Loading...
HomeMy WebLinkAbout0868 MAIN STREET (COTUIT) �CJ/ _� r Town of Barnstable Building Post�This-Card So That�t.is.-Uisible�From the Street,,Approved;Plans,Must be,Retamed gn Jo,b and.th�s Gard Must;be Kept��� ��- �- MPWAS&LB: ��J� .f� ¢<: t ,Xf x� i "✓ � � .'� � :€ c� "tr� 4 �x tam � / d. �. � Dyam • r �R Where Ce�ificate of�Occupancy r Requrec;-suchBulldmg shall�Not�be Occupied until a�Final Inspection,--has;been mader �i jiilt Permit NO. B-19-1816 Applicant Name: Robert Rostocka Approvals Date Issued: 06/03/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 12/03/2019 Foundation: Location: 868 MAIN STREET(COTUIT),COTUIT Map/Lot. 035 077 Zoning District: RF Sheathing: Owner on Record: FEDERATED CHURCH PARSONAGE I` Contractor Namei'x ROBERT A ROSTOCKA Framing: 1 Address: PO BOX 436 K Contractor License; 113252 2 COTUIT, MA 02635 Est Project Cost: $5,173.00 Chimney: Description: Insulation &Air Sealing. -; Permit Fee: $85.00 V,4 Insulation: Project Review Re Fee Paid- $85.00 1 q final: Date 6/3/2019 Plumbing/Gas Rough.Plumbing: Building Official . Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by,,,this permit is commenced within six months after;issuance. . All work authorized by this permit shall conform to the approved appl cation�and the'approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and str'.uctures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures byathe Building and Fire Offrcials are''provided on this;permit. Minimum of five Call Inspections Required for All Construction Work: €� y Service: 1.foundation or Footing ` Rough:. 2.Sheathing Inspection 5 .. ... _ ... ,. •. . 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection - 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Qiv«✓� Town of Barnstable ern-iit:EZ-34 P�pFTHE Regulatory Services ate: 1 -)05 Thomas F.Geiler,Director sa ASS, 1 Building Division ee: M . 00 y Mass. bpi 1639. s�0� Tom Perry, Building Commissioner Eon 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 TOWN OF BARNSTABLE SOLID FUEL STOVE PERMIT Owner: r /�/` /?�' ::�/",one: c' Install at:' d_ &, Village: 0 —U �- Map/Parcel: �/ Date: Stove A. New se B. Type: Radi tur /Circulating C. Manufacer: ,, 6s Lab. No. D. Model No.:im Chney A. New/ xistin f existing,please note date of last cleaning � 7 - © �� B. Flue Size ' C. Are other appliances attached-to Flue? /►/O D. Pre-fab Type and Manufacturer E. Masonry: ine mined Hearth � A. Materials: `3 e / C,�C B. Sub Floor Construction: Installer „ C Name: o� fl'1 d"res Phone: Location of Installation: APPROVED BY: Please make checks payable to the Town of Barnstable *This constitutes an official stove permit after inspection,photographed, and approved by the Building Inspector Q:formsatove Rev 122801