Loading...
HomeMy WebLinkAbout0351 PHEASANT HILL CIRCLE ���i ���s�� / Ci�c ��/ � l,.o.r_' � Ova-- � - - _ �---�--�-. 4`-71 3 - O i 1 � �: Town of Barnstable Building Department - 200 Main Street ELARNST"LE, * Hyannis, MA 02601 9�A 1639. .+� (508) 862-4038 Certificate of Occupancy Application Number: 201102083 CO Number: 20110135 Parcel ID: 002002048 _ CO Issue Date: 08123/11 Location: 351 PHEASANT HILL CIRCLE Zoning Classification: RESIDENCE F DISTRICT Proposed Use: DEVELOPABLE LAND Village: COTUIT Gen Contractor: BAYSIDE BUILDING, INC Permit Type: RCOO CERTIFICATE OF OCCUPANCY RES Comments: Q - 4yk Building Department Signature Date Signed 1 �IKEA TOWN OF BARNSTABL.E Building Application Ref: 201102083 BARN"ABLE, Issue Date: 04/29/11 P e it 9 MASS 1639. 1 3�A�� Applicant: Permit Number: B 20110838 Proposed Use: DEVELOPABLE LAND Expiration Date: 10/27/11 Location 351 PHEASANT HILL CIRCLE Zoning District RF Permit Type: NEW SINGLE FAMILY HOME Map Parcel 002002048 Permit Fee$ 1,198.50 Contractor BAYSIDE BUILDING,INC Village COTUIT App Fee$ 100.00 License Num 005645 Est Construction Cost$ 235,000 Remarks APPROVED PLANS MUST BE RETAINED ON JOB AND TO CONSTRUCT A SINGLE FAMILY 3 BEDROOM. 2 1/2 BATH THIS CARD MUST BE KEPT POSTED UNTIL FINAL CAPE WITH AN ATTATCHED 2 CAR GARAGE INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH Owner on Record: COTUIT EQUITABLE HOUSING LLC BUILDING SHALL NOT BE OCCUPIED UNTIL A FINAL Address: PO BOX 95 INSPECTION HAS BEEN MADE. CENTERVILLE, MA 02632 Application Entered by: RM Building Permit Issued By ' THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY+STREET;ALLY OR SMEWALK.OR.ANY,Y,PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY. ENCROACHEMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY�THE JURISDICTION. STREET OR ALLY GRADES AS WELL AS DEPTH AND LOCATION ORPUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF.PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION:RESTRICTIONS., MINIMUM OF FOUR CALL INSPECTIONS REQUIRED FOR ALL CONTSTRUCTION WORK: 1.FOUNDATION OR FOOTINGS. 2.ALL FIREPLACES MUST BE INSPECTED AT THE THROAT LEVEL BEFORE FIRST FLUE LINING IS INSTALLED. 3. WIRING&PLUMBING INSPECTIONS TO BE COMPLETED PRIOR TO FRAME INSPECTION. 4.PRIOR TO COVERING STRUCTURAL MEMBERS(READY TO LATH). 5. INSULATION. 6.FINAL INSPECTION BEFORE OCCUPANCY. WHERE APPLICABLE,SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF CONSTRUCTION. PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED ABOVE. PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO GUARANTY FUND(as set forth in MGL c.142A). $;rs. 1 BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS. 1 (jfOA oc Y s-9 ,e 01C44— 1 1 7 /q it Z// 3 1 Heating �f 7 Inspection Approvals Engin ering Dept 0,4 r /f r Fire Dept (' 2 -,�ryA� ''G S Board of Health F�t 1?3/ �w r may. J }+.. ;���,q �: �c �. ,�. � C �Jy�'F Y- ;'"<' .Np;r j•w.. .�,. .. . r: .. '�., TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION aQ I l G 2a� Map Parcel I'�®0�• ® Application Health Division Date Issued , ZQ, Conservation Division .: ::Application F Planning Dept. Permit Fee, Date Definitive Plan Approved by Planning Board Historic - OKH Preservation/Hyannis Project Street'Address 351 ����5,9,v�• H141- O/,efJ-R' Village TV l T Owner C01-61T E01117 LL Address 040C g�_ CF_AM . ✓14-t-15 Telephone SAD '7 7/7 Permit Request 19�W14Y 3 ._L?�F D,eaaI4 d 2 P,f}?tf L'ft!✓� 4JL761 PI Ll i7�,b cA CA4 dt4,PA-ae. Square feet: 1 st floor: existing proposed i39� 2nd floor: existing proposed y Total news y� Zoning District Flood Plain G Groundwater Overlay Project ValuationoZ0 Construction Type V®QZ 1926A Lot Size' ��� 9 Grandfathered: ❑Yes 9lo If yes, attach supporting documentation. Dwelling Type: Single Family Two Family ❑ Multi-Family (# units) Age of Existing Structure i�/' (� Historic House: ❑Yes &rlqo On Old King's Highway: ❑Yes ®-Po Basement Type: qkfull ❑ Crawl ❑Walkout ❑ Other Basement Finished Area(sq.ft.) Basement Unfinished Area(sq.ft)_? 13?0 Number of Baths: Full: existing new Half: existing new- Number of Bedrooms: existing 3 new Total Room Count (not including baths): existing new First Floor Room Count ? Heat Type and Fuel: was ❑Oil ❑ Electric ❑ Other -• Central Air: U/Yes ❑ No Fireplaces: Existing New Existing wood/coal stove ❑Yes Flo Detached garage: ❑ existing ❑ new size Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: ❑ existing new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes Q1r o If yes, site plan review# Current Use V140!,A1)r LD 7- Proposed Used I .�/� `�✓/'� �Ib�tL.y APPLICANT INFORMATION "� -- - (BUILDER OR HOMEOWNER) Name Telephone Number 771 - 1 t�lO Address License# oe,50 Home Improvement Contractor# Worker's Compensation # 140C-' 0073 "o-A) ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TOJnAtull &L4W SIGNATURE,--' DATE 5 FOR OFFICIAL USE ONLY APPLICATION# z e DA I-E,ISSUED- ;F 1E =? } , MAP=/PARCEL NO.; F ADDRESS:. VILLAGE OWNER a f t DATE OF INSPECTION: r .'kFOUNDATION 711 „ { FRAME � ®IF�� , "KIN SULATION FIREPLACE 4 ELECTRICAL: ROUGH FINAL r' `M PLUMBING: ROUGH FINAL " GAS A .r" a ROUGH 6_*r-,, FINAL ASSOCIATION PLAN NO.r ' The Commonwealth of Massachusetts .Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111' www.mass.gov/dia ' Workers"Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers _Applicant Information .Please Print Legibly Name(Business/Organization/ludividual): v�' 7`5�� ��G��/ l� 1A16, 'AddXeSS: r • � �/" l/ yLLB �City/State/Zip Phone.#: Are you an employer? Check the appropriate box: :Type of project(required):. 1:❑ I am a employer with 4. I am a general con.tractor and I 6. ❑New construction . 'employees(full and/or part-time).*• have hired the sub=contractors 2;❑ I am a'sole proprietor or partner- listed on the'attached sheet. 7. Remodeling ship and have no employees These sub-contractors have g, EJ Demolition 'working for me in any capacity, employees and have workers' r 9. Building addition [No workers' comp,insurance comp. insurance ' required.) 5. ❑ We area corporation and its 10.❑•Electrical repairs or additions 3.❑ I am a homeowner.doing all work . officers have exercised their 11.❑Plumbing repairs or additions ' myself:[No workers'comp. right of exemption per MGL 12,[]Roof repairs insurance.required.]t c: 152, §1(4), and we have no . employees. [No workers' . 13.❑ Other comp, insurance required.] *My applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners,who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such, tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees, If the sub-contractors have employees,they must providb their workers'comp.policy number. I qt i an employer that is providing workers'compensation insurance for my employees. Below is.the policy and job site' information. Insurance Company Name: tIe4.-b 14 /AI S Ue1AZE CO, U / I Policy#or Self-ins.Lic.#: WC� Q 0 2� y0 Exp� / i ration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page'(showing the policy,number and expiration date). Failure•to secure coverage as required under Section 25A ofMGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK.ORDER and a fine of up to$250.00 a day against the violator, Be.advised that a copy of this stateme&maybe forwarded to the-Office of Investigations of the WA for insurance coverage verification ' I do hereby certify un er th _ penalties of perjury tltat the information provided above Is true and correct. Si afore: Date VL2- — Phone#' ' 9 r?l l OVQ ' Official use only. Do not wrlte in this area, to be completed by city or town official City or Town: ' Permit[License# Issuing Authority(circle one): 1.Board of Health 2,Building Department 3. City/Town Clerk 4,Electrical Inspector 5,Plumbing Inspector 6, Other Contact Person: Phone#: '�~of 1HF>'p�� Town. of Barnstable. Regulatory Services v$�MSS '� Thomas F. Geiler,Director Building Division Tom perry, Building Commissioner 200 Main Street, Hyannis,MA 02661 v -w-town.barnstable.ma.us Office: 508-862-403 8 Fax: 502-790-6230 Prop e 7rty Owner Must Complete and Sign This Section If Using ABuilder as Owner of the subject property hereby authorize �s `1S l��J lL�/r7lp' , /it/e to act on my behalf, in all matters relative to.work authorized by this building permit application'for; . 35l H1tL e l,-c Cp7v lr /r)A (Address of Job) Signature of Owner Date Print Name QTOP MS:OWNERPERMISSIGN All Cape Garage Door. 06/01/04 10/07/11 06/01/04 04/01/12 Aluminum Products of Cape 08/15/04 044/15/1 008/15/04 04/15/12 Anthony Averinos 07/20/04 03/O1/12 . 07/25/04 03/01/12 Cape Cod Marble & Granite 07/01/05 07/01/11 08/16/05 04/16/12 Cape Concrete Forms 06/05/07 09/29/11 12/07/07 03/01/12 - Carpet Barn Inc 01/01/06 05/01/11 0110.1105 01/01/12 Casella Waste Management 04/30/08. 04/01/12 05/01/08 04/01/12 Chaves Robert 08/13/04 08/13/11 12/17/11 12/17/11 Christopher Costa, Inc. 01/22/08 08/27/11 02/06/12 -02/06/12 I Cornerstone dba Tony Arede 03/10/06 10/22/10 02/O1/11 02/01/12 • Coy's Brook, Inc 04/24/04 .. 04/2411.1 09/21/04-. 10/01/11 Davids Building & Remodel 01/01/07 01/01/12 06/14/04 03/01/12 D.P. Fuccillo Construction Inca 10/20/06 10/20/11 10/20/08 10/23/11 Govoni Land'Services 05/31/04 03/01/12 07/04/04 03/01/12 ' Hill Construction. 04/29/07 04/29/11 08/14/04 08/14/11 Kitchen Appliance Mart 08/12/04 08/12/11 01/01/05 01/10/12 MAP Insulation 10/01/07 10/01/11 10/01/07 10/01/11 Meagher Bros. Construction(DECKS) 04/25/09 03/24/11 11/09/08 03/10/12 Meagher Construction(ROOFER)_ 06/19/04 04/01/12 06/23/04 04/01/12 Morse's Masonry 03/10/07 - 03/10/11 10/11/08 10/11/11 EReed, Mef 07/21/04' 04/01/12 07/21/04 2ohnson- SMJ Carpentry 04/25/04. 10/26/11 04/25/04 10/26/11 Whiteley, W. Vernon 10/01/04. '10/01/1 T 10/03/04 10/O1/11 K�loor Specialists 02/03/0$_ 02/03/11 02/03/08 02/03/12 M !.!q}.i ail oa P'Imrno—z Re,, Oa$S€9alS and Stand-m-d � p �TM�67p� �p'i�•'�S �3��r�i � EPIAN T DACES PO BOX 95 CENTERVIL(E', MA 02632 'fir=: 29209 Restricted to: 00 GO- Unrestricted I -1 2 Family Homes Failure t0 possess a current edition of the Massachusetts State Building Code is cause for revocation of this license,. Refer to: WWW.Mass.Gov/,DPS f AWC Guide'to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(786 CMR 5301.2.1.1)1 THE OSPREY MODEL COTUIT MEADOWS Q Check Compliance 1.1 SCOPE Wind 3-sec. ust Speed P ( gust)..........................................................................•...:......................................110 mph Q WindExposure Category.........,.............................. ....:...................:..:...........................................................B Q 1.2 APPLICABILITY Number of Stories(a roof which exceeds 8 in 12 slope shall be considered a story) ..... 2 stories :5 2 stories Q RoofPitch .......................................................:...................(Fig 2) .......................................::.........12<_ 12:12 Q MeanRoof Height ............................................... ..................(Fig 2)... ......... ,........ ..................16 ft,:5 33' Q BuildingWidth,W ..............................................................(Fig 3)............... ......... ................ 44 ft <_80' Q Building Length, L ..............................................................(Fig 3) ..................................................56 ft <_80' Q Building Aspect Ratio(L/W) ......... ......... .........:.........(Fig 4).......:........................................1.5• <3:1 Q Nominal Height of Tallest Opening2 ..........................................(Fig 4)..............:..................................6,-8'.'s 6,8„ Q 1.3 FRAMING CONNECTIONS General compliance with framing connections....................(Table 2)..............................................:................. Q 2.1 FOUNDATION Foundation Walls meeting requirements of 780 CMR 5464.1 Concrete..............................:....................................................................... .......:.:..;.....:....:. Q ConcreteMasonry .........................................::............,........................................................ 2.2 ANCHORAGE TO FOUNDATION'.3 5/8"Anchor Bolts imbedded or 5/W Proprietary Mechanical Anchors as an alternative in concrete only Bolt Spacing—general ......................:........::. ........(Table 4)................................................... 38 in: Q Bolt Spacing from endfjoint of plate ........::.................7(Fig 5)........................................12 in..<_6"=12" Q Bolt Embedment—concrete........................................(Fig 5)...................................................7 in.>7" Q Bolt Embedment—masonry........................................(Fig 5)........................................... in.>_ 15" N/A Plate Washer....................................I.................,:.......(Fig 5) .............................................. 3"x. 3"x'/V Q 3.1 FLOORS Floor framing member spans checked ...............................(per 780 CMR Chapter 55).................................... Q Maximum Floor Opening Dimension...................................(Fig 6)...................................................12 ft 5 12' Q Full Height Wall Studs at Floor Openings less than 2'from Exterior Wall(Fig 6)....................................... N/A Maximum Floor Joist Setbacks Supporting Loadbearing Walls or Shearwall................(Fig 7) .................................................... ft <_d N/A Maximum Cantilevered Floor Joists Supporting Loadbearing Walls or Shearwall................(Fig 8)......._...............................:..........._ft <_d N/A Floor Bracing at Endwalls...............:...................................(Fig 9)...........:...:................................................... Q Floor Sheathing Type ............:...........................................(per 780 CMR Chapter 55).................................... Q Floor Sheathing Thickness ......:.........................................(per 780 CMR Chapter 55)..........................314 in. Q Floor Sheathing Fastening:.................................................(Table 2)............8 d nails at 6 in edge/12 in field Q 4.1 WALLS Wall Height Loadbearing walls.......:................................................(Fig 10 and Table 5).................................8.ft <_ 10' Q Non-Loadbearing walls................................................(Fig 10 and Table 5).............................18 ft <_20' Q Wall Stud Spacing .......:.......:.............::..:..:..........,...:....(Fig 10 and Table 5).....................24 in.<_24"o.c. Q Wall Story Offsets ............................................_ ...........(Figs 7&8)..........................................._ft sd :. N/A AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone' Massachusetts Checklist for Compliance(780 CMR 5301.2.1.1)1 4.2 EXTERIOR WALLS' Wood Studs Loadbearing walls.......................:................................(Table 5)..........................................2x6-8 ft 0 in. Q Non-Loadbearing walls................................................(Table 5)..._....................................2x6-18 ft 0 in. Q Gable End Wall Bracing Full Height Endwall Studs............................................(Fig 10).................................................................. Q WSP Attic Floor Length...............................................(Fig 11).........:.................................... ft>_W/3 N/A Gypsum Ceiling Length(if WSP not used)..................(Fig 11).........................:....................26 ft>_0.9W Q and 2 x 4 Continuous Lateral Brace @ 6 ft.o.c. .. (Fig 11).............................. ............................... N/A or 1 x 3 ceiling furring strips @ 16"spacing min.with 2 x 4 blocking @ 4 ft. spacing in end joist or truss bays Q Double Top Plate Splice Length ........................ ....:.........................(Fig 13 and Table 6).........................................8 ft Q Splice Connection(no.of 16d common nails).............(Table 6)..............................................................6 Q Loadbearing Wall Connections Lateral(no.of 16d common nails)...............................(Tables 7).............................................................2 Q Non-Loadbearing Wall Connections Lateral(no.of 16d common nails)...............................(Table 8)..._.........................................*..........:..:..3 Q Load Bearing Wall Openings(record largest opening but check all openings for compliance to Table 9) Header Spans ........................................................(Table 9)..........................................6 ft 0 in.s 11' Q Sill Plate Spans ........................................................(Table 9)..........................................3 ft 0 in.<_11' Q Full Height Studs (no.of studs)................................... able 9(T )..............................................................3 Q Non-Load Bearing Wall Openings(record largest opening but check all openings for compliance to Table 9) Header Spans.............................................................(Table 9).................c........................9 ft 0 in.<_12' Q Sill Plate Spans...........................................................(Table 9).............................:....—ft—in.<_12" N/A Full Height Studs(no.of studs)...................................(Table 9).......................... Exterior Wall Sheathing to Resist Uplift and Shear Simultaneously4 Minimum Building Dimension,W", Nominal Height of Tallest Opening2 .........................................................................6'.8%.6'8" Q Sheathing Type.............................................(note 4)...................................................I.........WSP Q Edge Nail Spacing.........................................(Table 10 or note 4 if less).............................3 in. Q Field Nail Spacing.....................7....................(Table 10)......:.................................>............12 in. Q Shear Connection(no.of 16d common nails)(Table 10).................... p� Percent Full-Height Sheathin able 10 .......................................................59% 5%Additional Sheathing for Wall with Opening>68"(Design Concepts)..................... Q Maximum Building Dimension, L ' Nominal Height of Tallest Opening?.....................................................................6'-8"<_68" Q Sheathing Type.............................................(note 4)..........................................................WSP Q Edge Nail Spacing.........................................(Table 11 or note 4 if less).............................3 in. Q Field Nail Spacing.........................................(Table 11).....................................................12 in. Q Shear Connection(no.of 16d common nails)(Table 11)............................................................4 p� Q Percent Full-Height Sheathing.......................(Table 11)........................................................31%0 5%Additional Sheathing for Wall with Opening>6'8"(Design Concepts)..................... N/A Wall Cladding Rated for Wind Speed?...............:......................:.........:....................... .. Q...................................................... AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance(780 CMR 5301.2.1.1)1 5.1 ROOFS Roof framing member spans checked?.......................(For Rafters use AWC Span Tool,see BBRS Website) Q Roof Overhang ..................................:................(Figure,19)...............2/3 ft<_smaller of 2'or U3. Q Truss or Rafter Connections at Loadbearing Walls Proprietary Connectors Uplift_............................:................(Table 12)....:,....................................:... U=236 plf Q Lateral.............................................(Table 12)..:............................................L=176 plf Q Shear......:. .....................................(Table 12).................... ...........................S=77 plf Q Ridge Strap Connections,if collar ties not used per page 21... (Table 13).........::....:...............T= plf N/A Gable Rake Outlooker.........................................(Figure 20).............-ft<_smaller of 2'or U2 N/A Truss or Rafter Connections at Non-Loadbearing Walls Proprietary Connectors , Uplift................................................(Table 14)............................................U=' lb. N/A Lateral(no.of 16d common nails)...(Table 14)....................a...................L= lb. N/A Roof Sheathing Type...................................................(per 780 CMR Chapters 58 and 59) ............ Q Roof Sheathing Thickness............................................ ...............................................5/8 in.z 7/16°WSP Q = Roof Sheathing Fastening....................................:......(Table 2)............................................................8d Q THE OSPREY MODEL COTUIT MEADOWS MEETS THIS CHECKLIST IN ITS ENTIRETY,THEREFORE THE FOLLOWING NOTE APPLIES: Notes: 1. This checklist shall be met in its entirety,excluding the specific exception noted in 2,to comply with the requirements of 780 CMR 5301.2.1.1 Item 1. If the checklist is met in its entirety then the following metal straps and hold downs are not required per the WFCM 110 mph Guide: a. Steel Straps per Figure 5 b. 20 Gage Straps per Figure 11 c. Uplift Straps per Figure 14 d. All Straps per Figure 17 e. Corner Stud Hold Downs per Figure 18a and Figure 18b 2. Exception:Opening heights of up to 8 ft.shall be permitted when 5%is added to the percent full-height sheathing. requirements shown in Tables 10 and 11: 3. The bottom sill plate in exterior walls shall be a minimum 2 in. nominal thickness pressure treated#2-grade. 4. a. From Tables 10 and 11 and location of wall sheathing and Building Aspect Ratio,determine Percent Full-Height Sheathing and Nail Spacing requirements b. Wood Structural Panels shall be minimum thickness of 7/16"and be installed as follows: i. Panels shall be installed with strength axis parallel to studs. ii. All horizontal joints shall occur over and be nailed to framing. iii. On single story construction, panels shall be attached to bottom plates and top member of the double top plate. iv. On two story construction,upper panels shall be attached to the top member of the upper double top plate and to band joist at bottom of panel. Upper attachment of lower panel shall be made to band joist and lower attachment made to lowest plate at first floor framing. v. Horizontal nail spacing at double top plates, band joists,and girders shall be a double row of 8d staggered at 3 inches on center per figures below:Vertical and Horizontal Nailing for Panel Attachment f AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Cheeklist for Compliance (780 CMR 5301.2.1.1)1 4 • -Y11}IEN THE EDGE RESTS ON RRAMING VSESd NAILS AT6�o.c. -- u 1.1 11- II 11 II 11 11 11 11 11 1 ' N 1-I 7 1 1 I l G -- I { F I Il 11 it 4it M OD rl 1 I i 'If 11 1 4 1 Z 1 11 li OQ •le a 11 II 11 7 - u ! NAILSPACING �i PANEL d See Detail on Next Page Vertical and Horizontal Mailing for Panel Attachment AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Zone Massachusetts Checklist for Compliance (7so CMx 5301.2.1.1)1 dza �� ; ixa ; a Bri FRAUAING MEMBERS , EDGE RdTERMF.DIAT£ ��1 �; I 1 ---. 1 1 STAGGERED 3"MMd NNL PATTERN PANEL PALE_EDGE DOUWA NAIL EDGE SPAMG DETAL Detail Vertical and Horizontal Nailing for Panel Attachment REScheck Software Version 4.4.1 Compliance Certificate Project Title: THE OSPREY MODEL Energy Code: 2009 IECC Location: Barnstable,Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 180 deg.from North Glazing Area Percentage: 9% Heating Degree Days: 6137 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: COTUIT MEADOWS BAYSIDE BUILDING,INC. s .m x Compliance:9.3%Better Than Code Maximum UA:353 Your UA:320 The%Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. TOTAL CEILING:Flat Ceiling or Scissor Truss 1345 38.0 1.0 39 Skylight 1:Wood Frame:Double Pane 12 0.340 41 SHGC:0.31 FRONT WALL:Wood Frame,24"o.c. 1264 21.0 1.0 60 Orientation:Front WINDOWS:Wood Frame:Double Pane with Low-E 63 0.310 20. SHGC:0.31 Orientation:Front Door 1:Solid 21 0.280 6 Orientation:Front Door 2:Solid .21 0.280 6 , Orientation:Front REAR WALL:Wood Frame,24"D.C. 732 21.0 1.0 30 Orientation:Back WINDOWS:Wood Frame:Double Pane with Low-E 108 0.310 33 SHGC:0.31 Orientation:Back SLIDER:Glass 42 0.310 13 SHGC:0.31 Orientation:Back RIGHT WALL:Wood Frame,24"o.c. 546 21.0 1.0 27 Orientation:Right Side WINDOWS:Wood Frame:Double Pane with Low-E 31 0.310 10 SHGC:0.31 Orientation:Right Side LEFT WALL:Wood Frame,24"o.c. 490 21.0 1.0 24 Orientation:Left Side Window 4:Wood Frame:Double Pane with Low-E 20 0.310 6 SHGC:0.31 Orientation:Left Side Floor 1:All-Wood JOISt/Truss:Over Unconditioned Space 1345 _ 30.10 1.0 42 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title:THE OSPREY MODEL Report date:04/18/11 Data filename:C:\Program.Files\Check\REScheck\THE OSPREY.rck Page 1 of 6 Name Tide Signature Date I, Project Title:THE OSPREY MODEL Report date: 04/18/11 Data filename:C:\Program Files\Check\REScheck\THE OSPREY.rck Page 2 of 6 REScheck Software Version 4.4.1 Oh Inspection Checklist Ceilings: ❑ TOTAL CEILING:Flat Ceiling or Scissor Truss,R-38.0 cavity+R-1.0 continuous insulation Comments: Above-Grade Walls: ❑ FRONT WALL:Wood Frame,24"o.c.,R-21.0 cavity+R-1.0 continuous insulation Continuous insulation specified for this above-grade wall has consistent R-value rating across full area of the wall. Comments: ❑ REAR WALL:Wood Frame,24"o.c.,R-21.0 cavity+R-1.0 continuous insulation Continuous insulation specified for this above-grade wall has consistent R-value rating across full area of the wall. Comments: ❑ RIGHT WALL:Wood Frame,24"o.c.,R-21.0 cavity+R-1.0 continuous insulation Continuous insulation specified for this above-grade wall has consistent R-value rating across full area of the wall. Comments: ❑ LEFT WALL:Wood Frame,24"o.c.,R-21.0 cavity+R-1.0 continuous insulation Continuous insulation specified for this above-grade wall has consistent R-value rating across full area of the wall. Comments: Windows: ❑ WINDOWS:Wood Frame:Double Pane with Low-E,U-factor:0.310 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ WINDOWS:Wood Frame:Double Pane with Low-E,U-factor;0.310 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑ WINDOWS:Wood Frame:Double Pane with Low-E,U-factor:0.310 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break?- Yes No Comments: ❑ Window 4:Wood Frame:Double Pane with Low-E,U-factor;.0.310 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Skylights:. LJ Skylight 1:Wood Frame:Double Pane,U-factor:0.340 #Panes - Frame Type Thermal Break? Yes No Comments: Doors: ❑ Door 1:Solid,U-factor:0.280 Comments: ❑ Door 2:Solid,U-factor:0.280 Comments: Project Title:THE OSPREY MODEL Report date: 04/18/11 Data filename: C:\Program Files\Check\REScheck\THE OSPREY.rck Page 3 of 6 ❑ SLIDER:Glass,U-factor:0.310 Comments: Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-30.0 cavity+R-1.0 continuous insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Air Leakage: ❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/door jambs and framing. ❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation: (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. (f) Corners,headers,narrow framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration 0-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroorn from conditioned space meet the building thermal envelope requirements. Materials Identification and Installation:: ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. ❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U-factors,and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: ❑ Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: Building framing cavities are not used as supply ducts. ❑ All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Project Title: THE OSPREY MODEL Report date: 04/18/11 Data filename: CAProgram Files\Check\REScheck\THE OSPREY.rck Page 4 of 6 Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction leakage to outdoors test:Less than or equal to 107.6 cfm(8 cfm per 100 ft2 of conditioned floor area). (2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 161.4 cfm(12 cfm per 100 ft2 of conditioned floor area)pressure differential of 0.1 inches w.g. (3)Rough-in total leakage test with air handler installed:Less than or equal to 80.7 cfm(6 cfm per 100 ft2 of conditioned floor area) when tested at a pressure differential of 0.1 inches w.g. (4)Rough-in total leakage test without air handler installed:Less than or equal to 53.8 cfm(4 cfm per 100 f:2 of conditioned floor area). Temperature Controls: Lj At least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. Heating and Cooling Equipment Sizing: Lj Additional requirements for equipment sizing are included by an inspection for compliance with the Inte'mational Residential Code. ❑ For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Circulating service hot water pipes are insulated to R-2 Lj Circulating service hot water systems include an automatic or accessible manual switch to turn off the Circulating pump when the system is not in use. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: Lj Heated swimming pools have an on/off heater switch. ❑ Pool heaters operating on natural gas or LPG have an electronic pilot light. ❑ Timer switches on pool heaters and pumps are present. Exceptions: w Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. ❑ Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12 Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. ' Lighting Requirements: A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage<_15 (d)50 lumens per watt for lamp wattage>15 and<=40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: Snow-and ice-melting systems with energy supplied from the service to.a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requiremenf'c'). Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title:THE OSPREY MODEL Report date: 04/18/11 Data filename:C:\Program Files\Check\REScheck\THE OSPREY.rck Page 5 of 6 4 Project Title:THE OSPREY MODEL Report date: 04/18/11 Project P Data filename: C:\Program Files\Check\REScheck\THE OSPREY.rck Page 6 of 6 2009 CC Energy Efficiency Certificate MOM�a- Ceiling/Roof 39.00 Wall 22.00 Floor I Foundation 31.00 Ductwork(unconditioned spaces): Window 0.31 0.31 Skylight 0.34 0.31 Door 0.31 0.31 'oo :i° Coo e • o s -'a - Heating System: Cooling System: Water Heater: Name: .. . . Date: Comments SMOKE DETECTORS REVIEWED o — ` Z9 :@'RRN TABLE BU DItJG DEPT: y DATE/' DATE - _ _ ALARMS . r ARTWNT —. p �b !NATURES ARE REOVIREO FOR PERMI7"fING - co d :i (5� MASSACHUSETTS BUILDING CODE - r1 _.. CARBON MONOXIDE ALA ' MUST BE INSTALLED PER — — -- -: -- -- — -- -`� - L 8 ----------- o � I17 J i {F ! I f E r �I I 11 li D C3I� i I 1 i I ill 1�1'r-� iCI _- - ==11,�; L 11 m ui ® L m � FRONT -LEVATION m EL SCALE, 1/4° Lu Z Z _ - -zo .u� La Ed I-FID 4 — v DRA.V''N c1': h'iN SCALE, lion _ II_`�u DATE: /.i 14/il f �.� WINDOW SGNEDULE \ � p KEY OTY DESCRIFTION MAKE/MODEL - - uy A 10 DOLeLE W-"'-6/i ANDERSEN TW 24410 g 2 DOUBLE 4iR4&A MULL ANDERSEN TW 24410-2 •� P.-K � - c I DOUBLE 1#JNG 6A t'NLLED ANDERSEN TW 24410-3 LF D t AWNING ANDERSEN A21 E t AWNING MULLED AJIMER_E A2 F 4 Alv'NlNG A!7Du`t_�N AIwSi - G I AWNING FV5D MEN A_i H i C45'EFIEtNT ANDOMEN C<-S _ _ _ _ kA. CO I 1 SKiTJTE YEy7C YS 606 / _ .._ - O . J 1 CN DDVR Tr.AN-a'S f2k106°14 LITE ELI e calme_=R TO VERIFY WItNDCW CME t G•JAtMrr - _ AND OFENiNG R57JiREME1NT3. _ LLI A J e.�a LL a M� l LEFT ELEVATION SCALE, 1/4° G.E V \ La 1 tu t \ �ZO Lu iIF U LU LU SY.EET RIC,P i ELEVATION Jos: I:F Gc;,Le: i/4° - 1'- Drk"N Er: Kw -DATE: 4/14/11 _ , Q La < „ r - (.� �s bob -w a ve..a.7/g .-.._ ___.._ _. Ob ^� I _ t s a°xab v• so,vs',ao ris• LLI MASTER — OI .I N m 1 I —-— s nR 'X / IX BED RM ---.— --- m OAK 22 E W G�-Oe --------- Ip Le JNDR7 O I 4 2Q o I >4 eras I. ' I (� IP - u 0 1 00 u I FAMfl.'f RM ' 2E' 6 VL41'f PC6T KuO STc-EL AaCVS PLUSH . 4°9 VLAI'7 PCs ' TW 2G410 Ep p so ve,-xw I 2$ � n MASTE- I I rer� n c Vj RIM BAT14 Klic — cOAK -4 - // OFEN 2A IF — _ LITE L 2 LIP zp l} 2 R n 13 1 Z LU �y c2 s GARAG-E c K Q W r 24 7/ Q EE1 u A 6 I ei e j :X �111-°,cx+� - I � EaT '='` ib'-C° I G. f/3° CIZAI4N EY: k7V SAT& 4/:S/11 0 § � LO -i n a-9I2 T p_p F' in BED PM tt3 ....I - BED RM #2 _ — — - V L r-s In°t STORAGE _ I _ CO 4f _ - L114ENoprN To O V I _ V � U1 uT , ` pz0 r _ Z n �tnh V m�• S co N RENT N SYI /14 a y�y ++1 . I Gk T F. .F09T ' - 1 Gt,LV.tSETAL PoST ANOHOR to,--ONO nee FIER w 1 23``BIG FOOT`FOOTING TYi?. e d I .1 L I ' I te° 'W/I I ° I 0, - -------- ' 1---J �--- - - --------.•--------1----- ----- -_ ---- _... --" of - ------ - ------ La L O IL I I Im FULL BASEMENT a L>_.;..: - 3 t!2`CCOCREM SLAB_ 5 MIL VAFCR BARR.°_-ti' - -I { V-6` T_pv y-C 21-q° 2: I a ma Lo Lu L 1- _®{.��f® i-�_�i---. -�-_®mom�,��_®J bn�_..d�s® . �s®_�:-.; - IFxT® L_-1 L_J _- J L-1 ---' L-J L_ < 1 'z1Y CONCRETE 7AD - c I . I- z r---- ----------- I G WIN I 6`xtC c�-nr ors o T NG s o = I ' I c I b LU _ I L— —— ——I— —— AT DOORi - I oo I --------------- . ------ I -� . ---- -- . --------- ------- . z TO Ul UlE� v I I KAL.Ls Q Q I 'I I I o ll1NQ I GAfRAG-E I I l!QEtJ € I I a•��S s s I (j3� _ I e`rt0 cxTNv�F NG I I <�� � I I 516 .,IdCI4CR SALT ft l3EL•C�iF I i r M " I S hcFr,_, I I I t+tFL I I 12, From CORKERS Q . L------ AT xcR----, i WASHERS 3'z5°z1/4' i 5 I ------- -- .. REET ——— ---- -r 07 GATE, 4lia/tl " . m o . RIDGE YEN O L _ t ' RIOlD W[ND WASH 2ARRlH2 REO'JIRID � ... AT DCT9210R EWE OF EXTWUOR hE S @"' O.G TOP PLATE .. p} U €L. P�{ �2�J^l GDX P_PW 7D L .o 260#A4 {ALLT EKN.GLES m y- � O✓FR SId GOX PLYWOOD tE Fffi6 Q . t0 RAFTER Q 16`OC m STORAGE GRADE -3 +� 2p •i1RR GJ:E cu P• /y FASTENERS AT ALL 2 X 6 CEILING.101-T 2 X 10 RAFTER @!6'C V RAFTER/TOP PLATE F W = •NURRICANE CLIP. .PJNCTIONS TYP. a-35 INSAAMON FAS.FAER5 AT ALL r` FASCIA HEIGHT TO BATON 47USE RAFTER/TOP PLATE ZWS @ W O.G. .. 9b4 @ WOG JUNCTIONS Ty?. SOFFR VENT r VENTED DRIP EDGE �ppg Lp . . R-21 INSULATION U) MASTER 9] z GARAGE BATHMASTER g1 ' ALL W!ND9Ws TD sE A E�sxa FFNOOWS � W`2 X 4 ETUM@ O: 2x4 M WHR7 O 24` �} e. . - - =G_PAR 6.ilh"s•s5 OJc2. - < � 1/Y CCX PLYWOOD 4•CC:Y ETE CAs . r" �(5)1 4/4•X 4 V2'LVL GIRT _ ... .. �E Cry , R" TICid-/ ��.' 12� B'-9'EfiY 6 Ti lCY_ '�-2•X 6•cE...TREATED MI. O ✓ER SILL EEAL Y.2` 61 FREESUF.E TREATED.SILL 07NCRE IF TE FOOT[NG - - O✓ER SEL SEAL �Ih`?!J!>. �( . 6 X EW E,-o^ BASEMENT CCar_.WALLS V 61 Xa` U 4•POURED CONCRETE SAS VAPOR SA:mmm (!j CROSS SECT I ON — x �,R�E ZT�, SCALE: 114" = i'-0" a Z o 0 W� < o GROSS SECTION 5 a<tu SCALE: 1/4" = V-G)" Q� - C� �cn � U z a� 0 1 NOTE: O I,4A.CTO TO TO WF R-FED }t TO tl0 X Fi CHECKLIST FOR ADDITICNAL j Ht�r,N fNIh:D TE6Fft�IQt'E3 .ATTACHED TO DIZ=hthiGS JOB: lio_ - :MAKN SY: KYN GATE:- 4/14!i1 PimE ,z _ .N ' ' IYC`5 R- O.G. 72 _ - • a RIGiD WEND A.a4 BARPdE2 FE'dUIRED 5 7/Y 76'0' r N 5 6� AT EXTERIG4 6DCF OFER10:2 I,ta. h0`6 B a . _ . - - _ TOPOPA� - - FwsN uDR R-58 INSU(An FA-5-i VERS CLIP' .UZ ' h RAFTER/ kT PLA L.AUNDR RAFTER/TOP PLATE JUN 01/2 SAT-1 awhs TrP. t[�� Lj • - � .n 2'Ass F5:-:ALT 5t?M:LEs l`i � �' �:-b� OVER E/S'CDX PLY'rKx7D �I.^9 e1 I� CL CL S�cD FOAL 2 X 10 RAFTER 0 16' L'i Q 2:70'a fb'CL ZslOe 9 K x '''T -FIT VENT -1 st9 Ld WI O X-s STEEL I EEJJ'i AA- - - R-i1NEVLlnON I� U L{. - - ` O - ALL WINOOWS TO SE ANDER99.4 WINDOWS Q ® . KITCHEN LIVING- w CY ` in n v 2[70'a®Ib'x 2'10'e 9 t6'x w I (=)2.10 GIRT t in Lo / S y {d \ L 1 a- 6 uLAn / ew Ol L6{ �—T'X 6'F-icE.iS'h2E TREATED SILL OVER'ILL SEF1 'v. z \� BASEMENT cvaG waLLs 7'6'%s• M :c / - - 4•POJRED CdICRBTE SLAB FxnNG a-�n �nDN GROSS SFEC i ION C; J \' SCALE: 1/4i1 1'-0° V i0G Z:T _ "NURRIU.NE CLIP, FCSTW=RS AT ALL Q_Z O � . FJ.FTER/TOP PLATE F5 Q Q z JJrJ'S�TST L o tu DINI IC a lu GAR.AC:E c�cn 2110'.0 16 x - - ---� __ —a-sc a,«:LarleN 4 O BASEMEN! 91?EET " SAT°: =r4Jii LO . j L Q _ Ln F U 0 a �- IX o w 2x1ae o IM m (L �(3) 4 1/2° LVL GIRT h'IOz45 STEEL FLUS4{ o 61 b . h U zZ FIRST FLOOR FRAMING BECOND FLOOR:' FRAMING Qzo SCALE: 1/4° - V-0° SCALE, 1/4° - V-0° - _ Fl.{N Q (uQW LU E ul 1 F`r# AB JOS' 1i07 LR:k:N uY: K4V CATS: 4/14/.I ' E TEND AOR TO CORN_ I i 2a&DSL TOP PLL,TE - - RAFTER®IS'O.C. e�1 FELL!:T.STVDS I ♦ . JACK ET VD I _ _ c •.! r:A.IL TOP-'LATE = TO TM Of 1 - GFPLY SirPSGJ i=T."-1E vi'.�'i.EcTfJi2 W/ OF I I 2 ROWS OF bd MAILS ON TI CE 4 JACK STLI CP 4:=-D-_Z: o 9•G.C. � \ y TO Eq�J-I JACK STIiD ST'RVCTVRAL FA..15L WEALS TGF PLATE NAILED ed COM1014 .'T=-.TS WESDCR [ Q 5"O.C.EDGE AND FIELD - CORN To CG3NEic / J OVER MULTIPLE OFENIIJ.25 I" d DOOR TRIMMER STUDS x 03 W. RAFTER TO PLATE CONNECTION t�! � SCALE,N.T.S 0. _ z / U 5". PLAT_WASHER Sul S - ELCN ARROW WALL SECTION . - DOUSLE Row t - STSC-->ER NAILII - • INTO EOTW PLATES DEL TOP PLATE ^ q • VERTICAL �n STRLC7l.nAl PANEL {�, Lo AI NLED Sd CC;;MO1� m ==e " 0NARRON NALL BRACING AT GARAGE DOOR ANDci `=�D 6Y tda SCALE.N.T.S. Z SPEAR NALL COMPLIANCE: W- 26S GF EAGH WALL RUN t �. �J EL . VERTICAL SHEATHING WIT,{ - d - _ ad NAILS 5°EDC-E/12° FIELD (4)!Cd NAILS FER FT PlJTTOT7 F1::Tc - VERTICAL STRVCTIJRtG 1,_ DO'=tE RCW L. [T%01=EAG4 WALL RUN _EcaND FLOOR -1 STAG ER WJLIN VERTICAL SHEATVING WITH RIM JOIST . �} INTO acre PL0..FS Sd NAILS S° ED.:FJ12" FIELD 2.E-:SL TO?FLATS K (4)16d MAILS FER FT�O`I PATE tu !" _E FLOOR Z ER 1 \ RItl J_JO!ST VERTICAL . I - STRUCTI AL FANZL �✓ F-f Z O I RVCTVRP.L FAH-!. N Q 0 K- tJAILED h C/J:`tMCN n WSILED 6d COMMON @ 5"O.G.EDGE ED_E AND 12"IN FIELD AND 12•IN FIELD i j I _.. . IL'1d' I14'0 avx D SILL \ y\ \lII I IRO.,a,-, el_, •\ I i [— 'ems :a_ 1 a :_-,! NEIGLIT7 FLi rE T Hi11G- -i;ULT! =LOOK \\ N.T S. - DATE: V SaAili I TempParcelEdit Page 1 of 1 Ana 3P N 1 Etas.., x a n Logged In As: Wednesday,January 16 2008 Frank Schlegel New Parc Application Center Road System Reports Road System The record has been added. New-Parcel Detail New Mapparcel: 002 002 048 Street Number: 351 Unit: Dev Lot LOT 48 1 Road Name: PHEASANT HILL CIRCLE T/R Sec. Road: T/P: Villlage: 07 COtUIt Part of M/P: MAP 002 PCL 002 Plan Ref: jPLBK 617/69-75 (APP 7-62) Date Added: .... Updated: E1 UP �Updat '®e'I�ete � Add A pother Y http://issgl2/Intranet/Propdata/TempParcelEdit.aspx?ID=Add 1/16/2008 i T . r REScheck Software Version 4.4.1 Compliance' Certificate Project Title: BAYSIDE BUILDING CO. ' Energy Code: 2009 IECC Location: Cotuit,Massachusetts Construction Type: Single Family Glazing Area Percentage: 15% ► Heating Degree Days: 6137 Climate Zone: 5 + Construction Site: Owner/Agent: Designer/Contractor: LOT 48#351 PHEASANT HILL CIR. COTUIT,MA 02635 Compliance:Passes using UA tr Compliance:6.6%Better Than Code Maximum UA:256 Your UA:239 The%-Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. . It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. AssemblyGross Cavity Cont. Glazing ILIA or or D•• Perimeter U-Factor Ceiling 1:Flat Ceiling or Scissor Truss 500 38.0 0.0 15 Ceiling 2:Cathedral Ceiling(no attic) 500 38.0 0.0 14 Ceiling 3:Cathedral.Ceiling(no attic) 410 30.0 _ 0.0 - ,14 Wall 1:Wood Frame, 16"o.c. 230 15.0 0.0 2 Window 1:Vinyl Frame:Double Pane with Low-E 187 0.280 52 Window 2:Vinyl Frame:Double Pane with Low-E 4 0.280 1 Window 3:Vinyl Frame:Double Pane with Low-E 14 , 0.290 4 ' Wall 2:Wood Frame,16"o.c. 1390 21.0 0.0 ` 76 Door 1:Solid 20 0.190 4 Door 2:Glass 41 0.290 12 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1370 30.0 0.0 45 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.1.and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title r I.r Signature Date s . r 0 :h V18 9- s. Project Title: BAYSIDE BUILDING CO. Report date:05/26/11 Data filename: Untitled.rck Page 1 of 4 REScheck Software Version 4.4.1 Inspection Checklist .i Ceilings: - ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation , Comments: ❑ Ceiling 2:Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: ❑ Ceiling 3:Cathedral Ceiling(no attic),R-30.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame, 16"o.c.,R-15.0 cavity insulation . Comments: ❑ Wall 2:Wood Frame, 16"o.c.,R-21.0 cavity insulation Comments: Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.280 , For windows without labeled U-factors,describe features: + #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 2:Vinyl Frame:Double Pane with Low-E,U-factor:0.280 For windows without labeled U-factors,describe features: ' #Panes Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Vinyl Frame:Double Pane with Low-E,U-factor:0.290 , For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: ❑ Door 1:Solid,U-factor:0.190 y ' Comments: ❑ Door 2:Glass,U-factor:0.290. Comments: Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R730.0 cavity insulation. Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking:' 7 , " Air Leakage: -. Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/door jambs and framing. ❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. Project Title: BAYSIDE BUILDING CO. Report date: 05/26/11 Data filename: Untitled.rck Page 2 of 4 ❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-burning fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: Lj Building envelope air tightness and insulation installation complies by either 1)a post-rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. , (f) Comers,headers,narrow framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs.and exterior wall Sunrooms: 0 Sunrooms that are thermally,isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. - Materials Identification and Installation: , w ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value., ❑ Materials and equipment are identified so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications. r Duct Insulation: Supply ducts in attics are insulated to a minimum of R-8:AII other ducts in unconditioned spaces or outside the building envelope are. insulated to at least R-6. Duct Construction and Testing: Building framing cavities are not used as supply ducts. ❑ All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws.' Exceptions: Joint and seams covered with spray polyurethane foam. ' Where a partially inaccessible duct connection exists,_mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). Lj Duct tightness test has been performed and meets one of the following test criteria: ' (1)Postconstruction leakage to outdoors test:Less than or equal to 109.6 cfm(8 cfm per 100 ft2 of conditioned floor area). (2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 164.4 cfm(12 cfm per 100 ft2 of . conditioned floor area)pressure differential of 0.1 inches w.g. (3)Rough-in total Leakage test with air handler installed:Less than or equal to 82.27cfm(6 cfm per 100 ft2 of conditioned floor area) ' when tested at a pressure differential of 0.1 inches w.g. (4)Rough-in total leakage test without air handler installed:Less than or equal to 54.8 cfm(4 cfm per 100 ft2 of conditioned floor area)., Heating and Cooling Equipment.Sizing:. ' Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. 0 For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Project Title: BAYSIDE BUILDING CO. Report date: 05/26/11 Data filename: Untitled.rck Page 3 of 4 I i ❑ Circulating service hot water pipes are insulated to R-2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: T 4, Lj Heated swimming pools have an on/off heater switch. t " Lj Pool heaters operating on natural gas or LPG have an electronic pilot light. ❑ Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source,,-. Lighting Requirements: Fl. A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage—15 (d)50 lumens per watt for lamp wattage>15 and<=40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: 4 ❑ Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement's'). Certificate , ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. Y+ . NOTES TO FIELD:(Building Department Use Only) c a ` Project Title: BAYSIDE BUILDING CO. Report date:05/26/11 Data filename: Untitled.rck Page 4 of 4 2009 IECC Energy n • Efficiency Certificate • c Insulation Rating R-Value Ceiling/Roof 38.00 Wall 21.00 Floor/Foundation 30.00. • ' - Ductwork(unconditioned spaces): Glass&D.. ` Window 0.28 0.31 Door 0.29 0.33 CoolingHeating& Heating System: Cooling System: Water Heater: Name: Date: Comments: +, i i fix, ' MAP Installed Building Products(350). _ P�'Q]'�Qsa` Y PO Box 1309 l' Sagamore Beach,MA 02562 (508)888-3599' ; (508)888-9609 FAX Customer Address Job Name 48-4351 PHEASANT HILL CIRCLE/CAPE BAYSIDE BUILDING CO. INC. P.O.BOX 95 Job Address 3 BAYBERRY SQ. 48-351 PHEASANT HILL CIRCLE CENTERVILLE,MA 02632 COTUIT,MA 02635 Date: 5/26/2011 Job: 2186268 Workarea Inventory Item° t. Phase: 3701209 IA PO: , Ceiling R-38 16"x:48"-Kraft-Wood Framing r Walls R-21 15"x 93".-Unfaced-Wood Framing + Walls with Poly POLY 4MIL.8'4"X100'CLEAR - Flat Ceiling R-38 16"x 48" -Kraft-Wood Framing 4 Basement Ceiling W/Blockers a R-30 16" x 48"-Kraft-Wood Framing• Work Area Notes:HOLD Ceiling R-38 16"x 48" -Kraft-Wood Framing' Garage House Wall R-21 15"x 93" -Kraft-Wood Framing Blockers And Runners R-21 15"x 93"`-Kraft-Wood Framing Cathedral Ceiling R-30C 15.5"x 48"-HD Kraft-Wood Framing 1st Floor Ceiling R-30C 15.5"x 48"-HD Kraft-Wood Framing , Cathedral Walls "R-15 15"x 93" -Kraft-Wood Framing Treads R-19 19.25"x 48"-Kraft-Wood Framing Stairwell R-13 15"x 93" -Kraft-Batts Flat Ceiling R-38 16"x 48" -Kraft-Wood Framing w Attic House Wall R-15 15" x 93"-Kraft-Wood Framing 1St Floor Ceiling To Knee Wall, R-38C 15.5 x 48"'-HD Kraft-Batts ' Attic House Wall R-21.15"x 93"-Kraft-Wood Framing , Walls R-15 15"x 93"-Kraft-Wood Framing Cathedral Walls R-21 15"x 93"-Kraft-Wood Framing Wing Ceiling R-38C 15.5':'x 48"-HD Kraft-Batts G Vents EAVE VENTS r OPTIONS: 1)DIRECT VENT 36"FIREPLACE$1350.2)GUTTERS&DOWNSPOUTS$725.ALL OPTIONS ARE IN ADDITION TO PRICE BELOW. We propose hereby to furnish material&labor-complete in accordance with the above specifications,for the sum of: $49075.00 ° Terms:Net 15,Payments to be mailed to P.O.BOX 1309 Sagamore Beach,MA 02562 1.5%late payment charge on balances outstanding more than 30 days from date of invoice(18%annum). p•I,the customer representative hereby subjects themselves personal jurisdiction to the commonwealth of Massachusetts. . All material will be as provided in the attached description.All work will be completed in a workmanlike fashion in accordance with the standards of the industry.Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate(s).All agreements are contingent upon strikes,accidents,acts of God or delays beyond our control.Owner to carry fire and tornado insurance and other insurance that may be required by law.Our workers are covered by workers'compensation insurance to the extent required by law. 5/26/2011 Page 1 of 1 ' MAP Installed Building Products(350)., PO Box 1309 Proposal roposal Sagamore Beach,MA 02562 ` (508)888-3599 (508)888-9609 FAX r, Customer Address Job Name 484351 PHEASANT HILL CIRCLE/CAPE BAYSIDE BUILDING CO. INC. , P.O.BOX 95 Job Address 3 BAYBERRY SQ.' 48-351 PHEASANT HILL CIRCLE CENTERVILLE,MA 02632 COTUIT,MA 02635 Date: 5/26/2011 Job: 2186268 . We do not warrant against and shall not be liable for any damage or injury,including but not limited to mold accumulation,when due to any of the following causes:the failure of the builder or contractors(other than our Company)to follow the instructions and specifications of the insulation manufacturer;faulty or improper installation or maintenance of drywall or other wall covering;use of accessories or wall preparation materials that do not properly receive the insulation;and compliance with applicable building codes or other government regulations relating to surface preparation,wall coverings,required materials or mandatory procedures. ; ANY WARRANTIES IMPLIED BY LAW,SUCH AS THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,ARE HEREBY EXPRESSLY DISCLAIMED.WE SHALL NOT BE LIABLE FOR ANY CONSEQUENTIAL DAMAGES OR INCIDENTAL DAMAGES for breach of any warranty associated with the insulation.Our liability shall in no event exceed the cost of the materials set forth herein.We cannot and shall not be liable to you for the breach of any other express warranties,such as those given to you by other dealers,contractors,applicators, distributors or manufacturers.Your exclusive remedy with respect to defective materials provided by us shall be repair or replacement,at our option,of the defective materials. _ Note:this proposal may be withdrawn by us if not accepted within 30 days ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Please note that we cannot schedule this job without receiving a si n " proposal by fax or DATE:4w, SIGNATURE: Sales Representative:Peter Taylor " c DATE: SIGNATURE: 4 Customer Representative: ` Printed Name Title IN 5/26/2011 Page t of 1 Foundation Certification in Barnstable, MA Prepared For : Lot 48 351 Pheasant Hill Circle Subdivision of Barnstable Assessors Map: 002 Parcel: 02 Baxter Nye Engineering & Surveying Flood Zone C ® FIRM Community Panel Number No. 025551 0021 D OWNER: Cotuit Equitable Housing, LLC ® Deed Book 21804 Page 41 Registered Professional OPEN SPACE. Cotuit Meadows Homeowner's Association, Inc. ® Deed Engineers and Land Surveyors Book 23161 Page 59 78 North Street, 3rd Floor Barnstable Zoning Board of Appeals No. 2005-082 ® Deed Book 21059 Hyannis, MA 02601 Page 158 Minor Modification No. 1 ® Deed Book 22249 Page 282 Phone - (508) 771-7502 Fax (508)-771-7622 Job Number. 2005-214 Scale : 1" = 20' 05-02-2011 OPEN SPACE S 74'41,101. E ono 54.50. M rn r7 - cn rN. a". a it, ( to CO (O 00 � co a LOT 49 W ago ,hh LOT 46 _ 11,159f S.F. o 0.26f ACRES Z LOT ss �tK* ^� so, ZIP �o ogo�.�0 G e° o��oti;p'I'p � o LOT 47 N �RIr Cb 9, CL cry - Q d I CERTIFY THAT TO THE BEST OF MY KNOWLEDGE THE EXISTING STRUCTURE SHOWN HEREON IS IN COMPLIANCE WITH FRONT, SIDE AND REAR SETBACK REQUIREMENTS (20'/10'/10') AS NOTED IN TOWN OF - BARNSTABLE ZONING 'BOARD OF APPEAL No. 2005=082 (DB 21059 Pg 158) IS LOCATED IN RELATION TO ` PREIMETER MONUMENTS SHOWN PER EXHIBIT "A" (DB 21804 Pg 45) AND IS NOT LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA. THIS PLAN IS NOT TO BE CORDED NOR IS IT TO BE USED, TO ESTABLISH PROPERTY LINES. q VTR d � -�2 �2-�3, . F s►r��EO a REGISTERED PROFESSIONAL LAND SUR YOR N BAXTER NYE ENGINEERING & SURVEYING DATE C os-02-i f 0 - N eo. i GENERAL NOTES: 1. LOCUS PROPERTY IS SHOWN AS: ASSESSOR'S MAP 002 — PARCEL 02 2. SETBACKS: FRONT = 20' SIDE/REAR = 10' 3. UTILITY INFORMATION AS SHOWN ON PROPOSED SUBDIVISION CONSTRUCTION PLANS. 4. COMMUNITY PANEL NUMBER: 025551 0021 D THE FLOOD INSURANCE RATE MAP DEFINES THIS AREA AS ZONE C, AREA OF MINIMAL FLOODING. 5. ENVIRONMENTAL NOTES: SITE IS NOT WITHIN AN AC.E.C. (AREA OF CRITICAL ENVIRONMENTAL 00 CONCERN). o VEGETATED 12"'bECP SITE IS NOT WITHIN AN AREA OF ESTIMATED HABITAT OF RARE RAIN GARDEN (125 WILDLIFE PER NHESP MAP OCTOBER 1, 2006 "ESTIMATED Z C.F. STORAGE) x,`' HABITATS OF RARE WILDLIFE" FOR USE WITH THE MA WETLANDS PROVIDE (1) 6' DIA. x TOP-51.0 PROTECTION ACT REGULATIONS (310 CMR 10).' 6' DEEP LEACHING BOTTOM-5o.o _ SITE DOES NOT CONTAIN A CERTIFIED VERNAL POOL PER NHESP BASIN N N STONE S 4, x49.0 MAP OCTOBER 1 2008 "CERTIFIED VERNAL POOLS." AL�NATE EQU(OR , 4 �0" SITE IS NOT WITHIN A PRIORITY HABITAT PER NHESP MAP OCTOBER VOLUME) 5� 54.50' E 00 �, 1, 2008 "PRIORITY HABITATS OF RARE SPECIES" FOR SPECIES CONNECT ALL ROOF h UNDER THE MASSACHUSETTS ENDANGERED SPECIES ACT, DOWNSPOUTS TO LEACHING BASIN W REGULATIONS (321 CMR10) ' SITE IS WITHIN A STATE APPROVED ZONE II GROUND WATER RECHARGE PROTECTION AREA VEGE TEO ` o 12" D `� co co O Qv RAIN G N �� / CONSTRUCTION NOTES: (125 C.F. STORAGE) ,�hh 1. ALL GENERAL CONSTRUCTION NOTES ON SHEET C-2 FROM THE Bo T� .o Xv SUBDIVISION CONSTRUCTION PLANS FOR COTUIT MEADOWS DATED 6125107, SHALL HEREBY APPLY TO THIS SITE PLAN. �� Dh �• o LOT 48 �'`� 2. ALL GRADING, DRAINAGE, AND UTILITY NOTES ON SHEET C-5 FROM �. 11,159E S.F. THE SUBDIVISION CONSTRUCTION PLANS FOR COTUIT MEADOWS, OO \ x5&0 '�� 0.26E ACRES DATED 6 25 07 SHALL HEREBY APPLY TO THIS SITE PLAN. s• / / � X � , 3. SEWER BUILDING CONNECTIONS: _ MIN. COVER SHALL BE 3 FT 54.5 x \ ` SET CLEANOUTS AND MAINTAIN CLEARANCE FROM OTHER �r UTILITIES AS REQUIRED BY BARNSTABLE DPW. SMH �►10 0ate• ♦ �, �� \ °' - MINIMUM SEWER SERVICE CONNECTION SLOPE SHALL BE 2AX INV .6 JDi Is, , 55.0 ��• \ \ 1 - \ 53 0 A* S INV.-43.86 ' �h b x - � x u� �• (MIN) �� '� _.. 100 11__\ 53.0 63 LF- SCH� � �5 x 9• s s 40 SEWER , Cotuit Meadows Subdivision 9� O Qr 9 SERVICE O V. - / A S-2AX MIN. .R Cotuit■Barnstable, Massachusetts 54.5 1�-- x - 1 ---J L_ 55'A,` 4� PREPARED FOR \s \ OUTP - COTUIT EQUITABLE HOUSING, LLC o 0 54so " OX � KM a� CUR 55.50 �,� --- - ss� P. 0 Box 95 0 STOP Centerville, MA 02632 1TRE 5 S`tNV.-41.54 00- + 53.59 Site Plan Lot 48 . 351 Pheasant Hill Circle Jo BAXTER NYE ENGINEERING & SURVEYING �\ o Registered Professional J \ Engineers and Land Surveyors ��H eF 1•'ASS 3 �o�'v rrHV 78 North Street, rd Floor,Hyannis, MA 02601 E \ Phone (508) 771-7502 Fax - (508) 771-7622 0 0 \ No 43 3 20 0 20 40 s� ep.S10 AL ���� SCALE IN FEET SCALE: 1" = 20' DATE: 04-20-11 REV. DATE: REMARKS Lot 48 DRAWING NUMBER 0: 2005 2005-214 CIVIL DESIGN 2005-214PBLOTS.dw 2005-214