HomeMy WebLinkAbout0305 HOLLY POINT ROAD o � �M1
,�
{
Q
``
Un��fi� li`�
a�
°FZHEry Town of Barnstable
aAxHsr"LF. : Building Department-200 Main Street x
. a MA 02601
9$ a63q. �00 Hyannis,
AlEO M Tel. (508) 8624038
Certificate Of Occupancy
Permit Number: B-19-2441 CO Issue Date: 8/24/2020
Parcel ID: 232-068 Zoning Classification: RD-1
Location: 305 HOLLY POINT ROAD, CENTERVILLE Proposed Use:
Name of Tenant: Sprinklers Provided:
Gen Contractor` WILLIAM A RILEY
Permit Type: Residential - Single Family
Type of Construction:
Design Occupant Load: D
Comments: Single Family Home, 3 BR, 4 1/2 Bath with 2 car attached garage
2 �
Building Official Date:
A Certificate of Occupancy is Required Prior to Occupying Space
Building Code: 780 CMR 9th Edition
ACUSMCT MVMY SmUTIONS
TeL 774-320-0360
Blower Door Test Form
sue• our ®�
Mm Area(f : --
Cm a Vam(
Lot Nwnber
Y. : Acu bad Energy Soluf N
z ]BPI caddcwm M9315
-- `�` -- Pbaw. 774.3M360
L
• Alctm Door Mug TDlamm
Fan Con6ig onFlow Rage(cfm)far Nadel 3 Fm
Opm Gm Flow Ring} b,34Q-2,430
Ej
2,800.915
• 10100- 1
C 330-95
emm ma based on 3 ACMO(Code Limit}
CFM5O MANOO:05 x Volume
Volume Valame= �
7 d=O
BU
ILpING pEPT' CFMsa --
• .. TAg�E
-..ice TOWN Of BARNS
FWVMmMN: Modal 500Q,#5FN102249
Manmdw. DM 32 #408990\.t
TbW radon ACHS
Paselm
Duct Leakage Test Farm
C=errmati�sTmdcondbbm
Name: Data:
Addt+o &- Tim: 2-4-
ch9= _ Indoor TempemtM n.
outdoor Tmpwdm f FY
FIMAM(* G�DGIJ
Sj►8tm Aitfiow(o ttY.
Cooing ske{tons):
i fd flnm aboyd Iiea�c+g Size(btt�k
Pshmy Looatiost of
cr tmiA Pftm Loa d=Of
Retum DwntworlC
Commemilm
T l _balAt ----
UILDING DEPT.
TeatPressm (Pe) AUG 2 0 2020
Baser Duct Frese� ; , - -
Flow Mg Fm WN OF BARNSTABLE
DudPrm bMded i
Fast Mod*M.-AM Te&20 IFLA WS
AGE&" V Solutions
Rom
1 Leo Pachm I#545"15
CM MCM&
Tow Lpa{c$n);
ToW%ftorArea: ��, s.
Town of Barnstable Building
Ixn> t Post This Card So That it is Visible from the Street-Approved Plans Must be Retained on Job and this Card Must-be Kept
"' een Made.
Posted Until Final Inspection Has B Permit
s639 ,�
°i Where a Certificate of Occupancy is Required, Building shall Not be Occupied until a Final Inspection has been made.Permit No. B-20-1702 Applicant Name: Tim Sanborn Approvals
Date Issued: ' 07/17/2020 Current Use: Structure
Permit Type: Building-Solar Panel-Residential Expiration Date: 01/17/2021 Foundation:
Location: 305 HOLLY POINT ROAD,CENTERVILLE Ma L p/ ot: 232-068 Zoning District: RD-1 Sheathing:
Contractor Name `-_R, USSELL CAZEAULT Framing: 1
Owner on Record: POLIVY, LINDA �
1 7 License: CS'108 5
Address: 120 GORDON RD Contractor2
43 956.00
WABAN, MA 02468 "�; Est. Project Cost $ Chimney:
f Y
i
Description: Install 12.21 KW Solar system with 37 Solaria XT330 watt_Panels on Permit Fee: $ 274.18
Insulation:
roof 1 x
I Fee Paid: $274.18
Final:
Project Review Req: „ Date � 7/17/2020
:.
Plumbing/Gas
Rough Plumbing:
ff
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after Issuan icial Final Plumbing:
All work authorized by this permit shall conform to the approved application and theapproved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. I Final Gas:
The Certificate of Occupancy will not be issued until all applicable signatures by'the Building.and-Fire-Officials are`provided onthis permit. Electrical
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Service:
2.Sheathing Inspection ,•
3.All Fireplaces must be inspected at the throat level before firest flue liningIs installed Rough:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
Final:
S.Prior to Covering Structural Members(Frame Inspection)
6.Insulation
Low Voltage Rough:
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Final:
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final-
ryirwt,=__ 5
Lauzon, Jeffrey
From: Lauzon,Jeffrey
Sent: Monday,July 06, 2020 2:53 PM
To: deborah@cazeaultsolarhome.com
Cc: Lauzon, Jeffrey
Subject: TB-20-1702
Applicant,
Please be advised that the above application has been reviewed and the following is noted:
1)The construction documents reflect 305 Holly Point Rd. and the application is for 312 Holly Point Rd. No worker
compensation affidavit has been submitted for the subcontractor and the sub contractor is not identified. Our records
indicate Linda Polivy as the owner of 312 Holly Point Rd. (not Ken Polivy as submitted). (780 CMR R105.3)
The application is denied pending submission of all required documents that reflect the correct information. And, if
aggrieved by this notice; you may appeal to the Building Appeals Board within 45 days in accordance with M.G.L. Chapter
143 Section 100. Thank you.
Jeffrey Lauzon
Chief Local Inspector.
(508)862-4034
ieffre y,is uzon Cad to wn,barnstabie,ma,us.
1
Town Of Barnstable RECEIPT
HAANsrAeLr, ' 200 Main Street, Hyannis MA 02601 508-862-4038
Application for Building Permit
Application No: TB-20-1702 Date Recieved: ,7/2/2020
Job Location: 312 HOLLY POINT ROAD, CENTERVILLE
Permit For: Building-Solar Panel-Residential
Contractor's Name: RUSSELL CAZEAULT State Lic. No: CS-108157
Address: 2071 MAIN STREET, Brewster, MA.02631 Applicant Phone: (978) 2814625
(Home)Owner's Name: POLIVY,LINDA Phone: (617)968-7575 -
(Home)Owner's Address: 120 CORDON RD, WABAN,MA 02468
Work Description: Install 12.21 KW Solar system with 37 Solaria XT330 watt Panels on roof
Total Value Of Work To Be Performed: $431956.00
Structure Size: 0.00 0.00 0.00
Width Depth Total Area
I hereby swear and attest that I will require proof of workers'compensation insurance for every contractor,subcontractor,or other worker before
he/she engages in work on the above property in accordance with the Workers' Compensation Act(Chapter 568).
I understand that pursuant to 31-275 C.G.S.,officers of a corporation and partners in a partnership may elect to be excluded from coverage by
filing a waiver with the appropriate District Office;and that a sole proprietor of a business is not required to have coverage unless he files his intent to
accept coverage.
I hereby certify that I am the owner of the property which is the.subject of this application or the authorized agent of the property owner and have
been authorized to make this application. I understand that when a,permit is issued,it is a permit to proceed and grants no right to violate the
Massachusetts State Building Code or any other code,ordinance or statute,regardless of what might be shown or omitted on the submitted plans and
specifications. All information contained within is true and accurate to the best of my knowledge and belief.
All permits approved are subject to inspections performed by a representative of this office. Requests for inspections must be made at least 24
hours in advance.
Signed: Tim Sanborn 7/2/2020 (978)281-4625
Applicant Date Telephone No.
Estimated Construction Costs/Permit Fees
Total Project Cost : $43,956.00 Date Paid Amount Paid Check#or CC# Pay Type
Total Permit Fee: $274.18 7/2/2020 ( $224.18 Paypal Paypal
Total Permit Fee Paid: $274.18 7/2/2020 1 $50.00 Paypal Paypal
y THIS, IS NOT.A PERMIT tNe
110
Town of Barnstable Building
r � Post ThiswCard So That it is.Vrsible From the Street-Approved Plans Must beRetained on Job antl this Car._d Must;beKept
Posted Until.Final-Inspection Has,Been Made yam �*
Where a.Certificate of Occupancy is Requi'red,-.such Building shall Not be Occupied until a Final Inspection has been made ��i liil'l
�.� .._
Permit No. B-19-2441 Applicant Name: William Riley Approvals
Date Issued: 08/19/2019 Current Use: Structure
Permit Type: Building-New Construction-1 or 2 family Expiration Date: 02/19/2020 Foundation: 1011-7 I(g
Residential May Lot 232-068 Zoning District: RD-1 Sheathing:
Location: 305.HOLLY POINT ROAD,CENTERVILLE Z�
Contractor Name: WILLIAM A RILEY Framing:
Owner on Record: 305 HOLLY.POINT LLC
Contractor License: CS-069004 2 Z( I'(
a
Address 120 GORDON ROAD
Est P,rolect Cost: $ 1,100,000.00
Chimney:
WABAN,MA 02468 Permit Fee: $5,735.00
Description: Demo existing,saving foundation(Demo permit Insulation:
has been,
Fee ,735.00
submitted). New construction from foundation up' Paida $5 final®8lyo ZaZ0-R1K�
Date.- ' 8/19/2019
Project Review Req: AS BUILT SURVEY REQUIRED BEFORE START OF FRAME "� p
Plumbing/Gas
_G '✓ Rough Plumbing:
Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall tie in compliance with the local zoning by-laws'and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same.
------------------
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by.the Building aril Fire Officals are provided:orrthis,permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
I.Foundation or Footing Rough:
2.Sheathing Inspection g
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection)
Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
6N�^a�
AGRI BALANCEO Oo A ' �O
D - 800aoop
Company Name Cape Cod Insulation Phone Number 508 775 1214
Applicator Name Josh Alston Installation Date 2/25/20
Jobsite Address 305_Holl_y Point A-Side Lot #'s PA86001994
Permit Number B-Side Lot #'s P1319334019
o o o� fl ►� �1 -� O � ! 00 0 - �o (�,
Walls/ Rim Joists 5.5" R-24 2200
Attic 8.511 R-38 2500
Vapor Barrier Paint all open cell foam 17 mil wet
FDC315 all exposed foam 118 mil wet
www.Demilec.com CBDEMILEC
Town of Barnstable
. . uil n
reiar,�rn r Post This Cacd So That°it is Visible From the Street Approved Plans:M'ust"be Retained on Job and t ,Is Car Must a Kept
Posted UntiI Final Inspection Has Been Mader Perm
i here a�Certificate of Occupancy ss Requ red such Building shall Not be Occupied until a FinalJnspection ha en made ~ 1 el ilil
Permit No. B-19-2375 Applicant Name: William Riley Approvals
Date Issued: 08/19/2019 Current Use: Structure
Permit Type: Building-Demolition Expiration Date: 02/19/20210 Foundation:
Location: 30S HOLLY POINT ROAD,CENTERVILLE Map/Lot: 232068 Zoning District: . RD-1 Sheathing:
Owner on Record: 305 HOLLY POINT LLC Contractor Name:`'�WlLLIAM A RILEY Framing: 1
Address: 120 GORDON ROAD Contractor License: C5=069004 2
WABAN, MA 02468 � Est Project Cost: $_15,000.00 Chimney:
Description: Demolish the existing house,keeping the foundation,theinbuild a Permit Fee: $125.00
new home. I Insulation:
.P
�.
Fee.Paid: $ 125.00
II
Project Review Req: ; Date "' 8/19/2019
Final: O h/141
Plumbing/Gas
Rough Plumbing:
�.. ui m icia
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuan Final Plumbing:
All work authorized by this permit shall conform to the approved application and the'approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.. Rough Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. y final Gas:
J E
The Certificate of Occupancy will not be issued until all applicable signatures by the Building-and-Fire.Officials are provided on this permit. Electrical
Minimum of Five Call Inspections Required for All Construction Work:
1.Foundation or Footing Service:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lirnng s installed „ Rough:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection w} i4
Final'
5.Prior to Covering Structural Members(Frame Inspection)
6.Insulation
7.final Inspection before Occupancy Low Voltage Rough:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage-Final:
Work shall not proceed until the Inspector has approved the various stages of construction. Health
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final:
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
JUL/23/2019/TUE 06:55 AM COMM Water Dept FAX No. 5084283508 P. 001/001
CENTERVILLE-OSTERVU,LE-MARSTONS NhLLs
WATER DEPARTMENT
PO BOX 369-1138 MAIN STREET
OSTERVILLE,MA 02655
WWW.CO WA_U- .COM
OFFICE OF o
BOARD OF WATER COMMSSIONERS
WATER SV?EItVT)rNA)tNT
Tel 508-428-6691 ZATER
FX 508-428-3508 DEPT.
July 22, 2019
Town of Barnstable
Building Division 1
Via Fax-508-790-6230
RE: 305 Holly Point Rd Centerville `
Acct: 3616 ='
To Whom It May Concern:
On Monday, July 22, 2019 the water service was disconnected after the.
curb stop for the property mentioned above. It is our understanding that the
owner plans to demolish the house, re-build and will install a new water
service at a later date.
If you have any questions regarding this do not hesitate to contact our
office Monday through Friday, 8:00A,M until 4:30PM at 508-428-669 1..
Sincer ,,
Cr Cro er, Superintendent
Centerville-Osterville-Marstons Mills Water Department
CC/cvb
,Parcel Detail Page 1 of 3
`�.
67
'A'
Logged In As: Parcel Detail Thursday, November 13 2014
Parcel Lookup
Parcel Info
Parcel ID C232-068 _ I Developer LOT 41
Lot
Location 1305 HOLLY POINT ROAD I Pri Frontage r126
Sec Road IVINE STREET ( Sec
Frontage 90I
Village�CENTERVILLE W � _ I Fire DistrictC-O-MM
Town sewer exists at this address NO � I Road Index I0731
Interactive *�
Map , "
T
Owner Info
Owner KUMIN,ANITA H ESTATE OF I Co-owner jC/O KUMIN, MAX, EXECUTOR
Streets;BOX 74 I Street2 - I
City ICUMMAQUID � � � I State!MA zip102637 country
Land Info _
Acres 10.34 Use iSingle Fam MDL-01 I zoning f RD� 1 I Nghbd 0108
Topography KeVel �I Road[Paved �� (
Utilities 1 Public Water,Gas,Septic ) Location Marginal View
Construction Info
Building 1 of 1
YearExt
Built J 1969 Struct Wall 1 Roof Gable/Hip all iWood Shingle -.WDris2,2 el
Living 1992 I Roof Asph/F GIs/Cmp ( AC'None Ib
Area cover Type
]U � '
Bed
Style Ranch I wen Typical I Rooms I3 Bedrooms ( ��•
Model R Floor esidential I Ior Hardwood I Bath 3 Full
Roomswth3a
Grade Avera a Plus Heat Hot Water Total(66Ro�or s n
��g ._._.I TYPe�� Rooms t ._`_.____� ,• �w �•.� �' ��.
Stories 1 Story IHeat Fuel Gas F ation TypicalI r
Gross 14772 _I
Area
FPermit History
http://issgl2/intranet/propdata/ParcelDetail.aspx?ID=16597 11/13/2014 .
-Parcel Detail Page 2 of 3
Visit History
Date Who Purpose
9/7/2012 12:00:00 AM Teresa Wright In Office Review
10/24/2000 12:00:00 AM Paul Talbot Meas/Listed-Interior Access
- Sales History
Line Sale Date Owner Book/Page Sale Price
1 4/25/2006 KUMIN,ANITA H ESTATE OF D1031916 $0
2 2/15/1989 KUMIN,ANITA H C116907 $155,000
3 11/6/1975 RASK,ALICE A ET AL C65853 $0
Assessment History
Save# Year Building Value XF Value OB Value Land Value Total Parcel Value
1 2014 $147,700 $50,100 $5,500 $194,300 $397,600
2 2013 $147,700 $50,100 $5,600 $194,300 $397,700
3 2012 $147,700 $49,300 $4,400 $189,100 $390,500
4 2011 $196,300 $3,100 $0 $189,100 $388,500
5 2010 $196,200 $3,100 $0 $199,600 $398,900
6 2009 $188,600 $2,600 $0 $248,100 $439,300
7 2008 $222,600 $2,600 $0 $280,700 $505,900
9 2007 $221,100 $2,600 $0 $280,700 $504,400
10 2006 $212,600 $2,600 $0 $257,500 $472,700
11 2005 $193,900 $2,500 $0 $236,400 $432,800
12 2004 $156,700 $2,500 $0 $236,400 $395,600
13 2003 $161,100 $2,500 $0 $55,600 $219,200
14 2002 $161,100 $2,500 $0 $55,600 $219,200
15 2001 $161,100 $2,500 $0 $55,600 $219,200
16 2000 $116,800 $2,300 $0 $45,500 $164,600
17 1999 $116,800 $2,300 $0 $45,500 $164,600 .
