HomeMy WebLinkAbout0203 ZENO CROCKER ROAD �� a�o3� Z�C�
o
S.
�� � n
G
/i �
I
I,
I.. t ..
4
9
Town of Barnstable Building
•
• �� � PFps is ost d U tilrFino That
it isVisible
From
he Street Approved tans Must b'e ketained'on''Job and this hard Must t,e KeNI° F
Inspection •
6 Wheresa Certificate of Occupancy is Required,such Building shall Not be Occupied until a final nspection has been made. �ermit
r .
Permit No. B-18-3782 Applicant Name: William McCluskey Approvals
Date Issued: 11/15/2018 Current Use: Structure
Permit Type: Building-Insulation-Residential Expiration Date: 05/15/2019 Foundation:
Location: 203 ZENO CROCKER ROAD,CENTERVILLE Map/Lot: 170-220 Zoning District: RC Sheathing:
Owner on.Record: GREGOIRE, LORRAINE A Contractor Name:; ,WILLIAM J MCCLUSKEY Framing: 1
Address: 203 ZENO CROCKER ROAD Contractor License: CSSL-102776 2
k
CENTERVILLE, MA 02632 Est:Project Cost: $2,600.00 Chimney:
Description: Add R-30 cellulose, and R-38 fiberglass to the attic:Add R-19 :Per"mit Fee: $85.00
fiberglass,and R-10 rigid insulation to the basement.,Air seal the Insulation:
attic plane and basement with expanding foam General .Fee Paid: $85.00
weatherization. .,�;'
Date: 11/15/2018 Final:
`,
.. Project Review Req: � � � s .� . -----
Plumbing/Gas
Rough Plumbing:
r _ Building Official'
Final Plumbing:
Rough Gas:
Final Gas:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months aft'
r issuance;
All work authorized by this permit shall conform to the approved,application and the`approved tconstruction documents for whichthis permit has been granted. Electrical
All construction,alterations and changes of use of any.building and structures shall be m compliance with the local zoning by-lawsand codes.
This permit shall be displayed in a location.clearly visible from access street or road and shall.be maintained open for public inspection for the entire duration of the Service:
work until the completion of the same. )
o _ Rough:
The Certificate of Occupancy will not be issued until all applicable signatures by the 4Buildingand Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Final:
1.foundation or Footing Low Voltage Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Final:
5.Prior to Covering Structural Members(Frame Inspection) Health
6.Insulation
7.Final Inspection before Occupancy Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical installations. Fire Department
Work shall not proceed until the Inspector has approved the various stages of construction. Final:
.°Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
} AsqIqqpWp and lot number 9 r. ® `'`.....,/..... .............................. S �� THE Tee
Sewage Permit number ........ � ' � ..e.,
tub a ITL E SA"STLB_
House number b aea LE'
S
................. .........................................,
Hi.riT.: GAj�463g Ar-
TOWN OF RARNSTIRIS,
VSTE IAlt! cE
l�®�T�R
p {�p ODE ANDBUILDING INSPECT TOWN REGULATIONS
APPLICATION FOR PERMIT TO ....... ut.W......... ..... 5 .0.4......................
TYPEOF CONSTRUCTION ...........:....w.Q.Q.�:.....,�..�c .�.�.............................................................................
.... ,S.M. .... ,9........................
TO THE INSPECTOR OF BUILDINGS:
The undersign d here appli s, for a permit according to the following information:
Al
Location ...... ... ... ... ... ... .......... .... :D.. G .....:... .. ..................................
ProposedUse ............ . lr /1 . ....................................................... ........... ....................................................
ZoningDistrict ...................�................................................Fire District .................. .....6.....................................................
�S �j S .......................Address ...���.��.... ' F:..h. ...f: .�Y N!V(.,�................
Name of Owner .......... ............. ....................
�C,B L LL 0!4 PKIK(-74r 3 AName of Builder .........�r.... ..... .a.....Q.......... :........Address ...... .T..<......�..................... .&!.!Ul.J.......................
Name of Architect .... � .................Address ...en(. . ..6.4. lRe*.TI_ .T....................
Number of Rooms `........................�........................................Foundation ......... ..O..U.�.��2.........�4.�1.C/2CTcz.................
Exierio.r ............... ...........................................Roofing ........... 10
4(—.7 Skevj.4.*61..................
Floors �}�.kl 9r ............................................Interior ......:......J�1.CE,r4d. .' ....................................... I
/ -7-
Heating ................� ,�........................................................Plumbing ........./..o.d.�%.��.�l��G.�:.............,1...�::.�.�.1..�
Fireplace ....................................................Approximate Cost ....................d.: ............................:..
Definitive Plan Approved by Planning Board __O___________I� __. Area ................- r�
Diagram of Lot and Building with Dimensions Fee S7"`sue
SUBJECT TO APPROVAL OF BOARD OF HEALTHT
J
i
OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS
I hereby agree to conform to all the Rules and Regulations ofYnSupervisor's
Barnstable regardin the a ve
construction.
Name d?v
Constr License ....lnd. 2.. .
S L S Trust
-'28122 1 1/2 story
........;........... Permit for ....................................
single family dwelling
.........................................................................
203 Zeno Crocker-Road
LoEation ............................................;.....................
Centerville
..........................................................
Owner ..............S L S Trust
....................................... ............
Type of Construction ..........f r am.e ..
. ....... .
..........
................................................................................
2 '
Plot ............................. Lot .............................
Permit Granted ...........jUy:.2...............19 85
Date of Inspection......................................19
.470' .......19.�Date ..Completed .4.......................
CC
J!,
S.
*,,Agri
In
ti
Jz
its
M
M i
•TM� a TOWN OF B RITSTABLE Permit No. 281L�
t Building Inspector
SARMAK cash
OCCUPANCY PERMIT Bond ________________16
Issued to S L S Trust Address
_'03 Zeno Crocker Road, Centerviii
Wiring Inspector L// ��"/J Inspection date
Plumbing Inspector ' Inspection date
Gas Inspector r ' ,
� � �� Inspection date
Engineering Department Inspection date
Board of Health ! Inspection date
THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL
SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN
REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE
BUILDING CODE.
....................................................... 19......_.._ ........../........................................................_........................................._
Building Inspector
to F
TOWN 'OF Permit No. --------
{ �� = Building Inspector cash
- -
� -
o nr
_ OCCUPANCY PERMIT Bond X___
Issued to S L S Trust Address
Lot 2,/ 203 Zeno Crocker Road, Centerville
Wiring Inspector i s � �$ T Inspection'•date
Plumbing Inspector A � � Inspection"date
r �p
Gas Inspector > ', Inspection date
X Engineering Department Inspection date
Board of Health —., \ Ctj v Inspection date 10/�---/es
THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL;NOT BE OCCUPIED UNTIL
SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN
REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE
BUILDING CODE.
24. ....... 19AI
Building Inspector
n
M1. +r,e.+-nv...w•.+mosww-...�.,....w......w......�>_ .......-,..-..-�...........,.r,......,._.....,,,,,,....,...........-,.-.eww.an.........,w.n._.....--u.n..a,.=+.................e.-.a...,......n.,..v. __—_--_
1
f
t
I
I
i !
2 I,I
i
'I +
10 _
, 0
0 Q
i S �
— 0
I � �
4 �K.I � rIti1� �
I j
� s
i
�FOFO
o . WILL IAM A o s
;E M.
WARWICK.: ."!i
42
On the of my knowledge, information and I
belief, I certify to The Town of Barnstable,
The Boston 'Five Cents Savings Bank and Ticor PA-riot,� G��4r�tG�•1�vr l
Title Insurance, Co. that as a .result of a
survey made on the ground on c -, I find LU'j'2 �t5�o -- �
that: L)r--t J Tf 1z V►LLz M A
The structure (s) are located on the site as „�� , .� i► :z0' PA T'Ii-.-, 6,/7,I
shown.
The title lines and lines of occupation of the
site are as shown hereon. WM, M, W A'#=K1 I C44. t h 6�0L, ►r1 G'
The site is situated in .Flood Zonen/p�_,t�G2�,�G �at4 bO VALMvi..MAA , M tiSS,
Community.-Panel_No. Date
Date: 2 y
William- M.- Warwick,RLS
i
I