Loading...
HomeMy WebLinkAbout0172 CROCKERS NECK ROAD � �� C�o�GC�.�c-s D�le�b� `�c�-; ., i E .� Town of Barnstable _ Buildin g IFost Th�sCard SoyThat it�skV�s�b.le-From the Street Approved;Qlans IVlust be,Retamed on Job arid'this Card Must_be Kept ■A7tNt3CXW.ld', - ,`+x r l t .�' v� ,c �,,. ,s',`L5'+ s : 3 '' • v b Posted Untii l Fnal Inspection Has Been Made 4¢ Fi � � t er, +° �WFiereaCertrficate of Occupancyis Required,such Bwldmg sFiall Nof be Occupied untilaFinal Inspection has been made Permit Permit No. B-19-3092 . Applicant Name: Roland Langevin Approvals Date Issued: 09/18/2019 Current Use: Structure Permit Type: Building- Insulation-Residential Expiration Date: 03/18/2020 Foundation: Location: 172 CROCKERS NECK ROAD,COTUIT Map/Lot_ 019-056 Zoning District: RF Sheathing: Owner on Record: EBERLE,CHARLES G JR $ Contra'tor,Name''. ,,IRNSULATE 2 SAVE INC. Framing: 1 Address: 172 CROCKERS NECK ROAD Contractor License;. 180747 2 COTUIT, MA 02635 ?• ,Est Project Cost: $5,063.00 Chimney: Description: . 10 mil ground cover to crawlspace,air sealing;uveatherstrip door , Permit$Fee: $85.00 and add sweep,R-10 rigid board to crawlspace wall,6"R 22.'cellulose' - Insulation: to attic flat,FG batt+2"to common wall ven n'tilatiochutes, R-38 Fee Paid, $85.00 Date, 9/18/2019 Final: fiberglass attic damming,vent bath fan thru roof;seal;and:insulate a' attic hatch,reposition existing insulation, Plumbing/Gas <- Project Review Req: Rough Plumbing: -� a. , Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application andAh'e�approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall tie in compliance with the local zoning`by'lawsand codes. This permit shall be displayed in a location clearly visible from access street or road,and shall be maintained open for public mspectlon for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by theyBuildmg:and Fire Officials ae6-provided on,his;permit. Minimum of Five Call Inspections Required for All Construction Work:; ` -„ Service: 1.Foundation or Footing ' q Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing I nspectio ns to be completed prior to Frame Inspection Final' 5.Prior to Covering Structural Members IFrame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Tom` Fire Department Building plans are to be available on site- All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: