Loading...
HomeMy WebLinkAbout0008 BUCKSKIN PATH gs � p. r . S O ,�J31r9 Cape Save Inc. 7-D Huntington Avenue South Yarmouth, MA 02664 Tel: 508-398-0398 Fax: 508-398-0399 4/30/19 Brian Florence CBO Town of Barnstable Building Division 200 Main St. Hyannis,MA 02601 RE: Insulation Permit 19-1077 Dear Mr. Florence: This affidavit is to certify that all work completed for 8 Buckskin Path, Centerville has been inspected by a third party Certified Building Performance Institute(BPI) Inspector. All work performed meets or exceeds Federal and State Requirements. Sincerely, William McCluskey NUISIAIC Sty -E Rd E- AN �IQZ B V� "O.L __ Town of Barnstable_ __ lil J ng eai>rirn � Post This Card So That it is Visible'From the Street Approved`Plans:Must beRetained on Job and this Card,Must be Kept 1 ,, Posted,UntilFina) lrspection Has Been Made: i `°` iWhere aFCertificate-of Occupancys4Requred,such"Buildingshall Not!be Occup�edRuntil a Final Inspection has been made Permit Permit No. B-19-1077 Applicant Name: William McCloskey Approvals Date Issued: 04/03/2019 Current Use: Structure Permit Type: Building-Insulation—Residential Expiration Date: 10/03/2019 Foundation: Location: 8 BUCKSKIN PATH,CENTERVILLE Map/Lot 190-007 Zoning District: RC Sheathing: Owner on'Record: HASSETT, ROBERTA B a_ _ Contractor'Name,�WILLIAM J MCCLUSKEY Framing: 1 Address: 8 BUCKSKIN PATH Contractor License; CSSL-102776 2 Est. Project Cost: $3,800.00 Chimney: CENTERVILLE, MA 02632 .ATM -fl i `• .Description: Add R--33.cellulose,and R-38 fiberglass to the Pttic. Air seal the attic Permit Fee: $85.00 with expanding foam. General weatherization. ' Insulation: � 7 Fee Paid:' $85.00 f Final: Project Review Req: - Date: 4/3/2019 - Plumbing/Gas. Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit'is commenced"withinsix months after issuan iCia Final Plumbing:, All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access streetorroad and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. € I Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building.and,Fire,officials are'prroovided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing Service: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flu0imng is-installed r Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Final: 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy g g Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: