Loading...
HomeMy WebLinkAbout0143 TERN LANE � � 3 ��T��--h 1`.rx.-n�- J .; �i ,�. ^'44s' . ALTERNATIVE WEATHERIZATION 0. kzo of �NGO Date: OFB OZ0 Town of Barnstable 200 Main St. Hyannis,MA 002601 ` / f Re:Permit#cJ ���Tr l Village: 7�J �The insulation/weatherization work at ZOA has been completed in accordance with 780CMR. Regards, Timothy Cabral, President CSL-105454 58 DICKINSON STREET FALL RIVER,MA 02721 (508) 567-4240 ALTERNATIVEWEATHERIZATION@GMAIL.COM Townof Barnstable Building di g Post;This Card So That it is Visible From the Street 'Approved Plans Must,be Retained on Job and this Card Must be Kept Posted e Until Fin'aI nspection Has Been Made. `' _'r w � '` • Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made �er Permit NO. B-20-1937 Applicant Name: Michael Woessner. Approvals Date Issued: 08/11/2020 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 02/11/2021 Foundation: Location: 143 TERN LANE,CENTERVILLE Map/Lot: 212-019 Zoning District: RD-1 Sheathing: Owner on Record: TWOHIG, BRIAN Contractor Name: MICHAEL WOESSNER Framing: 1 Address: 153 OKENUCK WAY Contractor License: CS-080957 2 SHELTON,CT 06484 ` Est.'Project Cost: $ 12,950.00 Chimney : Description: Bathroom Remodel ( Permit Fee: $ 116.05 Insulation: Project Review Req: TEMPERED GLASS REQUIRED IF LOCATED WITHING Fee Paid.. $ 116.05 HAZARDOUS LOCATION-AS DEFINED BY CODE ' ° '' Dater 8/11/2020 Final: Plumbing/Gas Building Official Rough Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. Allwork authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Final Plumbing: a All construction,alterations and changes of use of any building and structures shall.be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Rough Gas: work until the completion of the same.. Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work- Electrical 1.Foundation or Footing 2.Sheathing Inspection Service: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed ' 7 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection _ Rough: h: _ 5.Prior to Covering Structural Members(Frame Inspection) Final: 6.Insulation i 7.Final Inspection before Occupancy Low Voltage Rough: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. "Persons contracting with unregistered contractors do not have access to the guaranty fund." (as set forth in MGL c.142A). Health Final: Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Fire Department Y ` . � Final: Town of Barnstable _ Buil ding g s Post This Card So T'_ it`is Visible From the Street.-Approved Plans Must be Retained on Job and this Card Must be,Kept� 9ai51CAaiL" m^ Posted Until FinaI inspection Has Been-Made. Permit q iWhere a Certificate of Occupancy is Required,such Budding shall Not be Occupied until a Final Inspection has been made Permit NO. B-20-1329 Applicant Name: Michael Woessner Approvals Date Issued: 06/10/2020 Current Use: Structure Permit Type: Building-Addition/Alteration- Residential Expiration Date: 12/10/2020 Foundation: Location: 143 TERN LANE,CENTERVILLE Map/Lot: 212-019 Zoning District: RD-1 Sheathing: Owner on Record: TWOHIG, BRIAN Contractor Name:'�,MICHAEL WOESSNER Framing: 1 Address: 153 OKENUCK WAY Contractor.License: C5'080957 2 SHELTON CT 06484 Est. S,875.00 Chimney: Y Project Cost: $ hi ` � t Description: Front of house remove three existing Windows install 3 Harvey's t Permit Fee: $85.00 Majesty new construction type windows retrim interior and exterior i' Insulation: , of window. Front interior wall,approximately30 linear feet kitchen Fee Paid Final: : $85.00 wall and living room wall front of house remove'sheetrock remove_ „v,. ' Date* J 6/10/2020 insulation re-insulate apply vapor barrier apply 1/2'inch blue board ' apply smooth finish veneer. Plumbing/Gas Rough Plumbing: Project Review Req: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after,issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. t Final Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Electrical The Certificate of Occupancy will not be issued.until all applicable signatures by the Building and Fire Officials are provided on this'permit. Service: Minimum of Five Call Inspections Required for All Construction Work: ` ' 1.Foundation or Footing ) 'r Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final' 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as.set forth in MGL c.142A). Fire Department Building plans are to be available on site /�L Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT s