure or 2) to raze the building and start over. At the present time. I must also stop work on the job as the scope of the job has to change. Once you decide which course of action to take,we will discuss the steps needed in order to issue a new permit. Sincerely. Ralph Crossen Building Commissioner RC:lb Certified Mail Z 368 667:12 Q990319A .rs. i�` USA 22 p,.Mq 0 PM w - �'. �3 MPM AR.oj� IS o 0 vowim � 1L61MGflgG00z� 926 Main St. • P.O. Box 120 • Yarmouth Ft, Mass. 02675-0120 R. CROSSEN/T. PERRY - W BUILDING DEPARTMENT BARNSTABLE CONSERVATION COMMISSION 367 MAIN STREET HYANNIS, MA 02601 t' c.�,��..r�a.�:W�ca-�t- 1i1�����.1�{,IL��II�;s�� {I��II►i�1�;11���:f�a�l��;l�ii. -:..,," _ r F 1 I I J J } i Engineeriqg Dept. (3rd floor) Map - --,,—. Parcel 4WI iit# b `I House . .,,,.,�.... 6�A d / CONNECTION P IT FROM TiIE /3 Board of Health(3rd floor)(8:15 -9:30/1:00-4:30) F.NerNFFR��re�„ ,. ._ �/ i , s r our IV Conservation Office(4th floor)(8:30-9:30/1:00-2:00)' a�Sw. UCTION, fi J�6�.Eo �/,o Fla k i v ►�- 19 MASS TOWN OF BARNSTABLE _ 'F°"9+'� ' JA Buildin Permit Application yrtreet Address West Main St., Hyannis, MA. Village ' Owner COMPASS BANK, Address 791 Purchase St., ;New Bedford, MA. Telephone (508) 994-5000 -Permit Request RADA + APr, +A ANJAUngl}14ildiR�see plans �ttael�gd�=�e==o v Q�=o==o �o o�� l First Floor_ o2,�D square feet Second Floor square feet Construction Type Estimated.Project Cost $ ZE6 Zoning District Flood Plain Water Protection Lot Size Grandfathered ❑Yes ❑No Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family(#units) Age of Existing tructure Historic House ❑Yes LkNo On Old King's Highway ❑Yes No Basement Type: ' ull ❑Crawl ❑Walkout ❑Other Basement Finished Area t. Basement Unfinished Area . t Number of Baths: Full: .Existing New Half: fisting New ;r No.of Bedrooms: Existing New Total Room Count(not including baths):Existing a First Floor Room Count 4 Heat Type and Fuel: ❑Gas ❑Oil ❑Electri ❑Other Central Air ❑Yes ❑No Fireplace • xisting New Existing wood/coa ve ❑Yes ❑No Garage: ❑Detached(size) Other Detached Structures: ❑Pool(size) ❑Attached(size ❑Barn(size) ❑None Ll Shed(size) ❑Other(size) Zoning Board;?e als Authorization ❑ Appeal# Recorded❑Commercial ❑No If yes, site plan review# Current Use Proposed Use Branch Bank Builder Information f y�QQ Name Collins Construction Co.,Inc. Telephone Number (508) 678-5201 '� Address 33 Swindells St., Fall River, MA. 02723 License# 008915 (cop; attached) (See Workmens Comp. Insurance Affidavit form ttachedi Home Improvement Contractor# N/A Cc L) Z L-CS 2 Worker's Compensation# v a7a,c-:� NEW CONSTRUCTION OR ADDITIONS REQUIRE A SITE PLAN(AS BUILT)SHOWING EXISTING,AS WELL AS PROPOSED STRUCTURES ON THE LOT. '7 ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO B.) ,I. Industries, Inc. CGLLIIslS S U Nnolz - SIGNATUR e — DATE January 29, 1999 age o ns, si en BUILDING MIT D I D T FOLLOWING REASO f T FOR OFFICIAL USE ONLY ,,,, PERMIT NO. DATE ISSUED C _ ` _ • *y - ' f — F e ` tit ..' - - _ E ^ MAP/PARCEL NO. ADDRESS �.� VILLAGE NER DATE OF INSPECTION: s n FOUNDATION `'' �j�q-'�-e 5 � ov'T� ©'� - c 9 �4- i - FRAME INSULATION L l/" f _ FIREPLACE' ELECTRICAL: ROUGH FINAL UMBING: ROUGH - FINAL GAS: ., - ROUGH FINAL' FINALJBUILDING . s . DATE CLOSED OUT ASSOCIATION PLAN NO. ` y /�_ '\ • The Commonwealth of MassacAusetts Department of Industrial Accidents Office ot/nlvesffoo oos tl 600 Washington Street Boston,Mass. 02111 Workers' Compensation Insurance Affidavit name: N/A location: r city phone# ❑ I am a homeowner performing all work myself. c am ❑ %% %/%%/ eto and%%e no one %%%%/%% ///%%� I am an employer providing workers' compensation for my employees working on this job. companvname• - .nilins Cnnstrnntinn Cn_,inr_ address �� CiVinrinllc C+ .:. city F phone* (508) 678-5201 insurance co. Libert Mutual Insurance ohcv# SEE COPY ATTACHED ❑ I am a sole proprietor, general contractor, or homeowner(circle one)and have hired the.contractors listed below who have the following workers' compensation polices: cons anv name: address: city. phone#: Insurance co olrcv#` „ . companv name: address: dtv- hone#i olicv.#:.. ... . ,. . insurance co . �::.. Failure to secure coverage as required under Section 25A of MGL 152 can lead to the imposition of criminal penalties of a fine up to S1,500.00 and/or one years'Imprisonment as well as civil penalties in the form of a STOP WORK ORDER and a fine of$100.00 a day against me. I understand that a copy of this statement may be forwarded to the Office of Investigations of the DIA for coverage verification. I do hereby cerfi the pains and p ies of perjury that the information provided above is tru.-and correct COLLIN ON TR 0 0 1999 Signature Date January 29, Print name J H. Collins, President phi# (508)678-5201 --------------- official use only do not write in this area to be completed by city or town official city or town: permit/license# ❑Bufiding Department (]Licensing Board ❑check if immediate response is required ❑Selectmen's Office ❑Health Department contact person: phone N, ❑Other��� (rowed 9/95 PJA) MI III IN JUL 29 '98 12:36PMIWERTY MUTUAL ,WESTWOOD P• C.ertifi>icate of Insurance `_,NIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON YOU THE CERTIFICATE HOLDER THIS CERTIFICATE IS NOTr'ae N INSURANCE POLICY AND DOES NOT AMEND EXTEND OR AL-U THE COVERAGE AFFORDED BY THE POLICIES LISTED BELOW. - This IS to Certify that — svwrio�s STREET COMPANY,INC.33 � Name and LIBERTY '- P.O.BOX 2569 1— address of M v 1 Uru,® FALL RIVER,MA 02722 Insured. ATTTN: NANCY Is,at the issue date of this oertificate,insured by the Company under the policy('(ies)listed below. The insurance afforded by the listed pollcy(ies)is subject to all their terms,exclusions and conditions and is not altered by any requirement,term or condition of any contract or other document With respect to which this certificate may be EXP.DATE • L3 CONTNUOUS TYPE OF POLICY ❑ EXTENDED POLICY NUMBER LIMIT OF LIABILITY 9 POLICY TERM WORKERS 7/1/99 WC5-111-422081-138 COVERAGE AFFORDED UNDER WC I EMPLOYERS LIABILITY Bodily COMPENSATION LAW OF THE FOLLOWING STATES: Injury By Accident MA,RI I $500,000 Each Accident . Bodily Injury By Disease $500,000 Polley Limit Bodily Injury By Disease i $500.000 Each Person GENERAL 7/1/gg YY7-111-422081 148 General Aggregate-OtherthanProducx CompletedOpe►ations LIABILITY $2,000,000 i ® OCCURRENCE Products/CompletedOperatiens Aggregate i $t,Q00,QQQ ❑ CLAIMS MADE Body Injury and Property Dameoe Liability Per j $1,003,000 Occurrence Personal and Advertising Injury Per Person/ Personal DATE j�$1,000,000 Organization f Other $W,000 FIRE LEGAL Other $5,000 MEDICAL t uABIuTY PAYMENTS Each Accident-Single Limit AUTOMOBILE 7/1/99 AS1-1 1 1-422081-068 $1,000,000 CSL B.I.and P.D.Combined LIABILITY - ® OWNED Each Person Each Accident or Occurrence ® NON-OWNED © HIRED Each Accident or Oocurrenoe OTHER — s1,10o,01M EACH OCCURRENCE 7/1/99 11 22Q81-117 $1,000,0WGENERALAGGREGAT-c UMBRELLA EXCESS $1,000,000 PROD/COMPLETED OPERATIONS t I f10,oD0 RETENTION f} ADDITIONAL COMMENTS Project: Compass Bank, Pilgrim Hil ranch, Plymouth, MA d J U L �: 9 1998 { •If the certificate expiration date is continuous or extended term,you will be notified it coverage is temlinated or reduced before the certificate expiration date.----- i ' SPECIAL NOTICE-ONO; ANY PERSON WHO,WITH INTENT TO DEFRAUD OR KNOWING THAT HE IS FACILITATING A FRAUD AGAINST AN INSURER,SUBMITS AN APPLICATION OR FILES A CLAIM CONTAINING A FALSE OR DECEPTIVE STATEMENT IS GUILTY OF INSURANCE FRAUD. NOTICE OF CANCELLATION: (NOT APPLICABLE UNLESS A NUMBER OF DAYS IS ENTERED BELOW,) BEFORE Liberty Mutual Group z THE STATED EXPIRATION DATE THE COMPANY WILL NOT CANCEL OR REDUCE THE INSURANCE AFFORDED UNDER THE ABOVE POLICIES UNTIL AT LEAST 30 DAYS NOTICE OF SUCH CANCELLATION HAS BEEN MAILED TO: Compass Bank CAA cERTtFt.E 791 Purchase Street Lisa A, Hig HOAR New BEdford,MA AUTHORIZED REPRESENTATIVE Attn: Robert Couone II WESTWOOD (781)326-7100 7/1/98 J OFFICE PHONE NUMBER DATE ISSUED This certificate is executed by LIBERTY MUTUAL GROUP as respects such insurance as is afforded by Those Companies BS 7TSL I DEPARTMENT OF PUBLIC SAFETY CONSTRU�TIDN SUPERVISOR LICENSE Nu�}ae Expires: Keste>ctedaTo� �� O0 JAMESk t OCLIIF5 '�„„„�,•� 119 6IfFORD AVE SONERSET, NA 12726 - I e i 3 Collins 3 LLRI R, A.ST.SWINEVE LS2723 FIFTEENTH TEL 508 678-5201 ANNIVERSARY " consncu-()R I984 - I999 Thursday,January 28, 1999 BUILDING INSPECTOR TOWN OF BARNSTABLE RE:JOB#2619 COMPASS BANK,WEST MAIN ST.,HYANNIS,MA. GENTLEMEN; COLLINS CONSTRUCTION RESPECTFULLY REQUESTS FROM THE TOWN OF BARNSTABLE A BUILDING PERMIT TO PERFORM RENOVATIONS ON THE ABOVE MENTIONED PROJECT. IN AN EFFORT TO OBTAIN SAME AS QUICKLY AS POSSIBLE WE ARE HAND DELIVERING ON JANUARY 29, 1999 THE FOLLOWING: A. BUILDING PERMIT APPLICATION COMPLETED TO THE BEST OF OUR ABILITY. B. ONE FULL SET OF PLANS AND ONE REDUCED SET OF PLANS PER YOUR REQUEST. C. SPECIFICATIONS FROM BROWN&LINDQUIST,ARCHITECT SHOWING REGISTERED ARCHITECT'S STAMP. NOTE: A SET OF PLANS WILL ALSO BE DELIVERED TO THE FIRE PREVENTION BUREAU FOR THEIR INFORMATION AND USE. THANK YOU IN ADVANCE FOR YOUR ATTENTION TO THIS REQUEST. WE LOOK FORWARD TO WORKING UNDER THE JURISDICTION OF THE TOWN OF BARNSTABLE AND FOR A TIMELY COMPLETION OF THE PROJECT FOR THE COMPASS BANK. Y 0 S, L ES NS,�PRESIENT ENCL. Collins 33 L RIVER, ELLS ST. FALL RIVER,MA.02723 FIFTEENTH TEL 508 678-5201 ANNIVEBBARY CORSIMCHOR 11984-I999 Thursday,January 28, 1999 TOWN OF BARNSTABLE FIRE PREVENTION BUREAU RE:JOB#2619 COMPASS BANK,WEST MAIN ST,HYANNIS,MA. GENTLEMEN: IN ACCORDANCE WITH THE REQUIREMENTS OF THE TOWN OF BARNSTABLE WE ARE HAND DELIVERING ON JANUARY 29, 1999 A SET OF DRAWINGS FOR RENOVATIONS ON THE ABOVE MENTIONED PROJECT. ALL PAPERWORK REQUIRED BY THE BUILDING DEPARTMENT HAS ALSO BEEN DELIVERED ON JANUARY 29, 1999. ALSO ENCLOSED IS A SCOPE OF WORK FROM THE ARCHITECTS BROWN&LINDQUIST INC. SHOWING ARCHITECT'S STEMP. VERY TRULY YOURS, JAMES H. COLLINS,PRESIDENT ENCL. CC:BUILDING DEPARTMENT 926 Main Street • Yarmouth Port, Massachusetts 02675 • (508) 362-2727 • FAX: (508) 362-9171. 25 January 1999 COMPASS BANK - 715 WEST MAIN STREET, HYANNIS, MASSACHUSETTS RENOVATIONS & REHABILITATION OF EXISTING BUILDING SCOPE OF WORK: INTERIOR OEA. Cutting & PatchingPerform all necessary cutting and patching for new electrical, fire alsecurity, camera system and installation of a new ATM and surroun B. Demolition 1. Remove all floor covering including carpet and quarry tile in vestibule. 2. Remove spline ceiling in lobby area. 3. Remove and dispose of two (2) sets of entrance.doors in vestibule. 4. Remove and dispose of_entire teller counter and undercounter equipment. C. Finish Carpentry 1. Throughout entire lobby area, install a vertical piece of trim to create a wainscot effect. This is a simplified version of the new Westport branch. D. Millwork 1. New teller counter with Corian. 2. Modifications and additions to existing_ check desk. 3. Re-laminate existing back countertops (2). 4. Re-laminate existing drive-up top.. 5. Re-laminate existing time clock counter. 6. Re-laminate existing coupon booth tops.- 7. Re-laminate existing vault top. 8. Modifications and re-lamination of existing vault work counter. _ 9. Re-laminate kitchen counter top. 10. Construct glazed half height partitions in accordance with accompanying B&L drawing A-1, entitled, "Proposed Plan, Elevations and Details", dated 25 January 1999. r xy J COMPASS BANK - 715 WEST MAIN STREET, HYANNIS, MASSACHUSETTS 25 January 1999, Page 2 E. Door Hardware 1. Remove`locksets on fourteen (14) existing doors. 2. Install new ADA lever handle locksets. F. Aluminum Fronts 1. Install two (2) new sets of white aluminum doors, sidelights, and tran- som, similar to Westport branch, with mullions between glass. 2. Furnish and install new card reader for vestibule ATM. G. Drywall 1. Drywall, tape and sand vaulted ceiling in lobby area where spline ceiling was removed. H. Quarry Tile 1. Install new tile at teller area and vestibule. I. Painting 1. Remove all existing wall covering, backing and paste. 2. Patch walls. 3. Wash ceiling grids and woodwork. 4. Paint all walls, drywall ceilings and new wood dado. 5. Entire inside of existing bank will be repainted. J. Carpet 1. Furnish and-install new carpet throughout bank at an allowance of $22 per square yard installed. K. Pedimat 1. Furnish and install new Pedimat in vestibule area similar in size to Westport branch. r COMPASS BANK+ 715 WEST MAIN STREET, HYANNIS, MASSACHUSETTS 25 January 1999, Page 3 L. Electrical 1. Install four (4) new recessed drive-up lights in canopy. 2. Wire new drive-up tube system. 3. Disconnect and reconnect wiring to teller area counters. 4. , Install new plug mold strips for rear counters. 5. Install new fire alarm system. . 6. Replace outside wall fixtures by doors, four (4) total. 7. Replace bulbs and ballast in five (5) pole lights. 8. Add new wall pack to each end of building. 9. Add safe deposit room buzzer. 10. Install all new lighting fixtures in office areas 2x2 with parabolic lenses, lx4 over teller line, 2x4 at rear of teller line. 11. Install new phone system. 12. Install new CAT 5 computer wiring. 13. Replace existing exit lights. 14. Repair existing emergency lighting system and add heads, as needed. 15. Replace lunch room fixtures with 2x4 surface-mounted fixtures. 16. Remove lobby chandelier and replace after new ceiling is installed. 17. Re-lamp and re-ballast the following areas only: -lobby soffit money rooms safe -bathrooms 18. ATM should not require any electrical work. 19. Remove old computer and telephone wiring, as needed. M. HVAC, 1. Furnish 'and install new gas-fired heat and electric air conditioning. 2. Price based on-duct work remaining. COMPASS BANK - 715 WEST MAIN STREET, HYANNIS, MASSACHUSETTS RENOVATIONS & REHABILITATION OF EXISTING BUILDING SCOPE OF WORK: EXTERIOR A. Sidewalks 1. Removal and disposal of existing sidewalks and installation of new concrete sidewalk along east side of building. B. Seal Coat 1. Crack fill and seal coat entire asphalt parking area. C. Asphalt Patching ` 1. Cut out bad areas of asphalt especially along east side of building and c patch before seal coating. D. Striping , 1. Re-stripe entire asphalt area after seal coat. E. Gas Service s 1. Excavate and install new concrete pad for HVAC. Patch asphalt. F. Exterior.Demolition i 1. Remove all. exterior siding and trim. 2. Repair or replace furring nailed to masonry walls. - 3. Perform all cutting and patching necessary for installation of tube system. G. Vinyl Siding 1. Install new.high-end Wolverine vinyl siding and trim over entire area of existing building. 'r COMPASS BANK - 715 WEST MAIN STREET, HYANNIS, MASSACHUSETTS 25 January 1999, Page 5 H. Painting 1. Using two-coat system, paint the following: y •chimney - -five (5) light poles -main entrance trim •two (2)`attic louvers twenty (20) shutters -all exposed piping -bollards at drive-up canopy BROWN & LINDQUIST, INC., ARCHITECTS B ERT C W No. 182 By: BARNSTABLE, Z '" Peter G. Brown, President 02 MASS. �2F�fTH n F M As��, Construction services shall be provided by the Architect in accordance with 780 CMR .116.0. Property Location: 715 W MAIN ST HYANNIS MAP ID: 249/ 155/ Other ID: Bldg#: 1 Card I of 1 Print Date:03/19/1999 AID —'qj 1 1 USESSIff-ENT' 011 111111�11'Wjji � r esFiptio- Code Appraised value ssesse a ue oAMXNNE I rKqjjrLM I 1jr^11-4t- D UOM LAND --34T(F— 1174Ut P 0 BOX 4023 —COMMERC. 3410 234,,40( 234,4 801 N .EW BEDFORD,MA 02740 COMMERC. 3410 135,60( 135,E BARNSTABLE,MA NO,XIM ccoun an Ref. iu-//IUU ax Dist. 400 Land Ct# Per.Prop. UP FYOO #SR Life Estate #DL I LOT I& Notes: 491,019 VISION #DL 2 2 joral 48 7 40 4 87,40 U AN ""A C� ",J I V noAKIJIN IN b I rmL)rhK 1 1h;5,1IN 11641/218 1 Ut I Ls rr. Code Assessed Value r. 0 e ssesse a ue r. Code Assessed Value FIRST NATIONAL BANK BOSTON 5973/137 10/15/198, U I 10C B FNBC RLTY CORP 3648/258 01/15/1982 U 345,00( D ToTaT-. 551,uu. 0 1 55 Toa.— 551,UUC I his signature acknow ctor or Assessor w� v ft 1% -Ir ledges a visit by Data Co e Year ypelDescriptiun Amount Code be'scription Number Amount Comm.Int. Ly'u v S --th"Ift,4*1111, Appraised Bldg.Value(Card) 234,400 Appraised XF(B)Value(Bldg) 0 Appraised OB(L)Value(Bldg) 135,600 lotal., Appraised Land Value(Bldg) 117,400 4 W1111 Special Land Value One room 15x15 in attic. LAND ADJ FOR LOCATION Total Appraised Card Value Total Appraised Parcel Value 487,400 Valuation Method: 487,400 Cost/Market Valuation NetTotal Appraised Parcel Value 487,4UU "Al 4� .....�"&§1' 41, ,&,JWLJ'V"' ,J AW1111"S'ly Permit ID Issue Date J)pe Description Amount Insp.Date %Comp. Date Comp. Comments Date urposelMesult B# Use Code Description one D Prontage Dept nits nit Price 1.Pactor S.I. C Eactor Nbhd. Adj. Notes- )qeczal Pricing Adj. net Price an Value 1­ 3410 BANK BLDG —HB---T —U.-4'-;A L 16l'umut T2C-IG7-----T 260,8z 117,40( JU JSJ I JE Total an Units U.41 AL 16 an Vau t 117,4(R Property Location: 715 W MAIN ST HYANNIS MAP ID: 249/ 155/// Other ID: Bldg#: 1 Card 1 of 1 Print Date:03/19/1999 Element Cd. Ch. Description CommercialData Elements Style/'Iype 31 BrancWB­a`ffW- Element Cd. Ch. Description Model 94 Commercial Heat Grade OB B Frame Type 2 WOOD FRAME Baths/Plumbing 2 AVERAGE Stories 1 1 Story ccupancy 00Ceiling/Wall 8 TYPICAL ooms/Prtns 2 AVERAGE Exterior Wall 1 14 Wood Shingle /o Common Wall 2 Wall Height 12 18 Roof Structure 3 able/Hip Roof Cover 3 sph/F GIs/Cmp nterior Wall l 05 rywall -3 �.. :: 20 2 Element Code Vescription lactor Interior Floor 1 14 arpet Complex 2 Floor Adj Unit Location eating Fuel 3 Gas Heating Type 4 Hot Air Number of Units 3 C Type 3 Central Number of Levels 4 /o Ownership Bedrooms 0 ero Bedrooms Bathrooms 0 Zero Bathrms 0 0 Full 5 12 14 ze Total Rooms 1 1 Room A.Base Rate ize Adj.Factor 1.07117 Grade(Q)Index 1.41 ath Type Adj.Base Rate 113.28 11 11 Kitchen Style Bldg.Value New 366,234 22 22 Year Built 1983 ff.Year Built 1983 13 rml Physcl Dep 14 uncnl Obslnc con Obslnc 22 pecl.Cond.Code pecl Cond Code I TiescrWhon ercenta a Overall%Cond. 64 341U FINK HLOU ILU(T eprec.Bldg Value 34,400 o e Description nits n:t rice r. o p t n" Apr. value PAVIPAVING-ASPHALT L 10,OOC 0.90 1983 0 50 4,50 Code Description LivingArea CirossArea Ljj.Area Unit Cost n eprec. a ue rrs oor , , CAN Canopy 0 324 65 22.73 7,36 FAT Attic,Finished 45 225 45 22.6 5,09 i{ ,a tL Gross LivlLease Area , g Val: A °FtrE tq� r The Town of Barnstable * snnxsrne�, 9� 1639. 1�$ Department of Health Safety and Environmental Services '�Fn�a+A Building Division 367 Main Street,Hyannis MA 02601 Office: 508-862-4038 Ralph Crossen Fax: 508-790-6230 Building Commissioner July 27, 1998 Mr. Robert J. Donahue Attorney At Law 86 Willow Street Yarmouthport, MA 02675 Re: 715 West Main Street Hyannis (Map 249 Parcel 155) Dear Mr. Donahue: The building located at 715 West Main Street, Hyannis, may be used as a bank, including drive-in facilities, and there would be no need for site plan review unless changes were to be made to the exterior of the building. Sincerely, Ralph M. Crossen Building Commissioner RMC/lbn g980727a ROBERT J. OONAHUE ATTORNEY AT LAW 86 WILLOW STREET YARMOUTHRORT,MA 02675 TEL.1506j 362-4022 FAX 1506]362-1125 July 27, 1998 Mr. Ralph Crossen Building Commissioner Town of Barnstable 367 Main Street Hyannis, MA 02601 Re: Map Id. 249/155 715 West Main Street Hyannis,. MA File No. 215(19) ' Dear Mr. Crossen: In accord with our conversation of Monday, July 13, 1998, please confirm that the aforesaid premises may be used as a bank, including drive-in facilities, and that there would be no need for site plan ;;review' unless changes were to be made to the exterior of the building. Should there be any questions, please contact me. 4bert ce 1 , Donahue RJD:bcl TOT" OF BARNSTABLE SIGN PERMIT PARCEL ID 249 155 GEOBASE ID 15901 ADDRESS 715 WEST MAIN STREET PHONE HYANNIS ZIP - LOT 1 & 2 BLOCK LOT SIZE DBA DEVELOPMENT DISTRICT HY PERMIT 35940 DESCRIPTION COMPASS BANK (85 SQ.FT.-- 3 SIGNS) PERMIT TYPE BSIGN TITLE SIGN PERMIT C CONTRACTORS: Department of Health, Safety ` ARCHITECTS: and Environmental Services TOTAL FEES:. $85.00 TN BOND $.00 CONSTRUCTION COSTS 1.00 753 MISC. NOT CODED ELSEWHERE * STABLF, *' 039. A�O� ED MI�►I BUILDI. ( VISI DATE ISSUED 01/19/1999 . EXPIRATION DATE j DEC — i 6 - 9e WED 9 : < 3 P . 02 A AA it A WTI Al fly's ,J""A jSj,31""A0. nsruvsxA�t . =1 Department of Health, Safety and Environmental Services - ='• Building Division plFo °t W Main Street,Hyannis MA 02601 t'Dtficc: 508-862-4038 Ralph CtMan Fav 508.790-6230 Building Commissioner Tax Collector TreasurerQT 3 Application for Stgr1 Permit Applicant:_� 1 r C.JG /��l yvv��r,v'����J/'y'%rt c i '✓.�r�l c�.Asse:ssors No. q_��� Doing Business A9; �GUv�y�/7f 1 �J?�,,,+�:• '1'elcplioa�c Nc�,_���'��1��� G���/ sig''nl Location Srrect/Road:_,- C_-S T Y+�fis t�i S i /�yi���.../! �!(��G� 0-2 C> Zunhig District:_.--. Old Dings FS,igljw:cy? Ye:& Hyannis Historic District' 'Yc IS Property Owner /'�' 7,16.r ;. I� `• Clepl)(Ale Auldress: d <'rZ[ '!��$ r S Sip Contractor N:wxtc: /a.«i�:�r�J,✓ Address; �0 O&rlJ 5'T /'�J sus/��T cKj /) ��Z Vili,-,. Desc:ripdon Pie,= draw a di,`k6IMm Of lot showing locatic>rl cal•buildings wid existing signs Witt] dirrtensions, location and size of die new sign. Tfiis should be dr twt1 on die reverse side ot'tllis applic;aUon. Is the: sitrn to be elcetri#rcd? YesiNo (1'ntc�.'If;vrs. Rr rvarrrr,��y�er,»it/s re c�uircrl) I tfc%by certify teat I am the owner or tI1<1t I havC rife :ttlth06ty cal•dIC owner to ru:tke this application, that die information is Cat'reet attd 111at dic: trsc Bind c(?Asir U6011 shall cor11•Ort7: Lo the ()revisions of Section 4 3 of the Toa�m of B;LnjsUtl)le &rting Ordin:uice. Sit,►rtaturc of Owrier/A.uthorj7.ed A b*c:r1t; Date: / GS Sire/) Z 5 fr/jgt�55w-f U 4?1/'/ s' r CAI 3 S?`r' />NeiE :r7 /,C. Si;n Perrnit was approved,— [� , `?igxtaear'e of Building M(e:- So_ a-,7 1it�nt�tnc �Z7 s7 :{ .�� ,r '� `, �. tx �< .. k �. �� � � �r. �� ,.i.� r r ����� � ', Y, J y3,�� ��� �.� ���� � z� t •,r , f Cf�v- � �^�: _ �`�� DEC —!1 E. - 92 WED 8 - 2S P Y" , iL.�� 1 1' dull, I Ont . zll gn UVE wc. signs of ouaiiv — 200 North Street, New Bedford,Massachusetts 02740 Tel:508.990-1701 a Fax, 508-993-3230 Toll Free: 1.800-474-.1701 ax To: Gloria Urenas From, Rick Beaumont _._�. �------�---�- Fax: 508-790.6230 _ Pages- 3 . Plaonz _ - Date- �December 16, 1998 Re: Compass Bank Urgent x For Review Pieaso Comment x Please Reply Please Recycle comments: Per our discussion this morning, here is my application for Compass bank @ 715 West main Street. Please advise me of the correct fee and i will send you the check immediately. Thank You , Rick �MPLLc�, D COD INC.Beaumont sogn SEFRV4 `v "Signs of Quality-' 200 North Street, New Bedford, Massachusetts 02740 ; Tel: 508-990-1701 • Fax: 508-993-3230 Toll Free: 1-800-474-1701 December 11, 1998 Town of Barnstable Building Inspector's Office Hyannis, MA 02601 Attn: Gloria Urenas RE: New Compass Bank located at 715 West Main Street, Hyannis Dear Gloria, Enclosed are plans for signs and building decorations, which include the following: (1) new freestanding or pylon sign (1) front wall sign (1) gold leaf Compass decoration on the North side (2) directional signs Please review and let me know you r comments at your earliest convience. Thank you for your assistance. Sincerely, Rick Beaumont RB/hm Enclosures ,x`' � .� r' '`. s"`�_r.��x� rf� �,�,E�-'`-R� � ��-���{,,'�``. '. �f;�,y �� c�,��ti��,"` .� kyti`3'`�„f•."Fu���"'�r`�`�,•.��F f MOVE SIN 800 iir S Jp E� 3•*�=c•�a �"1 �� it�' UA,�'G11.��s'�'a�.�'i ,7 .� �� �'. t" d E�� E�[E ^t z F Y v 't ✓�.�,� �y#°`�.,yrlF' 5+��`'',`q � a s'�'`a'd' `3� c4` d��v'"t�^'�" 3'�m y x' Y fi� �\ ',I ,7_ 4� G � F/LE NAME: • Mlwork is EukmW Pmpedy ot: aHF sedyarm®nt 1200 NOFWT-M E r� Ne-W BEDPORD.FA^ ya S�s soy-990-ir 1 — raoo-AWWIrM r z_ 926 Main Street • Yarmouth Port, Massachusetts 02675 • (508) 362-2727 • FAX: (508) 362-9171 13 April 1999 Town of Barnstable Building Department 367 Main Street _' m Hyannis, MA 02601 Attn: R. Crossen Building Commissioner BUILDING DIV• Re: Compass Bank 715 West Main Street Hyannis, Massachusetts Mr. Crossen: I am enclosing a copy of a report regarding the subject project from David Geisser of Briggs Engineering & Testing. In the report, Mr. Geisser establishes the procedures for the removal of the unsuitable soil, and the general scope of the replacement of suitable bearing material. Inspections will be performed by Briggs Engineering & Testing, with copies of the report being furnished to your office. I am also enclosing a structural drawing from Mr. David Odeh of Odeh Engineering, our structural engineers on the project. This drawing depicts the desired structural remediation for the building. Both these reports represent a collaborative effort on the part of Briggs and Odeh. Ralph, I know you are leaving Friday for a much deserved vacation. The Bank has suffered a considerable financial hardship because of this condition which, of course, was not in any way of their making. The success of the branch necessitates opening early this summer. We would greatly appreciate it if you could review this material prior to your leaving and hopefully, to give us authority to proceed with the remediation work for this building. Mr. Ralph Crossen Building Commissioner 13 April 1999 Page 2 Thanks for you consideration and continued assistance in this matter. Yours truly, BROW LINDQUIST, INC. Peter G. Brown President Enclosures cc, enc.: R. Cozzone, D. Geisser, D. Odeh, J. Collins, P. Lindquist f 1-617-871-7982 SRIGGS ENGINEERING 533 P02 PPR 13' 88 06: 45 113RIGGS1 Briggs Engineering & Testing A AMSM or PAC A56oCIA70,INC. April 12, 1999 Project No. 93039 Compass Bank c/o Robert Cozzone 791 Purchase Street New Bedford, MA 02740 RE: Geotechnical Recommendations for Proposed Compass Bank Soils Removal Fine & W. Main St., Hyannis, MA Dear Mr. Cozzone: Briggs Engineering & Testiti.g, A Division! of PK Associates, Inc. (Briggs) has completed our Subsurface investigation at the above captioned location (herein of referred to as the "Site"). The investigations consisted of test pits excavated around the perimeter of the building and test borings advanced inside the building. These j investigation results are detailed in our letters dated March 25 and. April 5, 1999. These investigations encountered unsuitable soils along the northeast edge of the existing building. This letter docurnents Briggs recommendations regarding remedial measures to remove unsuitable soils and replace them with suitable fill in the northeast part of the building area. Previous Investigations The test pit investigation encountered unsuitable soils including debris and organic i tatter extending under the right front portion of the building under the existing exterior wall footings, slab and 'interior haunch wall footing. The unsuitable soils were a fill layer with organic matter and debris extending as deep as 8 feet below existing grade. This corresponds to a depth as deep as 4 feet below footings. The test borings were advanced inside the building to determine if the unsuitable fill extends in toward the middle of the building. The explorations locations were selected to provide geographic coverage of the building area while concentrating more borings in the .front right (northeast) portion of the building, adjacent to the Lip-suitable soils encountered in the test pits, Defer to Figure 1 for exploration locations. 100 Weymouth Street-Unit B-1 100 Pound Road Rockland,MA 02370 Cumberland,RI 02864 Phone(781) 871-6040 9 Fax(781)871-7982 Phone(401)658-2990•Fax(401)658-2977 1-617-871-7982 BRIGGS ENGINEERING 533 P03 APR 13' 99 06: 46 .A r . Pi-,,)posed Compass Bank,Hyannis,MA Briggs Project No. 93039 April 12, 1999 Page 2 of 3 No unsuitable soils were encountered in the test borings. A very dense undisturbed gravelly sand layer was encountered at depths of 1 to b feet below the slab grade in the test borings. Based on the conditions observed in the test borings an allowable soil bearing pressure of 2.5 tons per square foot is recommended for foundations to be supported on the undisturbed gravelly sand or compacted Structural Bill. Excavation Briggs recommends complete excavation of the organic and debris laden fill from beneath the footings and floor slab stress zone. ne stress zone is the volume of soil extending down and out from the outside edge of footing at a 45 degree angle. Given that the existing slab, foundations and building require support during this removal, shoring and temporary support will be required. It is our understanding that David Odeh, Structural Engineer will present a design for support of the existing foundations and building during the unsuitable soils removal. This design may include removal of the existing floor slab in the unsuitable soils area to allow access for the soil excavation. Briggs will not develop the foundation and building support systemm. The support system will be designed by the Structural. Engineer. Backfill and Compaction The excavations may be backfilled using Structural Fill anal/or flowable fill. The Structural Fill must meet the gradation recommendations rioted below. The flowable fill must have a compressive strength adequate to safely support the building prior to removal of the temporary support systems. Briggs therefore recommends the flowable fill specifications be developed by the Structural Engineer and that compressive strength testing be accomplished on flowable fill cylinder samples to verify adequate strength. Within the areas excavated for footings, walls, and other limited areas where large compaction equipment cannot work, we recommend that the fill be placed in loose lifts no more than six inches in thickness and be compacted with small hand manipulated machines such as pneumatic compactors, vibratory compactors, etc. Within more open areas where access is better, larger equipment such as a double drum self propelled walk-behind vibratory roller can be utilized for loose lift thickness not exceeding 8 inches. All backfill placed within the foundation stress zone or access walkways should be compacted to a. minimum of 95% of the maximum dry density as determined by the test designated ASTM D1557.- Backfi.11 in proposed landscape areas should be compacted to 92% of the fill maximum dry density. , Structural Fill should consist of well graded natural sands and gravel free from excessive plastic fines, organic matter and deleterious material, and should have the following gradation.. 1-617-871-7982 BRIGGS ENGINEERING 533 PO4 APR 13, 99 06: 47 Proposed Compass Bank, Hyannis,MA 13nggs Project No,93039 April 11 1999 Page 3 of 3 RECOMMENDED STRUCTURAL FILL GRADATION Percent Passing U.S. Sieve Size & Number Maxims'x Minimum M 1 inch 100 60 No-4 85 25 No. 20 60 10 No. 50 35 4 No. 200 8 0 Limitations and Exclusions All the professional opinions presented in this report are based solely on the scope of work conducted and sources referred to in our report. The data presented by Briggs in this report were collected and analyzed using generally accepted industry: methods and practices at the time the report was generated. This report represents the conditions, locations, and materials that were observed at the time the field work- was conducted. No inferences regarding other conditions, locations, or materials, at a later or earlier time may be made based on the contents of the report. No other warranty, express or implied is made. This report was prepared for the sole use of our client. The use of this report by anyone other than our client or Briggs is strictly prohibited -without the express prior written consent of Briggs. Portions of the report may not be used independently of the entire report. The above recommendations and conclusions are based on our evaluation of the obtained data presented in the text. We would welcome the opportunity to monitor the pertinent phases of the foundation construction; thus, if differences are found between the field conditions described herein and those encountered during construction, we can modify our recommendations in a timely and professional manner. Thank you for engaging our services to undertake this project. If you have any questions, please do not hesitate to contact us at your convenience. Very truly yours, Bri E ineer'n e Testing -A David Geisser Paul M. Skorohod Project Engineer President DWG:PNIS:dg Enclosure: Figure 1 COLLINS CONSTRUCTION CO.,INC. 33 SWINDELLS ST.P O BOX 2569 APR 1 1999 ':J FALL RIVER,MASS. 02722 BY -------------------- BUILDING DIV. APRIL 13, 1999 BUILDING DEPARTMENT RE: COMPASS BANK,HYANNIS,MASS. 367 MAfIN ST. HYANNIS,MASS. ATTN: RALPH CROSSON DEAR MR. CROSSON: PLEASE BE ADVISED THAT OUR ESTIMATE TO PERFORM THE WORK OUTLINED IN REPORT FROM BRIGGS ENGINEERING AND DESIGN FROM ODEH ENGINEERING ON THE ABOVE PROJECT IS IN THE AMOUNT OF: Sixty Thousand & 00/100 Dollars ($60,000.00) PLEASE AMEND BUILDING PERMIT APPLICATION AND PERMIT. ENCLOSED FIND CHECK IN THE AMOUNT OF $36B.00 BASED ON$6.10 PER$1000.00. WE TAKE THIS OPPORTUNITY TO THANK YOU FOR YOUR ENDEAVORS IN THIS MATTER AND LOOK FORWARD TO WORKING IN THE TOWN OF HYANNIS. VERY TRULY YOURS, COL S STRU TION CO.,INC. J ES C L INS,PRESIDENT JHC/NSF ENCL.(CHECK) I � r r of12/1999 11:03 508-672-2960 COLLINS CONSTRJCTION E, PAGE 01 APR 1999 o u r�OhS f( ON R'INCY:__ - gin Div. 33 SWIN'DELLS ST. 1 F 0 BOX 2569 ,; F. I. MVER,MMS. 02722 TFI.508 678-5201 FAX 508 672-2960 APRIL 12, 1999 BROWN& LINDQUIST INC. RE:#261RZiDUPASS BANK HYANNIS P.O. BOX 126 ,- RUC-WRAP. FOBLEMS YARMOUTHPORT, MASS. ATTN: PETER BROWN DEAR SIR: THIS LETTER IS BEING SENT TO NOTIFY YOU AND ALL INTERESTED PARTIES LISTED BELOW THAT MR. RALPH CROSSON, BUILDING COMMISSIONER FOR , THE TOWN OF.HYANNIS, MASS, WILL BE ON VACATION FOR TEN(10) DAYS BEGINNING FRIDAY, APRIL 16, 1999. THE STRUCTURAL SITUATION AT THE ABOVE PROJECT MUST BE RESOLVED WITHIN THREE DAYS FROM TODAY,APRIL 12, 1999, OR THE MATTER WILL BE DELAYED APPROXIMATELY TWO WEEKS. VERY TRULY YOURS, CO NS_ STRUC N CO,,INC. O S H. I ,PRE JHC/NSF COPIES FAXED TO ADDRESSEE ALONG WITH ROBERT COZZONE, COMPASS BANK DAVID GEISSER, BRIGGS ENGINEERING DAVID ODEH, ODEH ENGINEERING RALPH CROSSON,TOWN OF HYANNIS i 1. 04/09/1999 15:58 508-67272960 COLLINS CONSTRUCTION PAGE 01 (Oliff1S (00510(f l00 (0:.lh(. 