Loading...
HomeMy WebLinkAbout0005 YALE STREET Town of Barnstable Building'ng Post'This Card So That it.is`Visible;.From the Street .Approved„Plans'Must beRetained on`Job and.this Card Must.betKept ! �AEA"b"PABr.R ♦: .i„ .:'`" t a:=. .,vF' ..•- .'+.,:1.`-!, '+"".sr,?`:x.-+' aM a 4r , ..i n- r. .: C a c uo- r: # ,, R,-..••„r, ,:� ,. "�" Posted Until Frnal Inspection Has JBeen Made. ib34 ei> r t°aw a itea Wherea Certificatebtf, ccupancyAs, equired;such Building shall Not be Occupied until a Final Inspection has been made �� Permit "..G+ 31'KdwN «�SkXvme>^ "ukXFC '4ulnlr3air:.l. :dF' a G..',SF-48'm — .'s,+ x` a4td +Tfrkd..a.+.e.v"ri. "d{�.&'S'dyM1N.a4��"n: °•'^-•A"ut.,d3.x«".as..�.rNs.,.�s3 e Permit NO. B-16-2904 Applicant Name: Paulo Paraguay.. Approvals Date issued: '10/06/2016 _ Current Use: Structure Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 04/06/2017 Foundation: Location: 5 YALE STREET, HYANNIS Map/Lot 307-137 Zoning District: RB Sheathing: Owner on Record: Paulo Paraguay Contractor Name: Framing: 1 Address: 21 LIBERTY LANE Contractor License 2 f ..:, ` G, MARSTONS MILLS, MA 02648 <" Est Project Cost: $3,500.00 Chimney: Description: Replacement of windows s Perrnt Fee: $35.00 MI Windows S1556 ,� a Insulation: Fee Paid; $35.00 .10 U Value.27 �5" Date 10/6/2016 Final: Project Review Req: Replacement of windows Plumbing/Gas MI Windows S1556 , J � ' k ap U Value.27 a Rough Plumbing: ,* Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six riionths afief issuance. Rough Gas: All work authorized by this permit shall conform to the approved application and the;approved construction documentsifor which thi's permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zornng by laws and codes. �� Final Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. ^ Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided onthi atu s_ p rmit.' Service: Minimum of Five Call Inspections Required for All Construction Work: �. 1.Foundation or Footing � Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7:Final Inspection before Occupancy Low Voltage Final` Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have-access to the guaranty fund" (as set-forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT