Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0302 PHEASANT HILL CIRCLE
/470 Town of Barnstable Regulatory Services Richard V. Scati,Interim Director Building Division moss.s63q. Tom Perry,Building Commissioner �0 , Eo " 200 Main Street,Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 Approved: Fee: Permit#: - HOME OCCUPATION REGISTRATION Date: /I Name: Alt 1! (,+�'-,G r�(L— Phone#: Address: t>J�-'- � �.,(�-69 l=l'� ('i z 1 (,u is Village: _ a Name of Business: rc' 2 O/1Q(✓ ©Wyt Type of Business: Map/Lot: cJ INTENT: It is the intent of this section to allow the residents of the Town of Barnstable to operate a home occupation within single family dwellings,subject to the provisions of Section 4-1.4 of the Zoning ordinance,provided that the activity shall not be discernible from outside the dwelling: there shall be no increase in noise or odor;no visual alteration to the premises which would suggest anything other than a residential use;no increase in traffic above normal residential volumes; and no increase in air or groundwater pollution. After registration with the Building Inspector,a customary home occupation shall be permitted as of right subject to the following conditions: • The activity is carried on by the permanent resident of a single family residential dwelling unit,located within that dwelling unit. • Such use occupies no more than 400 square feet of space. • There are no external alterations to the dwelling which are not customary in residential buildings,and there is no outside evidence of such use. • No traffic will be generated in excess of normal residential volumes. • The use does not involve the production of offensive noise,vibration,smoke,dust or other particular matter, odors,electrical disturbance,heat,glare,humidity or other objectionable effects. • There is no storage or use of toxic or hazardous materials,or flammable or explosive materials,in excess of normal household quantities. • Any need for parking generated by such use shall be met on the same lot containing the Customary Home Occupation,and not within the required front yard. • There is no exterior storage or display of materials or equipment. • There are no commercial vehicles related to the Customary Home Occupation,other than one van or one a" pick-up truck not to exceed one ton capacity,and one trailer not to exceed 20 feet in length and not to exceed 4 tires,parked on the same lot containing the Customary Home Occupation. • No sign shall be displayed indicating the Customary Home Occupation. ;" • If the Customary Home Occupation is listed or advertised as a business,the street address shall not be included. • . No person shall be employed in the Customary Home Occupation who is not a permanent resident of the dwelling unit. I,the undersigned,have read dwith the above restrictions for my home occupation I am registering. c Applicant: Date: v Homeoc.doc.Rev.103113 YOU WISH TO OPEN A BUSINESS? For Your Information: Business certificates (cost$40.00 for 4 years). A business certificate ONLY REGISTERS YOUR NAME in town (which you must do by M.G.L.-it does not give you permission to operate.) You must first obtain the necessary signatures on this form at 200 Main St., Hyannis. Take the completed form to the Town Clerk's Office, 1 st FI., 367 Main St., Hyannis, MA 02601 (Town Hall) and get the Business Certificate that is required by law. DATE: Fill in please: `�C UCH; APPLICANT'S YOUR NAME/S: '� l��v�,iL BUSINESS _ YOUR ME ADDRESS: TELEPHONE # Home Telephone Number L)q, NAME OF CORPORATION NAME OF NEW* b �h► u r TYPE OF BUSINESS IS THIS A HOME:OCCUPATION? _YE NO _ - ADDRESS OF BUSINESS ��' �' C_ �E s MAP/PARCEL NUMBER Q ( g) When starting a new business there are several things you must do in order to be in compliance with the rules and regulations of the Town of Barnstable. This form is intended to assist you in obtaining the information you may need. You MUST GO TO 200 Main St. - (corner of Yarmouth Rd. &Main Street) to make sure you have the appropriate permits and licenses required to legally operate your business in this town. 1. BUILDING COMMISSIONER'S OFFICE This individual has beeninformed of a .y ermit requirements that pertain to this type of business. MUST COMPLY WITH HOME OCCUPATION horized Signature** RULES AND REGULATIONS. COMMENTS: 0 �- —(o P _ ULT 2. BOARD OF HEALTH This individual has bten i rp' of the permit requirements that pertain to this type of business. Authorized Signature* COMMENTS: 3. CONSUMER AFFAIRS(LICENSING AUTHORITY) This individual has ylen inf r e of the licensing requirements that pertain to this type of business. [� D Authorized Signature* COMMENTS: IKE Town of Barnstable Building Department - 200 Main Street ry * BARNST"M * Hyannis, MA 02601 .E 9 MASS q, 1639. . (508) 862-4038 � icate Cert f f o Application Number: 201005835 CO Number: 20110015 Parcel ID; . 002002034 = CO Issue Date::. 01128111 Location; 302 PHEASANT HILL CIRCLE Zoning Classification: RESIDENCE F DISTRICT Proposed Use: DEVELOPABLE LAND': Village: COTUIT Gen Contractor: BAYSIDE BUILDING, INC Permit Type: RC00 CERTIFICATE OF OCCUPANCY RES Comments: Building Department Signature Date°Signed TOWN OF BARNSTABLE ` ti Bur ng �► Application Ref: 201005835 • * BA ffABIZ, Issue Date: 11/O1/10 Permit 9 MASS. �q 039. Applicant: BAYSIDE BUILDING,INC Permit Number: B 20102362 rFD MA'I A • Proposed Use: DEVELOPABLE LAND Expiration Date: 05/01/11 Location 302 PHEASANT HILL CIRCLE Zoning District, Permit Type: NEW SINGLE FAMILY HOME Map Parcel 002002034 Permit Fee$ 816.00 Contractor BAYSIDE BUILDING,INC Village COTUIT App Fee$ 100.00 License Num 005645 Est Construction Cost$ 160,000 Ltemarks APPROVED PLANS MUST BE RETAINED ON JOB AND CONSTRUCT A 3 BEDROOM,2 BATH COLONIAL WITH AN ATTACHE D THIS CARD MUST BE KEPT POSTED UNTIL FINAL 1 CAR GARAGE INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH Owner on Record: COTUIT EQUITABLE HOUSING LLC BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL Address`. PO BOX 95 INSPECTION HAS BEEN MADE. CENTERVILLE, MA 02632 Application Entered by: RM Building Permit Issued By: THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET;ALLY:,OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY ORPF,RMANENTLY'• ENCROACHEMENTS ON PUBLIC`PROPERTY,:NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION>i STREET OR ALLY_GRADES AS WELL AS DEPTH ANDLOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF P;UBL<IC WORKS: ' THE ISSUANCE.OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF FOUR CALL INSPECTIONS REQUIRED FOR ALL CONTSTRUCTION WORK: 1.FOUNDATION OR FOOTINGS. 2.ALL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED. 3.WIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME INSPECTION. 4.PRIOR TO COVERING STRUCTURAL MEMBERS(READY TO LATH). 5.INSULATION. 6.FINAL INSPECTION BEFORE OCCUPANCY. WHERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED ABOVE. PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in MGL c.142A). MON ON BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 �f� /(/D..! d 1 �I.�� p t�•e 1 1 !v �r , ov- -to I Vt l v W 3 1 .5 1 Heating Inspection Approvals Engineering'Dept C71I��ItI �IPn�K IV Fire ept ��,,,yt 2 � q �s of Heallb QN, 6 I I f4 7.� A, I �' I TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map 06 d Parcel, 000�, 6 3 y Application 40 Health Division Date Issued t 6 Conservation Division Application Fee l � Planning Dept. �f- 1W °"Z� Permit Fee Date Definitive Plan Approved by Planning Board Historic - OKH WT- Preservation / Hyannis u M Project Street Address Village (.0_TZ) B 7 Owner LL- Address Telephone 7 7 1 Permit Request 71) Cd 1U5T2(/G7 /t7�, 3 t3g,)12am , Z 15117d C'0 LOA114 4- Square feet: 1 st floor: existing proposed 2nd floor: existing proposed 730 Total new AW Zoning District Flood Plain C- Groundwater Overlay 0:9 Project Valuation Construction TypeA&-P241-- Lot Size -735' Grandfathered: ❑Yes Sr6o If yes, attach supporting documentation. Dwelling Type: Single Family Two Family ❑ Multi-Family (# units) Age of Existing Structure i / Historic House: ❑Yes Colo On Old King's Highway: ❑Yes Wlo Basement Type: Wfull ❑ Crawl ❑Walkout ❑ Other Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft) °7 Number of Baths: Full: existing new c;�, Half: existing new Number of Bedrooms: existing 2 new Total Room Count (not including baths): existing new (P First Floor Room Count 3 Heat Type and Fuel: ®R Gas ❑Oil ❑ Electric ❑ Other --/ Central Air: ❑Yes 5KNo Fireplaces: Existing New Existing wood/coal stove: ❑Yes l�'I�lo Detached garage: ❑ existing ❑ new size_Pool: ❑ existing ❑ new size _ Barn: ❑existing ❑ new size_ I yx zz Attached garage: ❑existing dnew size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes UX`No If yes, site plan review# Current Use 01A411— LOT Proposed Use APPLICANT INFORMATION _ O (BUILDER OR HOMEOWNER) Ctv Z � O Nam `C� Telephone Number `" �� N Address License# ���6 'V Home Improvement Contractor# Worker's Compensation # ALF,607 3 Y66 - 4/2 ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO��� SIGNATURE � � DATE FOR OFFICIAL USE ONLY APPLICATION# DATEISSUED MAP/PARCEL NO. ADDRESS VILLAGE OWNER DATE OF INSPECTION: FOUNDATIONhd - b FRAME INSULATION i� / / ry R�/ � FIREPLACE ELECTRICAL: ROUGH FINAL j, PLUMBING: ROUGH FINAL GAS: ROUGH FINAL F --ll FINAL BUILDINGI�.!ao 2s ' DATE CLOSED OUT ASSOCIATION PLAN NO. r The Commonwealtl'i of Massachusetts Department of Industrial Accidents os Office of Investigations a 600 Washington Street I Boston,M4 02111' ' ... www.mass.gov/did: ' Workers'CompensationT.usurance Affidavit: Builders/Coiltractors/Electr1 laus/Pluulbers A licant Information • .Please Print Le ibl • Name(Business/OrganizatiowUdividual): Address: 9 5 City/State/Zip: Phone.#: • 77l Are you an employer?Check the appropriate bow :Type of project(required):• 1.❑ I am a employer with 4• am a general contractor and I 6. []New construction . employees(full and/or part-time).* have hired the sub-contractors 7. Remodeling 2:❑ I am a'sole proprietor or partner- listed on the'attached sheet. ❑ ship and have no employees These sub-contractors have g, n Demolition 'tivorkin employees and have workers' g for me in any capacity,pi tY' 9. []Building addition [No workers' comp,insurance comp. insurance•$• required.] 5. [] We are a corporation and its 1o.[]•Electrical repairs or additions .3.❑ I am a homeowner doing ill-work officers have exercised their 11. ]Plumbing repairs or additions ' myself,[No workers'comp. right of exemption per MGL 12.[]Roof repairs insurance.required,]t c• 152, §1(4), and we have no employees. [No workers' 13'0 Other comp.insurance required,] *Any applicant that checks box#1 must also fill o.ut the section below showing their workers'compensation policy information. t Homeowners,who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such, . $Contractors that check this box must attached an additlonal sheet showing the name of the Sub-contractors and state whether or not those entities have employees, If the sub-contractorshaveemployees,they must providb their workers?comp,policy number. lain an employer that is providing workers'compensation insurance far my employees. Below is.the policy and job site information. �/ Insurance Company Na9ne: �6' ,L.!!1 ✓11�4 s Po Expiration or Self-ins.Lxc.#: � ' � � `1�� l Q Expization Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page'(showing the policy number and expiration date). Failure,to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to s 1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK.ORDER and a fine of up to$256.00 a day against the violator. Be advised that a copy of this.statemetit maybe forwarded to the:Office of Investigations of the DIA for insurance coverage verification ' Ida hereby certify u der the paitns•andpenalties ofperjury that the Information provided above Is true and correct. Signs.fore: $. Date: Phone#• ? 71 1416 6: Official use only. Do not write in this area;to be completed by,city or town official City or Town: ' .Permit/License# Issuing Authority(circle one): A.Board of Health 2,Building Department 3, City/ToTm Clerk #,-Electrical Inspector 5,Plumbing Inspector. - 6. Other Contact Person: Phone#: Bayside Building Inc. Certificates of Insurance 2010 Sub Contractor General Liability Workers Comp All Cape Garage Door 06101104 10107111 06101104 06101111 Aluminum Products of Cape 08115104 08115111 08115104 08115111 Anthony Averinos 07120104 04106111 07125104 07125111 Besse Landscape&Nursery 04130107 04130111 05118107 07117111 Baxter Nye Engineering&Surveying 08111105 08117111 08120104 08120111 Bortolotti Construction 03107104 03107111 03107104 03107111 Cape Cod Copper 02107108 02107111 04104108 04104111 Cape Cod Marble&Granite 07101105 07/01/11 08116105 08116111 Cape Concrete Forms 06105107 08112111 12107107 06108111 Carpet Barn Inc 01101106 05101111 01101105 01/01/11 Casella Waste Management 04130108 04130111 05101108 05101111 Central Vacuum House 12101105 12101110 01/O1/07 01/01/11 Chaves,Robert 08113104 08113111 12117104 12117110 Christopher Costa,Inc. 01122108 08105111 02106107 02106111 Cornerstone dba Tony Arede 03110106 10122111 03/17/06 02101111 Dartmouth Pools&Spas 01101108 01/01/11 01101105 01/01/11 Davids Building&Remodel 01101107 01/01/11 06114104 06114111 D.P.Fuccillo Construction Inc. 10120106 10120111 10120108 10123111 Fast Glass Service 08108109 08108111 04107109 04107111 Govoni Land Services 05131104 06122111 07104104 06122111 Hill Construction 04129107 04129111 08114104 08114111 Joyce Landscaping 11115104 11115110 11115105 11115110 Kitchen Appliance Mart and 08112104 08112111 01101105 01/01/11 Electronics L&M Glass Co,Inc 05101104 05101111 05101104 05101111 MacDonald Concrete Finishing 01109104 01109111 04107104 01109111 MAP Insulation 10101107 10/01/11 10/O1/07 10/01/11 Meagher Bros. Construction(DECKS) 04125109 03124111 11109108 11109110 Meagher Construction(ROOFER) 06119104 03113111 06123104 06123111 Morse's Masonry 03110107 03110111 10111108 10/11/11 New England Concrete Solutions 04101110 04101111 03123110 03123111 New England Home Technologies 01122110 01122111 01122110 01122111 Northern Sealcoating 10101107 10/01/11 04101107 04101111 Northside Design Associates O1115107 01115111 11130106 11130110 Pastore Excavation Inc. 06105108 06105111 10112108 10112111 Pro Fence Co.,Inc. 03126107 03126111 03126107 03126111 Reed,Mel 07121104 07121111 07121104 07121111 Sprinkle Home Improvement 07101108 07101111 01101109 01/01/11 Steven Johnson-SMJ Carpentry 04125104 04125111 04125104 04130111 Anthony Spagnuola dba Spags 04102107 . 04102111 08111107 08111111 Viola Associates Inc. 04129108 04129111 04129108 04129111 Walpole Woodworkers 10115106 10115111 10115106 10115111 Whiteley, W. Vernon 10101104 10/01/11 10103104 10103111 Wood Floor Specialists 02103108 1 02103111 1 02103108 1 02103111 Page 1 of 1 ° ��qN�rcky I own of Barnstable.. . Regulatory Services a c Thomas F.Geller Director Building Dxviacxa - Tom Ferry, Building Commissioner 200 Main Street, Hyannis,MA 02601 - office: 508-8624038 Fax: 508-790-6230 . I ropefty Owner Must Complete and Sign This Section If Using .A Builder 1,4 Al fiOUr7as..Owet.,or tlie.s.ubject property hereby author ze / f.'�L-�/�� : ::. :. .to`act on any beh. lf,. 1n all 3natters relative to-work authorized by this building.p e= t.applications for: (Address of Job) - b Signatutp of Owner.. Date p:unt:No-me `i s achtviett - Department of Ptr 4c Safeti Board of Buildim,Re,-Yulation.s and Standards . Y. Construction Suppirri:tsA:r i_irreasi? License CS 5645 Restricted to 00 ' - BRIAN T DACEY F ,g CENTERUILLE MA t72632 PO BOX 95 �. � .� , � � . . c-- - Expiration .4YI912012 C'umm�<sirroer Tr;: 21.209 Restricted to: 00 i 00- Unrestricted 1G-1 2 Family Homes - d a Failure to possess a current edition of the Massachusetts State Building Code 1 is cause for revocation of this license. Refer to: WWW.Mass.Gov/DPS F f Va REScheck Software Version 4.3.1 Compliance Certificate Project Title: THE EAGLE MODEL Energy Code: 2009 IECC Location: Barnstable,Massachusetts Construction Type: Single Family Glazing Area Percentage: 11% Heating Degree Days: 6137 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: COTUIT MEADOWS BAYSIDE BUILDING INC BARNSTABLE,MA Compliance: Compliance:9.0%Better Than Code Maximum UA:222 Your UA:202 The%Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Gross • Assemblyor or D•• Perimeter • TOTAL CEILINGS:Flat Ceiling or Scissor Truss 722 38.0 0.0 22 TOTAL WALLS:Wood Frame,24"D.C. 1848 21.0 0.0 90 TOTAL WINDOWS:Wood Frame:Double Pane With Low-E 155 0.310 48 Door 1:Solid 42 0.150 6 Door 2:Glass 42 0.280 12 TOTAL FLOORS:All-Wood Joist/Truss:Over Unconditioned Space 722 30.0 0.0 24 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.3.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: THE EAGLE MODEL Report date: 10/26/10 Data filename:CAProgram Files\Check\REScheck\THE EAGLE.rck Page 1 of 4 1 /' REScheck Software Version 4.3.1 Inspection Checklist Ceilings: ❑ TOTAL CEILINGS:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ TOTAL WALLS:Wood Frame,24"o.c.,R-21.0'cavity insulation Comments: Windows: ❑ TOTAL WINDOWS:Wood Frame:Double Pane with Low-E,U-factor:0.310 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: ❑ Door 1:Solid,U-factor:0.150 Comments: ❑ Door 2:Glass,U-factor:0.280 Comments: Floors: ❑ TOTAL FLOORS:All-Wood Joist/Truss:Over Unconditioned Space,R-30.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Air Leakage: ❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/doorjambs and framing. ❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Flodrs:Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. M Comers,headers,narrow framing cavities,and rim joists are insulated. Project Title: THE EAGLE MODEL Report date: 10/26/10 Data filename: C:\Program Files\Check\REScheck\THE EAGLE.rck Page 2 of 4 (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrcaoms:, Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: Lj Materials and equipment are installed in accordance with the manufacturer's installation instructions. Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. Materials and equipment are identified so that compliance can be determined. u Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications. Duct Insulation: Lj Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: Building framing cavities are not used as supply ducts. All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). ❑ Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction leakage to outdoors test:Less than or equal to 57.8 cfm(8 cfm per 100 111:2 of conditioned floor area). (2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 86.6 cfm(12 cfm per 100 ft2 of conditioned floor area)pressure differential of 0.1 inches w.g. (3)Rough-in total leakage test with air handler installed:Less than or equal to 43.3 cfm(6 cfm per 100 ft2 of conditioned floor area) when tested at a pressure differential of 0.1 inches w.g. (4)Rough-in total leakage test without air handler installed:Less than or equal to 28.9 cfm(4 cfm per 100 ft2 of conditioned floor area). Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International(Residential Code. ❑ For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Circulating service hot water pipes are insulated to R-2. Lj Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: Lj HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: !] Heated swimming pools have an on/off heater switch. Lj Pool heaters operating on natural gas or LPG have an electronic pilot light. Lj Timer switches on pool heaters and pumps are present. Project Title: THE EAGLE MODEL Report date: 10/26/10 Data filename:C:\Program Files\Check\REScheck\THE EAGLE.rck Page 3 of 4 Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. ❑ Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: Lj A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage—15 (d)50 lumens per watt for lamp wattage>15 and—40 (e)60 lumens per watt for lamp wattage>40 Other Requirements.: ❑ Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement's'). Certificate: Lj A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title: THE EAGLE MODEL Report date: 10/26/10 Data filename: C:\Program Files\Check\REScheck\THE EAGLE.rck Page 4 of 4 2009 IECC Energy Efficiency Certificate . . Ceiling I Roof 38.00 Wall 21.00 Floor/Foundation 30.00 Ductwork(unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.31 0.31 Door 0.15 0.28 Heating Cooling Heating System: Cooling System: Water Heater: Name: Date: Comments: AW C Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(780 CMR 5301.2.1.1)1 THE EAGLE MODEL COTUIT MEADOWS Q Check Compliance 1.1 SCOPE WindSpeed(3-sec.gust)...................................................................................................................110 mph Q WindExposure Category................................................................................................................................B Q 1.2 APPLICABILITY Number of Stories(a roof which exceeds 8 in 12 slope shall be considered a story) ..... 2 stories 5 2 stories Q RoofPitch ..........................................................................(Fig 2) ...................................................8<_ 12:12 Q MeanRoof Height .....................................................................(Fig 2)..................................................23 ft 5 33' Q BuildingWidth,W ..............................................................(Fig 3) ................................................. 24 ft <_80, Q BuildingLength, L ..............................................................(Fig 3)..................................................48 ft 5 80' Q Building Aspect Ratio (Fig 4 2 <_3:1 Q Nominal Height of Tallest Opening2 ..........................................(Fig 4).................................................6'-8"<_6'8" Q 1.3 FRAMING CONNECTIONS General compliance with framing connections....................(Table 2)................................................................ Q 2.1 FOUNDATION Foundation Walls meeting requirements of 780 CMR 5404.1 Concrete.............................................................................................................................. Q ConcreteMasonry.................................................................................................................................... N/A 2.2 ANCHORAGE TO FOUNDATION'3 5/8"Anchor Bolts imbedded or 5/8"Proprietary Mechanical Anchors as an alternative in concrete only Bolt Spacing—general ................................. ........(Table 4)................................................... 28 in. Q Bolt Spacing from end/joint of plate ............................(Fig 5 12 in.<_6"—12" Q Bolt Embedment—concrete........................................(Fig 5)..................................................7 in. z 7" Q Bolt Embedment—masonry........................................(Fig 5)........................................... in.> 15" N/A Plate Washer...............................................................(Fig 5)...............................................>_3"x 3"x'/V Q 3.1 FLOORS Floor framing member spans checked ...............................(per 780 CMR Chapter 55).................................... Q Maximum Floor Opening Dimension...................................(Fig 6) ..........................................—9'-0"_ft<_12' Q Full Height Wall Studs at Floor Openings less than 2'from Exterior Wall(Fig 6)....................................... N/A Maximum Floor Joist Setbacks Supporting Loadbearing Walls or Shearwall................(Fig 7) ...................................................—ft _<d N/A Maximum Cantilevered Floor Joists Supporting Loadbearing Walls or Shearwall................(Fig 8)...................................................—ft <_d N/A FloorBracing at Endwalls...................................................(Fig 9)...................................:............................... Q Floor Sheathing Type ........................................................(per 780 CMR Chapter 55).................................... Q Floor Sheathing Thickness ................................................(per 780 CMR Chapter 55)..........................314 in. Q Floor Sheathing Fastening...............:..................................(Table 2)............8 d nails at 6 in edge/12 in field Q 4.1 WALLS Wall Height Loadbearing walls........................................................(Fig 10 and Table 5).........................7'-8"ft <_ 10' Q Non-Loadbearing walls................................................(Fig 10 and Table 5).............................18 ft 5 20' Wall Stud Spacing .........................................................(Fig 10 and Table 5).....................16 in. <_24"o.c. Q Wall Story Offsets ........................................................(Figs 7&8)...........................................—ft <_d N/A AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(780 CMx 5301.2.1.1)1 4.2 EXTERIOR WALLS' Wood Studs Loadbearing wafts........................................................(Table 5)..........................................2x6-7 ft 8 in. Q Non-Loadbearing walls................................................(Table 5)........................................2x6-18 ft 0 in. Q Gable End Wall Bracing' Full Height Endwall Studs............................................(Fig 10).................................................................. Q WSP Attic Floor Length...............................................(Fig 11)............................................... ft zW/3 N/A Gypsum Ceiling Length(if WSP not used)..................(Fig 11)..............................................26 ft z 0.9W Q and 2 x 4 Continuous Lateral Brace @ 6 ft.o.c. .. (Fig 11).............................. ............................... N/A or 1 x 3 ceiling furring strips @ 16"spacing min.with 2 x 4 blocking @ 4 ft.spacing in end joist or truss bays Q Double Top Plate Splice Length ........................................................(Fig 13 and Table 6).........................................8 ft Q Splice Connection(no.of 16d common nails).............(Table 6)..............................................................6 Q Loadbearing Wall Connections Lateral(no.of 16d common nails)...............................(Tables 7)............................................................2 Q Non-Loadbearing Wall Connections Lateral(no.of 16d common nails)...............................(Table 8)..............................................................3 Q Load Bearing Wall Openings(record largest opening but check all openings for compliance to Table 9) Header Spans ........................................................(Table 9)..........................................6 ft 0 in. <_11' Q Sill Plate Spans ........................................................(Table 9)..........................................3 ft 0 in.5 11' Q Full Height Studs (no.of studs)...................................(Table 9)..............................................................3 Q Non-Load Bearing Wall Openings(record largest opening but check all openings for compliance to Table 9) Header Spans.............................................................(Table 9)..........................................8 ft 0 in.<_12' Q Sill Plate Spans...........................................................(Table 9).................................._ft_in.<_12" N/A Full Height Studs(no.of studs) ...................................(Table 9)............,.............:..............:....................3 Q Exterior Wall Sheathing to Resist Uplift and Shear Simultaneously, Minimum Building Dimension,W Nominal Height of Tallest Openingz .........................................................................6'-8"<_6'8" Q SheathingType.............................................(note 4)..........................................................WSP Q Edge Nail Spacing.........................................(Table 10 or note 4 if less).............................3 in. Q Field Nail Spacing.........................................(Table 10).....................................................12 in. Q Shear Connection(no.of 16d common nails)(Table 10)............................................................4 Q Percent Full-Height Sheathing.......................(Table 10).................................71%for two floors Q 5%Additional Sheathing for Wall with Opening>6'8"(Design Concepts) Maximum Building Dimension, L Nominal Height of Tallest Opening2.....................................................................6'-8"<_6'8" Q Sheathing Type.............................................(note 4)..........................................................WSP Q Edge Nail Spacing.........................................(Table 11 or note 4 if less).............................3 in. Q Field Nail Spacing.........................................(Table 11).....................................................12 in. Q Shear Connection(no.of 16d common nails)(Table 11)............................................................4 Q Percent Full-Height Sheathing.......................(Table 11).................................24%for two floors Q 5%Additional Sheathing for Wall with Opening>6'8"(Design Concepts)..................... Q Wall Cladding Ratedfor Wind Speed?.............................................................................................................................. Q AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(780 CMR 5301.2.1.1)1 5.1 ROOFS Roof framing member spans checked?.......................(For Rafters use AWC Span Tool,see BBRS Website) Q Roof Overhang ...................................................(Figure 19)..............2/3 ft<_smaller of 2'or U3 Q Truss or Rafter Connections at Loadbearing Walls Proprietary Connectors Uplift...............................:................(Table 12)............................................... U=236 plf Q Lateral.............................................(Table 12)...............................................L=176 plf Q Shear..............................................(Table 12).................................................S=77 plf Q Ridge Strap Connections, if collar ties not used per page 21... (Table 13)...............................T= plf N/A Gable Rake Outlooker.........................................(Figure 20)............._ft s smaller of 2'or U2 N/A Truss or Rafter Connections at Non-Loadbearing Walls Proprietary Connectors Uplift................................................(Table 14)............................................U= lb. N/A Lateral(no.of 16d common nails)...(Table 14)........................................L= lb. N/A Roof Sheathing Type...................................................(per 780 CMR Chapters 58 and 59) ............ Q Roof Sheathing Thickness........................................... ...............................................5/8 in.>_7/16"WSP Q Roof Sheathing Fastening...........................................(Table 2)............................................................8d Q THE EAGLE MODEL COTUIT MEADOWS MEETS THIS CHECKLIST THEREFORE THE FOLLING NOTE APPLIES: Notes: 1. This checklist shall be met in its entirety,excluding the specific exception noted in 2,to comply with the requirements of 780 CMR 5301.2.1.1 Item 1. If the checklist is met in its entirety then the following metal straps and hold downs are not required per the WFCM 110 mph Guide: a. Steel Straps per Figure 5 b. 20 Gage Straps per Figure 11 c. Uplift Straps per Figure 14 d. All Straps per Figure 17 e. Corner Stud Hold Downs per Figure 18a and Figure 18b 2. Exception:Opening heights of up to 8 ft.shall be permitted when 5%is added to the percent full-height sheathing. requirements shown in Tables 10 and 11. 3. The bottom sill plate in exterior walls shall be a minimum 2 in.nominal thickness pressure treated#2-grade. 4. a. From Tables 10 and 11 and location of wall sheathing and Building Aspect Ratio,determine Percent Full-Height Sheathing and Nail Spacing requirements b. Wood Structural Panels shall be minimum thickness of 7/16"and be installed as follows: i. Panels shall be installed with strength axis parallel to studs. ii. All horizontal joints shall occur over and be nailed to framing. iii. On single story construction, panels shall be attached to bottom plates and top member of the double top plate. iv. On two story construction, upper panels shall be attached to the top member of the upper double top plate and to band joist at bottom of panel. Upper attachment of lower panel shall be made to band joist and lower attachment made to lowest plate at first floor framing. v. Horizontal nail spacing at double top plates, band joists,and girders shall be a double row of 8d staggered at 3 inches on center per figures below:Vertical and Horizontal Nailing for Panel Attachment j AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(7so CMu 5301.2.1.1.)1 a Zza i 1 1 r 1 r 1 r r r rr I; ei m • ; ; Z LI ;1 1{ . ' FRAMIK.MEMBERS ' i EDGE KFERMEDIAM 1 •e I j �ll _ • 1 --i. 1 1 STAGGERED 3" 1111 XNL PATTERN PANEL PAWL EDGE DOUBLE NAIL EDGE SPAMG DETAL Detail Vertical and Horizontal Nailing for Panel Attachment SMOKE DETECTORS REVIEWED u N BARNSTABLE BUILDING DEPT. OKIE �mq g t o Ld u) FIRE DEPARTMENT DATE ,J BOTH SIGNATURES ARE REQUIRED FOR PERMITTING u 0 _ CARBON MONOXIDE ALARMS cl W - - - - MUST BE INSTALLED PER f" MASSACHUSETTS BUILDING CODE 'i �r V lL ®® _ it it IT ® ® 00 CY ll� w In FRONT ELEVATION }• w . ._ SCALES 1/4" m 1'-0° 'Q, Z m M 12 J u a J J i z cn QQQ Q �Qw .Q —— to > 1 -1a � 1 lu w �� mu m J I � SHEET .. L---� 1 REAR ELEVATION 1 JC9: 027 SCALE: I/4° DATE: i N _ N -- - —- ° Ln Lo Ls Lh OD it w Ln zjn 4 W ° Q ° cr h !A h �q w `o RIGHT ELEVATION m o SCALE: 1/4' 1'-0° tLj J Lu - 11 V , •� �Q w Q. to -1 O w L Q c` D w Ul 4 �V m u H O SWEET LEFT ELEVATION SCALE: 1/41 m p-O° JOB: 1027 DRAWN B7� KW DATE: 10/2(6\/ 40'-0" 14'-0° ED 04 O L o m m DECK J 1� re-0•X 12'-0• Z 1 0 _,..., ;.�_ 12'-4•X IV-w 244DH2449 „„ 12 a•x 1r oa I 2D• 51'LUNG oo KITC74EhI. I I 1e61 II ® h I vOm )- v iv 0-0 m ,^ III c Vt Ln p 21k I aD 5 O - 2..5 ' CEILING JOLOTS 13'-O° 1 '-01 m o ._-•"` -244DH244q e V, O i n 2e :5r n m 2440 42- GARAGE ' _ X 2I'-14'-O• O• w I J o V o a 12 i -DI 0•0' DINING IJ - - VINYL 2 14'-0° - 13'-0° 4'-10 1/2° 1, V-1 V2 -� t 7W O.H.DOOR 2 — - = N ,: g4 L9 VINYL - J 3 / W Z FQtu tu x� ems a m U 2'-6" q1_01 2'-6" 3'-6° 6'-7° 5'-4° 6'-I° 4'-6° O 14.-0° 20-0• -� SHEET FIRST FLOOR FLAN SCALE, 1/4" p_p° AB JOB, 027 - DRAWN-BY ?*I DATE, 10/26/10 fV O ,in 4 to 20_0' $-0 O ' W_Se R c O R x� � O �A �n ® I" Ln U o n - Ls2 O A m _4' 12'-2° OW444 244OW2449 _ p 28'x Sr Ina D # i� BED #2e 28'x Sr ^ T 2� Ln Q '.in • 2440W2t36 - Q. $ _ _ 2 - BATH 2W x 42' - e J IT-w X II'-O' m MASTER BEDROOM ? v U �N � 3 ' WZlu wad Z lJY OL~ Q Q IL x Nan x lu mpp 6'-7° V-4" 6'-i^ 4'-6^ 26'_0v O J SHEET SECOND FLOOR PLAN SCALE= 114° = V-O° JOB: 1027 DRAWN BY, KW DATE. 10/26/10 • 14'-0' 26'-0° - (may 21_0v V_4v V_Oe 12'-0° _ O CC 2-2x1O GIRDER 4Y4 P.T.POST O W-W GALV.METAL POST ANCHOR Li 10'-ONO T1BE'PIEC W/ --- - 26''BIG FOOD'FOOTING J ..'r---;'. �' � °u I I ~ Daw LL- ------------ I : r--------------- Lj O -- ---- ------- I ,r- - CY ZdO'. co I6'x10 GOIJTINUCRETE DTt11G TYP. I 3-200 GIRDER - I S 1/2'DIA.STEEL COLUMN m I ;I �/► W I 36!,06'x12'CONCRETE PAD I y� I - o 'I�i�I , I I o I GARAGE a ( - I 4'CONCRETE S I I�° •c9 L 1 1 1 1 1 1 I I �I- FULL PITCH TOWARD DOOR EASE N I I m o m^ NOTE, I I I I 66/8E DED NC44O A BOLTS I • I I I a;:i SPACED 32' O.C. r: ?7 I C W I 12' FROM CORNERS J I i WASHERS 3'xS'4/4 I :I I v . I DROP WALL 10' 12'-4' 121_4v e O DOOR 1 16410'CONTINUOUS FOOTING Cow.WALL °o� --------- I L W ZCIL O :. ------------------------------- ww z 14'-0' 26'-0' W Q m F- O FOUNDATION PLAN SCALE. 1/4' p-O° 1 JOa� 1027 DRAWN BY, KW DATES 10/26/10 ' O 4 - h + - RIDGE VENT _ - �. I / RIGID WIND WASH Be.RRIc-R REQUIRED RIDGE BOARD M OD AT EXT'ER1OR EDGE OF IX7'F321IX2 ', � Y,-.' T PLATE _ T SHIN6LE5 ® r. 12 •COX SHEATHING - y SIMPSON H2.6 B� L FABTEIIERS AT ALL a ,� I t U{�jNC'�OIJ5 TPPLATE 0G. D: �e�J W _ b LL ATTIC ®/s. ®+ U 0 qG VENTING DRIP EDGE O IN flRST TylO,p18T AND RAFTER M1F�� F.G INSULATION btB FASGA Ls . BAYS FROM GABLE WALL b SEf�ND MEMBER i. 2B.e 0 i6 O.G. A14 INUM�AGUTT WIJIIIY. B TB Y/4. it - L3 STRAPPING 1/2'GYP.BOARD EXT.STUDS 0 24.O.G./ WALL BATI I c•R21 F.G.INSUL/ - vY PLYwooD 9HEATNING/ n 22 13'-10° 3'-10 I/2• W-3 1/2• m TYVIX WRAP/W.C.SHINGLES ® r j BEDROOM n 'Ride 0 Ni'O.C. (BEYOND) O t 4.OSS SUSFLOOR - y� w r 2.10'e 0 IVO.C. 20(Y.0 IV O.C. m G W W�IOLJ! kMMY ,,••,, 2e 0 16'O. Z 4 s/s•FIRE RATED F YER rJ Q 0 BD BETWEEN �� m GARAGE 4 LIVING vG SPACE (OPEN o ABOVE) LIVING RM m � IL a GARAGE J h i0 3'-4 1/4• r-rRINI£#i STAIR9 19R .2X6 BILL+SILL SEAL J 3-242 CARRIERS S/4'OW SUB_ - R30 INSUL to 4'CONC.SLAB 2xlde 0 1W O.C. 2XIde 0 ii'O.C. J 3-2.12 GIRT "' V 9TA2d2 IRS I CARRIERS V •STEEL COLUMNS 13'-0• 13'-01 - DAMP F'ROOP BEILW GRADE N ' 9 VVAAPOR BARRIER '. C- w Z Q N �Qw O 26-0• m to U tu CROSS SECTION 130.H _ SCALE: 1/4° 1'-0' to m 0 V cn _52- O ' J SHEET JOB: 1027 DRAWN BY, KW 10/26/10 Y N EXTEND HDR TO CORN 2x6 DBL TOP PLATE ^ - u .. RAFTER @ 16°O.C. 0 FULL HGT.STUDS 4 L JACK STUD r NAIL TOP PLATE H2.5®.EA. RAFTER 0 - Lh TO BTM OF.[DR SIMPSON MSTAIB CONNECTOR �o q W/2 ROWS OF 16d NAILS ON THE INSIDE FACE OF HEADER ►¢� W ®9°O.C. - TO EACH JACK STUD ,`B STRUCTURAL PANEL HEADER HEADER TOP PLATE ���CCC -j r NAILED DGEMON NTINUOUS. a M •3'D.C.EDGE AND FIELD CORNER TO CORNER > W OVER MULTIPLE OPENINGS �y LLI DOOR TRIMMER STUDS ® ®ii u,RAFTER TO PLATE CONNECTION erg W 'Q SCALE:N.T.S. 2-5/S'ANCHOR BOLTS - U w/3'k3°PLATE WASHERS _ EACH NARROW WALL SECTION `I _ - � W/ O STAGGER NAILIN INTO BOTH PLATES 2x6 DBL TOP PLATE ', '0 1. VERTICAL �A Y' STRUCTURAL PANEL �l W I' NAILED Ed!COMMON M N ROW WALL 8R GIN ARAGE DOOR AND IV NEDFELD /W scru.E-N.T.S. SHEAR WALL COMPLIANCE. Wo 71%OF EACH WALL RUN m VERTICAL SHEATHING WITH IL - Bd NAILS 3° EDGE/12° FIELD (4)16d NAILS PER FT HOTTON PLATE _ La 24%OF EACH WALL RUN VERTICAL _ DOUBLE ROW VERTICAL SHEATHING WITFI STRUCTURAL PANELS w STAGGER NAILING- BREAK ON SECOND FLOOR _ INTO BOTH PLATES Bd NAILS L EDGE/12° FIELD RIM JOIST J 2xG DBL TOP PLATE (4)16d NAILS PER FT EOT'fOM PLATE - U Q SECOND FLOOR = Q VERTICAL VERTICAL f' Q STRUCTURAL PANEL STRUCTURAL PANEL �( NAILED 3d COMMON NAILED ad COMMON Q Q Q •S°O"C •3.O.C..EDGE EWE Q - AND 12'IN FIELDlu AND 12°IN FIELD N Q to D %3 — F DOUBLE ROW DOUBLE ROW m V STAGGER NAILIN I "- STAGGER NAILIN ,; INTO BOX AND SILL INTO BOX AND SILL m # r"- SHEET _ ®FULL HEIGHT SHEATHING -SINGLE FLOOR ®FULL HEIGHT SHEATHING- -MULTI FLOOR SCALE:N.T.S. SCALE_N.T.S. JOS, 1027 DRAWN 6Y, KW DATE. 10/26/10 REScheck Software Version 4.3.0 Compliance Certificate Project Title: BAYSIDE BUILDING CO: Energy Code: 2009 IECC ' Location: Cotult, Massachusetts Construction Type; Single Family Glazing Area Percentage: 89/0 Heating Degree Days, 6137 y Climate Zone: 5 Construction Site; Owner/Agent: Designer/Contractor: LOI 34 COTUIT MEADWOS COTUITE,MA 02635 Compliance; Passe.