HomeMy WebLinkAbout0076 CRANBERRY LANE a1
• ,
r.
1
n
-
„ u n
0
m
a
,
° t
a
,a r
°
u w ° a
e
a
. . Town of Barnstable Building
:�
? ew�vsrn Post This Card So That it is Visible From,the Street Approved Plans MJ'rust be Retained on Job and this Card,Must be Kept
Posted Until Final Inspection WWBeen,Made Permit
Where a Certificate of Occuparft is Required,such-Building shall No be 0ccupied,uh -il a Final Inspection�has been i�nade „ '
Permit No. B-19-1331 Applicant Name: dennis kerkado Approvals
Date Issued: 05/17/2019 Current Use: Structure
Permit Type: Building-Alteration INTERIOR Work Only- 'Expiration Date: 11/17/2019 Foundation:
Residential Map/Lot: 246-014 Zoning District: RB Sheathing:
Location: 76 CRANBERRY LANE,CENTERVILLE .
-Contractor Name:- DENNIS KERKADO Framing:
Owner on Record: North Atlantic Realty Group, Inc Contractor License CS'093445
2
Address: 16 Kings Way
l a Est Project Cost: $12,000.00 Chimney:
Hyannis, MA 02601 Permit Fee: $ 111.20 rr
Description: Vault ceilings in living room/dining room/kitc en.
Insulation: 0 (0�11/!�i
Fee Paid; $111.20
Final:
Project Review Req: SMOKE DETECTOR UPGARDE PROPOSED.
Date: 5/17/2019 01L�1�2
M Plumbing/Gas
Rough Plumbing:
�` Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after.issuance.
All work authorized by this permit shall conform to the approved application and the'approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures-shall be in compliance with the local zoning-by-laws and codes.
This permit shall be displayed in location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same. ,.
-.�
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures byfhel Building and Fire Officials are provided on this,permit.
Minimum of Five Call Inspections Required for All Construction Work: = Service:
1.Foundation or Footing
2.Sheathing Inspection , Mx Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is"installed
Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members.(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical;Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT
i
pill: 0.4 jm,; tp��
,r }
isr't C
Coe
, n r
y
f IS0
al
gy �
f:' 3 c I
Town of Barnstable B11Cl�
M .r _ g
�rA Post This Card So That it is Visible From the Street-Approved Plans Must be Retained onJob and this Card Must be Kept A
a � ` Posted Untit Rhal Inspection Has-Been Made m•
Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has..been made. �ern11t
Permit No. B-19-1313 Applicant Name: dennis kerkado Approvals
Date Issued: 05/01/2019
Current Use: Structure
Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 11/01/2019 Foundation:
Location: 76 CRANBERRY LANE,CENTERVILLE Map/Lot: 246 014 Zoning District: RB Sheathing:
Owner on Record: North Atlantic Realty Group, Inc Contractor Name DENNIS KERKADO Framing: 1
Address: 16 Kings Way Contractor License: CS-093445 2
Hyannis, MA 02601 �� "' Est�Project Cost: $10,000.00 Chimney:
Description: 12 replacement windows,3 exterior doors, 1 slider. Rip and redo Permit Fee: $51.00
front siding 3 sq of white cedar. Rip and redo. ront roof 8 sq. # k Insulation:
Fee Paid:, $51.00
Project Review Req:• `£ ,,.� Date �° 5/1/2019
Final: It>bOklive—
Plumbing/Gas V.
ram(
� Rough Plumbing:
Official -Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permi£is commenced'within six months aftePgMVe.
All work authorized by this permit shall conform to the approved application and the-approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and str`ucturesshall be in compliance with the local zoning by-laws and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. Final Gas:
The Certificate of Occupancy will not be issued until all applicable signatures b the Budding and Fire Officials are provided n_
P Y pp i; Y ed on this permit. Electrical
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Service:
2.Sheathing Inspection _ oi„�,S .
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed r':�`����'JG �a Rough:
...
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection ,._. D p N oT
S.Prior to Covering Structural Members(Frame Inspection) �r++�.RC� L� F�CikP� Final:
6.Insulation &j=—r.JE"TS.
7.Final Inspection before Occupancy g�LLB R-COL Low Voltage Rough:
10)19 /'I°" Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. s,� VVV
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT / Final:
. Town of Barnstable _ Building
n n o <and this Card Must be'Ke t
aA"Scnase Post This Card So That it is Visible From the Street.; Approved Plans.Must be Retai ed,o J b p
a,Ass.. Posted.Until Final Inspection Has Been Made.
Whehas-been
} e>y. it
1634 .� 4
� re a Certificate of Occupancy,is Required,such Building shall Not:be Occupied until a Final Inspection has been made 1�
Permit No. B-19-1331 Applicant Name: dennis kerkado Approvals
Date Issued: 05/17/2019 Current Use: Structure
Permit Type: Building-Alteration INTERIOR Work Only-- Expiration Date: 11/17/2019 Foundation:
Residential Map/Lot 246-014 Zoning District: RB Sheathing:
Location: 76 CRANBERRY LANE,CENTERVILLE Contractor Name:�,,DENNIS KERKADO Framing: 1
Owner on Record: North Atlantic Realty Group, Inc Contractor License CS-093445 2
Est,
Address: 16 Kings Way Per Fee:Project Cost: $ 12,000.00 Chimney:
Hyannis, MA 02601 ¢ �
k $ 111.20
Description: Vault ceilings in living room/dining room/kitchen. E' Insulation: pK 6l 7'1�j
Fee Paid'= $ 111.20
Final:
Project Review Req: SMOKE DETECTOR UPGARDE PROPOSED. v Date: 5/17/2019
y-- Plumbing/Gas
G �✓ Rough Plumbing:
Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months afterissuance.
All work authorized by this permit shall conform to the approved application and thetapproved construction documents for-which-this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same.
J Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are proyided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing
2.Sheathing Inspection h Rough:
_ ,.., •
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT pry V�
Final:
_
s E.>`r