Loading...
HomeMy WebLinkAbout0079 LAKE STREET��g �a� sr. �� i �, •� I I ._. J f REScheck Software Version 4.4.4, E Compliance Certificate Project Title: Renovation Energy Code: 2009 IECC Location: Cotuit,Massachusetts Construction Type: Single Family Project Type: Alteration Conditioned Floor Area: 0 ft2 Heating Degree Days: 6137 Climate Zone: 5 Permit Date: Construction Site: Owner/Agent: Designer/Contractor: 79 Lake St. Larson Realty Co.Inc. Cotuit,MA 02635 119 Rt.149 Marstons Mills,MA 02649 Compliance: Maximum UA: 159 Your UA: 159 Envelope Assemblies AssemblyGross Glazing CavitDoor Uk Perimeter U-Factor Ceiling 1:Flat Ceiling or Scissor Truss 280 38.0 0.0 8 Ceiling 2:Flat Ceiling or Scissor Truss 576 30.0 0.0 20 Wall 1:Wood Frame, 16"o.c. 1,060 21.0 0.0 51 Window 1:Vinyl Frame:Double Pane with Low-E 128 0.290 37 SHGC:0.00 Door 1:Solid 40 0.270 11 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 720 21.0 0.0 - 32 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations 9 submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 1 of 7 n F REScheck Software Version 4.4.4 Inspection Checklist Requirements: 25.0% were addressed directly in the REScheck software Text in the"Comments/Assumptions"column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliGnce is itemized in a separate table,a reference to that table is provided. 2009 IECC Pre-inspection/Plan Review Plans Verified field Verified Complies? Comments/Assumptions Value Value 103.2 :Construction drawings and ❑Complies [PR1]' documentation demonstrate energy ❑Does Not Comply M 4 »» code compliance for the building 012 ❑Not Observable envelope. ( , El Not Applicable 103.2, :,Construction drawings and ❑Complies 403.7 documentation demonstrate energy F r ` E k :" ❑Does Not Comply; [PR3]' code compliance for lighting and c < ❑Not Observable to ;mechanical systems.Systems serving El Not Applicable multiple dwelling units must , demonstrate compliance with the � � commercial code. 403.E Heating and cooling equipment is ; Heating: Heating: ;❑Complies [PR2]2 sized per ACCA Manual S based on Btu/hr Btu/hr 1❑Does Not Comply: AR (loads per ACCA Manual J or other Cooling: Cooling: :❑Not Observable 4approved methods. Btu/hr Btu/hr ;❑Not Applicable a Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 131 Low Impact(Tier 3) Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 2 of 7 �f 2009 IECC Foundation Inspection Complies? Comments/Assumptions 303.2.1 A protective covering is installed to i❑Complies ;Exception:Requirement is not applicable. [FO11]2 ;protect exposed exterior insulation El Not Comply; Kand extends a minimum of 6 in.below FlNot Observable grade. '❑Not Applicable 403.8 <Snow-and ice-melting system ❑Complies [FO12]2 controls installed. '❑Does Not Comply; gj j❑Not Observable ❑Not Applicable Additional Comments/Assumptions: , 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 3 of 7 a Plans Verified Field Verified 2009 IECC Framing.l Rough-in Inspection Value Value Complies? Comments/Assumptions 402.1.1, ;Door U-factor. U- U- ;❑Complies See the Envelope Assemblies table for 402.3.4 ❑Does Not Comply values. [FR1]' i❑Not Observable ❑Not Applicable 402.1.1, ;,Glazing U factor(area weighted U- U- ;❑Complies :See the Envelope Assemblies table for 402.3.1, 'average). ❑Does Not Comply:values. 402.3.3, ;❑Not Observable 402.5 ❑Not Applicable [FR2]' ; 303.1.3 U-factors of fenestration products are ' ❑Complies j [FR4]' determined in accordance with the d w �❑Does Not Comply NFRC test procedure or taken from ❑Not Observable the default table. { k N Y„❑Not Applicable 402.3.5 ;Sunrooms enclosing conditioned U- U- ;❑Complies [FR8]' ;space have a maximum fenestration ;❑Does Not Comply U-factor of 0.50 in Climate Zones 4-8. ;❑Not Observable New glazing separating the sunroom ;from conditioned space must meet ;❑Not Applicable ; code requirements. ----------------- 402.3.5 Sunrooms enclosing conditioned U- U- ;❑Complies [FR9]' space have a maximum skylight U- ;❑Does Not Comply; factor of 0.75 in Climate Zones 4-8. ;❑Not Observable j❑Not Applicable 402.4.4 Fenestration that is not site built is ❑Complies [FR20] 'listed and labeled as meeting € ❑Does Not Comply; J ;AAMA/WDMA/CSA101/I.S.2/A440or ❑NotObservable has infiltration rates per NFRC 400 y ❑Not Applicable `that do not exceed code limits. _ r } 402.4.5 IC-rated recessed lighting fixtures ❑4 Complies [FR16]2 sealed at housing/interior finish and f` ;, ❑Does Not Comply! labeled to indicE to 2:0 cfm leakage at ' ': s ❑Not Observable 75 Pa. ] 2❑Not Applicable 403.2.1 'Supply ducts in attics are insulated to R-h R- ;❑Complies [FR12]' R-8.All other ducts in unconditioned R- R- ;❑Does Not Comply spaces or outside the building ;❑Not Observable envelope are insulated to R-6. ❑Not Applicable ; 403.2.2 :All joints and seams of air ducts,air ❑Complies [FR13]' ;handlers,filter boxes,and building ' '❑Does Not Comply :cavities used as return ducts are _ ❑Not Observable ;.sealed. , ° y x❑Not Applicable 403.2.3 1 Building cavities are not used for ❑Complies [FR15]3 ;supply ducts. , _ ❑Does Not Comply; ❑Not Observable "r j❑Not Applicable 403.3 HVAC piping conveying fluids above R- ; R- '❑Complies [FR17]2 105 IF or chilled fluids below 55 IF =❑Does Not Comply 9 are in to R-3. ; i❑Not Observable ❑Not Applicable 403.4 l Circulating service hot water pipes are; R- R- ;❑Complies ; [FR18]2 insulated to R-2. ❑Does Not Comply: j 3 ;❑Not Observable ❑Not Applicable 403.5 dAutomatic or gravity dampers are : r 1WEIComplies [FR19]2 installed on all outdoor air intakes and El Does Not Comply; 8a !exhausts. y: $ ❑Not Observable 0Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2). 3 Low Impact(Tier 3) Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 4 of 7 , F 20091ECC Insulation Inspection Plans Verified Field VerifiedValue Value Complies? Comments/Assumptions 303.1 All installed insulation is labeled or the ❑Complies Requirement will be met. [IN13]2 3installed R-values provided. ❑Does Not Comply; g� ( j❑Not Observable ❑NOt Applicable 402.1.1, ;Floor Insulation R-value. R- R- ;❑Complies ;See the Envelope Assemblies table for 402.2.5, ;❑ Wood ❑ Wood C❑Does Not Comply!values. 402.2.E ❑ Steel ❑ Steel 1❑Not Observable [IN1]1 ❑Not Applicable 303.2, Floor insulation installed per omplies ;Requirement will be met. 402.2.6 manufacturer's instructions,and in `❑Does Not Comply [IN2]' substantial contact with the underside ; _ ❑Not Observable gj of the subfloor. ❑Not Applicable 402.1.1, ;Wall insulation R-value.If this is a R- R- ❑Complies ;See the Envelope Assemblies table for 402.2.4, mass wall with at least'/z of the wall ❑ Wood ;❑ Wood �❑Does Not Comply;values. 402.2.5 insulation on the wall exterior,the ❑ Mass ❑ mass ;❑Not Observable [IN3]' exterior insulation requirement Not ij applies. ❑ Steel ❑ Steel :❑ Applicable 303.2 `Wall insulation is installed per ,`❑Complies ;Requirement will be met. [IN4]1 manufacturer's instructions. , x Y. ❑Does Not Comply y _ ❑Not Observable ❑Not Applicable 402.2.11 :Sunroom wall insulation has a R- R- i❑Complies [IN8]' minimum R-value of R-13.New walls ;❑Does Not Comply' ;separating the sunroom from ❑Not Observable conditioned space must meet code requirements. ;❑Not Applicable 303.2 Sunroom wall insulation installed per 3 ,' (❑Complies [IN9]' manufacturer's Instructions. ❑Does Not Comply j .?❑Not Observable ., z ❑Not Applicable 402.2.11 ;Sunroom ceiling minimum insulation R- R- ;❑Complies [IN10]' R-value of R-19 in Climate Zones 1-4, ❑Does Not Comply ;and R-24 in Climate Zones 5-8. ❑Not Observable ❑Not Applicable 303.2 Sunroom ceiling insulation is installed ❑Complies [IN11]' ;per manufacturer's instructions. 3❑Does Not Comply' A []Not Observable -❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 5 of 7 1 � Plans Verified Field Verified 20091ECC Final Inspection Provisions Value Value Complies? Comments/Assumptions 402.1.1, Ceiling insulation R-value.Where>R-; R- R- ❑Complies See the Envelope Assemblies table for 402.2.1, 30 is required,R-30 can be used if. ;❑ Wood ❑ Wood ❑Does Not Comply values. 402.2.2 insulation is not compressed at eaves.:❑ Steel ❑ Steel :❑Not Observable ; [FI1]' R-30 may be used for 500 ft'or 20% ; ;❑Not Applicable (whichever is less)where sufficient space is not available. 303.1.1.1, ;Ceiling insulation installed per y( El Complies Requirement will be met. 303.2 manufacturer's instructions.Blown ❑Does Not Comply [Fl2]' insulation marked every 300 ft2. j❑Not Observable f ❑Not Applicable 402.2.3 Attic access hatch and door insulation ; R- R- ;❑Complies [FI3]' R-value of the adjacent assembly. ❑Does Not Comply gj ;❑Not Observable i ❑Not Applicable 402.4.2, 'Building envelope tightness verified ACH 50= ACH 50= ;❑Complies 402.4.2.1 by blower door test result of<7 ACH �❑Does Not Comply [FI17]1 at 50 Pa.This requirement may ;❑Not.Observable instead be met via visual inspection, :❑Not Applicable in which case verification may need to ,occur during Insulation Inspection. 402.4.3 Wood-burning fireplaces have j❑Complies [FI8]2 gasketed doors and outdoor ❑Does Not Comply; €combustion air. ❑Not Observable t j❑Not Applicable 403.2.2 Post construction duct tightness test cfm cfm ;❑Complies [FI4]' result of 8 cfm to outdoors,or 12 cfm ;❑Does Not Comply' :across systems.Or,rough-in test ;❑Not Observable result of 6 cfm across systems or 4 :❑Not Applicable cfm without air handler.Rough-in test 'verification may need to occur during Framing Inspection. 403.1.1 R Programmable thermostats installed ❑Complies FI9 z on forced air furnaces. ❑Does Not Comply. [ ] e �y []Not Observable p v h I❑Not Applicable a [ "TlCorn 403.1.2 ;Heat pump thermostat installed on s �: plies [F]10 2 heat pumps. , � ❑Does Not Comply: ❑Not Observable 14 + " t ❑Not Applicable 403.4 Circulating service hot water systems y ❑Complies " 2 have automatic or accessible anual ❑Does Not Comply [FI11] m ' £ controls. j❑Not Observable >❑Not Applicable 403.9.1 Readily accessible switch on heaters omplies [FI12]3 .for swimming pools. El Does Not Comply f I❑Not Observable - ❑Not Applicable 403.9.2 ;Timer switches on pool heaters and � � � r .; _ '❑Complies [FI19]3 pumps are present. f' "Does Not Comply' ej f ' '❑Not Observable "4 F *• ❑Not Applicable 403.9.3 Heated swimming pools have a cover. plies❑Corn [F[20]3 ;Covers on pools heated over 90 OF xr ❑Does Not Comply, are insulated to R-12. ❑Not Observable f z ❑Not Applicable 404.1 ;50%of lamps in permanent fixtures § x ;❑Complies [FI6]1 :are high efficacy lamps. 3❑Does Not Comply ❑Not Observable []Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 ILow Impact(Tier 3) Project Title: Renovation Report date: 02/27/13 Data filename: Untitled.rck Page 6 of 7 20091ECC Final Inspection Provisions Plans Verified Field VerifiedValue Value Complies? Comments/Assumptions 401.3 Compliance certificate posted. ❑Complies [FI7]2 ❑Does Not Comply: ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for mechanical ❑Complies [F]18]3 land water heating equipment have `❑Does Not Comply been provided. ;; ` { $❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovation. Report date: 02/27/13 Data filename: Untitled.rck Page 7 of 7 J i 2009 IECC Energy Efficiency Certificate Insulation . Wall 21.00 Floor 21.00 Ceiling/Roof 30.00 z Ductwork(unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.27 CoolingHeating& Heating System: Cooling System: Water Heater: Name: Date: Comments: