Loading...
HomeMy WebLinkAbout0012 MIZZENTOP LANE /d Irwi�vp /�i Town of Barnstable uildin g Post This Card So That�t is'Vis�ble:From the Street Approved Plans Must be Retained on Job andthis Card Must be Kept MA Posted Until'Final.lnspection Has Been Made - .b�� 1 �a Where a Cert�ficate'of Occu ancy-�s Re wired,such Bu ldm shall Not be Occu ied until a Final Ins ectidr has been made p a p p. . g �e ti �� .. s. .v.� ..�. .. �. p Permit NO. B-18-4001 Applicant Name: Richard Tupper Approvals Date Issued: 12/07/2018 ' Current Use: Structure Permit Type: Building Insulation'-Residential Expiration Date: 06/07/2019 - Foundation: Location:. 12 MIZZENTOP LANE,CENTERVILLE Map/Lot 247-056 Zoning District: RB Sheathing: Owner on,Record: OLIVEIRA,MARCO A ",Cont Name" - Richard STupper Framing: 1 w r Address: 6 IVIADISON AVENUE WEST I; Contractoricense CS069058 2 WINCHESTER, IVIA 01890 Est Project Cost: $ 1,316.00 Chimne y. Permit Fee: .Description: Insulation/Weatherization..Exterior walls-drill and plug $85.00 Insulation: , Project Review Req: ? Fee-Paid E $85.00 ti Date ., ` 12/7/2018 Final • � � �l ��� Plumbing/Gas Rough Plumbing: Building Official , Final Plumbing: pt This permit shall be deemed abandoned and in unless the work authorized by this permit is commenced within six months afte_issuance. Rough Gas: All work authorized by this permit shall conform to.the approved application and the'approved construction documer t& which this permit has been granted. ,All construction,alterations and changes of use of any building and structures,shall be in compliance with the local zoning by laws and codes. Final Gas: This permit shall be displayed in a location clearly visible from access street cr'road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. rElectrical The Certificate.of Occupancy will not be issued until all applicable signatures�by the Building and Fire Officials are provided on thts`permit. Service: Minimum of Five Call Inspections Required for All Construction Work: '` 1.Foundation or Footing _- ugh Ro 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 'Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection - 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage-Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in,MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT 14 2019 12:34PM Tupper Construction Co. 15087785,010 page 1 TUPPEP CONSTRUCTION CO.LLc 546A Higgins CmweA Rd,WEST YAi2MOUTH,MA 02673 PRONE: 508-7784111 FAX 508-778-5010 EMAIL:adm1n@tupperc0.c0Tn Date: Fln a Town of Barnstable Building Inspector 200 Main Street o , Hyannis, MA 02601 (508) 790-6230 fax Re: Insulation Permit at41-2=Mizzentop�Lane , Permit# Issued On This affidavit is to certify that all work completed for the above permit application has been inspected by a certified Building Performance Institute (BPI) inspector. All work performed meets or exceeds ,Federal and State requirements. Sincerely, r Richard Tupper License # CS-69058 Town of Barnstable Building..,r...,-.. p u T�. ' a�..,�r.. �`' rv",,r'z,r �, 9`,a .. 3p'°"9s Post This Card So ThatI�t�s`1/isibieFrom the Street A ' roved Plans Must:beRetamed on lob and this Card Mus be Ke`t g s 6A$�`$IX�1.E., •. ,.,.: .��S�La aj a ' " ? hs? a+ s pp.r-?��•^a c'� r' ✓?< ..£` �` "r" P..osted Until Final.,lns action Has�Been MadeIN', 1639 F y to Rpermit eat Where a Cert�ficateof Occupancyyis Requ►reduch Buifdmg shall Not..beOccupied.wntil a:Ftnai inspection hasF:been,made Permit No. B-18-3339 Applicant Name: William Callahan Approvals Date Issued: 10/10/2018 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 04/10/2019 Foundation: Location: 12 MIZZENTOP LANE, CENTERVILLE Map/Lot: 247-056 Zoning District: RB Sheathing: Owner on Record: OLIVEIRA, MARCO A Contractor'Name:, WILLIAM CALLAHAN Framing: 1 Address: 6 MADISON AVENUE WEST Contractor"License: CS=095581 2 r WINCHESTER, MA 01890 Est. Project Cost: $5,100.00 Chimney: Description: Install insulation in the attic,basement and crawlspace'. Permit Fee: $85.00 Insulation: Project Review Req: Fete Paid $85.00 Date.. 10/10/2018 Final: Plumbing/Gas L Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized'hy this permit is commenced within six months aftei issuance. Rough Gas: All work authorized by this permit shall conform to the approved application and the-`approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structuresll be in compliance with the local z sha oning by ,,Ws and codes. Final Gas: This permit shall be displayed in a location clearly visible from access street be.road and shall be maintained open for;public'inspeetion for the entire duration of the work until the completion of the same. Electrical t The Certificate of Occupancy will not be issued until all applicable signatures by the Building and:Fire Officials are;provided on this'permit. Service: Minimum of Five Call Inspections Required for All Construction Work:; 1.Foundation or Footing : `' Rough: 2.Sheathing Inspection . �.... .> 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing;and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A): Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT t "' { � _ Fes. ...''r-� - e sor's map; and lot Number WPTIC SYSTEM k i� F ETo� ` INSTALLED IN COPUPLI Sewage, Permit number WITH TITL . B i Z House number yn o b TOV f -TOWN'+ ,.:OF BARN.STABLET t U:ILD1: IN. P. C R G Family -room. addition APPLICATION..FOR PERMIT ,TO :..: ......................:...... ......... ......... ......... ......... ..................... ..............:. 4 Wood r ' TYPE •OF' CONSTRUCTION' ..,� ...k �. . . 3/23�87....:............. i9.87. TO THE INSPECTOR OF BUILDINGS: . The undersigned hereby ,applies for' a permit according the following information: Lot 39 Mizzentop Lane Hyannis Location ............................ ................................. :....... . ..............:.`. ............................................................ .. , f Proposed Us`e ...... Resldental ......... ..... ... ................. } Zoning District .......................................... ?. .Fire District jnnls ......................................... Cecyl Brethwaite _' ` ° 220 We mouth Street Holbrook MA Name of Owner .... .... .... Address .... ......... .. ..... ...... ............ , . Stanley St. Peter 3715 Main street Barnstable023 343 Name of Budder ....._.. Address .............. .. .. :..., ......... . ' Name of Architect :::.. .... ... NA .................Address ............................... .......................................... ......... Number of Rooms .... ......3 :.:Foundation CO21C ete WC shingles Asphalt Exierior ...:. ....... :.+.............................. .....................Roofing ... ........ Oak/carpet/vinyl Drywall Floors ........ ........... ........ .............. ..:.. ......."Interior; ......................................:. ...................................... Fo ced hot water k NA Heating ... ................................ .... .............................. .Plumbing ....................... Fireplace ... :..NA ......::... :........ .......{. .......Approximate•Cost .... :. 16K Definitive Plan,A roved b Planning pp Y 9 Board --- ------- --------'------19 ------- • -� Area .. :......i.�. ....�................ Diagram of Lot and Building with Dimensions =Fee ' SUBJECT TO�APPROVAL OF BOARD�.OF HEALTH i A d.1 N � LAL 3 A .P OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS'. - I hereby'agree'to :conform to all the Rules',andRegb fations of the,Town*of' Barnstable regarding the above construction. Nam - � i �--- . m 1 eI. ...... . ................... r , Construction Supervisor's License ...::®O 06.....:. i3RE`1:HWAITE, CLCYL _ 30552 Permit for ADDITION - - Single F amiJ_y Dwelling M .. ...:................................................... Lot #3 9 , 12 Mi z ent6p Lane Location ............................................ ............ ... i " ............. ...- . ==.:. C J,.I.le..... r J 47 Owner Cecil..-I;ret�iwaites{ 11-1 171 �. ............ . Type of Construction .....Frame.... y !l r i .. Plot ............................. Lot .............:.................. f c i t �✓ .�.i . t Permit Granted .........March 2 4 . .:...19 87 M: � •„ � �.;� 1 ' - Date of Inspection ........................... c19 r I •� Date.Completed ....... ....... ... ....19. -. < - - ♦ . - _. .r ( � _ - bi c } J AL �n�-+, f'f — Y.� _ M1..' - �•^,ter'• ~` fil"'