18 1998 $116,800 $2,300 $0 $45,500 $164,600
19 1997 $131,700 $0 $0 $40,700 $172,400
20 1996 $131,700 $0 $0 $40,700 $172,400
21 1995 $131,700 $0 $0 $40,700 $172,400
22 1994 $117,100 $0 $0 $32,600 $149,700
23 1993 $106,700 $0 $0 $32,600 $139,300
24 1992 $121,100 $0 $0 $36,200 $157,300
25 1991 $129,000 $0 $0 $72,400 $201,400
26 1990 $129,000 $0 $0 $72,400 $201,400
27 1989 $129,000 $0 $0 $72,400 $201,400
28 1988 $90,500 $0 $0 $39,000 $129,500
29 1987 $90,500 $0 $0 $39,000 $129,500
30 1986 1 $90,500 $0 $0 $39,000 $129,500
Photos
http://issgl2/intranet/propdata/ParcelDetail.aspx?ID=16597 11/13/2014
,,Varcel Detail Page 3 of 3
ONO
WHEN
_
r
n
4
s 3
http://issgl2/intranet/propdata/ParcelDetail.aspx?ID=16597 11/13/2014
713 L=20.0 1 LOCUS ADDRESS:
R=50G.39 305 HOLLY POINT ROAD
" 3 aa CENTERVILLE., MA
m 70 � ' e 5,57 55' 4011E
O O ' I 1 29 7O
O o ASSESSORS MAP 232 PARCEL 68
0 --a � ; a,
off o REFERENCE CERT: 218274
PLAN REFERENCE: LC 20239C (3)
END OF TOWN' 32.3 --' N LOT 41
BRB FND. LOT AREA = 15,869 S.F.
PLAN .LEGEND: < ZONING DISTRICT: RD-I
GROUNDWATER OVERLAY DISTRICT: GP
S
c7Q. UTILITY POLE % rn' 't N RPOD O
WETLAND FLAG 1,; = 01
,; (S� N z 20'FRONTAGE
J p O '1 -4 Z (� 0- 1 25'WIDTH
O �i
OVERHEAD WIRES p ; / ; lu
N �T a 30'FRONT YARD
_ O ' / 1 rn �O � 10'SIDE AND REAR YARD
C
n ; G; rnZ 2
r 700 c� MAX. BLD. HEIGHT = 30'
rn
O z 50' FROM MHW
I FEMA ZONE: "X"(0.2%)
FIRM MAP: 25001 G0562J
i
% O MAP DATE: JULY 16, 2014
32.9.
; 1 C
33.3'
1 It1 HEREBY CERTIFY THAT, TO THE BEST OF MY
\ ; KNOWLEDGE, BASED ON AN INSTRUMENT%Uf�YV
> THE STRUCTURES SHOWN HEREON A
THEY EXIST ON THE GROUND. =��� Cad`.i FJ.
CSC=
50 M O i o DOYLE 10.10.
.` 35
4� CB F'ND. "? ��9iyO d . NO. �P =
ES
=FFER
\31 o FOUNDATION CERTIFICATION PLAN
------------ ---- _ EDGE Prepared For
--------------- 305 HOLLY POINT ROAD, CENTEPWILLE MA
OF \` Tip N82° 35' 00"W PAVEMENT _-- -
F 7�c
BUILDING DEPT• _Pq M ` 8p_ - - Stephen Doyle * A550ciate5
`- ENT P. 0. Box G21
OhW
L=40.74 - ��'-�---___ — East Falmouth, Massachusetts 0253G
OCT 2. R=30.00 �, ---- ---_-___EDGE - OF Telephone: 508 540-2534 5jd5urvey@aol.ccm
TOWN OF BARNSTABLE EOW#3 . DATE: OCTOBER 17, 2019 SCALE: I" = 20'
EOW#I EOW#2 OF --------
�0�'� 0 20 40
��P Feet
wEQUAQUET LAKE