Loading...
HomeMy WebLinkAbout0114 TARAMAC ROAD !( �t nt� Ix 4 /L r ASt� p, j�. lf I 1�Yv •.�'�' .,d t'" 'Ih-n 1'` ':Ny�4st r b 41 ! Y v AR y� �%�-cr� rl Aft :�N flki y P r (aj a4 `h c�ly�tyk 4 p Iv«r pt Y J t ! r r� Iy��i I +, r t to .sr: `W" u r�W� ,iK r dri.r f Endless Mountains SOLAR SERVICES Town of Barnstable Jeffrey 1. Lauzon 200Main Street Hyannis Ma 02061 RE: 114 Taramac Rd. Centerville Ma Map169 Parcel:087 Dear Mr. Lauzon: Enclosed is the letter'from ASA Engineering for the reference address above, as discussed on the phone the report was reconfirmed to match the installation of the PV solar system at the 114 Taramac residence. Thank You for your patience and response to this matter, hope to work with you again soon. James Laskowski Endless Mountain Solar Services 288 Kidder St Wilkes Barre Pa 18702 0 c) R ASA. Engineering Shrewsbuty,, Ma February 5,,2012 To:John.Pitcavage Endless Mountains Solar'Services Re: Solar Array"installation 114 Tarainac Road: Centerville. Ma .Per your request, I have performed a site-inspection of the existing roof structures and framing system-,at the above referenced prajeet. This evaluation was conducted to determine if the existing roof structural system has.the load.carryiug capacity to support the additional proposed loading for the solar may system. Upon the review of the:roof structural components and.configuration (Truss support system at 24"OC )and based on my best professional opinion, I have determined, that the existing roof system.have:adequate load-carrying,capacity to support the proposed solar array and the loading is within the limitation of current.local building code. (Ground Snow Load o.f 35 Psf) The roof connection system for the solar panel shall also be in conformance with the system installation manual, in order to resi t.the'uplift forces due to basic wind speed as determined by the current building code (120 MPH). I also recommend staggering the attachment ofthe rail to the roof at alternating truss.supports between the upper and lower rail,to avoid concentrating .loads on one single truss support.Each lag screw must also be centered.on and fully penetrate.the 2"x6"upper cord (min 2"embedment). In particular the'installation is designed to confirm with. AS:CE-70 wind limitations and Endless Mountains Solar Services shall,confirm that the system designed will.be installedaccordingly. Please call me at 978-377-5084 if you have further question regarding;this report. Sincerel Ox. �. h 00 AZIM No.41410 �wg � Sod o l TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map Parcel Application # t &P 33� Health Division Date Issued < Conservation Division Application Fee P ..7� - � V Planning Dept. Permit Fee c Date Definitive Plan Approved by Planning Board - - Y Historic -.OKH _Preservation / Hyannis Project Street Address Villagei6z1/�f._,_ 1� Owner 1c kat_A 1_Zi S 4- Address a aLm a- Telephone 4 08 -H 2Z -]Q L-1 Q Permit Request 26c;-� MAUN4- Square feet: 1 st floor: existing proposed 2nd floor: existing proposed Total new Zoning District Flood Plain Groundwater Overlay Project Valuation C) -- Construction Type Lot Size Grandfathered: ❑Yes al" o If yes, attach supporting documentation. Dwelling Type: Single Family El- Two Family ❑ Multi-Family (# units) Age of Existing Structure Historic House: ❑Yes &VMo On Old King's Highway: U Yea 0<o Basement Type: Ur full ❑ Crawl ❑Walkout ❑ Other t Basement Finished Area (sq.ft.) - Basement Unfinished Area (sgft) Number of Baths: Full: existing new Half: existing - newt = Number of Bedrooms: existing —new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: Jtas ❑ Oil Utlectric ❑ Other Central Air: ❑Yes 01N_o Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: 0-e-xisting ❑ new size—Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: U existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes a o If yes, site plan review # Current Use Proposed Use APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name °� � Telephone Number .7t O-60 el Address f26=-"J ildse7 Rawl License # 7`3 � /� ,A� t- IS 6C / 2 Home Improvement Contractor# 4 921 Worker's Compensation # ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BETAKEN TO 1��%iA16_t4J T; e ,4y614-If A) �� 0 r �,16 � .0 c�� �.�sy 6 SIGNATURE DATE 2_4" �� t - FOR OFFICIAL USE ONLY APPLICATION# DATE ISSUED MAP/PARCEL N0. .0 ` ADDRESS VILLAGE ti :> OWNER DATE OF INSPECTION: FOUNDATION f i FRAME INSULATION FIREPLACE _ 4 ELECTRICAL: ROUGH FINAL. PLUMBING: ROUGH FINAL ' GAS: ROUGH `FINAL FINAL BUILDING I'hIMJA r DATE CLOSED OUT ASSOCIATION PLAN NO. The Coutriton.-wealth of Massadiusetts Deparmiew of Industrial Aeddenn Office of hivesdgations 600 Washrrgtorr.Street Bostorj JVA 02111 =y mev►nmass goy'/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Elee.trici ins/Ptumbers Applicant Information Please Print Legibly Name(Businessi0r_g=afionlbxUxidual): l✓' ✓� �y�/� Address: I 6 ,1'v�l�S G i I?-d A City/State/Zip: CAR L T 6C MA O i 7 V/ Phone#: 700 f 60 C- Are you an employer?Check the appropriate box: Type of project t �. I am a general contractor anc1l p 1 {�egnired): 1.❑ lam a employer with 6. ❑New construction eq*foyees(full and+or part-time).* have:hired the sub-contractors 2.UPM am a sole proprietor or partner listed on the attached sheet 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑Demolition. workingfar me.in an capacity. employees and have workers' n ry comp.insurance.: 9. ❑Building addition [No workers'comp,insurance P• required..] 5. ❑ We are a corporation,and its 10.❑Electrical repairs or additions 3.[1 I.am a homeowner doing all work officers have exercised their i LE]Plumbing repairs or additions myself.[No workers'comp. right of exemption per MGL 12.❑Roof repairs � insurance required.] 152, 1(4),and we have no ' c. employees.(No workers' 13.[R&her comp.insurance required.] I I 'Any applicant that checksbox 1l must also fill out the section below shoving their workers'compensation policy information. t HOmeovmers who submit this affidatrir indicating they are doing all'waa&and then hire outside contractors mmv submit anew affidavit indicating such =Contractors that check.this but must attached anaddidonal sheet showing the name of the sub-contrartots and statewhether or not those entities have employees. If the sub-contractors have employees,_they mast provide their workers'comp.policy number. I ant an employer that isprowi rug workers'con►pensation insnrarrce jbr my employees. Beloit,is the,policy and job site information. Insurance Company Name: Policy#or t3 fins.Lic.'I: Expiration Date: Job Site Address: City/BtateiZip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MOL c. 152 can lead to the imposition of criminal penalties of a fine up to S1,500.00 andlor one-year imprisonment,as well as civil penalties in the form of a.STOP WORK ORDER and a fine of up to$250.00 a day against the.violator. Be advised that a copy of this statement may be forwarded to the Office of 1aveWgations of the DIA fmr insurance cove m e verification. I do hereby ce eprritis and penalties ofperjrin that the itrforntatioti prmzde-d above i true art correct. Si tore: Bate: �Z�'/ ' Y-2,6d C Official rise only. Do not write in this area,to be completed by city or torrtt,ofczal Cite or Torn: PermitlUcense# Issuing Authority(circle one.): 1.Board of Health 2.Building Department 3.City/rm n.Clerk 4.EIectrwal Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone:#: 6 -%'L•, Mwss ichusctts-DeP41-tmcnt'it'Public S.IfctN Sr7.t�tt(�f Btliitiino Retv�tti.ttitrtus anti Stand.trtls Construction Supervisor License License: CS 57328 ry� J J SUPPLE 136 SUNSET RD CARLISLE, MA 01741 Expiration: 9/11/2013 (nnmii..i mcr Tr#: 428 091LlROYi[llP,.2��-�'�7��,l19dC6G/1-CldBf�sl F; Office of C�onsumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration: ..126933 Type: Expiration: 8l10l2012 DBA SPLE CONSTRUCTION CONTRACTING J SUPPLE 136 SUNSET RD �U CARLISLE,MA 01741 Undersecretary DEPARTMENT OF PUBLIC SAFETY Hoisting EngineerUcense F Number: HE 087366 Expires:09/11/2013 Tr.no: 912.0 Restricted: 1 C,2A J J SUPPLE 136 SUNSET RD / t, CARLISLE, MA 01781 Commissioner _ f HOISTING ENGINEER RFSTRIOTI®N C®9E-9 9A:All hoisting Gqulpment(except electrie and air powered heisting ltailure to poisess a current edition of the I. equlpmaht),Including all friction clutth inechihea;derriekks, _ Massachusetts State Building Code € guy derrioks,stiff legs.Chicago booms,gin poloo,lattice booms, is cause for revocation of this license. and equipment with telescoping boom@ with or without wire rapes {.. I&Equipment with telescoping booms with or without wiry ropes, �CfCP to: W W1d1a99.fi'Ov/1��� t C.5quipment with hydrollo telescoping boom without wire ropes, 2A.Crmwier and rubber-fired excavators,backhoas&loaders, I 213,Sackhoes and fronkend loaders, 20:Pront•end loaders; 3A,€lectrie and elf powered heisting equipment, 4A.Unrestricted,49.tlnll rigs,4C,Pipeline sldebooms,4b,Concrete I pumps, 4S.Catchbasin cleaners, 4p,51gn-hangers,40,Mowers bits SAFE CALL CENTER: (939)344•7233 l n Ucense or registration valid for individul use Only, before the expiration dote. iffound return to: Offiee'uf Consumer Affalrs'and Susiness Regulation 10 Park Pfau-Suite 5170 _ f Boston,MA 02.110 F o valid without signature i . t ., a .. .} .. 16" 20 DEG ROOF PrrCH 38-F CHIMNEY - mC [ JLE � MC?[[]kJLES k - UTILITY METER MAIN PANEL JAC DISCONNECT COMPANY:ENDLESS MOUNTAINS SOLAR SERVICES 288 KIDDER ST WILKES BARRE PA 18702 DRAWN BY:JAMES LASKOWSKI 10f25A 1 CUSTOMER: MICHAEL IRISH 114 TARAMAC'RD 17a{AEG SCUfH CE14MR VILLE-MA 02632 ASA Engineering Shrewsbury,Ma November 8, 2011 To: John Pitcavage Endless Mountains Solar Services Re: Solar Array installation 114 Taramac Road, Centerville, Ma Per your request, I have performed a site inspection of the existing roof structures and framing system, at the above referenced project. This evaluation was conducted to determine if the existing roof structural system has the load carrying capacity to support the additional proposed loading for the solar array system. Upon the review of the roof structural components and configuration(Truss support system at 24"OC ) and based on my best professional opinion, I have determined, that the existing roof system have adequate load-carrying capacity to support the proposed solar array and the loading is within the limitation of current local building code. (Ground Snow Load of 35 Psf) The roof connection system for the solar panel shall also be in conformance with the system installation manual, in order to resist the uplift forces due to basic wind speed as determined by the current building code(120 MPH). I also recommend staggering the attachment of the rail to the roof at alternating truss supports between the upper and lower rail, to avoid concentrating loads on one single truss support. Each lag screw must also be centered on and fully penetrate the 2"x6"upper cord (min 2"embedment). Further more I recommend that no panels be installed within 2' of any roof edge. Please call me at 97 - -8 377 5084 if you have further question regarding this report. ,43incei U OF /44ss AZIZI CIVIL � '® 1410 � L .. .i THE r Town of Barnstable j { Regulatory Services MA ASS. Thomas F. Geiler,Director ib39• �� �FDrV4P�p Building Division Tom Perry,Building Commissioner 200 Main Street,Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder a i cl s , as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building pern tt application for. (Address of Job) f .� y ' � Z AL J Sig a e of Owner Date l Print Name If Property Owner is applying for permit please complete the Homeowners License Exemption Form on the reverse side. Q:FORMS:OWNERPERMISS ION J Icy Town of Barnstable \r �FSHE Tp� Regulatory Services -- Thomas F. Geiler,Director • MMSTAat.e. NAM 9�A 1679. A,�� Building Division lf�MAy Tom Perry,Building Commissioner 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 HOMEOWNER LICENSE EXEMPTION Please Print DATE: 10B LOCATION: number street village "HOMEOWNER": name home phone# work phone# CURRENT MAILING ADDRESS: city/town state zip code The current exemption for."homeowners"was extended to include owner-occupied dwelling's"'of six uni or less and to allow homeowners to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor. DEFINITION OF HOMEOWNER Person(s)who owns a parcel of land on which he/she resides or intends to reside,on which there is, or is intended to be, a one or two-family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such "homeowner"shall submit to the Building Official bn a form acceptable to the Building Official, that he/she shall be responsible for all such work performed under the building permit.'(Section T09.1,1) 4+, The undersigned"homeowner"assumes responsibility for compliance with the State Building Code and other applicable codes,bylaws,rules and regulations. The undersigned"homeowner"certifies that he/she understands the Town of Barnstable Building Department minimum inspection procedures and requirements and that he/she will comply with.said procedures:and requirements. r Signature of Homeowner Approval of Building Official Note: Three-family dwellings containing 35,000 cubic feet or larger will be required to comply with the State Building Code Section 127.0 Construction Control. HOMEOWNER'S EXEMPTION The Code states that: "Any homeowner performing work for which a building permit is required shall be exempt from the provisions of this section(Section 109.1.1-Licensing of construction Supervisors);provided that if the homeowner engages a person(s)for hire to do such work,that such Homeowner shall act as supervisor." Many homeowners who use this exemption are unaware that they are assuming the responsibilities of a supervisor(see Appendix Q, Rules&Regulations for Licensing Construction Supervisors,Section 2.15) This lack of awareness often results in serious problems,particularly when the homeowner hires unlicensed persons. In this case,our Board cannot proceed against the unlicensed person as it would with a licensed Supervisor. The homeowner acting as Supervisor is ultimately responsible. To ensure that the homeowner is fully aware of his/her responsibilities,many communities require,as part of the permit application, that the homeowner certify that he/she understands the responsibilities of a Supervisor. On the last page of this issue is a form currently used by several towns. You may care t amend and adopt such a form/certification for use in your community. Q:\WPFILES\FOR.MS\bomeexempt.DOC SUPPLE CONSTRUCTION, INCORPORATED 136 SUNSET ROAD CARLISLE, MA. 01 741 PHONE (978) 369-7305 FAx (978) 371-3181 11-09-11 To, PAUL ROMA: BUILDING INSPECTOR BUILDING DIVISION TOWN OF BARNSTABLE 200 MAIN STREET HYANNIS, MA 02601 DEAR INSPECTOR ROMA, I AM WRITING TO YOU TODAY TO GRANT MY PERMISSION FOR MR. JIM LASKOWSKI TO ACT ON MY BEHALF AS MY AUTHORIZED AGENT FOR ALL BUSINESS MATTERS PERTAINING TO THE APPLICATION AND ISSUANCE OF BUILDING PERMITS IN BARNSTABLE COUNTY. THANK YOU FOR YOUR CONSIDERATION OF THIS MATTER. pis ULLY, LE PRINCIPLE SUPPLE CONSTRUCTION, INC. * MASSACHUSETTS UNRESTRICTED CONSTRUCTION SUPERVISOR LICENSE # 57328 * MASSACHUSETTS HOME IMPROVEMENT REGISTRATION# 126933 * MASSACHUSETTS HOISTING ENGINEER LICENSE # HE087366 02/07/2012 10:45 endless mountains (FAX)5708205993 . P.002/004 'ASA Engineering Shrewsbury, Ma February 5,2012 To; John Pitcavage Endless Mountains Solar Services Re;Solar Array installation. _ '`1r14 Taramae Road- Centerville, Ma y cz ; Per your request,I have perfonned a.site'inspection of the existing roof structures an4 framins— "- system,at the above referenced project. This:evaluation was conducted to determine if the existing roof structural system has the load carrying capacity to support the additional proposed loading for the solar array system. Upon the review of the roof structural components and configuration (Truss support system at 24" OC )and based.on my best professional opinion,I have determined,that the existing roof system have adequate load-carrying capacity to support the proposed solar array and the loading is within the limitation of current Iocal.building code. (Ground Snow,Load of 35 Psf The roof connection system for the,solar.panel shall also be in conformance.with.the system installation manual, in order to resist,the uplift forces:due to basic wind speed as determined by the current building code (120 MPH). I also recommend staggering the attachment of the rail to the roof at alternating truss supports between the upper and lower rail,,to avoid concentrating loads on one single-truss,support.Each lag screw must also be centered on.and fully.penetrate the. TW"upper cord (min 2"embedment), In particular the installation;is designed to confirm with. ASCE-70 wind limitations and Endless Mountains Solar Services.shall.confirm that the system designed will be installed accordingly. Please call me at 978-377-5084 if you have further question regarding this report. Sincerel ah 00 ,�� �, `t► AtANht000 -e AZIZI C,1-9 No. 1�it0 !b r . o-INE� Town of Barnstable _ Regulatory Services Thomas F.Geiler,Director 1639 ; Building Division Tom Perry,Building'Commissioner ,'200 Main Street,Hyannis,,N4A 02601 Office: 508-862-4038 Fax; 508-790-6230 January 20,2012 Supple Construction Contracting ' J Supple z 136 Sunset Rd. : Carlisle, Ma. 01741 RE: 114 Taramac Rd., Centerville.- Ma 169 Parcel: 087 Dear Mr: Supple: ' This letter is to inform,you that a finial inspection of permit application number 201106339 was conducted on or about January 17 2012. It was observed that the installation was not in accordance with the approved engineering and requires:a1etter from the engineer.stating that the `as built' installation is compliant with 780 CMR in order to pass the inspection.The other option would be to install the panels,in accordance with the approved plans and`arrange for a reinspection..Thank you for your immediate attention in this matter. Please do not hesitate to contact this office.with any questions., Respectfully,' r L Lauzon , Local Inspector .(508) 862-4034 June 16, 1975 Mr. J. Dalusz, Building Inspector Torn of Barnstable Town Hall Main Street Hyannis, Massachusetts 02601 Dear Mr. Dalusz: This is to notify you that I am planning to sell my house at ll-i TaramaCd-Road;Cen�erville,�Massachusetts in the near future, and"I would appreciate one of your repre sentatives stopping by to issue me a Certificate of Occupancy for the buyers Thank you for your courtesy in this matter. Ve truly yours. . Julia A. Tobin 114 Taramac Road Centerville, Ma. 02632 C � On ; yam, �� 19 I received this letter in compliance with S_ctlon 111.43 of the State Building Code. i],dlitSg Inspec or N Endless Mtns Solar Services 49y�Pz p�r� L 288 KIDDER STREETz m-G® WILKES—BARRE, PA 18702 � 11 $ 0 EY80.. 02 1P 000.450 r 0001729691 JAN`08 2013 MAILED FROM ZIPCODE 18702 lowh o � �*"�. Tr''f�i"P�� Lq V?o✓1 �. .. a. iaii;lr'i: 11110?IiI' r.il�Pf��3l�1�I 'I:j�,}lii�f�°ilk Nit- . .. .. .:t . _ e f ASA Engineering Shrewsbury,Ma January G,2013 To: John Pitcavage Endless Mountains Solar Services Re: Solar Array installation 114 Taramac Road,Centerville, Ma Per. your request,I have performed a site inspection of the existing roof structures and framing system, at the above referenced project.This evaluation was conducted to determine if the existing roof structural system has the load carrying capacity to support the additional proposed loading for the solar array system. Upon the review of the roof structural components and configuration (Truss support system at 24" OC)and based on my best professional opinion,I have determined,that the existing roof system have adequate load-carrying capacity to support the proposed solar array and the loading is within the limitation of current local building code(M.B.C-7 Edition). (Groun.d,Snow Load s of 35 Psf) The roof connection system for the solar. panel shall is in conformance with the system installation manual,in order to resist the uplift forces due to basic wind speed as determined by the current building code (120 MPI-1).I also recommend staggering the attachment of the rail to the roof at alternating truss supports between the upper and lower rail,to avoid concentrating loads on one single truss support. Each lag screw must also be centered on and fully penetrate the 2"x6"upper. cord(min 2"embedment). In particular the installation is designed to confirm with ASCE-70 wind limitations and Endless Mountains Solar Services shall confirm that the system designed will be installed accordingly. Please call me at 978-377-5084 if you have further question regarding this report. .Sincerely r Ornood Azizi,P.E. INVIL 41 F 8