HomeMy WebLinkAbout0151 OAK STREET (CENT./W.BARN) 41
Y How&I via A
m
y
e „ a
e
o z s r
u
P n
J
' c ;
o ,
r
o ,
a ,
o }
,P
TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION 1De n-r d
'Map l� � Parcel Application # �lo"2A
Health Division - ' Date Issued
Conservation Division Application Fee
Planning Dept. r Permit Fee
Date Definitive Plan Approved by Planning Board
Historic - OKH� _Preservation/ Hyannis
Project Street Address 1 S
Village CPhf erc-/l e-
5ir e t,Owner !
Telephone
ol
Permit Request Dewol fic-o ol' G Sic, "S 100ppq A'c, ! co S e- om /5- 1, 5
/ AP-,Y ;s C►/Su a S k1^ci l/ SL,Qr�P 7�q� r„�11 hP 4114rPh . 074fS/k. ,i
"'A
JA61re feet: 1 st floor: existing 7 proposed d 2nd floor: existing d proposed Total new A
pq rri p 17lr/ pro'er ham„ OVri/a y
Zoning District PC Flood Plain Zone C Groundwater Overlay `� rs.
Project Valuation 000 Construction Type ( 0000 vc+w2
Lot Size 2 I0,OW G Grandfathered: ❑Yes ® No If yes, attach supporting documentation.
- J
Dwelling,Type: Single Family �d Two Family ❑ Multi-Family (# units)
Age of E sting Structure 19(P O Historic House: ❑Yes_�'No On Old King's Highway: ❑Yes 0 No
Basement Type: A Full ❑ Crawl ❑Walkout ❑ Other��F
Basement Finished Area (sq.ft.) 0 Basement Unfinished Area(sq.ft) 75D
Number of Baths: Full: existing_ new Q Half: existing new
Number of Bedrooms: , existing d new
Total Room Count (not including baths): existing -new# `, `" First Floor Room Count L
Heat Type and Fuel: )d Gas0 Oil ❑ Electric, ❑ Other
Central Air: ❑Yes dNo/Fireplaces: Existing n New Existing wood/coal stove; ❑Yes A No
V a
Detached garage: ❑ existing ❑ new size—Pool: ❑ existing ❑ new size _ Barn: ❑ existing 0 new 'size_
Attached garage: ❑ existing ❑ new size _Shed:W existing ❑ new size 80 Other:
Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑
Commercial ❑Yes No If yes, site plan review # ' a
nn A
Current Use !1 y//I�.6 4 6A PS Co f2« Proposed Use -ro 6e �wk o
APPLICANT INFORMATION
- - `_ -,(BUILDER OR HOMEOWNER)
5
Name C►� ti CJT��jr / /�n /hwoGc CcoS6 ,r Tele phone Number' " 9-77010— '
Address S 3�O Cnm nile_ Soef License #
• -/Yyp 91/4' 0 Z I K y Home Improvement Contractor#
Worker's Compensation # O 15 L G- 3 9 S
ALL CONSTRUCTION DEBRIS RESULTING FROM THIS/ PROJECT WILL BE TAKEN TO
/5Uvs+rre IHc'pl�
1
SIGNATURE , � DATE C,! Z el J15
FOR OFFICIAL USE ONLY
APPLICATION#
DATE ISSUED
MAP/PARCEL NO.
ADDRESS VILLAGE
OWNER
DATE OF INSPECTION:
FOUNDATION
FRAME
INSULATION
FIREPLACE
ELECTRICAL: ROUGH FINAL
PLUMBING: ROUGH FINAL
GAS: ROUGH FINAL
FINAL BUILDING
DATE CLOSED OUT
ASSOCIATION PLAN NO.
i
BROWN. LINDQUIST FENUCCIO & RABER ARCHITECTS, INC.
13 May 2013
Thomas Perry, Building Commissioner
Town`of Barnstable
200 Main St. p -
Hyannis, MA 02601
RE: Submittal.of Controlled Construction Report No. I
12 Unit Housing Development for Barnstable Housing Authority,
70 Stage Coach Rd. & 151 Oak Street, Centerville
Dear Mr. Perry, ='
sti v ac i Construction activities
o t . es have been underwayat the subject project since late March. Over
J P J
the last couple of months, the following general work has occurred:
1. Site clearing and mobilization.
2. General excavation and preparation for footings
3. Form and pour of all 3 building foundations
4. Demolition of the 151 Oak Street house
5. Installation of underground site drainage structures
Briggs Engineering & Testing has been retained for compaction and concrete testing.
Their reports will be forwarded as part of this and subsequent progress reports. J.M.
O'Reilly& Associates, the civil engineer of record has also been on site inspecting site
work and will be submitting a certified foundation plan soon. -
We have been conducting weekly job site meetings to monitor work in progress and
adherence to the construction documents. All work completed to.date has been done in a
good and workmanlike manner and in accordance with the construction documents. A
series of testing reports and progress photographs are included for your reference.
If you have any questions,please feel free to contact me at any time.
.Sincerely
Tim Sawyer
CC: Jeff Lauzon(Barnstable Building Dept.)
Tom Shevory (Dellbrook Construction)
Sandee Perry (Barnstable Housing Authority)
Kevin Maguire(Oxbow Partners)
Rick Fenuccio (BLF&R Architects, Inc.)
203 WILLOW STREET,SUITE A PH 508-362-8382
YARMOUTHPORT,MA 02675 WWW.CAPEARCHITECTS.COM FAX 508-362-2828
INKE Tow I of Barnstable
Zonin s B and of Appeals Laura F. Shufelt, Chair
t67¢ �0
�°r�u�r.+• 200 Mai �Str rt, Hyannis, Massachusetts 02601 Phone(508)862-4785 Fax(508) 862-4784
Q�
Growth Management Department
367 Main Street, Hyannis, MA 02601
Jo Anne Miller Buntich, Interim Director
November 04, 2009
Reference: Request for Review of Barnstable Housing Authority Chapter 40 B Comprehensive
Permit Application for development of Stage-Coach Residences — 70 Stage Coach
Road and 151 Oak Street, Centerville,MA (Map 173, parcels 026 and 014-001)
Thomas Perry, Building Commissioner
Town of Barnstable, Building Division
200 Main Street ,
Hyannis, MA 02601
Dear Mr. Perry,
Enclosed is'a Chapter 40 B Comprehensive Permit Application submitted by the Barnstable
Housing Authority for the development of 12 affordable rental apartment units. The units are to
be located in three, two-story buildings and consist of 6 one-bedroom and 6 two-bedroom units.
The development.is located on a 6.9 acre site created by the combination of two lots (70 Stage
Coach Road and 151 Oak Street). The units are to be clustered on 2 acres accessed from Stage
Coach Road. The remaining area of the property is to be protected and.preserved through a
conservation restriction.
The Comprehensive Permit process designates the Zoning Board of Appeals as the local permit
issuing board. In accordance with CMR 760 Section 56.05(3), the Board is notifying you of this
application and requesting your review of the application prior to its decision.
The public hearing is scheduled to be opened on December 2, 2009 at 7:00 PM. If you could
provide your comments to this Office by November 24, 2009 for transmittal to the Board
Members and the Applicant prior to the hearing, it would be greatly appreciated. Should you
need any additional information, please contact myself or Carol Puckett at`508-862-4785. On
behalf of the Board, thank you for your participation and assistance.
Res ectfu I ly,
1 Z
y
Arthur P. Traczyk, Regulatory/Design Review Planner f�
Growth Management Department
File—Zoning Board of Appeals—Correspondence—2009—L-110409 BHA Stage Coach Road Residences Ch 40B.doc P.
Copy: James F.McGillen,Vice Chair,Zoning Board of Appeals
Jo Anne Miller Buritich,.lnterim Director,Growth Management Department
ZBA File 2009-069- BHA Stage Coach Residences Ch.40B �- 9