33 SWINDELLS ST. P O BOX 2569 FALL RAVER, MASS. 02722 TEL 508 678-5201 FAX 508 672 960 APRIL 9,1999 ODEH ENGINEERING COPIES TO: PETER BROWN 1223 MINERAL SPRINGS AVENUE RALPH CROSSON NO. PROVIDENCE, I .I. ROBERT COZZONE DAVID GEISSER ATTN: DAVID ODEH RE:JOB#2619 COMPASS BANK HY'ANNIS,MASS. DEAR SIR: THIS LETTER IS.TO INFORM YOU THAT MR, RALPH CROSSON BUILDING COMMISSIONER FOR HYANNIS, MASS. HAS REQUESTED THE FOLLOWING: DEVELOPMENT OF A WRITTEN PROGRAM FOR THE ABOVE PROJECT CONSISTING OF A COMPOSITE EFFORT BETWEEN YOURSELF AND DAVID GEISSER OF BRIGGS ENGINEERING. THIS PROGRAM SHOULD CONSIST OF METHOD DISCUSSED AT MEETING OF APRIL 5, 1999. MR. CROSSON REQUIRES THAT THIS PROGRAM BE PRESENTED TO HIM BEFORE HE WILL RELEASE THE BUILDING FOR ANY FURTHER WORK: OUR COMPANY CANNOT PROCEED IN ANY MANNER UNTIL THE ABOVE IS SUBMITTED. PLEASE COORDINATE WITH DAVID GEISSER ON THIS MATTER. THIS,LETTER IS BEING WRITTEN FOR RECORD PURPOSES AND TO INFORM ALL INTERESTED PARTIES LISTED ABOVE OF THE STATUS, WE HAVE SPOKEN TO YOU TODAY,APRIL 9, 1999 AT 2,,30 P W AS YOU REQUESTED WE ARE ATTEMPTING TO ONCE AGAIN INFORM MR, GEISSER TO CONTACT YOU. THANK YOU IN ADVANCE FOR YOUR CONSIDERATION AND USUAL PROMPT ATTENTION TO THIS VERY URGENT MATTER. UL O H SENT ALL INTERESTED PARTIES FAXED 4/9/99 04/09/1999 15:58 COVER PAGE TO : FAX : 15087 906230 FROM : COLLINS CONSTRUCTION FAX : 508-672-2960 TEL : 508-678-5201 COMMENT : co«in5 c0051UGIOn co., Inc. 33 SWINDELLS ST. P O BOX 2569 FALL RIVER,MASS. 02722 TEL 508 678-5201 FAX 508 672-2960 APRIL 7,1999 BUILDING DEPARTMENT 367 MAIN ST. HYANNIS,MASS. ATTN: RALPH CROSSON BUILDING COMMISSIONER RE:JOB#2619 COMPASS BANK,HYANNIS,MASS. DEAR MR. CROSSON: ENCLOSED HEREWITH PLEASE FIND GEOTECHNICAL LETTER DATED APRIL 5,1999 FOR ABOVE LOCATION FROM BRIGGS ENGINEERING& TESTING CO. THIS INFORMATION IS BEING HAND DELIVERED TO YOU TODAY, APRIL 7,1999. VERY'TRUI1LY YOURS, COUL]INS CONSTRUCTION CO.,IINC. [E4?611�LR S,IPIK�E�SIIDENT YIHIC/NS1F i' 1-617-871-7982 BRIGGS ENGINEERING 409 P02 FIPR 06199 14: 11 1BRIGGS1 Briggs Engineering & Testing A Divcs!mv of PK ASSOC7A7d5,INC April 5, 1999 Project No. 93039 Compass Bank coo Robert Cozzone 791 Purchase Street New Bedford, MA. 02740 RE: Geotechnical Letter for Proposed Compass Bank Pine & W, Main St., Hyannis, MA. Dear Mr. Cozzone: Briggs Engineering & Testing, A Division of PK Associates, Inc. (Briggs) has completed our investigation of the subsurface conditions at the above captioned location (herein referred to as the "Site"). The investigation consisted on advancing test borings inside the existing bank building to evaluate soil conditions in the test boring locations. This investigation was completed after the previous test pitting around the building perimeter. The test pit investigation result are documented in our letter dated March 25, 1999. The test pit investigation encountered unsuitable Soils including debris and organic matter extending under the right front portion of the building under the existing exterior wall footings, slab and interior haunch iv-all footing. Seven test borings were advanced on March 30 and 31, 1999 inside the building. The explorations locations were selected to provide geographic, coverage of the building area while concentrating more borings in the front right (northeast) portion of the building, adjacent to the unsuitable soils encountered in the test pits. Refer to Figure I for exploration locations. 100 Weymouth Street- Unit B-1 100 Pound Road Rockland,MA 02370 Cumberland,R102864 Phone(781)871-6040•Fax(781) 871-7982 Phone(401)658-2990•Fax(401)658-2977 1-617-671-7962 BRIGGS ENGINEERING 409 P03 -APR 06' 99 14: 11 Proposed Compass Bank,Hyannis,MA Briggs Project No.93039 April S, l 999 Page 2 of 3 The test borings were advanced by Able Soils, Inc. if Lincoln, RI utilizing a portable tripod rig. Sampling was continuous in all borings with split spoon sampler penetration and un-cased hole drilling methods. Refer to Appendix A for Test Boring Logs. I Soil samples from the test borings and test pits were classified in the field by a Briggs, Geotechnical Engineer based on visual and textural examination using the Unified Soil Classification System (USCS). i The borings were advanced through pre-cored concrete core holes throught the existing floor slab. The floor slab is approximately 5 inches higher in elevation than the surrounding exterior grades. The explorations generally encountered a thin layer of gravelly sand fill over i undisturbed inorganic gravelly sand with cobbles. Coring was required in places to advance into the gravelly sand laver as shallow refusals were encountered at depths ; of approximately 7 to 9 feet below the existing top of slab grade. The fill layer consists of fine to coarse sand with up to 30 % gravel and 15% non- plastic fines (silt). The fill extends to depths of 2.5 to 4.5 feet below the slab grade except at B-2A and B-7 where the fill is 6 ft. and 1 ft. thick. The fill is well compact with SPT N-Valued ranging from 16 to 30 except in a few locations vdhere higher N-Values were recorded, likely due to cobbles in the fill. The undisturbed gravelly sand layer consists of fine to coarse sand with up to 30% gravel and 10% non-plastic fines (silt). This layer extends to the full depths of explorations which range from. 7 to 15 feet below the slab grade. The gravelly sand is well compact with SIFT N-Values ranging from 34 to greater than 100. Generally the iV-Values were in excess.of 100. Tltis is likely due to cobbles in this stratum. A three inch thick very desne laver of sand with a trace of organic content was encountered in B-5 at 8.7 feet below the slab. This laver has an N-Value of 200 and was very dense throughout the entire penetration of the sampler penetration. The thin layer was observed to be very densely compacted in the sampler. Groundwater was not encountered in any of the test borings o., test pits at the site. SPT N-Value is the number of blows for a 1401b.hatntner falling fteely through 30 inches,required to a&ance the standard split spoor sampler the last 12 inches of an 18 inch sampling inter%'nl. l� I r Proposed Compass Bank,Hyannis,NIA Briggs Projec?No,93039 A;prd 5. 1999 Page 3 of 3 Based on the soil conditions encountered in the test borings, it appears that the tnsuitable soils encountered in the exterior test pits does not extend to the test boring locations. The anticipated extent of the unsuitable soils is delineated on the attached Figure 1. 1 The undisturbed gravelly sand layer is very dense. Based on the conditions observed in the test borings an allowable soil bearing pressure of 2.5 tons per swquare foot is recommended for :future foundations to be supported. Remedial options are presently being considered by Briggs, the contractor., and the structural engineer. Possible options- to support the existing building include underpinning the existing wall and paunched footings and remox al of the unsuitable soils from below the slab area or the use of helical piles to suppoprt foundations during the unsuitable soils excavation. If you have any questions, please do not hesitate to contact us at your convenience. Very truly yours, BRIGGS ENGINEERING&TESTING David Geisser Project Manager r Paul M. Skorohod President DWG:PMS:dg Enclosures: Site Sketch, Boring, Logs - I LOCATION PLAN N PROPOSED COMPASS BANK �, J HYANNIS,MA �`~' BRIGGS ENGINEERING &TESTING -- iiRl 1100WEyL0JTHS'TTCET,UWS1 �" ROCIQ.P�D,NWS� OR BY:DNXx SCALE: NTS PRdJ NO: 9003i9 cKo BY; PMS UATT=MAR 1989 SGURE NO 1 6XIJVIA16 R P ? r 11-2 oe B•7 I B4 B-3 f B=S B-b LEGEND -� NUMBER AND APPROX. .5,00r' LOCATION OF TEST ,(J' B-1 BORING f NOTES LOCATIONS ARE APPROXIMATE. SS =b T 66,90 a&d Z0d 2 T b SN I?JS3N I 9N9 SSS I�AH 2!86L-T L.9-L T 9-T ON FrCAL749AE _._.......PROPOSED COMPASS 1B1A". EORN3N0. PPOJECTLCCATION PINE & WEST MAIN STREETS SHEET See HYANNIS, XA .........Plan...................... Mac,$ BLaB IING&TESTING PA0=NLN13ER ELEVATION C3R0UZWATEP108S8WA-110N5 CASING SAMPLER CORE DA7ESTART 3/3.0,!.99 TM CEDTH SPLIT SPOON DATE FINISH �LAIL . ................ ....... .............. 3;/30/99 20 min. none I SIZE 1JD. UER A ble, J.P. . ..........140 LBS K4AAMWr. T49PECTM D. -as *s"a'er ............... KAUR FALL ....,portable ................. SAMPLE 7 'PEN I DE STRATA H ITH Type RE C (fleet) i SLOW$.6" inches ...................... roncrete S.Islb SLAB 0.5 0.5-2.5 IS-4-7-4 ...................................... sandy pill - f/q sand, 10-2096 gravel, 5-10%. SANDY ............. non-plastic fines, 0-1% asphalt and root fibtrs, j FILL dark brown, orancra brown, dxy (SP SH) 30/30 sand - f/c sand, 10-20% gravel, 5-1096 non-plastic 28 Ifines, orange brown, dry (SP) . ..................... ...................................... ............... ......................... 5 ............... ........ ,q-3 24120 6-8 - �19-47-63-50 similar to above, 110-30% gravel. SAND FA (COBBLES ..........-1.1................................................. ............................................ ... ......... 7/0 8-8.7 98-105/1 ple recovered. ............. sam .................. ..................... ....... Spufi core barrel 8.7 to 12 ft. -5 1 39/8 8.7-12 S �P�.................. Soil In corebarral similar to S-2. ...................... _r- I sample 10 .............. ................... . [. ­.. ...I..... - - -.] at 9.5 and Core barrel penetration very difficult 10.5 feet. Moderately difficult elsewhere. S-6 /0 12 Borehole collapsed upon removal of core barrel preventing further sampling. ........... ............................................ .......... I.................._......I.....................,...... ...................... 151. .............. Bottom of coring at 12 it. ................... ..... SOAPLETYPES i REMARKS: S-split spoon i ......._.....I................_............. :/t means coarse . !i...n.e...... ..................... . ST-Sw ............................................. . .... .......... .............................. ........................ AF-&yr.r fd;h m/c ........................................ . ..... ........... ................. FIC-=Kccm ' PR 0 ED COMPASS BANK BAN Ad! REETS] OF IN STREETS S-EET ^ see Plan ' 3/3 '13/30/99 20 win. none .................................. DFLLER Able., J.P........... FOGTYPE D SAMPLE 1P 'PEN DEPTH SLOW LAB 85-10C/I Sjmjj;%r to above I .e=ninated boring at 4.7 ft. moved one foot to a0u,�n in an attempt to achieve gxeater depth, Drilled B 101 Bottom of Boring at 4.7 ft, :1J1.--:_-_-_-_1........... ............. � \ o t 1-61?—a?1-7982 BRIGGS ENGINEERING 409 P0a APR 06199 14: 13 PF30JS�rNl C _..............PROPOSED .COMP1!�39 BANK . e-2A .. 9OF�NGNO. _...._..-......._.:...._. C'3ia1�08 PF�'CfLOCAIM PINE & WEST MAIN STREETS I' l OF 1_,.,,,,._.. k HYANNIS, MA LOCA704 see ._Pisa.._....... ..............__..::..._... _..........__..._._....._....._.._..__.._....__... BRIGGS 6NG[NS8RING 8 TEST1Nti PFC:IS7NMER 9 3 0 3 9 ELEJATiON ..................... .._......_... GRO JEAN ERCBSUWATKM CASING SAMPLER.. COPE i DA;F_STA i' 3/3 0/99 CA I TM CEPrH -r'PE H8A SPLIT SPOON NA �pATEr�ASH 3/31199...._......._ ................... 3/30/99 s 30 mix none { SIZEID. ..4..-_.1/4"....... 1'3/8" _......... _.. l U LLER Able, J.P. :..................... 14 0 LBB F-MNERVrl. MFEGTOR _D. f3eiseer ................I.......................Y............................... I 3 - I i I LiAMVERFALL MWIDE portable... e SAMPLE P ipEIN I DEPTH n STRATA + T I Type i/RECi BLOWS 16, H -No � inches {feet) ft. Concrete Slab _ SLA5 &-� 2.1/14� 0.5-2.5 9-12-9-14.jSilty Sandy Fill - fic sand, mostly fine, 5-10% 0'S ! gravel, 10-15% non-plastic fines, 0-1% concrete } I 1fragment, brown, dry (SP-3m) .. ..................... ........... ..............................................._..... .._............_._....: ....................... � � sA.vD�t 24/4 ! 4-6 3?-68-115-81Similar to above, no cc-tarete. PILL I � I ....._....._.... ...._.._.._.........I...........................L..............__..:..:............i { ...:. ...................................._._.._._:._._;_......_............... i. 5 ............._._........,.:.::...,,.,.,...:.........................._... _.. ._............................ b i .9=3.....1•_Z4/18....._...6-8 �35-,37.-42,-6;4 Sand - f/c sand, 15-25% gravel, 5-10% non-plastic fines, orange brown, dry (SP) . I S-4 3/3 8-e.3 180/3 1 Similar to abo-je, ao gravel I{ I I Spun core barrel 8.3 to 9 ft. 1 S-5 9/6 f 8.3-9_ cored......_ _ {I GRAIELL _..._. .........__.._...__. ... soil in corebarrei similar to S-4. 1simi) & sample ;COBBLES ;. i 4 cored No sa,nple recovered. 1. /_0......._...9..-10.. . ................................._.. 7.4� �• sample Borehola collapsed upon removal of core barrel ... preventiag deeper sampling. , ......................................,..._ ._._.._......_.._....................................:.......,,., C I i �.. Core barrel penetration very difficult below. 8.3 f 15 .................I......................... ..1...._..._._..._...__....'.........:...... _... .,..-,.,........... { f ! Bottom of Boring at 10 ft. .... .............. WIPLETtPES I REMARKS: ......._......_.._.._... _ �!.� ereaas coarse t, line. AF- � IST-Shektibe .._Sn/f•,means .ed tT,`?.t.++............................................._......................_.. .... ....................................................._....,.,.....,............................... _......._ RC-rockwe i 1-617—e71-79e2 BRIGGS ENGINEERING 409 P09 APR 06199 14: 14 PROPOSED BANK iSORINGNO, B'3_ .._. _. � ,- ` Pf NAME _. ... ......... • ®pRlvt39 ' pFCXjMTLOCA70N PINE & WEST MAIM STREETS T 1.,..,,OF ..1,. .. '4 I� ANN I S A LQC,ATfQN r, ................__,_......_...._Y...................... .... M .............._ ...........,....,............ BRIGNS 4LO a TESTING I PFGJELTNUYE63 _9 3 0 3 9 1 ELEVATXNN SLAB GACLM11A1EROBSUWA7M CASING SPUREP CORE DATE START 313 0/9 9.-.. TYPE HSA SPLIT SPOON NA �r ...._................. ....... T)A'ERNI511 13/30/99 i 20 min.j none 51ZE1D. 4 114"..._. DRIVER AJ.P. .... J iK4AERV+IT. 140 LBS INSPECTOR D. Qeie'ter HAiUrvAFAtI 30� RGTvpE Portable, D i SAMPLE STRATA - T Type P EN DEPTH BLOWS i 6 , -No. inches l w Et. O'3,. . I................. .. ... concrete SEAS � S-7. 24120L0.5-2..5I 12-29-24-20 Sandy Fill - f!c Band 2 Opt gravel, 3-S�s 0.5 ........_..........._....... . i 8ANDY non-plastic finee, dark brown, dry (SP). �.:............................:..... ...-.................._.....«....._..._...._... FILL ...................................... .....................:..:.......:................._........ ................. ,. I Similar to above ............................ ............. 9-2 241211 4-6 A7-67-88-100 ........................a........:............... ..._.....;.._.....-- ._.._.... ......................)-..........................I .,:..._........._..._..._...._...._. 6 1 � i ....................... ..::.............................._.. Gravelly sand - f/c sand. 20-3096 gravel, 3-9% S-3, .._••15/7, 6-7.3 88-9 -100.:noa-plastic fines, orange brown, dry (SP) . ... .............................. ........,...:... SAND . .............. j I. CUBLES j.....:................i.............._......... ................_................................................. Refusal to sampler at 7.3 feet. Coring not 10i "'"' I � .... accomplished as bore hole collapsed with cobbles and rock. •i I l Refusal to Boring at 7.3 ft. I f f I .. { 15 j•-........... ........_............................._......._..............._........_................... ..... s.... .. ...........,...._.................. .... _ _ _......_.._.._...__....._.......... � ! i III SAWLEI-PFS �REFAARKS: S-� :.........................................._........_.........._.._......................................... ......_.............._........................................:....:...:..::,......................._........_...... spoon ST3hdby#1b6 c, means coarse, to. ti...!......_.........................................................-........................................... ..._ .....,.........................:.....,............. ...__.._.... ........... . ....................._..:...,............. ..... K: au?er m/t mains mQlium. co tiny ..................................... _......................_............._...._............ RC-lock=a f 1-617-871-7962 BRIGGS ENGINEERING 409 P10 APR 06199 14: 15 i PRS.TNA►vE PROPOSED COMPASS BA1!Yk( „ tINGNO. 8..-4 BFttG I� PRQF_CTLc3CATlON PINE & WEST MAIN STREETS SHOT OF 1 �-��- HYANNI S MA LOCATION See Plan SRIGG$ I ATION SLAB 9.3 0 3 9 B_EV ENGINEERING do TESTING i ��V _._..............-_._...._..... GFCU\VNAT8108SFBVA71CiVS CASING SAMR.M OGRE (t)AM$TAF r 3/3 0/99 04 TtVE OFPA1 I 11PE XSA SPLIT BPUON N7► _...... DATEFAi 3/31/99 -1./4',___. 1-3/81, r J.P. 13/31l99 24 min. none SKID. ..........,....... _._.... ...,.... ._a... ............................ I_...... ., .. j 140 LBS �Ug3ECfOR D. Geia'q'ar.,.__ I! HAP�VEII�^�T KAWvM FALL 30" I ROTYPE k?ozCable _.._ D i SAMPLE l TPEN I DEPTH b STRA'LM1A T Type 7 REC, BLOWS 164 No. inches (feet) f t pn rete Slab I, 5 2i/20 C:5-2:SI 11-.... 241 Cazdy Fill - f/c sand, 3-5� gravel 10-iS% i' BANDY _.........._..i......._........... ..................ron-plastic fines, dark brown, dry (9P-SX) . FILL I'.................................._..._...........................L..:...,,.,...,................ .......,... fff j I S-2 i 2i/12i 3-5 69-117-270 Similar to above 4.5 ........i.........._.._.._.....,........................._.._...__........................,.:...... L....................... .........................._...........400 sand - f/c sand, 5-lrA igravel, 5-1096 non-plastic 5 ... .. i.... ..........._.;............................1...........I.............................. fines, orange brown. dry (SP) . I ; BAND I S-3 i I 5-7 cored _ No sample recovered in core barrel. coring was very difficult through entire penetration. ........................................................,.................... ..............._.. I { ._...............I......_.._....._.......:............._.._....._..................... 1 � o . ' Refusal to 'boring at 7 ft. ,............. ..._.. 15 l.._....._....... ....._.._......-.........�_....-............................_..........._................. ........._....�.................__... _......... ........................_._........... .,.._ I SAMPLETYPES !REMARKS' S-Spgwoon _......._................................_................................ .......................................- -- �, clt me,zns scars® to tine. ...._...... ........................................... _....- ....... shebytJW AF8► -R!'.t...me¢nc,.medi_v_9...�4._F,int............_.................................................................._._... ..................................._....................................................._..... RC-rock ow 1-617-671-7962 BRIGGS ENGINEERING ' 4019 P11 APR 06199 14: 16 ' • j �� PRQ1ECr�1W1+1E _.:...........PROPOS . COMPl?.S_.. BANK .. I BOF�NGNA. B.'_5_..._....._....... 1 �gIGG� PP0JEG7LOCAT0CN PINE & WEST MAIN STREETS x.._...OF.- I­' F.... 1.......... SYANNIS, MP. I LOC.ATpV .see...._Plan...._...... I AS ENGMGIEERiN Ik T85rItiC f PRO�J� PAliJE36� 93039 __ 19FVATAN _._,._..._5?• _._.........-._ GFCU DNATIFCBSEP.VA7KM CASING SAMPLER CORE i pA 5 q� 3/31/9 9 DATE 'MIE CAM , I TYPE xea.......:.... SPLIT ...SPOON........NA....:. I UAtEF:PJS1-! 3/31/w99............. 3i31/99 20 min ' none j ST.EI.D. 4^-1/4°..._.. .......1-3/8.0... . ........................ !MLLM Able,......J.'.p.'........._ i. . . . .. . ......_. I F 1ifiW1'• 140 LSS I NSPB-70R D........G_isse�r...._. _ f E HANk ERFAtl, 30 RUTYPE E I SAMPLE iP I PE[V i DEPTH STSiAIi. s T ; Type REG� BLOWS f&' H I . c, i inches; (feet) jY ft. concrete slab ............................:............................... .... L 0.5 S-1 j 24/20 0.5-2.5 17-7-9-14 Silty Sandy Pill - f/c sand, 10-20% gravel, 8-15% r. f_......._.........._...._...... .-........ non-plastic fines, brox�m, dry (SR-SM). SANDY:. ........... ................__..__._._._....._...f_....._._.._.._............ ......__.._. .........._ .... I FILL _...._`{.........:. 2 S ............................._........_......_...... ! S-2 24/16 ....._.3-5 . .3'"48•-.56-72 Sand - tic sand, 5-10% gravel, 3-8% non-plastic �....... ................. .... . .. ..I:. .:..., ..... ........ fines, orange brown, dry SP) . .............._............._..................................................................................I- .......................................................................:...........,,.. I. ! j ,5.-?_-.5... ...._..45_-350.-60._ Similar to above, light brown. IGRAVELL 83-70 SAND & i............... ...l........ ............... ................... ... i. (_..._.._...... (( .. . ..... ._ ... fCOBBLXS 9-9 12l2 .I 7.5-8.5- -90-150 Similar to S-3 i I sand - f/c sand, 5-10% gravel, 10-15% non-plastic S-5 i 6/2 18.5-9 200 fines, 5-10% organic silt, dark brown, moderate ' I �.... ....... . .........................._..........:.........................._.........._.... organic odor, dry (SP-SDf} . l0i 5-6 24/3 I 9-11. 40-55-60-60 similar to S-2, one 2" piece of rock I plugged sampler. s-7 124/12 1 11.13 4E,9?�59-75 Similar to S-2 i I I� S 8 ! 24/4 113-15iQ7 86-56-0.3 9imilaz to S-' I 1 i ` 1�'..............._.. ....................._..............._..__......__................. ........ .._ f I Bottom of Boring at 15 ft. ` . I SAMPLTYPES REMARKS: S- ....................................... .... ........_.........................................................................................................._...::,...:..........................................................._......_.._........__..............._... SPOW c;f Weans coarse to fine, ................ ........._..,......._..........................................-. .. j rrit mane me�'um �o tine .........................................................................'................................................................_......:.:...:..,-:.,....,..,..............._.._...-- AF-auWrflic t :............-..................--.-.-..-..._................................. RC-roc*core 1-617—e71-79e2 BRIGGS ENGINEERING 409 P12 APR 06' 99 14: 16 `, PROU6CT(�WA1(�E PROPOSED .......,......PINE & WEs'1'COMPASS I�IAIAIS"CA�STREETS SHE'S? � l. . OF :.1......: . i BRIGGS PROJECf'LOCATION Ses Plan BRIGGS 9 3 0 3 9 F.LEVATIOIV SLAB ENGINEMNG&TESTING PRQEE(mwsam .................__......_....... . .. . --------------- C WATfftCBSEFNATKM CASE SAMPLER CUE DAMSTWT DATE TM DFTH T IiSA SPLIT 5PooN........ ....._. DATE Fr4SH ,3/3.1_/,9.9....._._... a-ifa^ 1-3/8^ 3 f 31 i 39 2 0 min. Woos SIB 1.D. __._._•.___..._...... .............. 140 LBS NSPECTOR D. Geisser .....__.,:,................... ..._. I. I FWAMH3FALL _.30 ........... f F:rTYPE ,..portable........._._. DC SAMPLE T IPEN DEPTH "�: BTRATi. T e REC BLOWS; 1 - r H YP {feet) I :'. ft. I -No. ,nche3 ................._' I Concrete Slab I........._......................_.......... .......... .........,......::.:....: ........ s-1 124!18 0.5-2.5 12-7-11-15 Sandy Fill - f/c Band, 10-15% grave'_, 10-15% i 0' ....................................._.... .. ......l.........._.........._..._.......... I ................................................_....II,.......................................... non-Plastic fines, brown, dry (SR-SX) - I SANDY ......................................_.................................. ................... i..:............... ...................._.....�_...._........_..._.. _.__.................._.... 3 Sand - f/c Band, 5-10k gravel, 5-10% non-plastic � 9-2 29/18I 3-5 ........•---........................... fines, light brown, dry a^P). .................:.:........_......_ 9-3 36/16 Similaz to above GRAVELLY �._..... .... ..._._....., 14 18.2 0 . ......} SAND & _...__.................................................._..,.. .. ' .... ... ..._ _.._................._..., COBBLES .. ...... - ... 1 S-d 24/9 I 8-10 34-40-70-901 Similar to above :::::::........::::: :::::: : ... ........ .. . . ......................... .. .. . .. . . . 24l101 10-12 43-55-58-58 Similar to above I � i 4 s-6 24/4 12-14 52-50-59-63 Similar to above I {........ ...... __.......1.. . 15 i,..:... .. .... .....................'.............__..._t....__.__.__..._........._.... I Bottom of Bori:14 at 14 ft. � I SANPIETYPES ',R.EMARKS- S-spik spoonT ............................_........._............._......_................ ............._......................................................................._........................................................... _..........._............................._.._.._. ST.Ilebyt" 5!t_..Means Coarse to fine. ......_... .. --......._._....................................__....._...............................................................:.... ..:...................................................._........................._...__.......... .AF-augW ......_.... ` i a/f.maans fn.dium to..Elra ......................................................................_...__._............_...................__......._..... .-_' ........._...,...-. FiC-roc}co�na I 1-617-671-79e2 BRIGGS ENGINEERING 409 P13 APR 06199 14: 17 OPOSED COKPASS BANK .......................................... PP0JECT1NkvE BORNGNO. ............ PR rLOCAM4 PIKE & WEST MAIN STREETS .9-EL7 ...............I.......... OFOJEC HYANNIS, MA LOCATCN ..................-........... ......-.................. FNGINEEPING&TESTING PROJECTN-AffR 93 39 ELEVATai .......... BLAB ............ CASING SAMPLER CORE I DA"MSTART 3/31199 CA7E 1 SPLIT SPOON NA. DATE 9491 .......... ............. ............... 312.1./`­.9�9 73/31- 9 9 20 min.1 Fiona StZE:.D. 4-1/4 .. ........ I DRILLER Able, ...................... 140 LES K*AMERwr. NSPECTOR P Geis.saY....... .......... i.................. KAAWER F 300. Portable A .................. .. FOGTePE D SAMPLE E STRATA P PEN4,,-­' DEPTH T 'Type EC11 SLOWS/61, H (feet) rinchesfr slab S:jAB 9-1 24/1 -2.51 31 Sandy Fill - f/m sand, 10-15% gravel, 10-15% SANX)yO 5 nor _- flues,-plaaticflues,_bxowr!, dry (SP-SX). ........... — sand - f1c sand, 10-15% gravel, 5-10's non-plastic fines, orange brown, dry (SP) . 4:'5 41-56- 2.5- Similar to above, 20-30% gravel .... .. ...................­....­.................. J44- � ................... ....................... .­­ __I ............ ..I Cored 4.$-5 ft. through rock .................. 3 -57 -144- -2.............. Similar to S GRAVELLY COBBLES 2 0 0 3 Similar to S-2 s-4 3/3 7-7.3 s-5 1.5110 7.3-8.5 SiMilar to S-2 ............ . ......I........... ............. ... ..................... 6 6/3 i 8.5-9 Similar to S-2 15 ....... ....... .................... ....... Refusal to Boring at 9 ft. S*)FtETYPES IREMARKS: S-Spmwm .......................................................................................... ........................... ..................................... ST-s��ftbe r. . . .................... ........ ............................... ......to fine................................................................................................................ 'M' AF-UKN&p .......................................................................... RC-=kcote Date Hour To WHILE =UWERE OUT M Of Phone Area Code Phone Number Telephoned Returned Call Left Package Please Call Was In Please See Me Will Call Again Will Return Important Message W o0 Signed AVERY FORM NO.50-736 PRINTED IN USA 1 BROWN & LINDQUIST, INC., ARCHITECTS 926 MAIN STREET, P.O. BOX 120 YARMOUTH PORT, MA 02675-0120 [5081 362-2727 - [5081 362-9171 FAX MEMORANDUM OF MEETING PROJECT: Compass Bank - West Main Street, Hyannis DATE: 22 March 1999 PRESENT: R. Cozzone, Compass Bank; R. Crossen, T. Perry, Barnstable Bldg. Dept.; J. Collins, M. DaCosta, Collins Construction; D. Odeh, Odeh Engineering; D. Geisser, Briggs Engineering; P. Brown, B&L DISCUSSION: 1. R. Crossen presented letter declaring building to be unsafe in accordance with 780 CMR, Section 121.0 (copy enclosed). 2. Reviewed procedures of exploration which have taken place; removal of northeast corner wall, foundation and footing and excavation of material down to 1 F-0"; existing demolished foundation and building debris was encountered from a level of 2'-0" below footing to the 111-0" depth; debris included wood lumber, plumbing pipes, electrical debris, concrete and brick:- ' 3. The nature of the cracking and settlement of the building indicates that the construction debris may not extend under the entire building, therefore, request was made to conduct certain exploratory measures in an attempt to determine if debris described above is localized, or indeed wide spread. 4. Exploratory measures will consist of test pits excavated around the perimeter of the building; these will be performed on Tuesday, 23 March 1999; Collins will perform excavations; soil analysis will be made by D. Geisser; all excavations will be inspected by R. Crossen and T. Perry prior to backfilling. 5. If the test pits described above, indicate generally satisfactory soil conditions, it is proposed to take a series of approximately 7 soil borings inside the building; these are intended to determine the extent of the unsuitable material under the building, and to indicate the feasibility of it's removal; R. Crossen, D. Odeh and D. Geisser determined, in the field, the locations for the borings; Collins will do the preparatory work necessary to provide clearance for the drilling; D. Geisser will provide soil analysis; copies of boring logs will be given to all parties. 6. If the above procedures prove that soil conditions are satisfactory for remediation, Briggs Engineering/Odeh Engineering will prepare designs to restore the building to it's usable status; all designs will be submitted to the Town of Barnstable Building Department for review and approval prior to implementation. Compass Bank - West Main Street, Hyannis 22 March 1999, Page 2 7. All fees and expenses required for the above procedures must be reviewed by Compass Bank prior to commencement. 8. Please respond to this memo within seven (7) calendar days of it's writing with any revisions and/or addenda; if none are received, it shall be considered a correct record of the meeting. Submitted by: BROW & LINDQUIST, INC. Peter G. Brown President PGB:phs Enclosure cc,enc.: R. Cozzone, R. Crossen, T. Perry, J. Collins, M. DaCosta, D. Odeh, D. Geisser, P. Lindquist, K. Raber of THE, ti The Town of Barnstable BA ;STABLE. 9� "9. 06 Department of Health Safety and Environmental Services Building Division 367 Main Street, Hyannis MA 02601 Office: 508-862-4038 Ralph Crossen Fax: 508-790-6230 Building Commissioner March 19, 1999 Mr. Robert Cozzone c/o Compass Bank 791 Purchase Street New Bedford, MA 02744 RE: 715 West Main Street. Hyannis, MA Map 249/Parcel 155 Dear Sir: I regret to inform you that your bank building under renovation at 715 West Main Street in Barnstable is being declared an unsafe structure under 780 CMR section 121.0. As you know,major settling under the footing was discovered under the front right corner of the building a week ago. Since then, I met with vour engineer and a decision was made to investigate under the footu-i2 by removing that portion of the foundation and footing. Today that excavation was completed and the results show maior deposits of construction debris under the footing area as well as under the slab and interior sections of the building. .A truck load of old debris was already removed from that hole and trucked away. The debris which is* lsb under the building as described before. is unstable and must be remove completely. As I see it you have two options: 1) to move the building in order to clean out all old construction debris from under the structure or 2) to raze the building and start over. At the present time. I must also stop work on the job as the scope of the job has to change. Once you decide which course of action to take, we will discuss the steps needed in order to issue a new pertrtit. Sincerely. Ralph Crossen Building Commissioner RC:lb Certified%laii Z 368 667 12 Q990319A UNITED STATES POSTAL SERVICE First-Class Mail N Postage&Fees Paid LISPS Permit No.G-10 m Print your name,address, and ZIP Code in this box Town of Barnstable Building [Division i 367 Main St. Hyannis, MA 02601 !.11:117111,1'i��li�lllllllltl T��il)Idt�idll•1 ti 1.l l�f l7�.111l Id�ll� d SENDER: I also wish to receive the ,v_ ■Complete items(and/or 2 for additional services. ■Complete items 3,4a,and 4b. . following services(for an d ■Print your name and address on the reverse of this form so that we can return this extra fee): card to you. d ■Attach permit,this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address ■Write'Retum Receipt Re uested'on the mail piece below the article number. d a 4 p 2. ❑ Restricted Delivery■The Return Receipt will show to whom the article was delivered and the date to., C delivered. Consult postmaster for fee. 0 -a 3.Article Addressed to: 4a.Article Number I O�GRT CQ ZaONE E E 4b.Service Type a c`O �Or»PASS Ant K ❑ Registered ❑ Certified of W ❑ Express Mail ❑ Insured c lc,c2.CN ASS S p ❑ Return Receipt for Mer andise ❑ COD c f`JG'c,aJ�Eb Fo 2� M Pr `o a 7.Date of Delivery Z oa 7 p 5.Received By:(Print 4me) 8.Addressee's Address O if requested and fee is paid)I j g 6.SIV u e:(Addressee or Agent) f a' PS F 1, December 1994 ' ' 102595-97-B-0179 Domestic Return Receipt Z 368 66'7 512 US Postal Service Receipt for Certified Mail • ' No Insurance Coverage Provided. Do not use for International Mail See reverses r— Sentto Ot�u� T Q'LZ•Of`lE 3, 0 Street&Number 12 fFS� S E T Post Office,State,&ZIP Code M(B�WBEIF-kb. MA Postage $ Certified Fee Special Delivery Fee Restricted Delivery Fee L Return Receipt Showing to Whom&Date Delivered Q Return Receipt Showing to Whom, Q Date,&Addressee's Address 0 TOTAL Postage&Fees co) Postmark or Date o U- i rl t f _ ao Stiol pastage•stamps to article to cover First-Class postage,certified n alktee,a d charges for any selected optional services(See front). 1. It you want this receipt postmarked,stick the gummed stub to the right of the return address leaving the receipt attached, and present the article at a post office service m window or hand it to your rural carrier(no extra charge). n 2. If you do not want this receipt postmarked,stick the gummed stub to the right of the m return address of the article,date,detach,and retain the receipt,and mail the article. LO f 3. If you want a return receipt,write the certified mail number and your name and address on a return receipt card,Form 3811,and attach it to the front of the article by means of the gummed ends if space permits. Otherwise,affix to back of article. Endorse front of article a RETURN RECEIPT REQUESTED adjacent to the number. Q 4. If you want delivery restricted to the addressee, or to an authorized agent of the C I addressee,endorse RESTRICTED DELIVERY on the front of the article. M j5. Enter fees for the services requested in the appropriate spaces on the front of this E receipt. If return receipt is requested,check the applicable blocks in item 1 of Form 3811. to 6. Save this receipt and present it if you make an inquiry. t o2595-97-B-ot 45 Cl) r o�� : . The Town of Barnstable MAM • BARN31'ABLE, • 9� 19.6 ,0�' Department of Health Safety and Environmental Services Building Division 367 Main Street,Hyannis MA 02601 Office: 508-8624038 Ralph Crossen Fax: 508-790-6230 Building Commissioner March 19, 1999 Mr.Robert Cozzone c/o Compass Bank 791 Purchase Street New Bedford,MA 02744 RE: 715 West Main Street,Hyannis,MA Map 249/Parcel 155 Dear Sir: I regret to inform you that your bank building under renovation at 715 West Main Street in ' Barnstable is being declared an unsafe structure under 780 CMR section 121.0. As you know,major settling under the footing was discovered under the front right corner of the building a week ago. Since then,I met with your engineer and a decision was made to investigate under the footing by removing that portion of the foundation and footing. Today that excavation was completed and the results show major deposits of construction debris under the footing area as well as under the slab and interior sections of the building. A truck load of old debris was already removed from that hole and trucked away. The debris which is also under the building as described before,is unstable and must be removed completely. As I see it you have two options: 1) to move the building in order to clean out all old construction debris from under the structure or 2) to raze the building and start over. At the present time,I must also stop work on the job as the scope of the job has to change. Once you decide which course of action to take,we will discuss the steps needed in order to issue a new permit. �s Sincerely, Ralph Crossen Building Commissioner RC:lb Certified Mail Z 368 667 512 Q990319A f r� Assessor's map and I -qumber .... ......... ........� 1?.. .... .... Sewage Permit ....... _ 7'f Z SAWSTADLt. i House number ✓.....;.7/S 9 M"& �0 i639 6� MAI a� TOWN OF BARNSTABLE BUILDING INSPECTOR APPLICATION FOR PERMIT TO ... �� la�vG.t......✓ ...............................................:......... TYPEOF CONSTRUCTION ..................................................................................................................................... ........................... ..................19��3 TO THE INSPECTOR OF BUILDINGS: - 1i The undersigned hereby applies for a permit according to the following information: 1 Location ...................................................... ........2 ......1..:. E.�� !( ( `.�i ...../:.�11 (!�l!. ..................... ProposedUse .... 'LNG ....��?/ `................................................................................................................................ ZoningDistrict ........................................................................Fire District .............................................................................. 2��Name of Owner ... ......................................Address .. .��. .. .P ....'.�:.. ��i .............. Name of Builder fl vf... .�!t' 1.� ....1�� Address ..J:Q....�O:2-g..C��S.... �°: P` /� INT2pP ��f/1. il... .................... (AJ N t / /!v I� U uj(Name of Architect ..1......�................k..........'�..�..................Address .....................................XW.1� .......................... Number of Rooms ..................................................................Foundation O ,c+C .......^............ .......................................................... Exterior .. ..( ... ...l ).E.... .5......................................Roofing ........... !... ................. .............................................. Floors e' /14 e z Interior ................ ............................................................... Heating .....................................................................Plumbing .................................................................................. Fireplace ............ D. .P........................................................Approximate Cost � �1.A!;v`.'.... ..... . Definitive Plan Approved by Planning Board -----------_------_-----------19________. Area .....................................:.... Diagram of Lot and Building with Dimensions Fee ..........................:.................... SUBJECT TO APPROVAL OF BOARD OF HEALTH a OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of,Barnstable regarding the above construction. C/ Name ..... .............. .1./.��'� ..................................... 5 y Construction Supervisor's License F.N:B.C. REALTY TRU T 24856 - COMMERCIAL No ................. Permit for .................................... , Branch Bank ............................................................................... 715 West Ma. Street Location .................. ........................ .................HXan.....s............................................. Owner .—N. .C. Realt Trust ............ ...................... Type of Construction ,Frame asonr ... ............y...... .................................. ....................................... Plot ............... ........ Lot ................................ 1 Permit Granted Marc 83 Date of Inspection .................. ...............19 s Date Completed ... ................................19 F4 Assbssor's map and lot_+number ff��..:-�T / ecfe- 11/ e C-joi- �",3/-.71 s ; SEPTIC SYSTEM MUST SE �,. . ; °��• � / ,, �/ r INSTALLED � IN COMPLIANCE PLI A NCESwage Permit number ;.l� . :............ WITH AnTICLE II STATE�• SANITAqy r� ; AD TOWNFtNe T�ABLTOWN' O V BARNS BABH9DO TADL$; y MABB. Q 0 i639 13UtlD1HG k INSPECTOR _i ,ems � .. S eel +:. �. APRPLICATION FOR_PERMIT TO ....Bua.l .a..N @L.�} 7, �.. 1�.�4� ............................................................ r5 `0 hF. Masonry :and'Wood Frame TYPJEOF. CONSTRUCTION ...................:....................................................................................................... : 4_ ...... ugu ................ 1 TO.. THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: West Main and Pine Sts. Location .................................................................................................................................................... ProposedUse ...Office Building... . ....................................................... .............................:................................... Business Hyarmis ZoningDistrict .......................................................................Fire District .............................................................................. John E. & Patricia A. Comm 183 Columbia Road Hanover, Ma. Nameof Owner .....................................................................Address ..........................................:.....................::.................. Jack Conway Company 183 Columbia Road Hanover, Ma® Nameof Builder .....................................................................Address ...................................................:................................ Name of Architect Richard H. Walwood� Arehiteei In e 489 Blue Hill Parkway, Milton, Ma', ............................................. .................................................................................... Nine Concrete Numberof Rooms .......... ....................................................Foundation .............................................................................. Exterior Masonry sheathed with wood clapboards Wood Shingles ..............................................................................:....Roofing .................................................................................... Carpe Gypsum all Floors .....t.................................................................Interior ...yP........ .......................................................... Heating ...Forced..wa.rm..a.ir..by..oil............................,.Plumbin Three Lavoratories a 00 .. .... .... .. .... ..... ...... g .....No $5,000® (Foundation onlyr,,Cra Fireplace ... .............................................................................Approximate Cost .......................................................... !..... 19.42 s Definitive Plan Approved by Planning Board --------------------------------19--------• Area .............7..S....f...............Q.�... Diagram of Lot and Building with Dimensions See attached plan SUBJECT TO APPROVAL OF BOARD OF HEALTH �� �. .c 7 z0 I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name arila kgWit. ............................ Conway, John E. & Patricia A. s 7 F'Jo ,19669 permit for ..Rice.-Bldg Location .....W�.. a. 7R..Sk...�&..Piue••St ......••• M ...........�y.AJmis........................�........... Owner John..E,...4;..Patricia-.A, .. .CGj way.... , Type of Construction Masonry .&••.Wcod• Frame ' ............................................................. `.................. f Plot ............................ Lot .A.949 It.15.5...... Permit Granted .............Oc.t....12............19 77 4 Date of Inspection . Date Completed` ...,�)/�4� ....19 i a .; - •_ •. r, it PERMIT*REFUSED ................................................................ 19 ................................................ i ......................... ................................. Approved ................................................. 19 .......................................................... .......... ..: { ................... ....................................................... f e Assessor's map and lot number . . "'�-�- /�7 �� ~� L �� �' C — d'`3�' 77 �t .T.1c .. Sewage Permit number ........................................................... �QyOFTME'r��o TOWN OF BARN-TABLE i BARNSTABLE. • ° opY{t�e� BUILDING I SP Ro'*- fl APPLICATION FOR. PERMIT TO ...�lzii;1...... .....- R»il ;t:*"� ............... y!........... f......... TYPE OF CONSTRUCTION " • ................................................ �r..... TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies ttfor a permit according to the following information: Location ....................................................................................................................................................................................... ProposedUse ............................................................................................................................................................................. ZoningDistrict ........................................................................Fire District .............................................................................. do:ln a �: r�:S.-:plc k� Cor..;:ny 183 Cola.+-aM Rand Z!mvil*, "C Nameof Owner ......................................................................Address .................................................................................... Name of Builder jack Co.-w, Ct-�'?�'�r 18 Colmnb:V Rord HapvF x) +.n. ...................................................................Address .................................................................................... Name of Architect it3.Gh n3 f ?'�l.Toodr Arcs—i�t�et- T,n ,, �1�9 Blue Fi?11. I`� �"�y i' , ........................ ...................................Address ................................................ iT lnc C one J u:Z Numberof Rooms ..................................................................Foundation .............................................................................. (;hUctiled r'iull rood cl.p c.,wds Exierior ....................................................................................Roofing .................................................................................... Floorsr�"r:..Yu .::................ ..............:........................................................Interior .................... ........................................................... Heating ...+.....:.:.."`........::.......:...~.................. .......................Plumbing ...... t........+ ...... ..y....... ...............................X.. .... Fireplace ..................................................................................Approximate Cost .............:...........:....................................... Definitive Plan Approved by Planning Board -------------------_-----------19_____' . Area ...............................�ah2 r `. ` v40f . Diagram of Lot and Building with Dimensions JF.J t tt—vehid n3= ,.F�- ](ago z,•••f"..... .............. SUBJECT TO APPROVAL OF BOARD OF HEALTH e_: r�o� ,.-- 0 t ti 0 { I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name `......... ............................................................. Conway, John E. & Patricia A. iqo 1 9...... Permit for .......... ............................................................................... Location .... ............ ..............................Myamis................................. Owner Type of Construction M4A.Q.UrY..&..Wo*d..Frame ............................................................................... Plot ............................ Lot bi..249..L..155...... Permit Granted ..............Oct.....1.2..........19 77 Date of Inspection ....................................19 Date Completed ......................................19 PERMIT RED 0 .............. ... . .A......... . ........................ 19 i ..................... .............. .............. ....................V.......... . ......................... ..............1 r."'. . ... .... .......... . ... ...............................1... A. ... ..... a ........... Approve ....................... ....... ......... ... .. ppr ........................................................... ................. ........ ........... .............. . ............................... .. . TOWN OF BARNSTABLE SIGN PERMIT i' ' PARCEL ID 249 155 GEOBASE ID 1590 ADDRESS 715 WEST MAIN STREET P PHONE j Hyannis ZIP - ILOT 1 & 2 BLOCK LOT SIZE � DBA DEVELOPMENT DISTRICT HY PERMIT 22900 DESCRIPTION BANK OF BOSTON(2-5X4 & 3-1 X 2) - � PERMIT TYPE BSIGN TITLE SIGN PERMIT CONTRACTORS: Department of Health, Safety ARCHITECTS: and Environmental Services TOTAL FEES: �� $`$ BOND _00 � Ox THE CONSTRUCTION COSTS $.00 �T Qi► 753 MISC_ NOT CODED ELSEWHERE i * BARNSTABLK • MASS. j ` OWNER FIRST, NATIONAL' BANK BOST , 039' ADDRESS % BANK OF BOSTON E�MI`►I BOX 724 BOSTON MA BUILDING DIVISION ' BY/. --> , DATE ISSUED 05/06/1997 EXPIRATION DATE , x9vo The Town of Barnstable Department of Health, Safety Safe and Environmental Services MASS,►�, . * Building Division 1659. 1� 367 Main Street,Hyannis MA 02601 Office: 508-790-6227 Ralph Crossen Fax: 508-790-6230 Building Commissioner Application for Sign Permit Applicant: H n/ ! Assessors No._,4 g— 15� g n_ Doing: � /Business As: �1� !Y�5 Telephone Sign Location /�,� ,� / Street/Road: �1 �'I 11'�""" Sfi' c'�Z (� Q Zoning District: / Old Dings HighNvay? Yes/No Property Owner / 3J ame: 1.�W Q� � � Telephone: �� Address: SI-. UlKfi1 1�4. Village: Sign Contractor a Name: E-6jl t l y Li�ll,�l 516AI Telephone. ' [ Address: 0y Vo nn''TT. // K -•Village: la I 4&& Description Please draw a diagram of lot showing location of buildings and existing signs «zth dimensions, location and size of the new sign. This should be drawn on the reverse side of this application. Is the sign to be electrified? I es/�lo (Yore:If j es, a wiring permit is required) I hereby certify that I am the owner or that I have the authority of the owner to make this application, that the information is correct and that the use and construction shall conform to the provisions of Section 4-3 of the Town of Barnstable Zoning Ordinance. Signature of Owner/Authorized Agent: Date: Size: l n C Ca l r C3 Permit Fee: i Sign Permit was approved: Disapproved: Signature of Building Offici rc__ Date: 4— `�� LEGEND 4'-0' -1 RG REMOVEOWY. ..., REMOVE SAVE LOGO RR REFACE li If SIGN E03 N RP R flEPARET �i `( REMOW&1 RR REMOVER REPLACE ................... NM R PRO ' e REMOVE ONLY F CTM fls REMOVE- SIGN E04SAVE SIGNI. RSL REMOVE-SAVELAGO •`� ' RR E ^ ffq R; WMATES L sm tli ITTBankBoston Y yT y T It t At,w m tl "IY Nm sew z rIIpl"iq � i�IP ���ai RR E. � RR RO F + -> 42 3/4" EOL Eoa B � -ee E PINE ST. PF-3X PYLON(CUSTOM ELEMENT) Pl. HOURS PLAQUE SG1-9 REPLACEMENT PANEL SITE PLAN N.T.S. SIGN E01&E02 OW.2TOTAL 1/4'=1'-v SIGN E05 1°=1'-0" SIGN I01 3/4"=1'-0" EXACT COPY TO BE DETERMINED FINAL GRAPHICS TO BE DETERMINED TOP VIEW 'v .z r' x,+=IlTOP VIEW a TOP VIEW T Ntm°r 17' P I 4 nHfyi 2' 2' - D.B.T. SIGN X04 Lau WfEi�7PUR IDEVIEW LIDE VIEW SIDE VIEW DPD-2OPO-2 D�DIRECTIONAL DPD-2DPO-2 D�DIRECTIONAL F DPD-2 O DIRECTIONAL VLN-HO BANK LOGO&NAME-HOURS OF OPERATION VNet VINYL WINDOW NETWORK SIGN SIGN XOt 1/2'=1'-O' SIGN X02 I 1/2'=1'-0' SIGN X03 12'=17 SIGNXO5 SIGN X06 EXACT LAYOUT,COPY&STYLE T.B.D. EXACT LAYOUT,COPY&STYLE T.B.D. EXACT LAYOUT,COPY&STYLE T.B.D. SINGLE DOOR OPERATION/DOUBLE DOOR OPERATION (SEE VINYL PROGRAM) LOCATION#: 679 BANK# 1 FILE: B-0679.CDR PAGE: 1 OF 1 REVISED: 00/00/97 XXX ACMR WII,EY CORPORATION SIGNS AND SYSTEMS aooREss: 716 WEST MAIN ST SITE TYPE: B DATE: 04/11/97 SCALE: AS NOTED /..� aTY/STATE: HYANNIS,MA RC# 8440 DRAWN: JM DIRECTOR: 2480GREENLEAFAVE. ELKGROVE ILLINOIS 60M . Maloney Kathy From: Whitty Robert To: Maloney Kathy Subject: RE: Old Bank Boston building Date: Tuesday, October 07, 1997 3:39PM Priority: High The parcel number is 249-155 It's the building past Purity's at the turn onto Pine St to go to Osterville... From: Maloney Kathy To: Whitty Robert Subject: Old Bank Boston building Date: Tuesday, October 07, 1997 2:42PM Bob, Mary Jacobs says you've dug out old info re the building you're all going to look at tomorrow. Please give me the map/parcel number so I can check our old records? Thanks. Page 1 �sor's map and I umber .... .e. ff. 7:Y ...... ............ f L Z S d �f THE ,Sewage Permit ,/4 .... . .. ....... ....... .... re`�y ♦� Z 33"ISSeTAM i House number ..... �5.. ......................:.... ro a • O 1639' t TOWN- OF ``BARNS,TABLE BUII.D.IHIG INSPECTOR APPLICATION FOR PERMIT TO ..: � , l��'Gt....::. 4.0t.pl lD!t;l...........:.:......:................................... TYPEOF CONSTRUCTION .................. ........ ..................................................................................................... .............................. ..............19 TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: Location ........................'.—" 7' .. ........21�..... ...... .................... ProposedUse .... GN....lti.�4..K...................................�............................................................................................ Zoning. District .....:......:..... ......................................................Fire District .............................................................................. Name of Owner ...r... l .Address .... ...... r .............. Name of Builder .....�.>4v... ...............Address .. ........... ..4.i...�........... .........��. ..�. .... .. .. �`C.:....,� . Name of Architect .`)Sl.. .� ?�`!....... /ti .................. V10!!7I1 �0 It 1 Number of Rooms ..................................................................Foundation .....�1Q !.ez�.. ............................................ 6D od(2 fZa� Roofing s � .�' >J/,u/��'f Exterior ................................U�................. g A;. 7..... ........./....... .. ...................... Floors CD}tL• Gl �'�� Interior .........�?.t%/� e ..................................................:...... ............ ....................................................... Heating A.............. `..................... ........: ..... .........Plumbing ............................".`...... ...................................... _ •+ Fireplace ............ d. ........................................................Approximate Cost `° 4�'� Definitive Plan 'Approved by Planning Board -------------------_-----------19_______. Area .......................Q4 .... ....:......... �. Diagram of Lot and Building with Dimensions Fee SUBJECT TO APPROVAL.OF BOARD OF HEALTH t OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the T�yn of Barnstable regarding the above construction. / / Name ........ ..................................... Construction Supervisor's License .................................... N. B. C. REALTY CORP. s. 24856 COMMERCIAL ................. Permit for ..................................... Building (Branch Bank .............................................................................. • Location .7.15 West Main Street ............................................................ r Hyannis .................................................. ............................. Owner F�--N.B.C. REALTY CORP. q .................................................................. Te of Construction ...F.r am.e/.M����RT�y..... T yp .. .. .. .. .............................................................. ..................... r. Plot ..................... ...... Lot ........................... March w113 , ..19 83 Permit Granted ............................... ..... Date of Inspection ............................ ......19 D a te Completed .......bA .............. .......I.... (Y, 6 r 719:? ? -7 -�f.s,,..��... ..-.nt- -•�'; -3'K .�-... �•..... , ,�v�`•y'` �' >'i,.� +�_ .�+w. si`�:-r- m�•^ t+^,'.• r � ,y w - - -c r r: - _ -� -« ftr..r i sa' y +'{'/ Srtr t. Y.�.�/ { h �f.fi•s" r�'(- �i��a. �� ? c i"�' {,«"r .z:'���i4 't'� t � .* ,t., `. U �sir a �`+t'r 'S'.•d+_ .li s... F i �. tt S " - _ c: -� r �r« �' --4 - .fir...a � '. +.� _ "•� �' +.�' yJr. .�•, r zt -..q! f'cf/n -� �� , •. , ., , i + �,�,T s '�.'�... a M_�w, �. yr _. ♦k L .r+ 'A F., '' { d 1• , HY(� - ' { .. ' r• <� r ,� 'X. i _ 'is. / '` t r i;" Qi f r is F` .' �_, a - 77 N ry 19 N� d IV . p l }F,•T rya:,.,,mot ~ ^� .` a• ^• F � c�4,• - "�3 r. ', r •� aim ,`r`� L O G'/gT/O.L/:;, 1•�YP.t.�►.x t:S �A+.�N3�iC1t34� l�el�. _ 'j��4"�G�►Q�� �GZ 1� , t" SG,4i.G.E'� '�, , :s 2bt ' D�?7''�. fCo �• T24-V t: Cta F3 1c4 l ti� LG�� rye TrZ 4 .t 1 C=t 2° Ape CEBY! CL�CTIF;Y• TNAT' 730W 'BV,/G`DI.t✓F jt ?SH4►N%N O.V•.TI-!/S'�'PL�i.�'/`�%S' LOG�9T'Ea; O.V�TNE: ': � '.. _ - • . i.Lc./a AS"�%•/O N%V•N�eG'Cit•/ . �d�t.rD TNgT• /T , •, . .. w '��C.�ivNs off• TEE •�vr�iv,o�; t3A,�:�..►.�rA`��.:� a _ `j:1�.OF ,�,�, •a bt OIA�A t �r .T - tip. c• �i�.,,`EVG/�vt�Ess� ,� t� • i48. s A • ' L, F,E'OG%TE G.4, YX7.eMOG/Ts-/, MASS. x Z�/9T { � G L 1!Ole- - 3 TOWN OF'BARNSTABLE Permit No. _24856 �AUTrA Building Inspector Cash ---------------- ----- • w0.`� •'"` OCCUPANCY PERMIT Pond -------------x ------------ Issued to F.N.B.C. Realty Corp Address 715 West Main Street, :' Hyannis Wiring Inspector Inspection date Plumbing Inspecto �ax Inspection date Gas Inspector `/� ( f y i Inspection date (Engineering Department �,/� ' Inspection date 40 �f ard.o:Health Inspection date f THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE-MASSACHUSETTS STATE BUILDING CODE. r. ........, �`,... �Building..Inspector ....... � a BANK OF BOSTON YAMEE 24 r 44 y. �+1 f �• i � I BANK Fii F . BOSTON YMKEE '4 �. 'IAA (- I.�' ' 1 C[[��- • �. - a _��•� N •� J 4 f j V V, 'I!��! _ _ 1 �40 BANK OF BOSTON l �q w� i BANK OF BOSTON f . YMKEE .r :)S'= 6714NNNN3 .... l�_ Af opium W ' "Assessors'.map and Io0hurn or, 4- I% Z ............. ..... ...................... .Sewage Permit numberi,.,.... k -BAR, ! .�AR ow�r NST ' u NZI 63 BARIFSTAliL I M, MAO ',_. BU1LD1N.G -, I NS P EC TO W,,�_,,-, I4P A.4rrt li' 1"W rW —J. Uj ............... -APPLICATION FOR,-,PERMIT . ......................................... TO . ..... wFli f4 ;I 1 V�i: ..................;................. ...... jA . .......... jYPE OP CONSTRUCTION -------- ....... ...... (Z .,WI VI ij TO THE INSPECTOR OF BUILDINGS: Ile. The undersigned,,heret?y..:,app r; pberriit,"orgi 77. isiv thiaj ifblloWihg'��information 4S " 4 Ij -P &,& ,�4,�T�," Ny,L _ T ' ' .....rt:.. ... .... ...... �A-1 •Location ................. ......... ....... �X T Fi' Proposed .. Use .. • ..............1;e�.... .................... ... . ........ ................. ............. ................. ,A. 0 ;P . .......... Zoning.-District ......Fire District:.......... ............. ....... ....................... ............................. ...... .4 ..............Address ............... ...... ........... .......... Name of,Owner ...................... ....... .... .. ........... ............ ......... -.,Address ................. ............. ......... Name,of Builder 'I.... I. . ......... ......... ........................ TA . ................Address .................................... .......... ........... Name bf'Architect. ................................................ .....................7.•................ ..................�C'7',7777 . Number of Rooms ..................................... ............................Foundation ....... ' . .: -,- • I. , ....... .................................. ...... ...................... t. ieriorf .....................................................................................Roofing . .................... ...................... .. ................................................ :Floors ......................................................................................Inte'rior .........Plumbing ....................................................................... .......... Heating ................... ..................................................... .... .........Approximate Cost. ........... ....... .......... ............................. l;,ir'eplace. ........................... ... ............. Definitive Plan by Planning Board Area I ..... .............. ........................ . ..............I........... ........... ... Diagram of Lot and Building with Dimensions Fee . .. OF BOARD OF HEALTH SUBJECT TO'APPROVAL 0 q -TI I-A;T" h'Q ll 4-11. I'M A V, eq hereby agree to conform to all the,Rules and Regulations of.the Town of, Barnstable regarding the aboveA! 1. Ilk' construction. XI, N ';.mft"� V 1l4