*.,using UA trade-off Compliance: Maximum UA:208 Your UA;195 Cont.Gross Cavity Assembly Area or R-VaiLle 114alue or Door Perimeter U-Factor Ceiling 1:Flat Gelling or Scissor Truss 722 38.0 0.0 22 Wall 1:Wood Frame;24"o.o: 1848 18.0 0.0 98 Window 1;Wood Frame:Double Pane with Low-E 90 0.310 28 Window 2:Wood Frame;Double Pane with Low-E 12 0.280 3 Window 3;Wood Frame:Double Pane with Low-E 8 0.310 2 Door 1:Solid 42 0,150 6 Door 2:Glass 42 0,280 12 Floor 1;All-Wood Jolst/Truss:Over Unconditioned Space 722 30.0 0.0 24 CoYnp1lance Statement. The proposed bullding design described here Is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements In REScheckVersion 4.3,0 and to comply with the mandatory requirements listed In the REScheck Inspection Checklist. Name-Title Signature Date l! fi'� 91 Project Title: BAYSIDE 6UILDING CO. eel Report date; 12/16/10 Data filename: Untltled,rck. _ Page 1 of 4 b0/ZO 3Jtid NOIiV-InSNI ddW 6096888809 9T :ZO OTOZ/9T/ZT REScheck Software Version 4.3.0 Inspection Checklist Ceilings: U Ceiling 1;Flat Ceiling or Scissor Truss,R-38.0 cavlty Insulation Comments; Above-Grade Walls: ❑ Wall 1:Wood Frame,24"o.c„ R-19,0 cavity insulation Comments; Windows: U Window 1;Wood Frame:Double Pane with Low-E,U-factor:0.310 For windows without labeled U-factors,describe features: ' #Panes Frame Type Thermal Break? Yes—No Comments: ❑ Window 2:Wood Frame:Double Pane with Low-E. U-factor:0.280 For windows without labeled U-Factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments; U Window 3;Wood Frame,:Double Pane with Low-E,U-factor:0,310 For windows without labeled U-factors,describe features: Vanes Frame Type Thermal Break? Yes No' Comments: Doors: ❑ Door 1:Solid,U-factor:0.150 Comments: ❑ Door 2:Glass,U-factor.0,280 Comments: i Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-30.0 cavity insulation Comments: Floor insulation Is Installed In permanent contact with the underside of the subfloor decking Air Leakage:. Joints(Including rim joist junctions),attic access openings,penetrations,and all other such openings In the building envelope that are sources of sir leakage are sealed with caulk,gasketed,weatherstripped.or otherwise sealed with an air barrier material,suitable film or solid material. U Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/doorjambs and framing. Lj Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering, ❑ Access doors separating conditioned from unconditioned space are weather-stripped and Insulated(without Insulation compression or damage)to at least the level of Insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: Ll Building envelope air tightness and insulation installation complies by either 1)a post rough-In blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: Project Title: BAYSIDE BUILDING CO. Report date: 12/15/10 Data filename: Untitled.rck Page 2 of 4 V0/Z0 39dd N0Ild-1f1SNI ddW 6096888809 9T:Z0 0TOZ/9T/ZT r � (a)Air barriers and thermal barrier,Installed on outside of air-permeable Insulation and breaks or joints In the air barrier are filled or repaired. (b)Celling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation Is Installed in substantial contact and continuous alignment with the building envelope air barrier, (d)Floors:Air barrier is installed at any exposed edge of Insulation. (6)Plumbing and wiring:Insulation is placed between outside and pipes,Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring, (9 Corners,headers,narrow framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrooms: U Sunrooms that are thermally isolated from the building envelope have a maximum fanestration U-Factorof 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: 0 Vapor retarder Is Installed on the wane-in-winter side of all non-vented framed ceilings,walls,and floors;or It has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: Materials and equipment are Installed In accordance with the manufacturer's installation instructions, ❑ Insulation Is Installed In substantial contact with the surface being insulated and in a manner that achieves the rated R-value. U Materials and equipment are Identifled so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. U Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications, Duct Insulation: U Supply ducts in attics are insulated to a minimum of R-8.All other ducts In unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and.Testing: Cj Building framing cavities are not used as supply ducts. All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 1818 and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened,Crimp joints for round metal ducts have a contact lap of at least 1 1/2 Inches and are fastened With a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially Inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge affect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). U Duct tightness test has been performed and meets one of the following test criteria: (1)Postconetruction leakage to outdoors test:Less than or equal to 57.8 cfm(8 cfm per 100 ft2 of conditioned floorarea)- (2)Postconstruction total leakage test(Including airhandlerenclosure):Less than or equal to 86.6 cfm(12 cfm per 100 ft2 of conditioned floor area)pressure differential of 0.1 inches w.g. (3)Rough-in total leakage test with air handier installed,Less than or equal to 43.3 cfm(6 cfm per 100 ft2 of conditioned floor area) when tested at a pressure differential of 0.1 Inches w.g. (4)Rough-in total leakage test without air handler Installed:Less than or equal to 2B.9 cfm(4 cfm per 100 ft2 of conditioned floor area). ' Heating and Cooling Equipment Sizing: V Additional requirements for equipment sizing are included by an Inspection for compliance with the International Residential Code. �. For systems serving multiple dwelling units documentation has been submitted demonstrating compllance with 2009,IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Lj Circulating service hot water pipes are insulated to R-2, L.I Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. } Project Title: BAYSIDE BUILDING CO. Report date: 12/15/10 Data filename; Untitled.rck Page 3 of 4 b0/80 30Vd NOIld-lf1SNI dVW 6096888809 9T:Z0 0TOZ/9T/ZT Heating and Cooling Piping Insulation: la HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: Heated swimming pools have an onloff heater switch. U Pool heaters operating on natural gas or LPG have an electronic pilot light, U Truer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation, Where pumps operate within solar-and/or waste-heat-recovery systems. U Heated swimming pools have a cover on or at the water surface, For poolu heated.over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not requlred when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: 1-1 A minimum of 50 percent of the lamps In permanently installed lighting fixtures can be categorized as one of the following; (a)Compact fluorescent (b)T-b or 6maller diameter linear Fluorescent (0)40 lumens per watt for lamp wattage<=15 (d)50 lumens per watt for lamp wattage;, 15 and<=40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the.system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control Is also permitted to satisfy requirement'c'), Certificate: U A permanent certificate is provided on or In the electrical distribution panel listing the predominant Insulation R-values;window U-factors;type and efficiency of apace-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels, r NOTES TO FIELD: (Building Department Use Only) Project Title; BAYSIDE BUILDING CO. Report date: 12/15/10 Data filename: Untitled,rck Page 4 of 4 b0/b0 30Vd N0I1d-1f1SNI dt1W 6096888809 9T:Z0 0TK/9T/ZT TempParcelEdit Page 1 of 1 Logged In As: Wednesday,January 16 2008 Frank Schlegel New Parce I Application Center Road System Reports Road System The record has been added. New Parcel Detail New Mapparcel: 002 002 034 ! Street Number: 302 Unit Dev Lot LOT 34 } Road Name: JPHEASANT HILL CIRCLE T/R ( Sec. Road: _,_..._ ._, _• _ . _... ._. .._. E T/R. l Villlage: 07 Cotult Part of M/P: MAP 002 PCL 002 Plan Ref: IPLBK 617/69-75 (APP 7-62) Date Added: . ........ Updated: s Updafe D'el teeAddP nother httD:H1ssa12/Intranet/Prondata/Tem-oPare'elEdit.asnx?ID=Add 1/16/2008 Fou(n daYt io n '. Certificati o n i n Barnstable Cotuit M a• , 02635 Location: Lot 34 N : 302 Pheasant Hill Circle Subdivision of Barnstable Assessors Map: 002 Parcel: 02 Flood Zone C ® FIRM, Community,Panel Number No:: ; 025551,.0021 o Baxter Nye .Engineering �C'. Surveying OWNER; Cotuit Equitable"Housing LLC ®Deed'Book 21804 Page 41 Registered Professional OPEN, SPACE: Cotuit Meadows Homeowner's' Engineers and Land Association, .lnc. ® Deed Surveyors Book 23161 Page 59 78,-North Street, 3rd Floor Barnstable Zoning Board of Appeals No 2005-082 ® Deed Book '21059Hyannis, MA; 02601 Minor Modification ification No. 1 @ , '-:Deed Book 22249 Page: 282� Phone .(508) 771-7502 Fax - (508)-771-7622 Job Number: . 2005.214 Scale 17 - 10' 11-7,03=2010_ W. IV ^ � CIO ld� dd W t u O. •W A :. LOT 33 S W W >>.45141 A. W LOT" 34 p`E � 32j z � a 9,735f' S.F. 4 Q 'CO 0.24f ACRES h 40, r W N M N.. _ 0 o cv,�^oQoCv `� o o) 20, o) N M 11203 ~ / LOT 35 �l 94 W STAKE ® LOT CORNER EL = . , -c C , - 4 I CERTIFY THAT TO THE BEST OF MY. KNOWLEDGE THE EXISTING STRUCTURE SHOWN HEREON IS IN COMPLIANCE WITH.:FRONT, SIDE AND REAR SETBACK REQUIREMENTS. (20`/10'/10') AS NOTED IN TOWN OF BARNSTABLE ZONING BOARD OF APPEAL. No. 2005-082 (DB 21059 Pg 158) IS LOCATED IN RELATION TO PREIMETER MONUMENT �� c S. SHOWN PESPECI1 7 (AL FLOOD HAZARD4 9 AREA.S AND IS NOT LOCATED .WITHIN WITHIN A U, FL THIS. PLAN IS NOT TO BE, RECORDED NOR IS IT TO-BE USED TO ESTABLISH PROPERTY LINES.- M74 � c REGISTERED PROFESSIONAL LAND .SUR YOR N. BAXTER NYE ENGINEERING & SURVEYING DATE GENERAL NOTES: 1. LOCUS PROPERTY IS SHOWN AS: ASSESSOR'S MAP 002 - PARCEL 02 2. SETBACKS. FRONT = 20' SIDE/REAR = 10' 3. UTILITY INFORMATION AS SHOWN ON PROPOSED SUBDIVISION CONSTRUCTION PLANS. 4. COMMUNITY PANEL NUMBER. 025551 0021 0 THE FLOOD INSURANCE RATE MAP DEFINES THIS AREA AS ZONE C, AREA OF MINIMAL FLOODING. 5. ENVIRONMENTAL NOTES. SITE IS NOT WITHIN AN A.C.EC. (AREA OF CRITIC ENVIRONMENTAL 000 .-- CONCERN). SITE IS NOT WITHIN AN AREA OF ESTIMATED HABITAT OF RARE � `� WILDLIFE PER NHESP MAP OCTOBER 1, 2006 'ESTIMATED z HABITATS OF RARE WILDLIFE' FOR USE WITH THE MA WETLANDS PROTECTION ACT REGULATIONS (310 CMR 10).' ` SITE DOES NOT CONTAIN A CERflFlED VERNAL POOL PER NHESP ' MAP OCTOBER 1, 2006 `CER inED VERNAL POOLS.' SITE IS NOT WITHIN A PRIORITY HABITAT PER NHESP MAP OCTOBER 1, 2006 'PRIORITY HABITATS OF RARE SPECIES' FOR SPECIES UNDER THE MASSACHUSETTS ENDANGERED SPECIES ACT, \� REGULATIONS (321 CMR10) SITE IS WITHIN A STATE APPROVED ZONE II GROUND WATER RECHARGE PROTECTION AM LOT 34 `------ 9,73 f S.F. LOT 33 GETA 12i 0.24 E s N G D CONSTRUCTION NOTES: +� 13,?7. E�\ BOTTOM -5 3r y 1. ALL GENERAL CONSTRUCTION NOTES ON SHEET C-2 FROM THE_ b / \ SUBDIVISION CONSTRUCTION PLANS FOR COW MEADOWS, DATED --- ---5 53;� , y `� 6/25/07, SWALL HEREBY APPLY TO THIS SITE PLAN. c •---- - ----- ---- n/ 2. ALL GRADING, DRAINAGE, AND UTILITY NOTES ON SHEET C-5 FROM W x 55.0 �� THE SUBDIVISION CONSTRUCTION PLANS FOR COTUIT MEADOWS, w "k 53.3 y PROVIDE (1) DIA. x 6 DEEP LEACHING DATED 6/25/07, SHALL HEREBY APPLY TO THIS SITE PLAN. ' BASIN W/ 1' STONE SURROUNDING (OR 3. SEWER BUILDING CONNECTIONS. ALTERNATE QUIVALENT VOLUME) - MIN. COVER SHALL BE 3 FT. p40 -� y CONNECT A DOWNSPOUTS TO _ 54.5 x - / �`� AS REQUIRED BY BARNSTABLE DPW. Q a LEACHING BASIN SET CLEANOUTS AND MAINTAIN CLE4RANM FROM OTHER UTILITIES w y C /� MINIMUM SEWER SERVICE CONNECTION SLOPE SHALL BE 2.1 X VEGETATED 12" �l •3'o S INN. �" W 52.0 / 3 i DEEP RAIN GARDEN i (125 C.F. STORAGE) i ,0. =44.59 x55.0 -10 0)' TOP-54.0/ `. min.) bV BOTTOM=53.0 x 55.0 54.7 o 54.5 5• c --- 54.5x .4.4x +4.° ,� 3 Cotuit Meadows Subdivision x 55.0 ygyb �Cotuit■Barnstable Massachusetts OX CLE S INN. x ��"53.0 4.5 oUT, \-43.44 \ PREPARED FOR / L\ x 49 4 COTUIT EQUITABLE HOUSING, LLC R 0. Box 95 / w s Centerville MA 02632 � y l Site Plan co Lot 34 . 302 Pheasant Hill Circle BAXTER NYE ENGINEERING & SURVEYING Registered Professional I� N 3 Engineers and Land Surveyors � of.41 78 North Street,3rd Floor,Hyannis,MA 02601 qss Phone-(508)771-7502 Fax-(508)771-7622 g���v~ EW ED -4 v C1 20 0 20 40 N SCALE IN FEET ONAL ENG SCALE. 1" = 20' DATE. 10-26-10 REV. DATE: REMARKS Lot 34 0: 2005 2005-214 CML DESIGN 2005-214PBLOTS.dw 2005-214