Loading...
HomeMy WebLinkAbout1425 FALMOUTH ROAD/RTE 28 c i o - ` h „ = o° r - , e + " a 0 qA �— Town of Barnstable Building :: *��.., ,�, Post"Th�s Card So;That;it is Visible From,the Street�App'roved Plans Must be,Retamed.on Job,and;this,CardMust'be Kept enxtz:srees� a w A ,.,v "Yr ra �� s b �PostedUntil FinalnspectwnHas Been`Made ys • > n" fNNW R� Where,a Certificate of Oceu ancyJ9*etIu�red,such Buildmg shall Not,be Occu�piedKuntil a,Final Inspection-.has been made r p - •;,3u ;.; '.. r ur<-_ 2M .a"� ..r. :--, ,minx..�. .��. e.Mai.a`'��a. ,,, - Permit NO. B-19-3965 Applicant Name: William McCluskey Approvals Date Issued: 11/22/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 05/22/2020 Foundation: Location: 1425 FALMOUTH ROAD/RTE 28,CENTERVILLE Map/Lot: 229404 Zoning District: RD-1 Sheathing: Owner on Record: CAREY,CHRISTINE S Contractor Name: hWilliam J McCluskley Framing: 1 Address: 1421 FALMOUTH ROAD I: Contractor`License: 102776 2 CENTERVILLE, MA 02632 Est Project Cost. $ 1,500.00 Chimney: Description: .Add R-10 rigid insulation to the attic and crawlspace.Air seal the Permit Fee: $85.00 attic plane and crawlspace with expanding foam Gener 11 Insulation: FeeP�aid $85.00 weatherization. A( - A- s Final: Date 11/22/2019 kv Project Review Req: Plumbing/Gas f ` Rough Plumbing: Building Official Final Plumbing: z : This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within samonths after issuance. All work authorized by this permit shall conform to the approved applieki nand th6approved construction documents"for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by Iaws:and codes. i � This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Bu Idmg and Fire Officials�areprovided on thispermit. Minimum of Five Call Inspections Required for All Construction Work: " r Service: 1.Foundation or Footing 0. 2.Sheathing Inspection y - Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Building plans are to be available on site Fire Department Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT 1