HomeMy WebLinkAbout0036 BABBLING BROOK ROAD � � �� �'
. .
�.
. .� ry
. .,
� � _
... ..
�..
„ ,y;
o , .
�. � �..
r:
,. �. ,. ,
U ,,
.. � _ .
..
.. _ ,. .t:
F
�� �� ,.
.,
`'
t _ _ ..
. . . .
n Y - � .. ,.
¢ �' � -
4
.�. � ..
.. � '.
_ .: .. ..
.- - � �.
,�
,.
� ..
., ....
.. o
.. _ - ..
v ..
.. ., � M ..
w
.. . :. —,.
. .. - ..
w ., ... v
,. _
...
..� � s.
;. ..
.� ..
.. ..�� -.
� � ,� � -
(Q rJ
G`
Town of Barnstable
p4IHE rod Building Department Services
~ Brian Florence, CBO BARNSTABLE
" Building Commissioner �5 GMM . -. ..,
s +zs-ox wus amtrle-.en vsmR�i
y MASS. o.
0o i639. 200 Main Street, Hyannis, MA 02601
i0raA,�° www.town.barnstable.ma.us
Office: 508-862-4038 Fax: 508-790-6230
Request for Zoning Enforcement
Denial
August 30, 2019
Mr. and Mrs. Robert George
36Babbling Brook Road
Centerville, MA 02632
Re: 31 Babbling Brook Road
Dear Mr. and Mrs. George,
I am in receipt of a written request for zoning enforcement dated July 1,2019: In your letter you
allege that because the owner is allowing Cape League Baseball Players to stay in the home there is
a continuing a violation of.the Town's zoning ordinance for which a cease and desist order was
issued. Further,that the owner is ignoring a directive from the Zoning Board of Appeals
(ZBA). Based upon your assumptions you ask that I"enforce the directives issued by you and the
Board of Appeals".
It appears from your letter [para.3]that the basis of your argument is that because the owner is
receiving compensation in exchange for housing; she is continuing to violate the RC zoning
districts prohibition of bed and breakfast facilities.
In your own words however you"state that the owner receives"reimbursement"for allowing Cape
League players to stay in the home as guests. The practice of"reimbursing host families is
consistent with my understanding of how many of the Cape League's teams provide housing for
their players for the summer baseball season. For example,I reference.the Hyannis Harbor Hawks
website which reads: PERKS:Host brothers and sisters are given on field access after home
games,priority for bat boys/bat girl opportunities,families receive a stipend to help with some-
the costs of adding a family member for the summer.
I would disagree that these host families are receiving compensation in exchange for housing;but
rather that they provide free housing to players and are reimbursed for a portion of some of the
costs associated with hosting a player, not all. In speaking with two of the teams' managers I have
been informed that the"reimbursement"that is received doesn't even cover food costs and that the
hosts are in fact volunteering to house players as guests in their home for the summer to play ball.
After an investigation and a careful review of the facts I have found that:
1. My October 16, 2018 order to cease and desist use of the property as a bed and breakfast as
defined in the zoning ordinance has been and continues to be complied with.,
f
2. No decision was ever made with respect to Zoning Board of Appeals(ZBA)variance
request number 2019-001. The matter was withdrawn from consideration by the applicant
before the ZBA made a decision. There was never a directive by the ZBA.
3. Cape League hosts are not required by the Cape League or zoning to limit hosting of Cape
League players to one(1)per household.
4. Reimbursement is not compensation.
S. Speculation that"additional guests will arrive."And that, "A revolving door of transients
will appear" is not an appropriate mechanism for beginning an enforcement action.
Based upon my findings I hereby DENY your request for zoning enforcement. If you are aggrieved
by this determination you may file an appeal with the Town Clerk of Barnstable and the Planning
and Development Office, specifying the ground thereof within thirty(30)days.of the receipt of this
notice in accordance,with c. 40A § 15 of the Massachusetts General Laws.
Regardr,— -
Brian Florence
Building Commissioner
!
Assessor's map`and lot number .....l. ........., ...-........ - THE
cF roe
Sewage Permit number ....:............................�..,Kn-�v+...:..... d
- BARNSTADLE, i
House number ............�7...�............................ .........`........:.... M639 m�
\e
�fQ YPy A,
.: TOWN _ OF 'BARNSTABLE
BUILDING INSPECTOR .�
APPLICATION FOR PERMIT TO �`.�!^s;tr,�. tH /� T•,w,,;.y. . rsi i,P 9,,. .�..........0
TYPE OF CONSTRUCT ON t. ..1 u.V.. ........! !!.. >..-. - . .......................................
��� .
TO THE INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a//permit according to the following information: r7 ,/ / ("
��� G�b�nG LMrE Yet i L
Location .... ....................................:..... .........1..........,...U............. ... ..... .. ..............................
ProposedUse ........ .l !': .!.� 1' > 4 .:6........................................................I............................................................................
fn
ZoningDistrict ...............�...::::::...............................................Fire District ...............C.4.......................................................
Name of Owner fn 1#10i &44t ....Gnz,j,.!�.;...Address j.....1.fims.,N—...............................
Name of Builder ...� �4�!h....... .... °1 ✓L ... .........Address ..r...... s.S...........J�`./ .....................
rr f ,I J
Name of Architect ...r.I�s.<�T............ 1P vns ...............Address ..t/��oir�siti'r /I�G�SJ, �53..........................................
�0�5�
Number of Rooms ........... .................................................:.Foundation ........�lliYf fl0 �'�`
me 2
!.............. '".......................
Exterior (n t �,4A Roofing .............1�.................................. .............................
�f, iy ah `c �or�."?.........Interior
/�s� ;r
Floors G......
_: �ftS. ......��l,�a ... :atirn4. ........................:......Plumbig ....,�:7........... .....� . �......::...... ...:...
Heating .-
Fireplace ......g.►'!w.............................................................Approximat/Cost ......................................................... . ........
Definitive Plan Approved by Planning Board ________________________________19-------- . Area ........... .... .
Diagram of Lot and Building with Dimensions Fee
SUBJECT TO APPROVAL OF BOARD OF HEALTH "/
OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS
I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above
construction.
Name .... ....:. ..........................
Construction Supervisor's License .gex�.5, 9...........
GBORGE, ROBERT MR. & MRS. A=138-145
ti
No ...26018 Permit for ..One Story..................... .. ........
SinglSinq1e Fan-Lily Dwellin,5
e..................................... ....................
Location .....3.6..Babbl��..P�...
. .. ...........
Centerville
...................................................................... .......
Owner .....Robert George
...................... ........... ........ ...........
Type of Construction ..Fram
..................... .. ..............
................................................................................
Plot ............................. Lot ................................
,
Permit Granted ...............
January 2 7,.....i...................19 84
Date of Inspection '...................................19
Date Completed ......................................19
Aap and lot number
soessor m ........ ......... THE F
ypG tp�
Sewage Permit •number ........
_ � ..... �... .....3 .s Z BAHB9TADLE,
House number ............ �.... : ...........................:. 900 NAM
r
SEPfIC SYSTEM MUST
TOWN 0F� B%A 1l` S�T�AB
' A !y ��t.A tom'. f`��•�e C.�+'
�S
BUILDING IHSPECTO`R'
APPLICATION FOR PERMIT TO '? :Tiy.... . . .. ...�awtrl. '!s. ::�
TYPE* OF CONSTRUCTION .... .... r
.. ...."`:.:'.�' .,....r .. �
..........19........
a TO THE "INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a permit according to the foll wing information:
...Z'Qj. ..1. ..........&. ��.n ......:.:.��-4 �......:. .::.1..... CANT �? .. C
Location ••..... ..
ProposedUse .......... C..S.(. wT,c lr�.............................................. .....................................................................
Zoning District .? ...........:....................Fire District ............ ..C.;...E.)...............................................
Name of Owner Ar....44a°.........R :t'!: $Y'"CeG ...Address ... .....:.........................
• �'N pR.Ap f. �,
Name of Builder ...
..('.S•l.t...........'.:.. ................... ................Address .. ........ ..�...... ......�:: .. .. ...:.......:...............................
Name of Architect 8I.F1 ....... ..........Address ..........�53 �..............................
Number of Rooms ........... .............................................:.....Foundation ... ULYt ........L.V.d'!€r'F `°`:.......................
Exterior .4a!Et 4: W..................... ...Roofing ......&d l
Floors . 5�6.. °............... .....<?al!.....F�°r`` ........:Interior :... (.......................... `
Heating '...bco.........1.la......P.V.4k':...............................Plumbing ....ct�" ..........................
Fireplace � ..................... ......Approximate. Cost O®O. cV
Definitive Plan Approved by Planning Board --------------------------------19________. Area ....s .............
Diagram of Lot and Building with*Dimensions Fee .. � i.. ........................
SUBJECT TO..APPROVAL OF BOARD" OF HEALTH
• z w
OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS
I hereby agree to conform to all the Rules and Regulations,of the Town of Barnstable regarding the above
construction.
Name ! ...1 .,e4, ......... . ........
' T 0 Construction Supervisor's License .� o...........
SEORGE, ROBERT Mr,_y& Mrs.
a r
26018 One Sto #
o Permit for '..
` ..Singl ...Family. ....................... ^; '
13 �
Location . Lot.. A.....M..Babb,1jZg..]Zook..Rd.
Yg
Centerville. .. .........
Owner ... George..................................11
Frame
Type of Construction ..................... :........... ;
... ) -•-:. ,..- ;'^jam t
(
Plot ............................ Lot ..:.............................
Jnuary 2.7,
Permit Granted .......a.................................19 84
` Date of •Inspection,
Date Completed ... . .,�1901
4:. ~ ,f.� .�.''./ ,7� n T � � -^r�, f''p � `",ate 'r•. �
y .
7 r
Y
r
9 41 993 s F, jl 111 1, J T S
cl
r
%_v�.5`
G
1-u T
TIF D CER IE PLOT- Lea P
t of 414s,�, L o T > 3 /5A 3 c i�✓c;. 7r_ v.c
�y
G r
NEW CONSTRUCTION ONLY � RoBERT
TOP OF . FOUNDATION iS_. ,,,, FEAT. � IN
ADOVE . LOW POINT OF AOJACF.POT
Sit
4 �+
ROAD. ;. No st �i® SCALE,. / „✓ 4,9f DATE,rNqmff&lAL6 Mg
I CERTIFY TWAT THE ...,..�..
ERI3TEREq REOISTERiED 83 / 23 SHQIdt� ON THIS PLAN 19 LOc�ATEp
_ CIVIL LAND
Y d0 Imo« .. ,...,., 3 ON THE GROUND AS INDICATED AND
ENGINEER SURVEYOR ;` OR. COP�FOR&IS TO THE �ONIP�p �.A ,
OF SARNSTAS MA8,S
. 13
.712 MAIN STREET. C OY? ;'
HYANRIS, MASS. MET / Of ATE "REG. LAND
SURVEYCA
TOWN OF BARNSTABLE Permit No. ----------------
t E Building Inspector
BAMSTAa Cash _t --.-----------..--
� /Ne.
�eyo•
OCCUPANCY PERMIT Bond
Issued to Address
Tf?+ 1 36 '?� hl3 nQ tsr�r>k, Rf C�,. {`r�;�t---vjj,7 n
Wiring Inspector Inspection date
Plumbing Inspector r Inspection date
Gas Inspector Inspection date
Engineering Department Inspection date
Board of Health Inspection date
THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL
SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN
REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE
BUILDING CODE.
................................................... . 19......_... ........................................................................................ w.. .. _....
Building Inspector
TOWN OF BARNSTABLE Permit No. ----------_--------._.__.____
Building Inspector
Cash
OCCUPANCY PERMIT Bond ------_------- -------_
Issued to Address
Wiring Inspector Inspection date
Plumbing Inspector Inspection date
Gas Inspector Inspection date
Engineering Department Inspection date
Board of Health Inspection date
THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL
SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN
REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE
BUILDING CODE.
19_.......... ..................................... ........_.......... _._..... ._.. _...__....
Building Inspector