Loading...
HomeMy WebLinkAbout0624 POPONESSETT ROAD Y-1 s s e �, t i� � :�.. ,.� Town of Barnstable Building HAM t e r Post This Card So That.it is Visible From the Street-Approved Plans Must be-Retained on Job and this Card Must be Kept AS& Posted'Until Final Inspection Has Been Made. Permit Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final-inspection has been made. ��..!!11 ll.. Permit No. $-19-109 Applicant Name: - Cape Cod Docks Inc. Approvals Date Issued: 01/17/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 01/17/2020 Foundation: Location: 624 POPONESSETT ROAD,COTUIT Map/Lot: 007-001 Zoning District: RF Sheathing: Owner on Record: NORTH HOLLOW LLC Contractor Name: Cape Cod Docks Inca Framing: 1 Address: 15 WELCOME.LANE Contractor License: 156836 2 WRENTHAM, MA 02093 Est. Project Cost: $47,496.00. Chimney: Description: Construction of a stairway down coastal bank,60 linear feet of Permit Fee: $342.23. - .permanent pier,3x30 aluminum gangway and 8x16 floating dock insulation: Fee Paid: $342.23 1st extension expires on 1/17/2020 Date.: 1/17/2019 Final Project Review Req: - • - Plumbing/Gas Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. - Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:; Service: 1.Foundation or Footing Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are.to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT. Final: Coyle, Brenda From: Larry Demers <service@capecoddocks.com> Sent: Thursday, July 11, 2019 1:29 PM To: Coyle, Brenda Subject: Building Permit No. B-19-109-624 Poponessett Road, Cotuit Attachments: Scan0004.pdf Hi Brenda, Attached please find a copy of the Building Permit we acquired back in January of this year to construct a permanent pier with inshore landings and stairs, located at 624 Poponessett Road, Cotuit.We have been waiting for the Chapter 91 License to be issued so that we can start the construction.The good news is that the Chapter 91 License was received this week.The bad news is that our Building Permit expires on 7/17/19,and we will not be able to complete the construction in such a short window of time. I will mail a copy of the Building Permit to you, along with a check in the amount of$50.00. Please let me know if you need any additional information to extend this permit. Thanks, P� Jen ` ' � Jennifer Henry �- Cape Cod Docks, Inc. ; 23 Bog Road West Yarmouth, Ma. 02673 Tel: 508-778-4711 CAUTION:This email originated from outside ofthe Town of Barnstable) Do not`cli k links, open attach men t`s or reply, unless you recognize the sender's email address and know the content 3 safe!I i _......... ... Q Town of Barnstable Bail a £ � , ` Post 7hisGa. So Chat it is vis>iteNFrom the<Street1 prflveci PlanS.Mu be R,eta trec�;.bi�lob andFttns,CarciM.uistbe Kng ept Posted /ARA'xJTA018: � : .,> .:: '�' :,',y �-� m,�; ,.b�?.::.:'K.�' �P.: a` �:s -.... .;r � �.;. "' .':" � " " ' �> • 4. - ll • tint r a Where a.Ge,ificate.of:Oecu an :,,is.Re, wired such.BuiEdln s all N, t'be Occo led untiE a Final Ins motion hasbeer> made P�j l v 4 _.,.s o Permit No., B49=S09 Applicant Name. Gape Cad'Docks lnc. Approvals, , Date Issued: 01/17[2019_ Current Use: Structure Permit Type: Building-Addltio"teration'-Residential; Expiration Date:• 07/17/2Q19 Fou.ndation:, Location:-: 624 POPO.NESSE'IT ROAD,'COTUIT Map/Lox 007-001 `Zoning District:. RF Sheathing: Owner on Record. NORTH HOLLOW LLG. Contractor Name Cape Cod Docks Inc. Framing 1� Address: 15 WELCOME LANE:- Contractor[acense 156836 2 WRENTHAM,MA 02093 Est ProfectCost $47;496.00, Chimney:: Description:'• Construction ofa stairway down coastal bank,601inearfeet of, Permit Fee. $,292.23 permanent:pier;3z30 alum{num gangway and 8x16 floating dock Insulation: ,Fee Pald $292.28 Project Review Req:c ro � � �ateF 1/17/2019 final: 11 3 Plumbing/Gas: RoughP um rag This permit be deemed abandoned;and inval d.unless the work author�ied b this ermit Is commenced unthm six months 44ga cIa p _. .y p Final'Plumb{rag; All-work authorized I*this permit shalt conform o the appewed.appiicab and the approved,construction documents for uvhach this.permit:has been granted: All construction alterations an., angesiof use'of any building andstructures`sha11 W m compliance with the,local zoning by laws and-codes:. :: Rough Gas;. : . This permit,"shal l be displayed in. a location ctearlyvisible"from access"street`or roadand shalt;be maintained open for public lnspeetion for the entire duration of the work untiLthe completion of thesame:, - , . : Final Gas: The'Certificate of Occupancy O_I npt 4e issued until all applicable,signatures by the Building and Fire Officials are proviried�dh ibis permit. ETectrital Minimum of Five Call Inspections Required for AII=Construction Work r 1.Foundation or'Footin rvlce. Se g: 2 Sheathing Inspection: Rou h. g. :�. 3.All.Fireplaces must be inspected at the<thraat.levehbefore;firest flue inning is installed . F s 4 Wiring&PlUrn ng.ln'$pections to be completed pnorto Frame Inspection a . Fina{I 5.:Prior to Covering-Structural..Members-;(Frame,inspection): 6.insulation Low-UolI: Rough;. 7.Final Inspection before Occupancy; a, Low Voltage Final;;: Where apphcabte,separate permits are required'for:Eledrical;Plumbing,and Mechanical installations. Work shall nat-proceed.until thelnspector has,approved the various stages of construction. Health. "Persons contracting'With,unregistered contractors do,not have access to the guaranty farad" (as set forth in MGL c 142A). Final: Building plans are to be avallable omsite Fire Department .xr, Ah.permit Caecly re the property of the APPLICANT-;ISSUED RECIPIENT; Final: Town of Barnstable Building Post This GardSo That it is VisibleFrom the:$treet�;A, roved Plans Must beRetametl on Job and thisCard•Mush be Kept_ ,, xg`�;, "—,s't� rW11�M'dtle ., s «a f �..., sNAM6�� '4osted Until Final Inspection Has Bee .ry ,..� x Permit R Where a-Certificateof Occu"anc is Re uretl�suc Burltlm stall Not be Occu red unt�1 a.Final Ins ection ha :been made 1 �j jjjl� Permit NO. B-19-109 Applicant Name: Cape Cod Docks Inc. Approvals Date Issued: 01/17/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 01/17/2020 Foundation: Location: 624 POPONESSETT ROAD,COTUIT Map/Lot 007 001 Zoning District: RF Sheathing: s Owner on Record: NORTH HOLLOW LLC :� Contracto Name Cape Cod Docks Inc. Framing: 1 Address: 15 WELCOME LANE �r g Contractor License 156836 2 WRENTHAM, MA 02093 Est Project Cost: $47,496.00 Chimney: Description: Construction of a stairway down coastal bank 60 linear feet of PermitFee: $342.23 Insulation: permanent pier,3x30 aluminum gangway and8x16 floating dock $342.23 1st extension expires on 1/17/2020 �� i' Fee Paid NA" Date 1/17/2019 Final: Project Review Req: 5— 77 Plumbing/Gas Rough Plumbing: ,Building Official Final Plumbing:' This permit shall be deemed abandoned and invalid unless the work authbriiQ by this permit is commenced within six months after:issuance. All work authorized by this permit shall conform to the approved application a dthe-approved construction documents=for which this permit has been granted. Rough Gas: All construction,alterations and changes of-use of any building and structures sha`Il�be in compliance with the local zoning by laws"and codes. 8*1 This permit shall be displayed in a location clearly visible from access street&.road and shall be maintained open for public mspeetFon for the entire duration of the Final Gas: work until the completion of the same. s k «a Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Bullding and_Fire Officials are provided own th�s•permit. Minimum of Five Call Inspections Required for All Construction Work:., �• Service: 1.Foundation or Footing Rough: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final' Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Shea, Sally From: Shea, Sally Sent: Wednesday,July 17, 20193:50 PM To: service@capecoddocks.com' Subject: ViewPermit,,Permit No: B-19-109 To Whom it May Concern, - If you are seeking a permit extension, please let us know. We are in receipt of your check. I assume you are seeking an extension for your permit? Please give cause and I will submit your request to the Building Commissioner. Thank you. Sally Shea � Town of Barnstable j Assistant Zoning Admin7 Lead Permit Tech: . co 508-862-4031 _ 1 r � Town of Barnstable- • _ _ .,._.. Building Post This Card So That It,is Visible From the Street_=Approved Plans Must be Retamed'on'Job and this Card`Must be Kept Posted ' Until Final Inspection Has Been Made Permit +` Where a,Certificate of Occupancy is.Required,such Building shall'-Not be Occupied until a Final Inspectibn has been made: - ..i�i..nsta� .f�_..a..».....,...+.«.w..,:.,,._..r.r..,,.,._.w.-.::.a..-........�r...�sa.—.S...s,a - 6 w.....a''.F..,+k:e;-.z:r,,:�«swa+-.s:...S„ Applicant Name: Cape Cod Docks Inc. l Permit No. B-19-109 pp p Approvals Date Issued: 01/17/2019 Current Use: € Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 07/17/2019 Foundation: Location: 624 POPONESSETT ROAD,COTUIT Map/Lot: 007-001 Zoning District: RF Sheathing: Contractor Name_� Ca a Cod Docks Inc. Framing: 1 Owner on Record: NORTH HOLLOW LLC � � p g� Address: 15 WELCOME LANE Contractor License: 156836 r 2 1 . WRENTHAM,MA 02093 ~` Est. Project Cost: $47,496.00 Chimney: Description: Construction of a stairway down coastal bank,160 linear feet of Permit Fee: $292.23 permanent pier,3x3Qaluminum gangway and'8x16 floating dock Insulation: Fee Paid: $292.23 . �Project Review Req: Date: 1/17/2019�� Final: �l"_(' Plumbing/Gas Rough Plumbing: cial This permit shall be deemed abandoned and invalid unless the work'authorized by this permif is commenced within six months i Y99 . , Final Plumbing: All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws`and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of _the work until the completion of the same. Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building-and Fire Officials'are provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work: 1.Foundation or Footing I - Service: 2.Sheathing Inspection 'J 3.All Fireplaces must be inspected at the throat level before firest flue-lining is installed _ .__. ---'''t f Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation - Low Voltage Rough: , 7.Final Inspection before Occupancy l Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: I I i l Shea, Sally From: Larry Demers <service@capecoddocks.com> Sent: Thursday,July 18,2019 8:16 AM To: Coyle, Brenda; Shea, Sally Subject: FW: Building Permit No. B-19-109 - 624-Poponessett Road, Cotuit Attachments: Scan0004.pdf Hi Sally, Yes,we are seeking an extension on Building Permit No. B-19-109.We previously spoke with Brenda Coyle, (she is included in this email) on the phone, as well as sent her the information below,as to why we are seeking this extension. Please let me know if you need any additional information. Thanks, e Jennifer Jennifer Henry . Cape Cod Docks, Inc. 23 Bog Road West Yarmouth, Ma. 02673 Tel: 508-778-4711 From: Larry Demers Sent:Thursday,July 11, 2019 1:29 PM To: brenda.coyle@town.barnstable.ma.us Subject: Building Permit No. B-19-109-624 Poponessett Road,Cotuit Hi Brenda, Attached please find a copy of the Building Permit-we acquired back in January of this year to construct a permanent pier with inshore landings and stairs, located at 624 Poponessett Road, Cotuit.We have been waiting for the Chapter 91 License to be issued so that we can start the construction.The good news is that the Chapter 91 License was received this week.The bad news is that our Building Permit expires on 7/17/19,and we will not be able to complete the construction in such a short window of time. 1 will mail a copy of the Building Permit to you,along with a check in the amount of$50.00. Please let me know if you need any additional information to extend this permit. Thanks, Jen Jennifer Henry Cape Cod Docks, Inc. 23 Bog Road West Yarmouth, Ma. .02673 Tel: 508-778-4711 CAUTION:This email originated from outside of the Town of Barnstable! Do not click links, open attachments or reply, unless you recognize the sender's email address and know the content is safe! y Town of Barnstable Building Post This Card So That it is Visible From the Street-Approved Plans Must be Retained,on Job and this Card Must be Kept Ma&9 Posted Until Final.Inspection Has Been'Made. 16SA Permit Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until aTinal Inspection has been made: Permit No. B-19-109 Applicant Name: Cape Cod Docks Inc'. Approvals Date Issued: 01/17/2019 Current Use: Structure Permit Type: Building-Addition/Alteration- Residential Expiration Date: 01/17/2020 Foundation: Location: 624 POPONESSETT ROAD,COTUIT Map/Lot: 007-001 Zoning District: RF Sheathing: Owner on.Record: NORTH HOLLOW LLC Contractor Name: Cape Cod Docks Inc. Framing: 1 Address: 15 WELCOME LANE Contractor License: 156836 2 WRENTHAM, MA 02093 Est. Project Cost: $47,496.00 Chimney: Description: Construction of a stairway down coastal bank,60 linear feet of Permit Fee: $342.23 permanent pier,3x30 aluminum gangway and 8x16 floating dock Insulation: $342.23 1st extension expires on 1/17/2020 Fee Paid .` Final Date: 1/17/2019 Project Review Req: Plumbing/Gas Rough Plumbing: Building Official, Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall bemaintained open for,public inspection for the entire duration of the Final Gas: work until the completion of the same.` Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:, Service: 1.Foundation or Footing 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed' T Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department e" Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: Town of Building. Barnstable ,.. Post This Card So That it,is Visible From the Street Approved,Plans Must be Retained on lob and this Card Must be Kept , 6 ��" Posted Until Final1rispection Has Been Made t �uct� 'Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspect�on,h'- been made Permit Permit No. B-19-109 Applicant Name: Cape Cod Docks Inc. Approvals Date Issued: 01/17/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 07/17/2019 Foundation: Location: 624 POPONESSETT ROAD,COTUIT *mMap/Lot: 007-001 � Zoning District: RF Sheathing: Owner on Record: NORTH HOLLOW LLC Contractor Name: Cape Cod Docks Inc. Framing: 1 Address: 15 WELCOME LANE Contractor License. '156836 2 WRENTHAM, MA 02093 _ H'" Est Project Cost: $47,496.00 Chimney: Description: Construction of a stairway down coastal bank,60 linear feet of _. Permit Fee: $ 292.23 permanent pier, 3x30 aluminum gangway and 8x16 floating dock 1 I , Fee Paid:" $292.23 Final Project Review Req: Date fir`' 1/17/2019 Plumbing/Gas Rough Plumbing: o -- `..Building Official Final Plumbing: I 4 o Rough Gas: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. All work authorized by this permit shall conform to the approved applicationand the approved construction documents for which this permit.has been granted. Final Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Electrical Service: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on,this permit. Minimum of Five Call Inspections Required for All Construction Work:' Rough: 1.Foundation or footing 2.Sheathing Inspection Final: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed .0 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough: 5.Prior to Covering Structural Members(Frame Inspection) C 6.Insulation - Low Voltage Final: 7.Final Inspection before Occupancy Health Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Final: Work shall not proceed until the Inspector has approved the various stages of construction. "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Final: Building plans are to be available on site All Permit Cards are the property of the APPLICANT-,MED RECIPIENT .� Town of Barnstable Building. t Post This Card So That it is,Visible From the Street Approved Plans Musf be Retained on Job and thisrCard Must be Kept MASK r � • 1posted Until Final Inspection Has Been-Ma Permit ' +Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made Permit NO. B-19-109 Applicant Name: Cape Cod.Docks Inc. Approvals Date Issued: 01/17/2019 _Current Use: `Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 07/17/2019 Foundation: Location: 624 POPONESSETT ROAD,COTUIT Map/Lot: 007-001 Zoning District: RF Sheathing: owner on Record: NORTH HOLLOW tLC Contractor Name w,Cape Cod Docks Inc. Framing: 1 Address: 15 WELCOME LANE Contractor License "156836 .2 WRENTHAM, MA 02093 _n 'ti4 r Est Project Cost: $47,496.00 Chimney: Description: Construction of a stairway down coastal bank 60 linear feet of 'Pe rrnii Permit F.el: $ 292.23 Insulation: permanent pier, 3x30 aluminum gangway and 8x16 floating dock Fee Paid. $ 292.23 Project Review Req: � Date: . . 1/17/2019 Final: Plumbing/Gas Rough Plumbing: \Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance. Rough Gas: All work authorized by this permit shall conform to the approved application and the;approved construction documents for which this permit has been granted. Final Gas: All construction,alterations and changes of use of any building and structures shalfbe in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. Electrical Service: The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work: " Rough: 1.Foundation or Footing 2.Sheathing Inspection Final: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed - 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Low Voltage Rough: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Final: 7.Final Inspection before Occupancy Health Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Final: Work shall not proceed until the Inspector has approved the various stages of construction. "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Final: Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map 0 7 Parcel O a Application Health Division BUILDING Date Issued mil. L Conservation Division Application Fee J AN 112019 aq a Planning Dept. Permit Fee Date Definitive Plan Approved by Planning Board TOWN OF BARNSTABLE Historic - OKH _ Preservation/ Hyannis Project Street Address Fepone554 kv r,4 Village _CIOI r114 Owner_ Lhibr$e Address 1.67 �Veleofne tavie: WralAA"i Al . Telephone d`�` gN q7/2- v2-v9j Permit Request CO i✓6 51�►'GI Cff`D v► of'STa 1 rway=w. oho 4 r7 (,b4644 64 4:0—' &0 14 n w Tff perinave441 ',er 3. x-3o ' " u (d i e g rk I oa�i� o Square feet: 1 st floor: existing proposed 2nd floor: existing proposed Total new Zoning District Flood Plain Groundwater Overlay Project Valuation 7 q6 Construction Type Lot Size Grandfathered: ❑Yes ❑ No If yes, attach supporting documentation. Dwelling Type: Single Family ❑ Two Family ❑ Multi-Family (# units) Age of Existing Structure Historic House: ❑Yes ❑ No On Old King's Highway: 0 Yes ❑ No Basement,Type: ❑ Full ❑ Crawl ❑Walkout ❑ Other Basement Finished Area (sq.ft.) Basement Unfinished Area (sq.ft) Number of Baths: Full: existing new Half: existing new Number of Bedrooms: existing _new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑ Oil ❑ Electric ❑ Other Central Air: ❑Yes ❑ No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: ❑ existing ❑ new size_Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: ❑existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization . ❑ Appeal # Recorded ❑ Commercial ❑Yes ❑ No If yes, site plan review# Current Use Proposed Use APPLICANT INFORMATION (BUILDER OR HOMEOWNER) Name 1.4wre"wf otaniev:� ( e (0-d 0614�,JXTelephone Number 505-77>-�M T Address 93 01 6-19 6 5, Aac�.�j 06,601 s` IY4 License #CS-079 f 5 Y 9,01 W,-O �-feMvI46 /ya- d9V13 Home Improvement Contractor# 8'3 (a Email Se�'!�'I e(�'G�A�� �aG®�SZ C nj Worker's Compensation # (OS 53 A 0-6771 I N31-4-/6 ALL CONSTRUCTION DEBRIS RESULTING FROM,THIS PROJECT WILL BE TAKEN TO SIGNATURE DATE / /O // t FOR OFFICIAL USE ONLY APPLICATION# DATE ISSUED MAP/PARCEL NO. { ADDRESS VILLAGE } OWNER DATE OF INSPECTION: FOUNDATION FRAME INSULATION FIREPLACE ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH FINAL , x GAS: ROUGH FINAL 'FINAL BUILDING DATE CLOSED OUT l ASSOCIATION PLAN NO. Town of Barnstable _ • ek 'Buflding Department aervi.ces4 Briaumormee,CBO .x • �,.,���' Biding Commissioner Office: 5OM62-4038 r �' { Mu C}wter st =a Propeitt3r z Complete and'Sgri'1"his Section. E: Using A Builder:f # ° § . d • , 4^{ As __ t. 1 1 1 - fix sw _�. I , �, 1i�t tT reG ` ,asC3waer o£t3�e sidjcctpiop .r act 1i1'2 i 1b2ttim zdifi9C tD vork:3 t13i5 E' LII]t # Il . �Y p: aF hcgt° 4 ..� 71 >k}kPoal fesues afld alarms ate the respo�ffity of the applicant Pools fi . are not to be filled or i�b6fbtellfence is installed aIi final P' Lspecdbjjs.ain petfogaed and Re 3 A'JAI • S4�6 V W=° Carol i�n+��ee . e • . Lttw�e�tcrXl�ei��rs. �: •• ,Print I�Ta3ae "y- r. P&t;N=le ILL {� at.n_..}.. .. � ..... {• Rm.OM +all. ,. Scanned with CamScanner Ito?4 BABNSCABLE, 9� ,0� Town of Barnstable Regulatory Services Richard V.Scali,Interim Director Building Division Thomas Perry,CBO Building Commissioner 200 Main Street, Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-4038 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder i I. &'cj Jrhi6ttiG ,as Owner of the subject property hereby authorize cape 0043 /16 hlreVI CC &1"el-S to act on my behalf, in all matters relative to work authorized by this building permit application for: Z ode .SSA a�r� t�L�` (Address of Job 2,11 ignature o ner Date Print Name If Property Owner is applying for permit,please complete the Homeowners License Exemption Form on the reverse side. TAKFVIN D\Building Changes\EXPRESS PERMMEXPRESS.doc Revised 061313 Mass. Corporations, external master page Page 1 of 2 Corporations Division Business Entity Summary ID Number: 001265218 I Request certificate New search Summary for: NORTH HOLLOW, LLC The exact name of the Domestic Limited Liability Company (LLC): NORTH HOLLOW, LLC Entity type: Domestic Limited Liability Company (LLC) Identification Number: 001265218 0 Date of Organization in Massachusetts: 03-17-2017 Last date certain: The location or address where the records are maintained (A PO box is not a valid location or address): Address City or town, State, Zip code, Country: The name and address of the Resident Agent: Name: CAROL L. EMBREE Address: 15 WELCOME LN. City or town, State, Zip code, WRENTHAM, k1A 02093 USA Country: The name and business address of each Manager: Title Individual name Address MANAGER CAROL L. EMBREE 15 WELCOME LANE WRENTHAM, MA 02093 USA In addition to the manager(s), the name and business address of the person(s) authorized to execute documents to•be filed'with the Corporations Division: Title Individual name Address The name and business address of the person(s) authorized to execute, acknowledge, deliver, and record any recordable instrument purporting to affect an interest in real property: Title Individual name 'Address. http://corp.sec.state.ma.us/CorpWeb/CorpSearch/CorpSummary.aspx?FEIN=001265218&... 1/11/2019 Mass. Corporations, external master page, Page 2 of 2 (REAL PROPERTY JCAROIL. EMBREE (15 WELCOME_ LANE WRENTHAM, MA 02093 USA ❑ ❑Confidential ❑Merger ❑ Consent Data Allowed Manufacturing View filings for this business entity: ALL FILINGS ' Annual Report Annual Report - Professional Articles of Entity Conversion v Certificate of Amendment j View filings Comments or notes associated with this business entity: i 1 New search z. http://corp.sec.state.ma.us/CorpWeb/CorpSearch/CorpSummary.aspx?FEfN=001265218&... 1/11/2019 N W n O 0 o • o o Massachusetts.Department of Public Safety Board of Building Regulations and Standards License: CS-092954 Construction Supervisor " LAWRENCE D DEMERS . 919 OLD BASS RIVER70AD: DENNIS MA 02638 t y = Expiration: ; Commissioner 01/31/2019 • 1 1 4 11 Construction,Supervisor -Restricted.to:-- " �c . ... lJnrEstricted-Buildings of any use group which contain Ko enclosed spac � ' ' Failure to possess a current edition of the Massachusetts State Building.Code is cause for revocation of this license. DPS Licensing information visit:WWW.MASS.GOV/DPS I ra E Construction Supervisor Unrestricted-Buildings of any use group which contain -. less than 36,000 cubic feet(991 cubic meters)of enclosed space. s Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. --' For information about this license Call(617)727-3200 or visit www.mass.gov/dpi r4�S rr. JauolsslwwoD Coot 4� K-9ZO VW SINN30 3 a1y021?13AI21d,SSdB alo 6L6 4113W3a d 33N321 V I I:ZOZ/6£/i3O :sand53 1796Z60-90 Joslnia-dw, spaepue;S pue suoi;eln6ab 6uiplm8;o pieo8 ainsuaai-I leuolssa;oJd Jo uoislnlQ A s;;asn43esseW10 41leaMuowwo4 Office of Consumer Affairs and Business Regulation 10 Park-Plaza.--Suite 5170 Boston, Massachusetts 02116 r Home Improvement.Contractor Registration iQ _ Type: Corporation CAPE COD DOCKS,INC. k ���' Registration: 156836 23 BOG RD Expiration: 08/08/2019 WEST YARMOUTH,MA 02673-1426 `' _a 1.1 sCA 1 €3 20M-05!11 Update Address and return card. Mark reason for change. 47 Office of Consumer Affairs&Business Regulation � ! HOME IMPROVEMENT CONTRACTOR Y - Registration valid for individual use only TYPE:Corporation before the expiration date. If found return to: � y Realstration�` it o Exo ati n Office of Consu a and Business Regulation L 156836 08/08/2019 10 Park Plaza- uite 5170 CAPE COD DOCKS,INC., ston,MA 0 116 LAW REIVCE DE ERS--lam"" 23 BOG RD WEST YARMOUTH,MA 02673-1426 Undersecretary Not valid without signature I .4c^iev CERTIFICATE OF LIABILITY INSURANCE112/1212018 DATE(MMIDDIYYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endomement(s). PRODUCER CONNAMTACT MCHu h Arthur D.Calfee Insurance Agency,Inc. PHONE 508 540.2609 FAX 508 457-1715 www.calfeeinsurance.com -MAIL karen feeinsurance.com 336 Falmouth Street INSURERS)AFFORDING COVERAGE NAIC 0 Falmouth MA 02540 iN R R : Continental Casualty INSURED INSURER B: Cape Cod Docks,Inc. INSURER C 23 Bog Road INSURER 0: West Yarmouth MA 02673.1426 INSURER E: INSURE COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE,INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTRNSR TYPE OF INSURANCE ADD L U POLICY EFF POLICY EXP POLICY NUMBER immippinnnn LIMITS COMMERCIAL GENERAL ummrTY EACH OCCURRENCE $ CLAIMS-MADE OCCUR DAMAGE TO RENTED MED EXP one $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE POLICY PRO- JECT LOC PRODUCTS-COMP/Op AGG OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ HIRED AUTOS AUTOSNON-OWNED PROPERTY DAMAGE IPar accident) $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LiAS CLAIMS-MADE AGGREGATE III D D I I RETENTION $ WORKERS COMPENSATION X I PER OTH- AND EMPLOYERS'LIABILITY Y I N ANY A OFFICEWMEM ER EXCLUDED ECUTIVE 1 N iA 6S59U8-0731N31•A•18 07/1112018 0711112019 E.L.EACH ACCIDENT $100,000. (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $10i) - If yes,describe under DESCRIPTION OF OPERATIONS low E.L.DISEASE-POLICY LIMIT $500.000. DESCRIPTION OF OPERATIONS f LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space is required) Includes U.S.L.and H.coverage You will also receive a certificate from Continental Casualty CERTIFICATE HOLDER CANCELLATION Pahl&Carol Emtlree SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 624 POponessett Rd - ACCORDANCE WITH THE POLICY PROVISIONS. COtult,MA 02635 AUTHORIZED REPRESENTATIVE <KMM> 01988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD i7- 1 (A CAPECOD-07 JSTRAUSS ACORO" CERTIFICATE OF LIABILITY INSURANCE DATE/12120Y 1212/208 18 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT _NAME: Deland,Gibson Insurance Associates,Inc. (A//C,"N,Ext):(781 237-1515 T- - FAX No):(781 237-1805 36 Washington Street - ------�--- - - ----- - -- )-- - e-MAIL info deland ibson.com —Wellesley Hills,MA 02481 .AnDRESS:---@ -,-- 9 ---_ - -- _--- INSURERS)AFFORDING COVERAGE -__ _ NAIC# - -- INSURER A:Travelers Insurance Company_-`-----_ INSURED INSURER B: Cape Cod Docks,Inc. _1NSURERC_: 23 50g Road INSURER D: --- West Yarmouth,MA 02673 - ----- - -` -'-- —- - -- INSURER E: (INSURER F: T ,- ---Y----�,.....-------- --- -- ----- COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. -- _- --— -- ---- -- IL$R 1 IR TYPE OF INSURANCE TAN DL�SUBDRI YPOLICY NUMBER r MMLDDY YYY I EFF PMLICY EX� LIMITS A X I COMMERCIAL GENERAL LIABILITY I EACH OCCURRENCE_, $ 1,000,000_ X CLAIMS-MADE t OCCUR ZOL-31 NO5O4A-1H ND 10/30/2018 10/30/2019 DAMAGE TO RENTED 100,000 _ � j -J PREMISES(Ea occurrence)— $-_-_ _-- -_ _ _1r MED EXP(Any one person),_ $_— 10,000 PERSONAL&ADV INJURY.- $ _ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE _ $ 2,000,000 PRO- ff � - ---2,000,000 X POLICY i.JECT LOC ]] PRODUCTS I COMPIOP $ 1,000,000 OTHER: � I ' AUTOMOBILE LIABILITY _(O aBINEDtSINGLE LIMIT —1$ ANY AUTO BODILY INJURY(Per person)— $ OWNED 1 SCHEDULED AUTOS ONLY AUTOS BODILY INJURY,(Per accident)_ $_¢ _I AUTOS ONLY AOTOS ONLY ! _(PeOacEcde tj AMAGE- -$ A X UMBRELLA LIAR X OCCUR t 1,000,000 EACH OCCl1RRENCEM„ T_$�-_, EXCESS LIAB _ cLAIMS-MADE ZOB-41NO3080-18-ND 10/30/2018 10/30/2019 _- '- 1,000,000 DED rX rRETENTION$ 25,000 AGGREGATE _ $� J $ fWORKERS COMPENSATION PER I OTH- AND EMPLOYERS'LIABILITY Y/N L.STATUTE ER_ ANY PROPRIETOR/PARTNER/EXECUTIVE E,L.EACH ACCIDENT $. OFFICER/MEMBER EXCLUDED? N/A - - - - '--- (Mandatory in NH) E.L.DISEASE-EA_E_M_PL_OYEE_ $_ If yes,describe under 11 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE v Paul&Carol Embree THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 624 Poponessett Road Cotuit,MA 02635 AUTHORIZED REPRESENTATIVE - ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD LLIMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE A. General Information City/Town Please note: BARNSTABLE this form has 1.From:been modified Conservation Commission with added 2.This issuance is for space to a.®Order of Conditions b.❑Amended Order of Conditions accommodate (check one): the Registry of Deeds 3.To: Applicant: Requirements Paul &Carol Embree a.First Name Important: b.Last Name When filling out forms on c.Organization the 15 Welcome Lane �`� �1/Z computer; use only the d.Mailing Address tab key to Wrentham MA 02093 move your e.City/Town f.State cursor-do g.Zip Code not use the 4.Property Owner(if different from applicant): return key. _�I a.First Name b.Last Name c.Organization d.Mailing Address e.City/rown f.State g.Zip Code 5. Project Location: 624 Poponessett Road Cotuit a.Street Address b.City/Town 007 .001 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known: d m s d m s d.Latitude e.Longitude wpaform5.d0c• rev.6/162015 Page 1 of 12 I� C . , Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 Lid WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Ckyrrown A. General information (coot.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Barnstable a.County b.Certificate Number(if registered land) 30524 279 c.Book d.Page 7. Dates: 4/5/2018 5/1/2018 5/15/2018 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Revised Site Plan a.Plan Title Cape&Islands Engineering Raul Lizardi-Rivera, P.E. b.Prepared By c.Signed and Stamped by 5/7/2018 1"=30' d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ❑ Public Water Supply b. ® Land Containing Shellfish. c• R Prevention of Pollution d. ❑ Private Water Supply e. ® Fisheries f R Protection of Wildlife Habitat g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. i wpafcrm5.doc• rev.0612015 Page 2 of 12 �f f Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# ILI Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityfrown B. Findings (coot.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Acts interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. ❑ Land Under Waterbodies and a.square feet b.square feet c.square feet d.square feet Waterways e.c/y dredged f.c/y dredged 7. ❑ Bordering Land Subject to Flooding a:square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet s. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.'cubic feet d.cubic feet e.cubic feet f.cubic feet g. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- I200 ft g.square feet h.square feet i.square feet j.square feet f wpatorm5.doc- rev.6116/2015 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 -- Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction.# BARNSTABLE Cityrrown B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted ' Proposed Permitted Alteration Alteration Replacement Replacement 1o. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas Land Under the 4.36 Ocean a.square feet b.square feet c.c/y dredged d.c/y dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ® Coastal Beaches 2.79 cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 14. ❑ Coastal Dunes cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 15. ® Coastal Banks 1.60 a.linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. 0.27 ® Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.c/y dredged d,c/y dredged 19. ® Land Containing 4.36 Shellfish a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.c/y dredged b.c/y dredged 21. ® Land Subject to 1.60 Coastal Storm a.square feet b.square feet Flowage 22. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square feet i.square feet I.square feet wpaform5.doc• rev.6116I2015 Page 4 of 12 ' k Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown B. Findings (cost.) p 3.If is he for 23• ElRestoration/Enhancement the purpose of restoring or a.square feet of BVW b,square feet of salt marsh enhancing a wetland resource area 24. ❑ Stream Crossing(s): in addition to the square footage that a.number of new stream crossings b.number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section 13.5.c (BVW)or The following conditions are only applicable to Approved projects. B.17.c(Salt Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional g Y Y amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. The work is a maintenance dredging project as provided for in the Act;or b. The time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and'the special circumstances warranting the extended time period are set forth as a special condition in this Order. c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than one year. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. An Order of Conditions for Test Project may be extended for one additional year only upon written application by the applicant, subject to the provisions of 310 CMR 10.05(11)(f). 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 5/15/2021 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. I wpaformUoc- rev.611612015 Page 5 of 12 C. General Conditions Under Massachusetts Wetlands Protection Act 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] "File Number SE3-5561 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and . hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. wpaform5.doc• rev.6/16/2015 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# ILI Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 19. The work associated with this Order(the"Project") (1) 0 is subject to the Massachusetts Stormwater Standards (2) ® is NOT subject to the Massachusetts Stormwater Standards If the work is subject to the Stormwater Standards,then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and,,if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs)shall remain in place until the site is fully stabilized. b) No Stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment,the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; #. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; ili. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; wpaformMoc- rev.6/16/2016 Page 7 of 12 f Massachusetts Department of Environmental Protection Provided by MassDEP: ILIBureau of Resource Protection - Wetlands SE3-5561 W PA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c: 131, §40 eDEP Transaction# BARNSTABLE C;ityrrown C. General Conditions Under Massachusetts Wetlands Protection Act (cost.) iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan")and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with-the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpafomt5.doc• rev.611612015 Page 8 of 12 tl • , Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 Ll WPA Form 5 -- Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityfrown C. General Conditions Under Massachusetts Wetlands Protection Act (cunt.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal(for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance , with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): 20. For Test Projects subject to 310 CMR 10.05(1-1), the applicant shall also implement the monitoring plan and the restoration plan submitted with the Notice of Intent. If the conservation commission or Department determines that the Test Project threatens the public health, safety or the environment, the applicant shall implement the removal plan submitted with the Notice of Intent or modify the project as directed by the conservation commission or the Department. wpaform5.doc- rev.6/1612015 Page 9 of 12 e Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.C.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown LLI D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The BARNSTABLE hereby finds(check one that applies): Conservation Commission a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ®that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: BARNSTABLE S.237-1 - 1.Municipal Ordinance or Bylaw 237-14 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space for additional conditions, attach a text document): See Pages 10.1, 10.2, and 10.3 wpaform5.doc- rev.6116=15 Page 10 of 12 . q SE3-5561 Name: Paul& Carol Embree Approved Plan= Revised Site Plan dated 5/7/2018(Sheets 1 &2)by Raul Lizardi-Rivera,P.E. Special Conditions of Approval I. Preface Caution: Failure to comply with all Conditions of this Order of Conditions may result in serious consequences. Such consequences may include issuance of a Stop Work Order,fine(s),the requirement to remove unpermitted structures,requirement to re-landscape to original condition,the inability to obtain a Certificate of Compliance,and more. The General Conditions of this Order begin on Page 4 and continue on Pages 5 through 6. The Special Conditions,if necessary,are contained on Pages 10.1,10.2 and 10.3 All Conditions contained herein require strict compliance. II. Prior to the start of work,the following conditions shall be satisfied: 1. Within one month of receipt of,this Order of Conditions,and prior to the commencement of any work -' "77- approved herein,General Condition Number 9(recording requirement)on Page 4 shall be complied with. 2. It is the responsibility of the applicant,the owner and/or successor(s),and the project contractor,to ensure that all conditions of this Order are complied with. The applicant shall provide copies of the Order of Conditions and approved plans(and any approved revisions thereof)to project contractors prior to the start of work. 'Barnstable Conservation Commission Forms A_and B shall be completed and returned to the Commission prior to the start of work 3. General Condition No. 10 on Page 5(sign requirement)shall be complied with. 14_ The Cdffservation Commission shall receive.written notice one(1)week in advance of the start of work: 5._,The Natural Resources Department shall be notified at least twenty-one(21)working days prior to the start 1 _of work at the site,to inspect the areas for shellfish. If deemed necessary by the Shellfish Constable, shellfish shall be removed from the work area to a suitable site and/or replanted at the locus following construction. The,foregoing measures for shellfish protection shall ensue at the expense of the applicant. 10.1 CoastalRevised102317 i 6. The applicant shall obtain a building permit for the proposed pier from the Town Building Commissioner`. 7. Sediment controls shall be installed as indicated on the approved plan prior to patio replacement and replacement of stone steps. M. The following additional conditions shall govern the project once work begins: S. General Conditions Nos. 13 and 14(changes in plan)on Page 5 shall be complied with. 9. General Condition No. 18(maintaining sediment controls)on Page 5 shall be complied with. 10. The Conservation Commission,its employees,and its agents shall have a right of entry to inspect for compliance with the provisions of this Order of Conditions. 11. Unless extended,this permit is valid for three years from the date of issuance. 12. An Amended Order does not change the original date of expiration of this Order of Conditions. 13. All areas disturbed during construction shall be revegetated immediately following completion of work at the site. No disturbed areas shall be'left unvegetated or unmulched for more than thirty(30)days. Mulching shall not serve as a substitute for the requirement to revegetate disturbed areas at the conclusion of work. 14. Salt marsh shall not be disturbed. LA 15. CCA-treated piling and structural timber greater than three inches(3")thick is allowed. Otherwise;no CCA-treated or creosote-treated materials shall be used. 16. Grated decking shall provide at least 65%light penetration 17. The seasonal float and ramp shall be stored at a suitable upland site. Floats shall not be stored on banks, beaches,marshes or dunes. 18. Float stops shall be installed to keep the float a minimum of 18'above the substrate at low tide. 19. Permanent piling shall be driven into place. Some initial pilot-hole jetting is allowed. The following special conditions(in italics)shall govern boat use at the approved pier. These conditions shall continue over time. Note: for purposes of this Order of Conditions,the term"pier" shall refer not only to the linear pile-supported structure,but also to any of its components or appendages,such as the float(s),ell,tee,ramp,outhaul piling,etc. 20. Motorized craft shall not be used or berthed at the approved pier. CoastalRevised102317 10.2 ax 21. A small sign shall be displayed at the end of the pier,facing open water. It shall.read SE3-5561; 624 Poponessett Road, Limitations: • No motorcraft allowed ` 22. Any desired pier lighting shall receive prior approval of the Conservation Commission. 23. Lead piling caps shall not be used. 24. Access shall be provided as a means for along-shore public traverse. 25. Work on the pier shall ensue mid-tide rising to mid-tide falling,or as otherwise necessary to provide a minimum twelve-inch(12")clearance for the work barge above the substrate. 26. The applicant may maintain,in conformance with the plan of record,the proposed pier and other structures given in the Notice of Intent application for the longevity of the Order of Conditions(3 years). Thereafter, maintenance may be extended through any forthcoming Certificate of Compliance. IV. After all work is completed,the following conditions shall be promptly met: 27. At the completion of work,or by the expiration of this Order,the applicant shall request in writing a Certificate of Compliance for the work herein permitted. Barnstable Conservation Commission Form C shall be completed and returned with the request for a Certificate of Compliance. Where a project has been completed in accordance with plans stamped by a registered professional engineer,architect,landscape architect or land surveyor,a written statement by such a professional shall be submitted,certifying substantial compliance with the plans,setting forth what deviation(s), if any,exists with the approved plans. I This statement,along with Form C,shall accompany the request for a Certificate of Compliance. 10.3 CoastalRevised102317 II I Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection e Wetlands SE3-5561 WPA Form 5 m Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act'M.G.L. c. 131, §40 eDEP Transaction# Barnstable Citylrown E. Signatures Important:When This Order is valid for three years, unless otherwise specified as a special MAY 1 5 201R filling out forms condition pursuant to General Conditions#4,from the date of issuance. 1.Date of ssuance on the computer, use only the tab Please indicate the number of members who will sign this form. key to move your This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers cursor-do not use the return The Order must be mailed by certified mail(return receipt requested)or hand delivered to key. the applicant. A copy must be mailed, hand delivered or file nically at the same time with the appropriate MassDEP Regional Office. rab Signatures: ❑ by hand delivery on (� by certified mail, return receipt requested,on t MAY 1 5 010 Date Date ' F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions..The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CHAR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations(310 CMR 10.00).To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. i wpaftgs.doc•rev.02)252010 Page t[of I I. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 ® Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransactionLl •- BARNSTABLE Cityrrown G. Recording Information Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. BARNSTABLE Conservation Commission - Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ----------------- To: BARNSTABLE Conservation Commission Please be advised that the Order of Conditions for the Project at: 624 Poponessett Rd., Cotuit, MA 02635 SE3-5561 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant BARNSTABLE REGISTRY OF DEEDS Wform5.dac-rev.6116120ts John F. Meade, RegisterPip911 cl11 the Cam a swat&of g'assachrrsd#s Depurhaent ofhuFksti ial Accidents - - ��ace o,�� estiger#iarrs ' 600 WaivhingtanStrEet Boston,,MA 02U1 wwiu arrass.gmldia 'workers' Compensation InsuranceAffidavit:Builders/ConfractorsMectriciansMumbers Ap caut Infarmafion Please Print L�ihly Name la&idnal): Address- 2 5 0o, Kv el el City/State]Zip: WUf �rn,�v l�I _pal73 50 7 8 Axe you an employ ern Check the appropriate bo= Type of project(r 4uired} 1_9 I am a employer with emP to 4. ❑ I=a.general contractor and I .�_ 6_ New �--oa employees(full and/or part-time}* . have hired the sub-cvnkraciors. 2-❑ I am a so-le proprietor or partner- listed on the attached sheet 77- ❑Pere deling ship and,have no employees These sub-contractors have g- ❑Dte=litibn woricing far m,e in any capacity Effiployees and have:wadcers' insiira>x�� 9- ❑Building addition [No.workers'camp.insurance comp. required I 5-0 We are a corparaticnand its 10.0 Electrical repairs or additions officers base exercised their []Plum hin. I I. airs or additions 3_❑ I am a homatrwner doing all wankg� , Myself [No workers' - right ofemmption per MGL 120 Rnofrepaus ine nm=e required_]1 c_152,§1(41 and we have nex employees.[Nay worms' 13-9 QiheS / comp_insurance regnired-1 4 h pV� *Any alrpUcimt toot checks boa;mil must also fill out the section.below ffitir wolkes'compensadioa p¢iicy iuffi—ins T Hometrwners vrh�i submit u{is afdWit inmcati rg they am doing atllzme and then bire outside contractors mmI submit a new siud3vit imeri af„ MX11- . tractorsthatc'lPrkthisbCr--mcststtarhedsaifdditiensistreetshackingate=neo+ffiresnb-e onamdstareuhethecaenotfhnseW4ities employees_ Iythe sub-contractorshwe ennpkyees,they must provide this workers'comp.policy number. lam an employer iftrrt isproi iditrg workers'compgrLrrrhan iri wartce for trzy sngAgy:ees BeLatv is fh a palic}curd job site I nee Company-Name:e 00/tt e�fu j Cry f� Pollcg or Self ins Lam ` lD5 Q�J A" O Expirationbate. (/ 1I Job Site— dd es�:U/ 00`ICjSG �OG�C� t✓ifig/State/Zig__ ltl {�cl _ (/2 1 Attach.a copy of the workers'compensation policy deeclaration page(showing the poliq,number and7expiration date). Failure to secure coverage as requiredunder Section 25 k of MGL c_ 152 can bead to the imposition ofcriminal penalties of a fine up to S 1,500.00 and/or ane year imprison t as well as ciial penalties in the farm of a STOP WORK ORDER and a fine of'up to V-50-00 a day against the violator_ Be advised that a copy of this statement may be forwarded to-the Office of Im.estrptions of&e DIA far insmance,coverage verbcation- c lydra here Y c rant t r i�rs xs taricipenu ss afperjury thctthe in ormtdianpravidgd abiwe is hua and correct 5itmatmm: e/ U U Date.: 7 Phone i#:�D.O / 70 % 7(1 Q fzsiat arse atif. Tarr not write in this area:,to be completed by`cii}or town vfficzaL City or 'own:. PerutitUCeatse If a Issuing Authority(circle one): 1..Board of HeaItbL -2.Ruifding Ilepartrncnt I Git�Tl`avm Clerk 4a Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#: 6 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment G. Municipal Zoning Certificate Paul & Carol Embree Name of Applicant 624 Poponessett Road Popponesset Bay(aka Shoestring Bay) Cotuit, MA Project street address Waterway City/Town Description of use or change in use: Construct, license, retain and maintain a 3'wide x 40' long elevated timber stairs and landings, a 4' x 90' pier with appurtenant kayak rack and access stairs, a Tx 15'.ramp and 8' x 18' float. To be completed by municipal clerk or appropriate municipal official: "I hereby certify that the project described above and more fully detailed in the applicant's waterways license application and plans is not in violation of local zoning ordinances and bylaws." V Brian Florence Printed Name of Municipal Official Date Building Commissioner Barnstable Signature of Municipa-Official . Title Cityrrown �A& CH91App.doc-Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Important:When A. Application Information (Check one) filling out forms on the computer, use only the tab NOTE: For Chapter 91 Simplified License application form and information see the Self Licensing key to move your Package for BRP WW06. cursor-do not use the return Name(Complete Application Sections) Check One Fee Application# key. WATER-DEPENDENT- General (A-H) ® Residential with <4 units $215.00 BRP WW01a ❑ Other $330.00 BRP WW01 b For assistance ❑ Extended Term $3,350.00 BRP WW01c incompleting this _.............................................................._.._.._.._.._......................................_.._....................................... application,please Amendment(A-H) [] Residential with <4 units $100.00 BRP WW03a see the — "Instructions". Other $125.00 BRP WW03b NONWATER-DEPENDENT- Full (A-H) ❑ Residential with <4 units $665.00 BRP WW15a ❑ Other $2,005.00 BRP WW15b ❑ Extended Term $3,350.00 BRP WW15c Partial (A-H) ❑ Residential with <4 units $665.00 BRP WW14a ❑ Other $2,005.00 BRP WW14b ❑ Extended Term $3,350.00 BRP WW14c Municipal Harbor Plan (A-H) ❑ Residential with <4 units $665.00 BRP WW16a ❑ Other $2,005.00 BRP WW16b ❑ Extended Term $3,350.00 BRP WW16c Joint MEPA/EIR(A-H) ❑ Residential with <4 units $665.00 BRP WW17a ❑ Other $2,005.00 BRP WW17b ❑ Extended Term $3,350.00 BRP WW17c ._.._.._.._.._.._.._.._.._..--'--._.._.._.............__...................................................................____......................... Amendment(A-H) ❑ Residential with <4 units $530.00 BRP WW03c ❑ Other $1,000.00 BRP WW03d ❑ Extended Term $1,335.00 BRP WW03e CH91App.doc-Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment B. Applicant Information Proposed Project/Use Information 1. Applicant: Paul &Carol Embree matt@capeeng.com Name E-mail Address 15 Welcome Lane Mailing Address Note:Please refer Wrentham MA 02093 to the"Instructions" City/Town State Zip Code 508477-7272 508-477-9072 Telephone Number Fax Number 2. Authorized Agent(if any): Matthew C. Costa matt@capeeng.com Name E-mail Address 800 Falmouth Road, Suite 301C Mailing Address Mashpee MA 02649 City/Town State Zip Code 508-477-7272 ; 08-477-9072 Telephone Number Fax Number C. Proposed Project/Use Information 1. Property Information (all information must be provided): Paul &Carol Embree Owner Name(if different from applicant) 007/001 41°36'36.844"N 70°27'19.800'1N Tax Assessor's Map and Parcel Numbers Latitude Longitude 624 Poponessett Road, Cotuit, MA 02632 Street Address and City/Town State Zip Code 2. Registered Land ❑Yes ® No 3. Name of the water body where the project site is located: Popponesset Bay (aka Shoestring Bay) 4. Description of the water body in which the project site is located (check all that apply): Type Nature Designation ❑ Nontidal river/stream ® Natural ❑Area of Critical Environmental Concern ® Flowed tidelands ❑ Enlarged/dammed ❑ Designated Port Area ❑ Filled tidelands ❑ Uncertain ❑ Ocean Sanctuary ❑ Great Pond ❑ Uncertain ❑ Uncertain CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment C. Proposed Project/Use Information (cont.) Select use(s)from Project Type Table 5. Proposed Use/Activity description on pg.2 of the "Instructions" Construct, license, retain and maintain a 3'wide x 40' long elevated timber stairs and landings, a 4'x90' pier with appurtenant kayak rack and access stairs, a 3'x15' ramp and 8'x18' float. 6. What is the estimated total cost of proposed work (including materials& labor)? $10,000.00 7. List the name&complete mailing address of each abutter(attach additional sheets, if necessary). An abutter is defined as the owner of land that shares a common boundary with the project site, as well as the owner of land that lies within 50' across a waterbody from the project. Name Address Name Address Name Address Name Address D. Project Plans 1. I have attached plans for my project in accordance with the instructions contained in (check one): ® Appendix A(License plan) ❑ Appendix B (Permit plan) 2. Other State and Local Approvals/Certifications ❑401 Water Quality Certificate Date of Issuance ®Wetlands SE#03-5561 File Number ❑ Jurisdictional Determination JD- File Number ❑ MEPA File Number ❑ EOEA Secretary Certificate Date ❑ 21 E Waste Site Cleanup RTN Number i CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment E. Certification All applicants, property owners and authorized agents must sign this page. All future application correspondence may be signed by the authorized agent alone. "I hereby make application for a permit or license to authorize the activities I have described herein. Upon my signature, I agree to allow the duly authorized representatives of the Massachusetts Department of Environmental Protection and the Massachusetts Coastal Zone Management Program to enter upon the premises of the project site at reasonable times for the purpose of inspection." "I hereby certify that the information submitted in this application is true and accurate to the best of my knowledge." Applicant's signature Date Property Owner's signature(if different than applicant) Date Agent's signature(if applicable)CAPE&ISLANDS ENGINEERING,INC. Date CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application 310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment F. Waterways Dredging Addendum 1. Provide a description of the dredging project ❑ Maintenance Dredging (include last dredge date & permit no.) ❑ Improvement Dredging N/A Purpose of Dredging 2. What is the volume(cubic yards) of material to be dredged? 3. What method will be used to dredge? ❑ Hydraulic ❑ Mechanical ❑ Other 4. Describe disposal method and provide disposal location (include separate disposal site location map) 5. Provide copy of grain size analysis. If grain size is compatible for beach nourishment purposes, the Department recommends that the dredged material be used as beach nourishment for public beaches. Note: In the event beach nourishment is proposed for private property, pursuant to 310 CMR 9.40(4)(a)1, public access easements below the existing high water mark shall be secured by applicant and submitted to the Department. CHMpp.doc-Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment G. Municipal Zoning Certificate Paul &Carol Embree Name of Applicant 624 Poponessett Road Popponesset Bay(aka Shoestring Bay) Cotuit, MA Project street address Waterway City/Town Description of use or change in use: Construct, license, retain and maintain a 3'wide x 40' long elevated timber stairs and landings, a 4' x 90' pier with appurtenant kayak rack and access stairs, a Tx 15' ramp and 8' x 18'float. To be completed by municipal clerk or appropriate municipal official: "I hereby certify that the project described above and more fully detailed in the applicant's waterways license application and plans is not in violation of local zoning ordinances and bylaws." Brian Florence Printed Name of Municipal Official Date Building Commissioner Barnstable Signature of Municipal Official Title City/Town CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment H. Municipal Planning Board Notification Notice to Paul &Carol Embree Applicant: Name of Applicant Section H should 624 Poponessett Road Popponesset Bay(aka Shoestring Bay) Cotult, MA be completed and Project street address Waterway City/Town submitted along with the original Description of use or change in use: application material. p g Construct, license, retain and maintain a 3'wide x 40' long elevated timber stairs and landings, a 4' x 90' pier with appurtenant kayak rack and access stairs, a 3' x 15' ramp and 8' x 18' float. To be completed by municipal clerk or appropriate municipal official: "I hereby certify that the project described above and more fully detailed in the applicant's waterways license application and plans have been submitted by the applicant to the municipal planning board." Printed Name of Municipal Official Date Barnstable Signature of Municipal Official Title City/Town Note: Any comments; including but not limited to written comments, by the general public, applicant, municipality, and/or an interested party submitted after the close of the public comment period pertaining to this Application shall not be considered, and shall not constitute a basis for standing in any further appeal pursuant to 310 CMR 9.13(4) and/or 310 CMR 9.17. CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix A: License Plan Checklist General View ® PE or RLS, as deemed appropriate by the Department, stamped and signed, in ink, each sheet within 8 1/2 inch by 11 inch border ® Format and dimensions conform to"Sample Plan" (attached) ® Minimum letter size is 1/8 of an inch if freehand lettering, 1/10 of an inch if letter guides are used ® Sheet number with total number in set on each sheet ® Title sheet contains the following in lower left: Plans accompanying Petition of[Applicant's name, structures and/or fill or change in use, waterway and municipality] ® North arrow ® Scale is suitable to clearly show proposed structures and enough of shoreline, existing structures and roadways to define its exact location ® Scale is stated &shown by graphic bar scale on each sheet ® Initial plans may be printed on bond; final plans due before License issuance must be on 3mil Mylar. Structures and Fill ® All Structures and Fill shown in full BLACK lines, clearly labeling which portions are existing, which are Proposed and indicating Existing Waterways Licenses ® Cross Section Views show MHW*and MLW*and structure finish elevations ❑ Dredge or Fill, actual cubic yardage must be stated and typical cross sections shown ® All Structures and Fill shown in full BLACK lines, clearly labeling which portions are existing, which are Proposed and indicating Existing Waterways Licenses ® Cross Section Views show MHW*and MLW*and structure finish elevations ❑ Dredge or Fill, actual cubic yardage must_be stated and typical cross sections shown ® Actual dimensions of structures(s) and or fill and the distance which they extend beyond MHW*or OHW* ❑ Change in Use of any structures on site must be stated *See 310 CMR 9.02, Waterways Regulations definitions of High Water Mark, Historic High Water Mark, Historic Low Water Mark, and Low Water Mark. Note: DEP may, at its discretion, accept appropriately scaled preliminary plans in lieu of the plans described above. In general, DEP will accept preliminary plans only for non-water dependent projects and projects covered by MEPA to address site design components such as visual access, landscaping &site coverage. Anyone wishing to submit preliminary plans must obtain prior approval of the DEP Waterways Program before submitting them with their application. CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix A: License Plan Checklist (cont.) Boundaries ® Property lines, full black lines, , along with abutters' names and addresses ® Mean High Water(MHW)*or Ordinary High Water(OHW)*, full black line ® Mean Low Water(MLW)*, black dotted line, (.............) ❑ Historic MHW*or OHW* ❑ Historic MLW*(..._... _..._) ❑ State Harbor Lines, black dot-dash line (—. — . — . —)with indication of Chapter&Act establishing them (Ch. , Acts of) ® Reference datum is National Geodetic Vertical Datum (NGVD) or(NAVD). ® Floodplain Boundaries according to most recent FEMA maps ® Proposed & Existing Easements described in metes& bounds Water-Dependent Structures ® Distance from adjacent piers, ramps or floats (minimum distance of 25' from property line, where feasible) ® Distance from nearest opposite shoreline ❑ Distance from outside edge of any Navigable Channel ® Access stairs at MHW for lateral public passage, or 5 feet of clearance under structure at MHW. Non Water-Dependent Structures ❑ Depict extent of"Water-dependent Use Zone". See Waterways Regulations at 310 CMR 9.51-9.53 for additional standards for non water-dependent use projects. Note: Final Mylar project site plans will be required upon notice:from the Department, prior to issuance of the Chapter 91 Waterways License. CH91App.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix A: License Plan Checklist Cont. Registry Statement 3112 inche 5 inche A :L Locus Map 3 First Sheet Only OD a 1 „ 21/4 inche CD co CD Sample Plan 81/2 inche P.E. or RIS Stamp ---3 Y4 inch e Plan Accompanying Petition of... D EP Stamp First Sheet Only 3/4 " Border CH91App.doc•Rev.03/17 A . Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X280800 Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix B: Dredging Permit Plan Checklist For projects applying for dredging permits only, enclose drawings with the General Waterways Application that include the following information: N/A General View ❑ Submit one original of all drawings. Submit the fewest number of sheets necessary to adequately illustrate the project on 8-1/2 inch X 11 inch paper. ❑ A 1-inch margin should be left at the top edge of each drawing for purposes of reproduction.and binding. A 1/2 inch margin is required in the three other edges. ❑ A complete title block on each drawing submitted should identify the project and contain: the name of the waterway; name of the applicant; number of the sheet and total number of sheets in the set; and the date the drawing was prepared. ❑ Use only dot shading, hatching, and dashed or dotted line to show or indicate particular features of the site on the drawings. ❑ If deemed appropriate by the Department, certification by the Registered Professional Engineer or Land Surveyor is included. Plan View ❑ North Arrow ❑ Locus Map ❑ Standard engineering scale. ❑ Distances from channel lines and structures if appropriate. ❑ Mean high water and mean low water shorelines(see definitions of"High Water Mark"and "Low Water Mark" at 310 CMR 9.02, C. 91 Regulations). ❑ Dimensions of area proposed to be dredged or excavated. ❑ Notation or indication of disposal site. ❑ Volume of proposed dredging or excavation. ❑ Ordinary high water, proposed drawdown level, and natural (historic) high water(for projects lowering waters of Great Ponds). Section Views ❑ Existing bottom and bank profiles. ❑ Vertical and/or horizontal scales. ❑ Proposed and existing depths relative to an indicated datum. ❑ Elevation and details of control structure (for projects lowering waters of Great Ponds). CHMpp.doc•Rev.03/17 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X28O8OO Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix C: Application Completeness Checklist Please answer all questions in the General Waterways Application form. If a question does not apply to your project write"not applicable" (n/a) in that block. Please print or type all information provided on the form. Use black ink(blue ink or pencil are not easily reproducible, therefore, neither will be accepted). If additional space is needed, attach extra 8-1/2"x 11"sheets of paper. ❑ Proper Public Purpose: For nonwater-dependent projects, a statement must be included that explains how the project serves a proper public purpose that provides greater benefit than detriment to public rights in tidelands or great ponds and the manner in which the project meets the applicable standards. If the project is a nonwater-dependent project located in the coastal zone, the statement should explain how the project complies with the standard governing consistency of the policies of the Massachusetts Coastal Zone Management Program, according to 310 CMR 9.54. If the project is located in an area covered by a Municipal Harbor Plan, the statement should describe how the project conforms to any applicable provisions of such plan pursuant to 310 CMR 9.34(2). ® Plans: Prepared in accordance with the applicable instructions contained in Appendix A-B of this application. For initial filing, meet the requirements of 310 CMR 9.11(3)(b)(3). ® Applicant Certification:All applications must be signed by"the landowner if other than the applicant. In lieu of the landowner's signature, the applicant may provide other evidence of legal authority to submit an application for the project site." If the project is entirely on land owned by the Commonwealth(e.g. most areas below the current low water mark in tidelands and below the historic high water mark of Great Ponds), you may simply state this in lieu of the"landowner's signature". ® Municipal Zoning Certification: If required, applicants must submit a completed and signed Section E of this application by the municipal clerk or appropriate municipal official or, for the initial filing, an explanation of why the form is not included with the initial application. If the project is a public service project subject to zoning but will not require any municipal approvals, submit a certification to that effect pursuant to 310 CMR 9.34(1). ® Municipal Planning Board Notification: Applicants must submit a copy of this application to the municipal planning board for the municipality where the project is located. Submittal of the complete application to DEP must include Section H signed by the municipal clerk, or appropriate municipal official for the town where the work is to be performed, except in the case of a proposed bridge, dam, or similar structure across a river, cove, or inlet, in which case it must be certified by every municipality into which the tidewater of said river, cove, or inlet extends. ® Final Order of Conditions: A copy of one of the following three documents is required with the filing of a General Waterways Application: (1)the Final Order of Conditions (with accompanying plan) under the Wetlands Protection Act; (2)a final Determination of Applicability under that Act stating that an Order of Conditions is not required for the project; or(3)the Notice of Intent for the initial filing (if the project does not trigger review under MEPA). ❑ Massachusetts Environmental Protection Act(MEPA): MGL 30, subsections 61-61A and 301 CMR 11.00, submit as appropriate: a copy of the Environmental Notification Form (ENF) and a Certificate of the Secretary of Environmental Affairs thereon, or a copy of the final Environmental Impact Report(EIR) and Certificate of the Secretary stating that it adequately and properly complies with MEPA; and any subsequent Notice of Project change and any determination issued thereon in accordance with MEPA. For the initial filing, only a copy of the ENF and the Certificate of the Secretary thereon must be submitted. Note: If the project is subject to MEPA,the Chapter 91 Public Notice must also be submitted to MEPA for publication in the"Environmental Monitor'. MEPA filing deadlines are the 15th and 30'h of each month. CH91App.doc•Rev.03/17 r Massachusetts Department of Environmental Protection Bureau of Resource Protection -Waterways Regulation Program X28O8OO Chapter 91 Waterways License Application -310 CMR 9.00 Transmittal No. Water-Dependent, Nonwater-Dependent,Amendment Appendix C: Application Completeness Checklist (cont.) ❑ Water Quality Certificate: if applicable, pursuant to 310 CMR 9.33, is included. ❑ Other Approvals: as applicable pursuant to 310 CMR 9.33 or, for the initial filing, a list of such approvals which must be obtained. N/A Projects involving dredging: ❑ The term "dredging" means the removal of materials including, but not limited to, rocks, bottom sediments, debris, sand, refuse, plant or animal matter, in any excavating, clearing, deepening, widening or lengthening, either permanently or temporarily, of any flowed tidelands, rivers, streams, ponds or other waters of the Commonwealth. Dredging includes improvement dredging, maintenance dredging, excavating and backfilling or other dredging and subsequent refilling. Included is a completed and signed copy of Part F of the application. Filing your Completed General Waterways Application: ® For all Water-Dependent applications—submit a completed General Waterways Application and all required documentation with a photocopy of both payment check and DEP's Transmittal Form for Permit Application &Payment to the appropriate DEP Boston or regional office(please refer to Pg. 10 of the"Instructions"for the addresses of DEP Regional Offices). ❑ For all Non Water-Dependent applications—submit a completed General Waterways Application and all required documentation with a photocopy of both payment check and DEP's Transmittal Form for Permit Application &Payment to DEP's Boston office. Department of Environmental Protection Waterways Regulation Program One Winter Street Boston, MA 02108 ® Application Fee Payment for ALL Waterways Applications: Send the appropriate Application fee*(please refer to Page 1 of the"Application"), in the form of a check or money order, along with DEP's Transmittal Form for Permit Application &Payment: Department of Environmental Protection P.O. Box 4062 Boston, MA 02211 * Under extreme circumstances, DEP grants extended time periods for payment of license and permit application fees. If you qualify, check the box entitles"Hardship Request" on the Transmittal Form for Permit Application &Payment. See 310 CMR 4.04(3)(c)to identify procedures for making a hardship request. Send hardship request and supporting documentation to the above address. NOTE: You may be subject to a double application fee if your application for Chapter 91 authorization results from an enforcement action by the Department or another agency of the Commonwealth or its subdivisions, or if your application seeks authorization for an existing unauthorized structure or use. CHMpp.doc•Rev.03/17 BIrc 31285 P:E3 273 4243t a 5 LlMassachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE City/Town A. General Information Please note: BARNSTABLE this form has 1.From: been modified Conservation Commission ' with added 2.This issuance is for space to a.®Order of Conditions 'b. Amended Order of Conditions accommodate (check one): the Registry of Deeds 3.To: Applicant: Requirements Paul &Carol Embree Important: a.First Name b.Last Name When filling out forms on c.Organization the 15 Welcome.Lane computer, d.Mailing Address use only the tab key to Wrentham MA 02093 move your e.Cityrrown f.State g.Zip Code cursor-do not use the 4.Property Owner(if different from applicant): return key. V�I a.First Name b.Last Name c.Organization d.Mailing Address e.City/Town f.State g.Zip Code 5. Project:Location: 624 Poponessett'Road Cotuit a.Street Address b.Citynbwn 007 00.1 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known: d m s d m s d.Latitude e..Longitude wpaform5.doo•_rev.6116/2015 Page 1 of 12 l� Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 - Order. of Conditions MassDEP File# LIJ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown A. General Information (cont.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Barnstable a.County b.Certificate Number(if registered land), 30524 279 c.Book d.Page 4/5/2018 5/1/2018 5/15/2018 7. Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance 8. Final Approved Plans and Other Documents(attach additional plan or document references as needed): Revised Site Plan .a.Plan Title Cape& Islands Engineering Raul Lizardi-Rivera, P.E. b.Prepared By c.Signed and Stamped by 5/7/2018 1"=30' d.Final Revision Date e.Scale f:Additional Plan or Document Title g.Date B. Findings 1. Findings pursuant to.the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented'at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ❑ Public Water Supply b. ® Land Containing Shellfish c. Z Prevention of Pollution d. ❑ Private Water Supply a.. Z Fisheries f. Protection of Wildlife Habitat 9. ❑ Groundwater Supply n. Storm Damage Prevention i. Z Flood Control 2, This Commission hereby finds the project, as proposed, is:(check one of the following boxes). Approved subject to: a. Z the following conditions which are necessary in.accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General.Conditions, and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans; specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. wpaform5.doo•rev.6/16/2015 Page 2 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-55611 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40. eDEPTransaction# BARNSTABLE Cityrrown B. Findings (cont.) Denied because:. b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate,to protect the interests of the Act, and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. C. ❑ the.information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection.Act. Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes:measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource area specified in.310 CMR 1,0.02(1)(a) a:linear feet. Inland Resource Area Impacts: Check all.that apply below, (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration ,Alteration Replacement Replacement 4. ❑ Bank a.linear feet b.linear feet a linear feet d.linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square-feet d.square feet 6. ❑ Land Under Waterbodies and. a.square feet b,square feet c.square feet' d.square feet Waterways e.cly dredged f.dy dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g,cubic feet h.cubic feet e. ❑ Isolated Land Subject to Flooding a..square feet b.square feet Cubic Feet Flood Storage c.cubic,feet d.cubic feet e.cubic.feet f.cubic feet 9. ❑ Rivecfront Area a.total sq.feet b.total sq.feet Sq'ft within 100 ft c.square feet d.square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square.feet is square feet j.square feet wpaform5.doa-rev.6176/2015 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection-Wetlands SE3-5561 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown B. Findings (cont.) Coastal Resource Area Impacts:Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ® Land Underthe 4.36 Ocean a.square feet b.square feet c.clydredged d.,yydredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 3' Coastal Beaches 2.79 cu yd cu yd a.square feet b.,square feet c.nourishment A.nourishment 14' ❑ Coastal Dunes cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 15. ® Coastal Banks 1.60 a.linear feet b..linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. Z Salt Marshes 0.27 a.square feet b.square feet c.square feet d.square feet 1e. ❑ Land Under Salt Ponds a.square feet b.square feet c.cty dredged d.c/y dredged 1s. Z Land Containing 4.36 Shellfish a.square feet: b.square feet c.square feet d.square feet. 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodi•es and. Waterways, above a.cry dredged b.c/y dredged 21. ® Land Subject to 1.60 Coastal.Storm a.square feet. b.square feet Flowage 22. ❑ Riverfront Area a.total sq.feet b.total sq.feet Sq;ft within 100 ft c.square feet d..square feet e.square feet f.square feet Sq ft between 100- 200 ft g.square feet h.square feet is square feet j.square feet wpoform5,doc-rev.6/16/2015 Page 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 MassDEP File# WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction BARNSTABLE Citylrown B. Findings (cont.) pro. is for 23• Restoration/Enhancement the purpose of restoring or a.square feet of BVW b.square feet of salt marsh enhancing a wetland 24. ❑ Stream Crossin s resource area 9( ): in addition to the sq uare footage that a.number of new stream crossings b.number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c (BVW)or The following conditions are only applicable to Approved projects. B.17.c(Salt Marsh)above, 1. Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order, the additional g ry fy amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of-the necessity of complying . with all other applicable federal,state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. The work is a maintenance dredging project as provided for in the Act;or b. The time for completion has been extended to a specified date more than three years, but less than five years,from the.date of issuance.if this Order is intended to be valid` for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. c. if the work is for a Test Project,this Order of Conditions shall be valid for no more than one year. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application:tothe issuing authority at least 30 days prior to the expiration date of the Order. An Order of Conditions for a Test Project may be extended for one additional year only upon written application by the applicant,subject to the provisions of 310 CMR 10.05(1.1)(0. 6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 5/15/2021 unless extended in writing by the Department 7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath,. paper, cardboard,, pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the. foregoing. wpaform5.doe- rev.6116/2015 Page 5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 LA WPA Form 5 — Order of Conditions MassDEP File.# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Citylrown C. General Conditions Under Massachusetts Wetlands Protection Act 8. This Order is not final until all administrative appeal'periods from this Order have elapsed,. or if such an appeal has been taken, until all proceedings before the Department have been completed. 9. No work shall be undertaken until the Order has become final and then has,been recorded in the Registry of Deeds or the Land Courtfor the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall. also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is.done..The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words;. "Massachusetts Department of Environmental Protection"[or,."MassDEP"l "File Number SE3-5561 " 11. Where the Department of Environmental Protection is requested to issue a:Superseding. Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12; Upon completion of the work described herein, the applicant shall submit a,Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work,shall conform to the plans and special conditions referenced in this order. 14: Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the,Conservation Commission in writing whether the change is significant,enough to require the filing of a:new Notice of Intent. 15. The Agent or members of the Conservation,Commission and the.Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours.to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. wpaform5.doc•rev.6/16/2015 Pages of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M:G.L.c. 131, §40 eDEP Transaction# BARNSTABLE Citylrown C. General Conditions Under Massachusetts Wetlands.Protection Act(cont.) 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18. All sedimentation:barriers shall be maintained,in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland.or water body. During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove,accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem. necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 19. The work associated with this Order(the"Project') (1)❑ is subject-to the Massachusetts Stormwater Standards (2)® is NOT subject to the Massachusetts.Stormwater Standards. If the work is subject to the Stormwater Standards,then the,project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented.in accordance with the.construction period pollution prevention and. erosion and,sedimentation control plan and, if applicable,,the.,Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required.by Stormwater Condition 8. Construction period. erosion, sedimentation and pollution control measures and best management practices (BMPs)shall remain in place until:the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a.Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment,the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications andd that. the BMP has been properly cleaned or prepared for post construction operation; including removal of all construction period sediment trapped in inlet and outlet control structures; #.as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized, W. any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater Standard 10; wpaform5.doc• rev.6/16/2015. Page 7 of 12 r Massachusetts Department of Environmental Protection Provided by MassDEP; Bureau of Resource Protection-Wetlands SE3-5561 LI WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE City/Town C. General Conditions Under Massachusetts Wetlands Protection Act(cont.) iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e))shall execute and.submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following: 1.)the O&M Plan is complete and will be implemented upon receipt of the.Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution"Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP,and that the proposed' responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure;of the proposed responsible party to implement the.requirements of Conditions 18(o through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one;lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan.and easement deed that grants the responsible party access to perform the required operation and maintenance:must be submitted along with the legally binding agreement. fj The responsible party shall operate and maintain all stormwater BMPs in.accordance with the.design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wparorms.doe• rev.6116/2015 Page 8 of 12 Massachusetts Department of Environmental Protection Provided by MassQEF: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 — Order of Conditions MassDEP File# Ll Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE Cityrrown C. General Conditions Under Massachusetts Wetlands Protection.Act(cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof,and disposal (for disposal the log shall indicate the type of material and the disposal location); . 2. Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request;.and. 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved.by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 31:0 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose,of the Low Impact Site: Design Credit(as defined in the MassDEP Stormwater Handbook;Volume.3, Chapter 1, Low Impact Development Site Design_ Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing,constructed around stormwater BMPs shall include access gates.and shall be at least six inches above grade to allow for wildlife passage. Special Conditions(if you need more space foradditional conditions, please attach a text document): 20. For Test Projects subject to 310 CM 10.05(11), the applicant shall also implement the monitoring plan and.the restoration plan submitted with the Notice of Intent. If the conservation commission or Department determines that the.Test Project threatens the public heaith,safety,or the.environment, the applicant shall implement the removal plan submitted with the Notice of Intent or modify the project as directed by the conservation commission or the Department. wpaform5.doc- rev.6116/2015 Page 9 0(12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 MassDEP File# Ll WPA Form 5 Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, 540 eDEP Transaction - BARNSTABLE Cityrrown D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The BARNSTABLE hereby finds(check one that applies): Conservation Commission a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a.revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order of Conditions is issued. b. 0 that the following additional conditions are necessary'to comply with a municipal ordinance or bylaw: BARNSTABLE S.237-1 - 1.Municipal Ordinance or Bylaw 237-14 3. The Commission orders that all work shall be:performed.in accordance with the following conditions and with the Notice of Intent referenced above. To the.extent that the following conditions modify or differ from the.plans, specifications,or other proposals submitted with the Notice of Intent,the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space for additional conditions, attach a text document)- See Pages 10.1, 10.2, and 10.3 wpaform5.doc• rev.6/16/2015 Page 10 of 12 SE3-5561 Name: Paul&Carol Embree Approved Plan= Revised Site Plan dated 5/7/2018(Sheets 1 &.2)by Raul Lizardi-Rivera,P.E. Special Conditions of Approval I. Preface Caution: Failure to comply with.all Conditions of this Order of Conditions may result in serious consequences. Such consequences may include issuance of`a Stop Work Order,fine(s),the requirement to remove unpermitted structures,requirement to re-landscape to original condition,the inability to obtain a Certificate of Compliance,and more. Tke General Conditions of this Order begin on Page 4 and continue on Pages 5 through 6. The Special Conditions,if necessary,are contained on Pages 10.1,10.2 and 10.3 All Conditions contained herein require strict compliance. II. Prior to the start of work,the following conditions shall be,satisfied: 1. Within one month of receipt of this Order of Conditions,and prior to the commencement of any work approved herein,General Condition Number 9(recording requirement).on Page 4 shall be complied with. 2. It is the responsibility of the applicant,the owner and/or successor(s),and the project contractor,to ensure that all conditions of this Order are complied:with. The applicant shall provide copies of the Order of Conditions and approved plans(and any approved revisions thereof)to project,contractors prior to the start of work. Barnstable Conservation Commission Forms A and B shall be completed and returned to the Commission prior to the start of work:. 3. General Condition No. 10 on Page 5(sign requirement)shall be complied with. 4. The Conservation Coininission shall receive written notice.one(1)week in advance of the start of work. 5. The Natural Resources Department shall be,notified at least twenty-one.(2 1)working days prior to the start of work at the site,to inspect the areas for shellfish. If deemed necessary by the Shellfish Constable,. shellfish shall be removed from the work area to a suitable site and/or replanted at the locus following construction. The foregoing measures for shellfish protection shall ensue at the expense of the applicant. 10.1 CoastalRevised102317 6. The applicant shall obtain a building permit for the proposed pier from the Town Building Commissioner. 7. Sediment controls shall be installed as indicated on the approved plan prior to patio replacement and replacement of stone steps. III. The following additional conditions shall govern the project once work begins: 8. General Conditions Nos. 13 and 14(changes in plan)on Page shall be complied with. 9. General Condition No: 18(maintaining sediment controls)on Page 5 shall be complied with. 10. The Conservation.Commission,its employees,and its agents shall have a right of entry to inspect for compliance with the provisions of this Order of Conditions. 11. Unless extended,this permit is valid for three years from the date of issuance. 12. An Amended Order does not change the original date,of expiration of this Order of Conditions. 13. All areas disturbed during construction shall be revegetated immediately following completion of work at the site. No disturbed areas shall be left unvegetated or urimulched for more than thirty(30)days. Mulching shall not serve as a substitute for the requirement to revegetate disturbed areas at the conclusion, of work. 14. Salt marsh shall not be disturbed. 15. CCA-..treated piling and structural timber greater than three inches(Y)thick is allowed. Otherwise,no CCA-treated or creosote-treated materials shall be used. 16. Grated decking shall provide at least 65%light penetration. 17. The seasonal float and ramp shall be stored'at a suitable upland site. Floats shall-not be stored on banks; beaches,marshes or dunes. 18. Float stops shall be installed to keep the float a minimum of 18"above the substrate at low tide. 19. Permanent piling shall be driven into place Some initial pilot.-hole jetting is allowed. The following special conditions(in italics)shall govern boat use at the approved pier. These conditions shall continue over time. Note: for purposes of this Order of Conditions,the term"pier" shall refer not only to the linear pile-supported structure,but also. to any of its components or appendages,such as the tloat(s),ell,tee,ramp,,outhaul piling,etc. 20. Motorized craft shall not be used or berthed at the approved pier. CmtalRevised 102317 10.2 21. a small sign shall be displayed at the end of the pier,facing open water. It shall read,: SE3-5561; 624.Poponessett Road Limitations: • No:motorcraft allowed 22. Any desired pier lighting shall receive prior approval of the Conservation Commission. 23. Lead piling caps shall not be.used. 24. Access shall be provided as a means for along-shore public traverse. 25. Work on the pier shall ensue mid-tide rising.to mid-tide falling,or as otherwise necessary to provide a minimum twelve-inch(12")clearance for the,work barge above the substrate. 26. The applicant may maintain,in conformance with the plan of record,the proposed pier and other structures given in the Notice of Intent application for the longevity of the Order of Conditions(3 years). Thereafter, maintenance may be extended through any forthcoming Certificate of Compliance. IV. After all work is completed,the following conditions shall be promptly met:. 27. At the completion of work,or by the expiration of this Order,the applicant shall request in.writing a Certificate of Compliance for the work herein permitted. Barnstable Conservation Commission Form C shall be completed and returned with the request for a Certificate of Compliance. Where a project has been completed in accordance with plans stamped by a registered professional engineer,architect,.landscape architect or land surveyor,a written statement by such a professional shall be submitted,certifying substantial compliance with the plans,setting forth what deviation(s),if any,exists with the approved plans. This statement,along with Form C,shall accompany the request for a Certificate of Compliance._ 10.3 £oastalltev'ised i 023.11 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WLIJPA Form 5 - Order of Conditions MassDEP Fite# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Barnstable Cityfrown E. Signatures impi>,tunt:when This Order is valid for three years, unless otherwise specified as a.special MAY 1 5- 2Q'18 firing out forms condition pursuant to General Conditions#4,from.the date of issuance. 1.Date of ssuance on the compuf�er, Please indicate the number of members who will sign this form. use only the tab key to move your This Order must be signed by a majority of the.Conservation Commission. 2.Number of Signers cursorr-do not Use the return The Order must be mailed by certified mail (return receipt.requested)or hand.delivered to key the applicant.A copy must be mailed, hand delivered:or file' nically at the same time with the appropriate MassDEP Regional Office.. VQ Signatures: Ion .� ❑ by hand delivery on ® by certified mail, return receipt .requested,on . . MAY 15 2018 Date Date F. Appeals The applicant,the owner, any person aggrieved by this Order,.any owner of land abutting the land subject to this Order, or any ten residents of the city or town,in which such land is located, are hereby notified of their right to.request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions.,The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form,as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this. appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding,,means the submission of,written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the:wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection.Act or regulations, the Department has no appellate jurisdiction. wpa5sigs.doc• rev.0212512010 Page LIof I Massachusetts Department of Environmental Protection Provided byMassDEP: Bureau of Resource Protection -Wetlands SE3-5561 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# BARNSTABLE. City/Town G. Recording Information Prior to commencement of work,this Order of Conditions mutt be recorded in the Registry of Deeds or the Land.Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final.Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on this page shall be submitted to the Conservation Commission listed below. BARNSTABLE Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: BARNSTABLE Conservation.Commission Please be advised that the Order of Conditions for the Project at: 624 Poponessett Rd.,Cotuit, MA 02635 SE3-5561 Project Location MassDEP"File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and,has been noted in the:chain of title of the affected property in:; Book Page In accordance with the Order of.Conditions issued on: Date If recorded land,the instrument number identifying this transaction is: Instrument Number If registered land,,the document number identifying this transaction is: Document Number signature of Applicant BARNSTABLE REGISTRY OF DEEDS wpaform5.doc• rev.6/16/2015 John F. Meade, Register Page 12 of 12 Town of Barnstable R�cE�P�r 11Kma AMSTABLE200 Main Street, Hyannis MA 02601 508-862-4038 Application for Building Permit PP g Application No: TB-17-3396 pate Recieved: 10/3/2017 Job Location: 624 POPONESSETT ROAD,COTUIT , Permit For: Building-Insulation-Residential Contractor's Name: Carl J Rebello State Lic. No: CS-084358 Address: Swansea, MA 02777 Applicant Phone: (508) 567-4109 (Home)Owner's Name: COLGAN,ROBERT T JR&ESTELLE G Phone: (508)294=4712 (Home)Owner's Address: PO BOX 86, WRENTHAM,MA 02093 awe �> Work Description: Crawlspace walls& Vapor BarrierZE 51 s 1 UJ ma's Total Value Of Work To Be Performed: $6,533.00 `LAU Structure Size: 0.00 0.00 0.00 Width Depth Total Area I hereby swear and attest that I will require proof of workers'compensation insurance for every contractor,subcontractor,or other worker before he/she engages in work on the above property in accordance with the Workers' Compensation Acf(Chapter 568). I understand that pursuant to 31-275 C.G.S.,officers of a corporation and partners in a partnership may elect to be excluded from coverage by filing a waiver with the appropriate District Office;and that a sole proprietor of a business is not required to have coverage unless he files his intent to accept coverage. I hereby certify that I am the owner of the property which is the subject of this application or the authorized agent of the property owner and have been authorized to make this application. I understand that when,a permit is issued,it is a permit to proceed and grants no right to violate the Massachusetts State Building Code or any other code,ordinance or statute,regardless of what might be shown or omitted on the submitted plans and specifications. All information contained within is true and accurate to the best of my knowledge and belief. All permits approved are subject to inspections performed by a representative of this office. Requests for inspections must be made at least 24 hours in advance. Signed: Carl Rebello 10/3/2017 (508)567-4109 Applicant Date Telephone No. Estimated Construction Costs/Permit Fees Total Project Cost : $6,533.00 Date Paid Amount Paid Check#or CC# Pay Type Total Permit Fee: $85.00 10/3/2017 $35 00 Paypal Paypal Total Permit Fee Paid: $85.00 10/3/2017• $50.00 Paypal t Paypal 1 -14 ` , Cam\ /'l � `• /y t �' 'l7`T � �,.�='�'' •gym '•,, A � b � / b �d L'a At �'' 'cal f b/ (` 1 I / f '! �r. �!�1 I 'r/i '�\'� �i7✓ 1 J� i.j� \�1 ! i ............\ 1 '•J c R f r / �y I' , I / 1,'i•f vz 1r Z a Assessor's office(1st Floor): 1C221 CS)Assessor's map and lot numb o�THE>o SEPTIC SYSTEM MUST BE Consery�ation(4th Floor): r, a a INSTALLED �� COMPLIANCE Board of Health(3rd floor: S DdS17T�DLL Sewage Permit number 1 14 WITH ` ffLE 5 � rua Engineering Department(3rd floor):' ENVIRONRifiE TAL CODE AND 00�0 YA'1 d\,� House number 'TOWN REGULATIONS Definitive Plan Approved by Planning Board Y 19 APPLICATIONS PROCESSED'8:30-9:36 A.M.and 1:00-2:00 P.M.only TOWN OF BARNSTABLE s BUILDING INSPECTOR APPLICATION FOR PERMIT TO TYPE OF CONSTRUCTION 19 TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: &�Location Proposed Use Zoning District F Fire District CD Ica i / Name of Owner l�/�2Gfit/� / . Address- Name of Builder /�' ��/` /L,C' Addressi� Name of Architect 6,1//11�14?l � �� Address ;Sp .% Number of Rooms O Foundation Exterior Si` �' Roofing Floors lle�� Interior H"� Heating Plumbing Fireplace Approximate Cost Area Diagram of Lot and Building with Dimensions- Fee OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name Construction Siipervisor's License y � EICwHBLATT, URSULA No - 'o Permit For BUILD DWELLING . Location 624 Poponessett Rd. Cotuit Owner,Ursula Eighblatt Type of Construction , ' Yf. � t _ 1 Plot Lot #6 Permit'Granted, June 23 . 19 94 Date of Inspection: Fram 19 _ Insulation eo 19 Fireplace; j� 19 Mw Date..Completed- /d t'� 19 { M i �� gyp. `F • 4.#f w., i i 1 �'- f a t I'.a., r i� 1 .L I 4 j+s, i p ; ` TI T'a. 'I ..� ! 1.: y ,(,!V` i '.•� + e t,T jI 7s ) i We Xksr27 1. ' /gyp ti i :M1 • ' : . • ' � �I ; f , - r ._ .. So NCO 1 e T._ . } ESNOF f , I i t F f r f ••••,,nn I F t s GE, T%,c jE0 OcP/-.O7- �L_'4�c / Ti,'-Y T•-I�JT T,�/E DwKL�c/G .LaC.4T/G�t/ ; S14/OWN t _' . :7 r-•�/�5%OE.C/�/� A�/O Cl,-, I G' `,� ,$'ETBi4 t , =Ec�U/.2Ei�1EN7-S o.c' Thy-' 7"oWit/41=7 ; 0�-`•4i(! .2EP'E.2EiC/C� i Oc.4 7ez::> fyiTh�/�c✓ Tye .�LoaaPG4/y } BA XTE,C VYE /it/C• B.aSEO dit/. .4if/ t /NST,2U�l.�it/T,$'U.2YE'}i T,yE: l �2EG/ST• S,JAIV S�ULa --V,07 8� dtSTE.2Y/.C•C a ,ASS. OETEr/iC/E-A-aT .,N:':JJ'.eY�,s+itS�L •L.4Y 'v x 'J r ,. i �• G i n i ' ' .DEPARTMENT OF PUBLIC SAFETY .•� " 5 ONE ASHBORTON PLACE tr i �'L y t s BOSTON,MA 02108 , I , s F , �, i { : 5.: rIt t + !! 3 a �, . 5 LICENSE? r t %' . Y CONST.R. SUPERVISOR0" ,;t' a ` EFFECTIVE DATE 'd LIC-NO, r t t c } ;5 "i '05/31•/19?3 047b93 ,I i , , j.i, F�r 1'd w.m,o -o -0 g :STEVEN P -MCELHENY ', , , � � =.'d ,` ,� , C0TUIT NA4 07635 t t)r ` .. � � - o 1 t. Z } J'r t y.t d._-'t 3.�7 :CI �, f'1 c•t NOT VALID UNTIL SIGNED BY LICENSEE AND OFFICIALLY t 1'. (L 'cts- ,--c N t o (, ' , i , � STAMPED OR S10NATURE OF THE COMMISSIONER I F+ r ' ' `X x�'.0 �...v,.y [[yam, • , I y :l t .. Crs :--t ,,a., is CG F I 519NATURE,OF JCENSEE < i .•f r q i \ ' 1 4 t I I t ` .'I SSI ER r I, ,tt G . 4 I 31 1 I t , ) ' i 4 7 i t� i i i�Y I t.. 'ST( t �' ..I I {} \ j ? ' -!lir 'i ! ,' ' -JL' ! �I} I)1t 1 /5a+,i )li... }� `_+ r{' 51 t S I 41 �'1 - t , - ti.. ' a ,I )tt-u , {11w t. �i� �.�it >Ii.la t�; i,T '1 sf t'1 ` t • , >'<t�1 ti5 1 r t _ �� 15: 1, t .y�rp,} i. -,,t1� ,1,11i`2;;�( i^I Jf,1.1{Ftl �1�1t 51f{ 11;�tr ! Ilc r Y+Y3..j, > 7 I 1 - , t I Il i 1 r,{ e4a Ar�tia4 r1) 1 ') rr tl{2}v { ' 'I ) + -1 I z II ti, "rl i Ix ,1'¢tip l-Ij�y� l9,A1pvN f �t1�4t rt!�3?r1 `y,tri�it t1 J! ,y} �1 '+i: i I ,f f FF I r{i iW i1",V nri r � }� , ! I I 1 + t- t I I I j i, J , i i I lF1 !i ,(�t� I�.t ll,�7()1trS� YI� f 11 ,•q I7Jk F S P 1 r i I"1 t 1 1i.I, 1ii r 55 �,I.t, }4, 74tt�11 t{ Jt1[�' 'f4t j +t llil J,5, a ){.,i. ,,9 ,11+ t ; rfr f r/ >t F.��iFl ir1� t'i til 4 ^,I�+iSFP�12 1i}Ssrt�d r i 4 r jr, 1 t ) r t+s ' ' 11 �I' J}r I v' rr`11 ti §7 S Y r411 thLR rik JrilIn . .. iif. j 5 , t,.! , ` 5;,a� `.i$'t t 1,}t�i } Y. , y)t7. r rG FilySv, p ply r�ks s+ .I ' ,^ ` + 4t r {'A, ri rwl{\<aYift rt tt F�,V7f�cy{erll ft�1 w , i r, �' (! f i 3 - j ts• Ii ,�' �tY,�1) t r.r�[� llt pry 1 L}'4f li trl fi� .`t (1 F - .,' S `I ..rr, �htl \I +Ft n F Fi+ ' St �i{`ttlt i 4ryF G:)r.�.( S = 1-SYi l tt .-trU l t ' n �, It 7".. N,j .a cor4�jtk}ti) ')ir�')n) i t , t. tt [ 5' t I v t113�ttyla` r..l'�)III l,lSr')Y it�f IF.Ii ', ,, §IS 11.I,' I r �t rjli! ! ,.i . )• 1 -11 s A)..Sl s It . , i r�x 3 y }I i( 1 5 I. - r 1 r - r : 1 { t11 r f I ) tl f ..Ji ",.II ,`l,_,•t 1t I}j.�FJ,, �t�°- ( I C{ SI ,'t �+ d i ' �, + F��+ tJC4.lr.`�4{ r}}( + tc nr;Jri.t uA} r tad/r. "c.ii. t y t .'- ' q,} � 1, f}Fc 1 h. 1 L-1 , '; {IYrL,r )' t �Lry t Ye1,1_�tyi7iy 1•i,,(asft,� t )it_t tD�� ,^J ;IJt , 1t+P x')y;1F+�1 t + . ' i t .1 I t o trf ) i �'(vr t Z-ri t . i I tl w " J r t�. i r , -z ,1�Y 1.1 t �t�,yj'fa,}I��tY�It�j ' 3 r F !1 ,1 , t. ' t + ? . F. wf/i h TYf t -.'7K I II f,Zq hj( p i t r 1 j1r t i VA I I, tF (I 'i L r It'!ti rSx r1 y 1 r , G� I,I f v 1 1 J.,td 4�# 1 `i r i�t�yf r�Y w'I i 1 k+ rll r c sl j,r li�tlutf � ��se'y}rt +,�++ ,�h rt�yjnil > '<. a�V `,� ! 4 :y , ,r 1 ' I- tt , J , 'i- .1; k 4 , t c+ ..IJ I p rI' S f{ IF.I -I r� ,Fa,l ! F I r, . ] .t�.. t ' i, I xl.�t t 7{j ,'i,1�L f�-ht1) J,�t t tYra {�,1!(r. [t,r v1I "l. 4IE' J.I I )t }; +�) f , DI1 r t { pig I n t k ri, r 3 t . ,, - , 1 1 i te,�s((tEm."+�},�{�� l }ly,rt� j,.fr': ,+ �1G,I k I i + F,+.'il�i t1 '��.1+h�My'' -_ N-I4 t'H`�`.i}( '�t.Jy t.kj ifl,`Ki,l#5 41 } 'f 7 r ' �1 7 }' tr,fY,��`i, .tl pia k }'SS ,f T , J. 1 ,:i, t ' t•`rS3�1j1 Jt5 :gmG'[}�',n'z�lt 1,tr 'PI• 11 5.,Irt+ tt,i,;'t'k ? rt-..Jrt' +lrl+r. , t; i I i 1 i �I t Y" !i 1.i j a,'ij ✓'. lti t:i'rii b,7 }c'1}!},�f ,.I;��,^�>?'}�`l'T�,'tC+,IDS 1'fflr k if i&'-111{;1 vrtl J'I fiI' tt r., .. rt + ' rr i( ~fir ,. 'tj(.1J �Il C.l t'• J ,ti V.,1 os I�><i t�r ,h t[.. i J ,. - i;s ti t }ti J l I' t (t l I yM 11, 4 y �t t < I ' t\I P .S Lr L4..,'. t• }J111 �II,F;.:�/xyi+l'{'.i lJ J�A.IZ '17�.7'�'t�1�iJ'J.i?., ,�I 'i:,i�F�tP',i;.��i'i tt lj S. f 1 l� 7I' 1. ,,', t.C! { ,,I f l 7LpFi lh o�e� ) ) )I i�} s m Ft' t( i' i \ 1 \ , I+ - 'Ih r 11 34ti 17ii itbJl°t'I f':i+ .. INt` i'y x 1 4' f I 3 !r ',. I - , i. J I I) itl �.jy' . ! .µ. I+, 3 ji.. ) , tli )i frr ('1 j).l1 r,,' r• +' i F tt F. 1-I `, y�rt.'t i .rA�J ...,µj�lY'1�V1� + .,Ir�,t ,at 1}i st1, - str i 7.j 't }_. i t ,i 7r 1 5CS'1 ,{��.+ �t c (,I!a, r i C 3 1 L+ , t J r 11 it. 't{ , 1' ' 1 i ,' _lrp• t 5 ' i1,iF�Srl�rf.LL-u a' t�t1 �� i�r Its't �'{y>4 y, ir141 ': II '15,' t ,. �: .i l} - 11 },e, ,l t S 3F>S} t-�e {1}•�l Gt+l} G' , f..i.f rt.t(lti ,Jl I. i ✓1tif �,. ✓J-t;f. } ,: +., _ { t_t h r 1TZ p Lt by ,c i(4L :F�Ati3 tie F1 f rrc Sr yF'� ?tj tad .S.4i�'I �" } r'. - r, ii ,� ,. 1 .. tr ti, ., �-.iv{�ti l 'r'r-t'i� i-�'tf`t:{7�, ��- rt'i�'ii' ✓<r )g ;!X i Jti+Yilv C I- i'. , i' EE ,t L xJ sM1 r1 C- r 1t G n I�t i --,.y r r)Sf P,c i;'J. M} � ;,�t )i r+t ilk j4 f L {,£t +� r' 1'IFr fY G{ 3� ,� �;., . I. {,.,.-. �+ t ,.�..i I 2t: , '�f.t }3'�rt.FI.i �,it rii';p{r 'FAA7fd'��Gy4Vr yl''..r'�j- rt��{j{+]i1f +13 ,'1 1t!t,:}' 'r'i,'+,, t 5 rl ':r... \ ..1 < ,G,. x. t!• .ir "t laj ,, ,W( A�k Y)Yfr1�2'1' Y`'�",al of i t.,. s}'rw a .Ir:.S 11,.I,,. r P S, t Y + L y e t�{1 tt 1 r,1t rlf&, i i 1 :,� l 1� _,jl I a + +. C `, �i r 'ti rF s�;C f 1 -�'tT I ' I J r tr,'"t iA J, 1 i Py .IiJ j, , fl `F. g'ila' u s d t'J i I r- r r rr ..I I -S'. rF� JY?s l .. ,a.01 Y� , s fly i t f, S )i r CGS r f}1.l .0 ?�",1 jf� .; i 7 j,i i .t r 1 r' 1 i+ w4 ! iarac,3 'ttn' S :f�Y �xi+ rr fltiFuy if{t r 5 Y t rr y �'- i , rfe�.}''C ��-rn(l4F1' '(�;i�'!:}, ofFZS Yt5+ 5f�tijJti iyj� ,)rntl-,to,t z. F ) -(' x�., -1. f 1:1 tf r-y. '. 1 r11i! t f{ {1 1 'f fl ( a'I / , ..I , t Y' ;� i} iij IF dd �fl ,,14 tt,�,). lY, i s .. , } ,f L sr h l i r , ( +ts:. (r {1 I G. 1 , ,, - . `Is li .14+` i",'�i C,s ii ,i )��)4t''i!I'}!Y K#,(ru1 .. ',rill t/r Y'..I}i Ilx._,i t f /� ( + .,. ! , 'G ,.}�- 1r t/trpr.�.11'�i11i 41 1 t, ! .', t, I I i. i. , ti 11 t al Its ]j'it T3 t,I•KWjI'tk ltt; l`, (t t2j7i i.{, , GI ".', t , I 1 * jil 1 4 + t :.,t't,vl,f 4,'i� 1k,��t 7'qr -j,yEY(v.,$r jj d� to t fcj 1 i r I (+ j.� ; yr:` { !�! '+ rF Ay! 'i+8,, LY iyr ]14� 1+t�, �4.Ib� 1�{r. , ,, I it r+ x + Fi U y9 t,>" '� !k'f d P la atilt t5511 ri.; , F t - , , C.1 t .1. y , ,Ir ( t l s, j sl 'I:S'r k I1 y tFj j - �i fJ t� ? ' s �L�tt' t', �,g r � x 9�1t f 6')F I ,j I ,?' I , f .i 7+.es 1 3 J "#•• �•tt j { r t},ti+,F4.i r� 2r7 I' raf},;( , i �'— l I : t p �rl F 4,{f , � i,\ ly tq,!(,1�,F• ig � �,'.krC�S �F�, ,Y 1 } 7tfk, `� ) ] ( , t r - •' r -C,r rhTJiY I �I••r i�*,+1•'+r,>i, y7fFF'7t. >l✓+' ., t11-j k 1 S 1 t 3 t , :( , cI •51 +I!' {i-�y14!r i V4 q J�') 7t Y) I ).t1 rj 5 -'', t -<# I C F '�� lard t �i'0xV's I ) ✓k r.}7r af t ,r ' I,'s t t - t '-li 'iZ Z, al t t, ,(ii[:I I ( "i1,t j a itltt,l t t� ate v` uk.. �, .})2, III i i. yyt +,, , .I'• i.: t ,9 i 1.1'I}}�4 t )r(�' vI.�' X� ly 11'.. aFl1`ll�t�[ Gi3i,`�Ci,i} 57 r.'I �,}t,7 dj1 :'r e I ..t .. ' i 1 ,ti it 1 i F i! S°� vc �I I 0 I r 4 I f x!D' {, 1 'f I h i�++'{irT} N � 5�1 1 1 I�t r >� 4y;w a r'o YifA li�l l� (14`jtl yet,{ ll t l t t Y�' l i . 1 t YZl PI LEI!(, -' Itj ,I llr( { t 't+ }' l,}.. ,. 5 .4 u ;," lht J •I(tlrfx,'I�fSt k7Gntitl'J� I }R{,Pfi11r+{Itftf)Qzt�..".'. kl,�IP lttS(a)t y F k,:.,{,f� I••�i�.,i 74}1' 1 ,III l I� 1 t tr ( ,:'�,I)!. {1„ t U - t ' ( r• i J:_1,�ttiI,-11- l S IiFI— + � J). 4Jf � ' t a'7)Y4Y t •+ t 4' t 1,1 o+ty4,'. _j,l[Ii i. 1,,y fsW ri'It 4'.'hl ,IIV si it I -If r , 1 -�. t .i. jdY1r1�'.'iti3i ' i ".l.( ,il,<r)< 14' rS ;x r: ' a1,1��I i 1 1 r to liJi ,+ t. l�3 �{P i41)I� � ?+lt psI i -'t 1 1 '},i L Ik L ,r I '1 ,I ( ). t: r ,� tf'7' } I +tiT tti-il I , 1: r t r r ? I r ��tu(jF'�i `F(�txG 11�+°{, '� tr trI �. I �.� 'I ' tl _, I I i. j t ' t-, t , ' 1- ),.Wjy kti�'r`yyl�y�' ftt}tK'S}t)Ft JI(! i) .i!I 7't; = lI1, l 1 , . -I- ,F , '!. ). J}I rl'�r;4 pf.ttl'Y ,�1\ll r{f, , i ,Sl� 111 t.it I +f J:• s Y .,t .4. s..: . . ,.';Ltk;, , _."�r{1+•,.1�11.,1 F .,`..;: .t I 1 f: .'' ! 1; I .{xi lrt7r4 a.ey .-sf i ' CC CO MMO i H Oi A �A UV i i V C it L" .. 2 OEFAIO'IvME1�''I'OF L�iDiJSTRIA1i►ACCIDENTS� : 00 WASHING TON~STRF�T r BOSTON,'MASSACHUSEM 02111 a `` fames J Gamooei _ . Car::mssione: WORKERS' COMPENSATION I S-TRANCE AFFIDAVIT r (licensee/permits with a principal place of business/residence (Ci1#SLaae/Yip) s: do hereby certify,under the pains and penalties of perjury,thae - [] I am an employer providing the following workers'compensation coverage for my c nployces working on this ` Job ; - v 51 Insurance Co m any Policy Number r O I am a sole proprietor and have no one working for me. [) I am a sole proprietor, gcnc-Ij contractor or homeowner (circle one)and have hired the contractors listed below• who have the following workers' compensation insurance policier. - Name of Contractor Insurance Company/Policy Number. 1 lame of Conmaoi Insurance Company/Policy Number t . Dame of Contractor ,- 'Insuranee Companv/Policy Number _ Q 1 :m a homeowner performing all the work:myself. NOTE .Plcuc be aware tb1L wb11e b0[ncoMrners who employ persons to da 1n31IILCII2IICe.construction or repair wort;on a dwcliinr of not more ban trrcc unit in whicb Lbe bo=Co1wncr use resides or on the grounds appurtenant thereto arc not reneralIr considered to 6c emplovers under the workers' Cotrpa rsation Act(CL,C 152.sect. 10)),application by a bomeowoer for a license or permit may evidcrcc tac leral sutus of aII employer under the' orkers'CorapcnsationAet 1 u ccr_;.�d tra;:cat% cr t s::u ncr;will be forwa c=d to the�cna:r..cat or Indus;..z 'Aeddeiits'Ofnee of lnsurancc for covcragc. 'vc ..,s:ion arc:-- ;o sr_c:c cove:-ec=s recuizc^ cndc:,5cc:ion 'ca'of.%,G*!c==teat;to me imposition of cxir i--tal..peraluc.� consist:£of:imc ct,u--tc 5, Guf::.cor imprLonm=z of ua to one yc;- nc c.s pca:::ics i�'tsc form of Stop:4iorl:,Orcc :ac a, r fine of 5100.00d2y a€:ins- C. Signed this day of 19 9y r >'wi.�.` - :+• ,'� '�'i'!t=>T'+P,t. z>•+Vw7':—,V^.'�J`� •r---.�. ^,lc-G7� »t•i*�w�. -.+4s-'--+s:.�Ts y s.�.�' =�j _ •�.i �i•�' _1.'::?�r._ '? -sa� [t•ef — .:.'-_ - .i _ •e �- - -}3.6•. - ..ia- --o1�s `'rs —.e'�•e "• t:'_'"".'�'_ _ �s_ _ "-T�: +.+q:'ars�n im -------------- qp IOC,. ,:••• I r'r I _�. L.Lrx� �l.ii Fo,R4:vs7c..•1 1 � l icn.wvL z z omt; or_ '-HF++ rvtw4rxnot4 •I;_i'-Y. __ _ w, I - .. � .. ..FXISTN•Hj CIItLS:>i7'1LG � � � I I .� - ' i ' -C" - �---lt_i' w.ess' ' i -- � i --'• - ' �3e� �� wKLu J ^_j 40 ' , I .� � c :.�AJLSrir.L � • oe..w«. ww...l-'—�� _ a -- 41 - �'`- v ilE3L_ATr.:H0USG. - - .. -. .;La rt�o'�r-t•2�T.t.R LOT�IT Mrft. ` W-Xiam F Rosiensky�Artl>itect a �;,_���1•��•_, t. •a::•v�._. i - r..�...a�...a.L�.�s...maoa.e.frw_-. ,I ----Y�'; �'_.�`;•:�:�.: 'r��_'-.`-'���?::r �-r•• ,9Z �.-- :x;,[.�;�: =i�-"1'�6A*'s'€"ir' I _ �:,• � - ... VW{{s�� a ��t !' f N "'f-y �-�r—t'h'lu ��•�cl�r•i'--��isrs- I _i 'It�� __ w_+� _ -ro } t6 0 .:) i t t a �C.•.1s►►ar.a_ f .r +r c — F:I _ i. -J. -tt 7 M F .-+ � � � -��- .�: ,tar F./ .1�_ � II -� .. � r.�s•M -_ �_ � �j ..� � � .`� Ll .' �� �-,_ � f's �—` -...ems r iN•u-� � .,•w�lr<- ! ,_ _-_. _ _-� _, F _j , +- a.ti. ..i �� -•s 7 - �..[ / F'y; y� ' is •'I -. —�. - , r �j f j� - �t -. _• t4 � _' ��,i f\ Iba 1 s ,� I i :�'�+ S l �- - - - ifil -' -1 � 1 ` � h ...�';tf - � `I/ � �1'- �� ' '.I ►�.�.Z -=uv.�c.l ...r`e —.-_-. - .t'1 - - ;� 1 . _ - •4 '( "I - ..-,Y r �y i. r�sY.: M ~ _... 1'� � I • � —•' l :g. 1',, - ��- �- - _ �- d�1T S ..-TIC- --'• =� , - ' - ' fil 41 -s\• o o _ c,'-o• .--'r-----�._` t , �ItZ ST F;_ U- try a t�Qus ;; ,,�•�" ^ � 4 P9Pa•G s.4T c ter_ - .�: ,JF•.f- _ - T.�tit:b- �n._tr►:••�_L.vVc�L���`:?a��.a •� .._ -_ .. �_.-,"_�:?. _ _ _. �oF�HE r Town 'of Barnstable *Perml-t# 1131, Expires 6 months from issue date Regulatory Services Fee BARNSTABLE, e- MASS. �' Thomas F. Geiler, Director 1639. TE�MAi wilding Division IaPR Q 2 ?GU „ Perry,CBO, Building Commissioner �OWN 200 Main Street,Hyannis, MA 02601 ®� BARSlSTABLvLww.town.barnstable.ma.us Officc: 508-862-4038 Fax: 508-790-6230 EXPRESS PERMIT APPLICATION - RESIDENTIAL ONLY Not Valid without Red X-Press Imprint Map/parcel Number_-4�2-rl -7 Property Address D Ol�YS t /" GO vi� d 31 Y<esidential Value of Wor �5`Oe�a Minimum fee of$25.00 for work under$6000.00 Owner's Name& Address Sq� S�J�G� 41,y C'ontractor's Name Telephone Number _ lomc Improvement Contractor License#(if applicable) Construction Supervisor's License#(if applicable) ❑Workman's Compensation Insurance Check one: ❑ I am a sole proprietor V, am the Homeowner ❑ I have Worker's Compensation Insurance Insurance Company Name _ Workman's Comp. Policy # Copy of Insurance Coiapliance Certificate must be on file.. Permit Request(check box) /Re-roof(stripping old shingles) All construction debris will be taken to^AG,, ❑ Re-roof(not stripping. Going over existing layers of roof) ❑ Re-side ❑ Replacement.Windows/doors/sliders. U-Value (maximum .44) 'Where required: Issuance of this permit does not exempt compliance with other town department regulations,i.e.Historic,Conservation,etc. ***Note: Property Owner must sign Property Owner Letter of Permission: A copy of the Home Improvement Contractors License is required. SIC;NA"i URF- >. \4 I'I II.I.S\Pt)RMS\building permit forms\EXPRESS.doc Revised 100608 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations, 600 Washington Street Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Leeibly �Name(Business/Organization/Individual): S, f�jy� � Address: © s' City/State/Zip: ' G Phone.#: .Are you an employer?Check the appropriate bog: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the stab-contractors ..2:0 I am a sole proprietor or partner-' listed on the attached sheet. 7. .❑Remodeling ship and have no employees These sub-contractors have g.'❑Demolition working for me in any capacity. employees and have workers' 9. ❑Building addition [No workers'-comp.insurance comp. insurance.$ q��] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3. I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself.[No workers' comp. right 6f exemption per MGL 12.❑Roof repairs insurance required.] t c. 152,§1(4),and we have no employees. [No workers' 13.❑ Other comp.insurance required.] "Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy infomrdtion. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the subcontractors and state whether or not those entities have employees. If the subcontractors have�mployees,they must provide their workers'comp.policy number. lam an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure io secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine tip to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains-and penaMes of perjury that the information provided above is true and correct Si tore: Date: Phone# L Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health '2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone M Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their.employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied, oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more -of the forego mg-engag in a Join-en rpnse;and inclffd g t ie legarrepresehimtive3BfT_deceased.-empiYer,or the___ _...._._______7. receiver or 6ustee of an individual,partnership,association or other legal entity,employing employees.-However the e owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced-acceptable evidence of compliance witb the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall . enter into any contract for the performance of public work until acceptable evidence of compliance with the ins-unarice requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply to your situation and, if necessary,supply sub-contiactor(s)name(s),address(es)and phone number(s) along with their certificate(s)of insurance. Limited Liability Companies.(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial 4( Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete'and printed legibly..The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant Please be sure to fill in the permnittlicense number which will be used as a reference number. In addition,an applicant that must submit multiple permittlicense applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address" the applicant should write"all-locations in - (city or town).".A copy of the affidavit that has been officially stamped or marked by the city or town maybe provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. Anew affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (Le.a dog license or permit to bur leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to.thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call The Department's address, telephone-and fax number: T a Commonwealth of h&mohuseM Depa tment of Industrial Accidents 4fte of Investigations 600 Washington Street Boston,MA 02111 TO. #617-727-4900 ext 406 or 1-977-MASSAFE Fax# 617-727-7749 Revised 11-22-06 www.mass.gov/dia THME Town of Barnstable Regulatory Services ' Thomas F.Geiler,Director 16 Building Division Tom Perry,Building Commissioner 200 Main Street,Hyannis,MA 02601 www.town.barnstable.ma.us Office: 508-862-403 8 Fax: 508-790-6230 Property Owner Must Complete and Sign This Section If Using A Builder r� I, , as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application for. .(Address of Job) Signature of Owner Date Print Name If Property Owner is applying for permit please complete the Homeowners License Exemption Form on the reverse side. O:FO RMS:O WNERPERMISSION Town of Barnstable Regulatory Services r E R�NCPIAr c Thomas F. Geiler,Director 6 Building Division rFO Tom Perry,Building Commissioner 200 Mairi:Street;Hymns,M:A--026-01 wwwv.town.b arnstable-ma.us Office: 508-962-4038 - Fax: 508-790-6230 HO' EOWNER LICENSE EXEMPTION Please Print DATE: Q ' JOB LOCATION: C /d J7Cs�� z number street tu� 9village "HOMEOWNER': name / home phone# work phone# CURRENT MAILING ADDRESS: �v� '� /,O/J,(1P.1�CS5_ell / city/town state zip code The current exemption for"homeowners"was extended to include owner-occupied dwellings of six units or less and to allow homeowners to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor. DEFINITION OF HOMEOWNER Person(s)who owns a parcel of land on which he/she resides or intends to reside,on which there is, or is intended to be, a one or two-family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such "homeowner"shall submit to the Building Official on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. (Section 109.1.1) The undersigned"homeowner"assumes responsiblity for compliance with the State Building Code and other applicable codes,bylaws,rules and regulations. The,undersigned."homeowner?'certifies that.he/she understands the Tpwn of Barnstable,Building Department minimum inspection procedures and requirements and that he/she will comply with said procedures and requirements. Signature of Homeowner . e Approval of Building Official Note: Three-family dwellings containing 35,000 cubic feet or larger will be required to comply with the State Building Code Section 127.0 Construction Control HOMEOWNER'S EXEMPTION The Code states that "Any homeowner perfoming work for which a building permit is required shall be exempt from the provisions of this section(Section 1D9.1.1 -licensing of construction Supervisors);provided that if the homeowner engages a person(s)for hire to do such work,that such Homeowner shall ad as supervisor." Many homeowners who use this exemption are unaware that they are assuming the responsibilities of a supm isor(see Appendix Q. Rules&Rcgulations'for Liccnsing Construction Supervisor,Section 2.15) This lack of awareness often results in serious problems,particularly when the homeowner hires unlicensed persons. 1n this case,our Board cannot proceed against the unlicensed person'as it would with a licensed Supervisor. The homeowner acting as Supervisor is ultimately responsible. To ciisurc that the homcowncr is fully aware of his/her responnbilitics,many communities require,as part of the permit application, that the homeowner certify that he/she understands the responnbilitirs of a Supervisor. On the last page of this issue is a form currently used by several tDwns. You may care t amend and adopt such it fonn1cer1ifrcation.for use in your community. Q:forms:homccxcmpt Town of Barnstable *Permit# Regulatory Services e.6,no�ar ha ed M& `m Richard V.Scali,Director Building Division Tom Perry,CBO,Building Commissioner 200 Main Street,Hyannis,MA 02601 www.fownbaxsstable.maus" a��J_J��(� � ��,1 Office: 508-862-4038 F e50 790-61u EXPRESS PERMIT APPLICATION - RESIDENTIALTNTr Y�F A R � A L� Not Yafidwifleout RedX-Pre bgwint .. Map/parcel NumberO^O�(�` 6 0� � g ��f 2-T fit✓y7,Q cl � / Property Address !r� _L T�Lr deatial Value of Work$ 274 &Z'q" Nfinaimum fee of$35.00 for work under$6000.00 Owner's Name&Address ��, l_D��fit vL - (OZY Ao�012,9 SSA >< ,� �G4,74- Contractor's Name ✓;7i5! �+��c .,.s �` r^,s� Telephone Number' �5,� Some Improvement Contractor License#(if applicable) p �P_ 57,qri Email:_ r41,:.�- Construction Supervisor's License#(if applicable) 'eG bFS OW'orlcman's Compensation Insurance Check one: ❑ I am a sole proprietor p � ElI am,the Homeowner l [have Worker's Compensation Iwu=ce ®® A 16 Insurance Company Name t,7✓m�:;t`� cr T Ssa Yris�t�! ,,. 1°�~�`Q 5 Lo Workman'sGo=Policy# GZ� n�J�aa �`���� � TOWN OF BARNSTABLE Copy of Insurance Compliance Cerffla to must accompany each permit ., Pemut Request,(check box) 1144e-roof(hurricane nailed)(stripping old shingles) All construction debris will be taken to ❑Re-roof(hurricane nailed)(not strippk& Going over existing layers of roof) ❑ Re-side ❑ Replacement Windows/doors/sliders.U Value (maximum 32)4 of windows #o€doors: ❑ Smoha(Carbon Monoxide.detectors 4 floor plans marked with red S and inspections required. Separate Electrical&Fire Permits required. *Where required_ Issmoce o£this permit does note=pt compliance with,other town department regalsdous,i.e.Historic,Conservation,etc. ***Note: Property Owner must sign Property Owner Letter of Permission. A copy of the Home Improvement Contractch License&Construction Supervisors License is required.. SIGNATURE-. 0\WPFI M\FORMbQdmg mxs c Revised 040215 zz Co tam. veakh OfMwS C1J=ett Dep aat3rteat a ffiird?u�Acc uerats 600 Wasiu%,tou Street ,Bastori,HA.0211.E ' 4D�f�MlPlit7�,�flPP.��iQ . w-lers'Campeniatin Insn-mce Affidavit 13-midersi&ntractxr_-Juec£x c ans/.P�he,rs Apgh?c aut Infarmai�ugb PI.M P 3E e Address: c: r, L4 '6 7 Are you as emplayer?Checktheappropriatebad Type of I.�I ama employes with. �() � ❑I am a,gen�al confractar aad I . project(requi. e a Nen consrcionemployew(fultanWorpat- ).* "_ 2.❑ I am a sale prvpfietor orp3r1ner- Tisted on the aftc6d sheet~ Z ❑Re aoddkg slip and have so emplo5eez. nese soh Coufiactars have wading for=e in any capacity. employees andl re walkers',�. mud addifiorc [N4 S4'OAMM,Comp.;MS1w= 0 .Cor1117.imsura ce. ❑, - re uiEed_j 5_ 'ire are a cozporaii=aud ifs 101-❑Elecf dcal repaim or ad&dbw 3. I ama homeovmw doing aU work officers have rcised their 11-0 P3umbsngrapaus or addhia= mpsel£[Trio wcQ&.i , y,_ right of egeaip6on per UGL 7 ;*+ ice regPi=e&]T c-1-52,§1.n andwe have no, I y�$flofreptasrs employees.ETCworiae 13_0 then r comp_ `�Y%PP�t�Fastchedcs'�a Tl mest alse�II�tfi�se,c&asbe7awshc�siag it,�:¢uroskess'olmpnssatia�epo�'cgi�s�aas ' #Hameovrueiszchos¢b�this"MM&gcZia gtheym2•daic6gzUwcdcsnd.&mbiEcatQd�ca rs�stsafim5tanew dsest�dicxan�s:uh_ tCaatz7cmes tcbetTr h 5bxcanxstxt�r3esi�sasddi sZsicemtsIwuic�ti�ns:n�oftaresob cca crosrsamd sf ewlreth�car=ttbaseeadaeshmve e�3a3 eM TYthe�Ir-caa=Cft shave=giTtL,,-s;tat y�stpmside tfir�wackas'tamp.paT,cg m 'eL I am an einplDyer,Fiat ispratidi rg workers'can perrsrdiarz irasairance for M3F=Pz73wes. $eTopv is�hFtsp��Zcy�ararI jola srls Tr�cr.r„v-p Canipaayi am�e__ CJ V- )I m 1 ^/ ri1 S •PaSCy 9 or Self-ins.L a_4: G;e 0( 0 { E.eps aDai VZ rob Eta Address a •e z Csty/StafeE Attach a.ropy of the workers'compensatiaa.polk deriarafion pogo•(;hawing th,Policy=M*r aad esgiraiien 3a# Fad to secure:covecsaage as required.vader Sectffl¢25A of MM m 15-7 cam lead•to the imposKm of cdmimai penalties of a fine up to Sf 0(}0(b andfar Me Tear imprjsoa,xleut,as cv as ciml peaalties is tine farm of a STOP VJORY fJRDER azed a fsme Of up to$250-00 a day ag-ainst the 4iolutar_-Be ndi *tkdt a COPY of this stafement mgy.be frn-,m&d to IM OMB a of lmrestcgaatiow o€the DIAL h•insurance carvemge vedIffbadon. Ida Ftarehy earLfi y=. d.zr&e ' s and'penaftes aj)? iu*thattlia i armalim praN d d abrn rs hiss and correct Phone ik S c>,C,--- Li ` t?„�rud z�a7rTy. 37o at�t�rrlta�tl�s.a�+za,�►be cnrxp�Teted'by clip+arfai�n a,#�crat - Cify or Tawn Permifficense Issuing parity(ch76e-one): L$oasdofHedt€L 2-I3afftting Department S.CH3 roue Qerk d,Eieetrical lnapeetor S.Phrmbma hmpecfar 6.O ier Com#act Person. Phone#- f ISSUED BY THE STOCK INSURANCE COMPANY HEREIN CALLED THE COMPANY @� Q•� GRANITE STATE INSURANCE COMPANY 0103090-00 WC 009-93-0601 13102 013-82-0915-50 • PENN YLVAN ..• r FRASER CONSTRUCTION, LLC A I V P.O. Box 1845 COTUIT, MA 02635-2443 An AIG company EXECUTIVE OFFICES: SEE EXTENSION OF ITEM 1. OF THE INFORMATION PAGE- WC990610 175 Water Street - L New York, NY 10038D# 0001 0646 Ma ul#: ••. . •..• KEATING GROUP INC THE WORKERS COMPENSATION AND EMPLOYERS 144 TURNPIKE ROAD LIABILITY POLICY INFORMATION PAGE SUITE 150 OUTHB RO GH MA 2-0000 LI IS LAY NUMBER 0 MITE LIABILITY COMPANY RENEWAL 099 0601 OTHER WORKPLACES NOT SHOWN ABOVE SEE EXTENSION OF ITEM 1. OF THE INFORMATION PAGE- WC990610 ITEM 2 POLICY PERIOD12A1 A.M.standard time at the Insureds i maling address FROM 09126/15 To' 09/26/16 - ITEM 3 A. Workers Compensation Insurance: Part One of the policy applies to the Workers Compensation Law of the states listed here: MA B. Employers Liability Insurance: Part Two of the policy applies to the work in each state listed in item 3A. The limits of our liability under Part Two are: Bodily Injury by Accident$ 500,000 each accident Bodily Injury by Disease $ 500,000 policy limit Bodily Injury by Disease $ 500,000, each employee C. Other States Insurance: Part Three of the.policy applies to the states, if any, fisted here: AK AL AR AZ CA CO CT DC DE FL GA HI IA ID IL IN KS KY LA MD ME MI MN MO MS MT NC NE NH NJ NM NV NY OK OR PA RI SC SD TN TX UT VA VT WI WV D. This policy includes these endorsements and schedules: SEE EXTENSION OF ITEM 3.D. OF THE INFORMATION PAGE- WC990612 ITEM a The premium for this policy will be determined by,our Manuals of Rules, Classifications, Rates and Rating. Plans. All information required below is subject to verification and change by audit. Premium Basis. Rate Per Estimated Classifications Code Number Total:Remuneration $1011 OF Re. Premium O.Annual❑3 Year muac ration a Annual ❑3 Year SEE EXTENSION OF ITEM 4. OF THE INFORMATION PAGE- WC7754 TAXES/ASSESSMENTS/SURCHARGES EXPENSE CONSTANT(EXCEPT WHERE APPLICABLE BY STATE) MINIMUM PREMIUM $500 MA TOTAL ESTIMATED ANNUAL PREMIUM If indicated below,interim adjustments of premium shall be made: Semi-Annually Quartedy El Monthly DEPOSITPREMIUM 08125l15 PARSIPPANY 82 w Issue Date Issuing Office Authorized Representative WC 00 00 01A 39967(Revd 04108) I OffiCe of Con=mearAffaim an d Bus ess Region I4-P9*Phza--S—ete 5170 _ 3os�to�Iv1��cb.�s�fl21�5 . Rom-e li pror7eanent.Coa rador Re_emtaucx Type: :)SA - �Aa�6fln 31z31203 J it.�� ERASER COMS tom• jGTI0IN Co DE444 N ;RASA P.G.BOX 1846 OCTUI i,MA 02635 Tipdate address=ad:etcra�xd,ale reason=ar:.ha��. sMa� �vwr f7 Ad&— Q 1tzn 4 G1 T3mqi07mx-t Car& _ O:@eecPCo s easSb�rsaessS aiafioa ?ae s:as 0tvamYorira ad USL Only O s eaurEM - P. ta = 912-s-36 Tyz '8�e�of CoL:Rat't'A'.3i25310]B�SYIIGSS R� ^a `�� E.=p'ttaca -.3fLs124•C7 Dale laPID7 322a-SIIGt517L �smn..lvld.0211G- FPAS�t CCUSTRUC'7i.0N CO_ ! MAN FRASUZ 304 A, iVl^,^N'/FVL�NTIAPZE cLr.�� . �' N:assaenus_rs-3�aarrnan;o'=�hiie arty nOy:d Of BU21 j"-C K_7L o:1:.r:S an4�2a�O3i v9 �iC2n5$:CS-097568 ' DEAN C FRASLR= 104 TWON VIEW LAN L _ EAST FALMOUM-MA-,:; ' ✓ /' �r/� •0I07J2017 i Fraser Construction, LLC 31 Bowdoin Rd. Mashpee, MA 02649 Email: info(oDf-raserconstructioncapecod.com www.fraserconstructioncapecod.com - t PAX 1-508-428-01231 PHONE 1-508-428-2292 HICL#112536 CS#97668 \ RE-ROOFING PROPOSAL Date 2/11/16 Name Bob Colgan Email colgan.bob@gmail.com Phone 617) 962-9413 Job Address 624 Popponesett Rd, Cotult PRASER CONSTRUCTION hereby proposes to perform the following services in a neat, professional manner in accordance with the manufacturer's specifications and local building code. CertainTeed ShiM to O ti Good Better Best Shingles Landmark Landmark Pro Landmark TL Algae Resistantl 10 years 15 years 15 years Wind Warranty 130 MPH 130 MPH 130 MPH Weight/square 240lbs 260-270lbs 305lbs Shin le design Two-Piece Two-Piece Three-Piece Color Palate Standard Max Definition Max.Definition VaUeys Closed cut Closed cut Open copper Investment $Z7,625 $32,500 $51,250 * All above shingles qu Ce WTeed 50 year non prorated` Star warranty F % �2z� Shingle Selection: �� � Color: `� Initial IN _ r ' S Any deviation or alteration from above'specification will be executed upon written orders and will become an extra charge over and above the estimate. All.agreements contingent upon strikes, accidents or delays are beyond our control. Owner should carry necessary insurance upon the above work. We, if not accepted within,thirty days may withdraw 's proposal. Work Permit- I (Sign Name) give Fraser Construction the permis ion t p a e t f ork being done at ZA tMo- aecy (Address) FRASER CONSTRUCTION, LLC:..Carries Workman% Compensation and Public Liability Insurance on the above ork, certificate available upon request. DATE OF ACCEPTANCE: Homeown r Fraser Construction, LLC Assessors office(1st Floor): Assessor's map and lot numb ' i THE t PLO O`+ Conservation(ath Floor SEPTIC S11STIPRt1 MUST B Board of Health(3rd flo INSTALLED IN COMa �.IA ' � • DAH177�t1LL i Sewage Permit number WITH TITLES 0o r6ASK 30. Engineering Department(3rd floor):,, i r 1 ENVIR®i��,IENTAL CCU=AND House number ii Tovv E Definitive Plan'Approved by Planning Board � ' 19 ULATPONS APPLICATIONS PROCESSED18:30-9:30 A.M.and 1:00-2:00 P.M.only TOWN ' Of BARNSTABLE `BUILDING INSPECTOR _ APPLICATION,FOR PERMIT TO TYPE OF CONSTRUCTION s J�o 19 �7 r TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the followin information: Location �L2 (� q� 4 Proposed Use �"//I�� -1/G 'f}/V)L f � Zoning District /2 r r Fire District Name of Owner Address- Name of Builder / Address_ 0/� i Name of Architect Address Number of Rooms Foundation Exterior lzz"al2ea Roofing �— Floors Interior Heating_/� �� Ga Plumbing r ao Fireplace Approximate Cost zy, - Area Diagram of Lot and Building with Dimensions / F e ///9 1 64 8s0 v s o ww av­ s�,�csL� S► — D 5123 Ta � � V7 9 W L",q F OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name Construction Siipervisor's License �77 EICHBLATT, URSULA A=007 001 No 36719 Permit For DEMOLISH DWELLING Location 624 Poponessett Rd. Cotuit Owner` Ursula Eichblatt Type of Construction " Plot Lot t Permit Granted ' May 20 : 19 .9 4 j Date of Inspection: Frame 19 Insulation 19: Fireplace 19 4 Date Corhpletd 19 R007 001 , LOC 06.12A. F:,OF-',ONEC)P:)[..--r*-r RoAEI CTY 01 TEIS 200 Cl- KEY 16-24 1 1041 F'C,(-*a' Y FR PARENT 0 ------MAILING AEiDRESS--.-..-.-....- r C,A EICHBLAT'T, URSULA MAP, AREA 01WB liv m-rc, 0000 AM GRUNEN HOF 4A 11:3 F-1 1 Sp,.2 SF':,: 134,651 BEFU-IN-FROHNAU L J T2 1. . 16 S 0 FT 1.515 GERMANY C) c)0 A Y B 1-95 2 EYEI 1965 ORS CONST 0000 -,I31 A-3:-::00 I MP` 79600 OTHER -----L-E(3'Al-. IJES(.,RIPTION------- TRUE MKT 22:3400 REA CLASSIFIED #LANE, 1. 1 A-*3',----.:0 C) ASD I-NEI 1A.3800 ASE, I M F' -751600 ASE, OTH #BLDG(S) -CARD-1 1 '7'..-,- 600 DESCRIPTION 'TAX YR CURRENT EXEMPT TAXABLE 6*21A. POF'ONF.--SFET*T* RD TAX EXEMPT #RR 1301 (')C)::::() RESIDE:---N'r,L- 2. A 0 0 2'x"_`3400 223400 #D L L 0 T 6, 0 PE N SPACE J fl:U P F*Y COMMERCIAL- INDUSTRIAL- EXEMPTIONS SALE 1*.2'/-.-)3' PRICE' 299000 ORB :391.9/1.07 AFE, I LAST ACTIVITY 0*.2/()4/'.)4 PCfR Y f [ ] [R007 001 . _� ] • LOC] 0624 POPONESSETT ROAD- CTY] 01 TDS]' 2`00 CT KEY 1624 ----MAILING ADDRESS------- PCA] 1011 PCS] 00 YR] 00 PARENT] 0 COLGAN, ROBERT T JR & MAP] AREA101WB JV1430215 MTG12001 COLGAN, ESTELLE G SP1] SP21 SP31 241 GROVE STREET UT11 UT21 1 . 16 SQ FT] 3156 CHESTNUT HILL MA 02167 AYB11994 EYB11994 OBS] CONST] 137100- 0000 LAND 137800 IMP 287300 OTHER ----LEGAL DESCRIPTION---- TRUE MKT 425100 REA CLASSIFIED #LAND 1 137, 800 ASD LND 137800 ASD IMP 287300 ASD OTH #BLDG (S) -CARD-1 1 287, 300 DESCRIPTION TAX YR CURRENT EXEMPT TAXABLE #PL 624 POPONESSETT RD TAX EXEMPT #RR 1301 0080 RESIDENT'L 425100 425100 425100 #DL LOT 6 OPEN SPACE #UP FY98 COMMERCIAL INDUSTRIAL EXEMPTIONS SALE107/96 PRICE] 510000 ORB110306187 AFD] I TE LAST ACTIVITY] 08/29/96 PCR] Y r R007 001 . P P R A I S A L D A T jo KEY 1624 COLGAN, ROBERT T JR & LAND BLD/FEATURES BUILDINGS NUMBER ZN/FL=RF 137, 800 287, 300 1 A-COST 425, 100 B-MKT 201, 800 BY 00/ BY ML 3/95 C-INCOME PCA=1011 PCS=00 SIZE= 3156 JUST-VAL 425, 100 LEV=200 CONST-D 137100 ----COMPARISON TO CONTROL AREA O1WB -- TREND EXCEEDS STANDARD NEIGHBORHOOD O1WB COTUIT PARCEL CONTROL AREA TREND STANDARD 151 15 LAND-TYPE 1378001 LAND-MEAN +Oo 4251001 224000 IMPROVED-MEAN +280 250 ] FRONT-FT 11 100 DEPTH/ACRES TABLE 02 1000] LOCATION-ADJ APPLY-VAL-STAT 1 LNR] LAND LFT/IMP]ADJS/SB/FEAT STR] STRUCTURE ARR]AREA-MEASUREMENTS NOR] NOTES COM] MARKET INC] INCOME PMR] PERMITS GRR] GRAPHIC FUNCTION- [ ] STRUCTURE-CARD NO- [0 0 0] DATA- [ ] XMT [?] R007 001 . , P E R M I T [PMT] ACT* [R] CARD [000] KEY 1624 000000001 PERMIT-NO MO YR TYPE VALUE CK-BY MO YR oCMP NEW/DEMO COMMENT [B36719] [05] [94] [D ] A ] [LK] [01] [95] [100] [DEMO] [CO ] [B36821] [06] [94] [ND] A 3250001 [LK] [01] [95] [100] [NEW ] [CO 1 STORY] [ ] [ ] [ ] [ ] ] [ ] [ ] [ J [ ] [ ] [ ] [?J 5 . -AOPERTY ADDRESS I. I ZONING I DISTRICT CODE SIP-DISTS.I DATE PRINTED I CSTATE LASS I PCS I NBHDPARCEL KEY NO. LAND/OTHER FEATURES DESCRIPTION ADJUSTMENT FACTORS Tv UNIT ADJD.UNIT ` Lana By/Date sze Dimension ACRES/UNITS VALUE Dews Lion• EICNBLATT -'URSULA - - MAP- - SPEC.CLASS ADJ. COND. P PRICE PRICE- p c0. FF.De th/Acrea E #LAND i 1 1370,800 . CARDS IN ACCOUNT - 15-1WATERFNT'1 X`f 1.116 -100 95 124999.9 f 1187 49.98 14.16 137800: #BLDG(S')=CARD-1 1 ' 287.300 -01 00 01 - !!PL 624`POPONESSETT-RD COST 4 i BATHS:2.1.; U' 1 X A= 100 14700.0. 14700.00 1.00 14700:8. #RRs130T';.0080 , ARKET 201.800 F; PLACE U X: A= 100 480D.0 4800.00 . . Ti00 4800�8: #OL':?LOT"6° INCOME A A COND S . X+: A= 100 1:4 2.24: 3156 7100-8: USE. D 4_3SMT S . X, A= 100 3.7 5.73" 3156, `18100-8 _ APPRAISED,VALUE .425ll. U . ARCEL SUMMARY 'LAND ' '137800 S r LDGS 287300 ml O-IMPS E .,TOTAL 425100 N. I I iCNST' '137100 , T I BEED.REFERERNC yO DATE Sal"v R:I O R`YEAR-c V AL'U E age Mo. yr. 'LAND 137800 S 8949J107,1' I,12/93:' 299000 BLDGS 287.300 1522Y7i5, b0/00TOTAL' 425100 8.1981170:° t09192'. 30000 BUILDING PERMIT .SKETCH. .CARD 'O N Number Date Type 'Amoum LAND LAND-ADJ INC ME I SE SP-BLDS'j FEATURES BLD-ADJS UNITS 137800 8500. 36821; b/94 . NO 325000 cons'. Total year BuiR Norsv. Class Units Units Base Rate Atlj.Rate A1t� �fn Age Depr.m. C Oobntl. CND. Lot. %R.G. Rapt:COat New Adj.Repl.Value Stories, He{ghi Rooms Rma BaUa e'Fia. PeAyarall F.C. 01 - .000 : 115 115 72.20 . 83.03 94'94: 100 1.60.. 100 287283 287300 `1.0 6 . 3" 2.1? 10.0 ±- ption.. Rate Square Feet Repl.Cost MKT.INDEX: 1�00 IMP.BY/DATE:.,•��:ML• - 3I95 SCALE: 1/00.34 ELEMENTS CODE CONSTRUCTION DETAIL B 100 . 83.03 3156 262043 GROSS+AREA 3156 SINGL'E: FAMILY `DYELLING CNST GPs00." FFG: 30 24.91 672 16740 *-13*---24--* : TYLE,` 03 ANCH- 0. 0 ti - - - ----- ----- - _-- *---24--*' *-13-*: ESiGN/ADJ+IlT; 03 ESLGN."ADJUST' 15.0. - ----'--- --- --- ---- ------------ 5:. 13, _ . XTER WALLS,.'.1.1 OOD•`S.HINGLES 0..0 i 23 ! EAT/AC TYPE 1:2 IL,,YARMs.AIR-.--- 0�0 NT.ER .FINISH� 05 . LASTER , M --------------- --- ---------------------- BASE 13 NTER:LAYO it 1;1' OOD;.. O p = *-16-* *-12* *-12* ! ` _NTER4UAL7Y 02 AME'AS-_EXTER._- 0.0 *9-* 13 13 !:.. *=16-* LOOR`STRUCT 02 D.. JO.IST%8CAN 0.0 ------ ------ -- -- --- ! ! 21:' '18 E LOOR/COVER 01 ARDWOOD--------- 0.0 --------------- --- ---------ASPH'---=SH--------- E TatalA-,; A.._ 672 a...- 3156 *---24--* . ! OOf'TYPE 01 ABLE- 0.0 T *- BUILDING DIMENSIONS ---33--*-X LECTRIC _ AL _ 02__ _80VE"A____ ___.VER__AW_E --- A BAS. ,W33, FFG S28 E24 N28 .W24' .. ! ! OUNDATION- 01 OUREQ CONC' 99 9 BASIN21 W12 S1.3 W24'N13 ;W12 S05 ! ! ' ,. W09.BAS: N05•Y.1.6 N23 E24:N04: E13 28 28 NEIGH80RH000•'01YB tOTUZT L N06 :E24_ BAS'S10 .E13 S13.: E16`S13 ! ! LAND„ -TOTAL MARKET' E16.,S18 .. ! FFG ! " PARCEL: 1`37800.._.;_.425100 *---24--* AREA. 224000. a t S VARIANCE .t0` • +90 STANDARD' 25 : 'Ivor WHINWAO IMAM r,614—TUM I.,IN"), Mr T20:01ORM-21 m pffdp4fm,Mr.& r In WRIA,"M I W WO W/17MANOW-11 Me m NJ ILI 3 a MEN/ 0-4 94 —ml OFv A OR,% ,Arl W4 �/Al�M . I VA-5 MW � �-% y'� � '! � _tic.�// /—�— Ma"'We" momay, W'es",%, kw W/ Rllmllo .P 229 805; 3-49 US Postal Service Receipt for Certified Mail No Insurance Coverage Provided. Do not use for Intemational Mail See reverse Sent to Robert T. Colgan Street&Number 241 Grove Street Po office,State,&ZIP Code Ctthestnut Hill, MA 021 7 Postage $ Certified Fee Special Delivery Fee Restricted Delivery Fee L Return Receipt Showing to Whom&Date Delivered n Return Receipt Showing to Whom, Q Date,&Addressee's Address 0 TOTAL Postage&Fees is Postmark or Date E 0 rL Cl) Stick postage stamps to article to cover First-Class postage,certified mail fee,and charges for any selected optional services(See front). 1.If you want this receipt postmarked,stick the gummed stub to the right of the return address leaving the receipt attached, and present the article at a post office service m window or hand it to your rural carrier(no extra charge). 2. If you do not want this receipt postmarked,stick the gummed stub to the right of thoy a� return address of the article,date,detach,and retain the receipt,and mail the article. 3. If you want a return receipt,write the certified mail number and your name and address .' on a return receipt card,Form 3811,and attach it to the front of the article by means of they gummed ends if space permits. Otherwise,affix to back of article. Endorse front of article a RETURN RECEIPT REQUESTED adjacent to the number. Q 4. if you want delivery restricted to the addressee, or to an authorized agent of the addressee,endorse RESTRICTED DELIVERY on the front of the article. M 5. Enter fees for the services requested in the appropriate spaces on the front of this receipt. If return receipt is requested,check the applicable blocks in item 1 of Form 3611. li 6. Save this receipt and present it if you make an inquiry. a ' e Town of Barnst!ble Department of Health Safety and Environmental Services Building Division 367 Main Street,Hyannis MA 02601 Office: 508-790-6227 Ralph Crossen Fax: 508-790-6230 Building Commissioner November 4, 1996 Robert T. Colgan 241 Grove Street Chestnut Hill,MA 02167 Re: 624 Poponessett Road,Cotuit,MA Map/parcel 007/001 Dear Property Owner: A review of our records, including the permitting history of 624 Poponessett Road,as well as the Zoning Board of Appeals records indicates that the use of that address as anything other than a single family home is illegal. You are hereby ordered to discontinue the use of the above referenced property as it is now being used and restore it to a single family home. You are to accomplish this work and notify this office to inspect within 14 days of your receipt of this letter. A building permit must be applied for to redesign the layout to accommodate the conversion. You must do this before you make any changes. You have the right to appeal this decision. If you so choose,we will be more than happy to help you. If we do not hear from you within the 14 days,we will be forced to seek criminal action against you. Very truly yours, Gloria M. Urenas Zoning Enforcement Officer GMU/km CERTIFIED MAIL P 229 805 349 R.RR. Q960712B 405 `' ' ` :.: ..:.»»B ILUIN IJ VI L :..................:::::::.:. low > . x.. `< ;::.::.;>;:.::: NOR :: ::»:: >:::>:URSULA EICHBLATT ::M > Dim is < � . ... II RE-SEARCH ------ON MULTI. :. ?.::. <» :.:::.:. :. USING AS 2 FAMILY. ME :,;::;:.ASSESSOR S OFFICE---RESEARCH RESEARCH ETC. Ell OWN >:> .> 0 TOWN OF BARNSTABLE BUILDING DEPARTMENT DA"STAU TOWN OFFICE BUILDING rua �g 1659. HYANNIS, MASS. 02601 'fie rnr�• MEMO TO: Town Clerk FROM: Building Department DATE: An Occupancy Permit has been issued Cfotheuilding authorized by Building Permit„ �....... .. ...: . ... _.. .... _._.._ .... issued to � ' .. a... a ..... N . .. ....... ` . Please release the performance bond. TOWN OF BARNSTABLE, MAS` �USETTS , Ln11VG p T DATE _19 PERMIT NO. i`• APPLICANT Gruver J iicElheny _ _ •ODRE;S is : 159 � Cctuit, LA U4769� (NO.) (STREET) (CONTR'S LICENSE) PERMIT TO bL11 Ia CfWP_lll_1 t.., (_) STORY NUMBER OF � DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT (LOCATION) i u t 1,4 6-'4 YOtS(,t, o,;eLE -L., ZONING t`l, (N0.) (STREET) DISTRICT— BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION _. LOT LOT BLOCK SIZE BUILDING IS TO BE FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: Sewage #94-26!;; AREA OR !�Ul\:) VOLUME 3,OOO f t. ESTIMATED COST $ 3`S�UQJ FEE MIT 150.U0 (CUBIC/SQUARE QUARE FEET) OWNER - Ursula Eichblatt ) ADDRESS l oponessett ROac, Cotuit, 1.A U-,635 BUILDING DEPT. HPERMIT N RE -EASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL .APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE INSPECTIONS REQUIRED FOR PERMITS ARE REQUIRED FOR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND I. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE- MECHANICAL INSTALLATIONS. 2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED UNTIL MINAL INSPECTION TI TO BEFORE FINAL INSPECTION HAS BEEN MADE, 3. FINAL INSPECTION BEFORE OCCUPANCY. POST T A IS CARD SO IT IS VISIBLE FROM STREET BUILDIn INSPECTIO V PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS �j /V e to g%;W- • �� . �� � �� I� ,I;�'• �� � CY/-�/G,d� OG�7�7f/✓07<iJ>c'� Z z ` -- Z C� kN 7�oi✓!e r HEATING INSPECTION APPROVALS ENGINEERING DEPARTMENT Olt _? 3 BOARD OF HEALTH OTHER I SITE P VIEW APPROVAL O!c. ".ia_ CdR,ir WORK SHALL NOT PROCEED UNTIL THE INSPEC- PEnMIT w!LL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD CAN BE TOR HAS APPROVED THE VARIODUS STAGES OF WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE ARRANGED FOR BY TELEPHONE OR WRITTEN CONSTRUCTION I PERMIT IS ISSUED AS NOTED ABOVE. NOTIFICATION 3,3 �- -�- MASSACHUSETTS UNIF APPLlCAT10N FOR PERM1 DO GASFITTING . (Print or Type) .L\. rF TOWN OF BARNSTABLE Date----i=- -/�;— 19=_-�-- Hyannis, Massachusetts Permit # �!' _ Building Owner's —� .AZ: Locatiort �/" Name Type of Occupancy: New [ Renovation ❑ Replacement ❑ ;,. .: s No Plans Submitted Ye ❑ N W N W W 0: O V O J N W f. O 0 y N W z o W ~ a orc z ? o z a a m N Fr W W O 0. W F' a W a �. N > a N t7 W x z O W f W W NWt z a x W aUJ OaC W ~ W U x N a s LL J r c� z F- z w w t- J H o H z a W a c>; r ,. N 0 z O z a Cf us z ' a w y W z Q ¢ a a 0 o w o w I- a x O 0 7C LL a 3 a. 0 J U m >. a IL F� O i;.. SUB—BSMT. BASEMENT ;.... AST FLOOR 2ND FLOOR 3RD FLOOR 4THFLOOR 5THFLOOR 6THFLOOR 7THFLOOR OTH FLOOR (Print or Type) . .� Check One: C2rtific:ate ; Installing Company Name ❑ Corp. P Address /Z V1q QyiE4 >�eAvlell Partnership ,AFirm/Company Business Telephone q-•177 0 $-9 r�I Name of Licensed Plumber or Gasfitter 1 hereby certify that ail of the details and Information I have submitted (or entered)In above application are true and accurate to the best of my knowledge and that all plumbing work and Installations performed under Permit Issued for this application will be In compliance with all pertirfent provisions of the Massachusetts State Gas Code and Chapter 142 of the General laws. i By TYPE -LICENSE: Plumber.,, Title Gasfitter Signature of Licensed City/Town: Master Plumber or Gasfitter Journeyman _ 3q- 3 _ APPROVED-(OFFICE USE ONLY) Llt ?t1Se Number i _ THE FOLLOWING IS/ARE THE BEST IMAGES FROM POOR QUALITY ORIGINALS) m A , I / �0(�J L DATA -r•1r+:r."•< .tff :?. -•-vF s':x'n -n<-. 3w. +-"Ffe�rv-a.a.• 1 �,i.. .,r r aas n'• ey �c.,,{ .Y.:� +t t, . f.. .�_y As+>'^st .-. E - f. SH.,et ,-.,.i �.�.rra•+�,:ry r4 i X! r Uv 'fa.f.,r;}' Y_ c - t a . 'Gk4O "NY t .OR:OFFICEUSE t_:8EL0W. F INSPECTION PEC710* OGRESS ° �.- k i ,i, ..y;. F� t, .°.; } } ,�.. "� � �.�lo .,,. ,.,e....:,-.•e� ,c r. vire-� • SKETCHES FIHAL INSPECTION ... FEE= t�} .. a �•�l 7/'C�_ .. ? �' �'�n � ����� NO 3t APPLICATION FOR PERMIT TO DO GASFITTiHG a `a z e^ -; NAME& TYPE OF BUILDINtiJ LOCATION OF BUILDING :. PLUMBER OR'GASFITTE R - .L1C. NO , • ..:•. - - PERMIT GRANTED DATE o---- 1.-- x. n r 77 GASINSPECTOR - t v : :. ..4:% ... f of 2 �". •�i5"_`.a+`�_ .f n , r i -.;A•�-••Tt .,.a-y ., �: -e x.�...��7^•- _.••? ,�+: :��3rT�'x`r:.i`�c�'S x•:al.�.. .Fs�'?�.'Z'�.�"s. - .- - �••A.r rsa ALL.41KL AY.Pox6 - '.a iMLR.7Mc PNpJ.iiDi. - . _ :J.—jl�•�-r{�}�• -I �•]. � __',—''[,�1 �L'.:}"`'�`�y 'n �;r''?` �� �.�� f{I::�..riL,ulJi � - — �;� LJ ��--.I i Twn•+ � . �r_{L.—.a. r -'• �' �--'-bit-`�i�=� � 1..... .r �11i� � �F = �wi."�` J� � __�v *-r,' a I`r-,-.-'r� �-- •�r.i_!--i:l � _ l.r. -7 it ..I•..6 �_ NIO f .1.'1 TWCL ID to os nisi tM_a - s'L. i. .. 1 •� 1.ID60'OL77fLf t 1F ; ' r AF T.".. . •T Hl F �^�.��-�� _ _ _ L, ►Rltlw MUMT�W Ff Kaa - _�-.' �. W�S'1 IS � V-i Z _ T"'Ai1f /1RNb� .I.w+S AC4Ii�AN/. _ r.. vt-•L'° ' -(r+lla n ure►.auvu..) -. _ ,.� 0 .. � e awts h aAsa RA+� ta4-4 - -— -- - - - 41, fpu a _ ..%'s �nlw0.w•Rrl. L.s. ' _ I wa nai I L•iyylu/M14 1 �-r.t i •�•i•---• �'�J _ !-ty�I _-.___�I , J.L i .. ` • � (.Td.n Wd M) �:" L. _.-..._-_-.__-.-_---_.___.___-_ l-tJ 1� IOY.MLi RoLLwb SMYT7.R*-"f 77— TL .. - L 4♦ t-° 1.... - •'�10 CHi1L.Y Mca4•LN n-LTI-RR 1•b-G•'1 MOIL . ... - wm W.W a-.•rcur.ro - _ .. ., _ _ - - a - - � _ ,:'` --'� fl.�fCPONKS`Gf ROMo'tA1tl�f FiR1k• � _ 'W,Jfmi3 Roi]anskyAi+�tii ecEE'; •_,;:C - - - - _ _t :�V - ,1 E.t .4�- .f. �•'e'L.�'Y7-�Xy.1` _, _ '-•��;7a::'' 's�r�I�,a:.c�1.�W�a���ry ��'•_ * '-r c. .ti� •r` :��:�'�'�. '~- :,.:3 i: r+�'��t,•Y��•-'La►„�'��_°f.,t �1°4 ��-tA i,C - t:.•._�___a�:. -7:'� f.ti _ i' a `�� `• �, ` � � i •. - _ - � . YII.K viaµ- _ 13 it I�� _ _ _.. r '} R — � �\ f I�>-'i' i' ' � :�� : r y �f .� •rt.ws.w., a,s � i i_ .r�Cdr�P E-T {L ►!Wf {i 1��'A'4 f sV� �•... as - - .I ��;1 vyt___; `v ! f ~(.ff"l L-wg a.a wzqu +rsa Y-_� • - - _ ... _ - .- Wit, rtrencsr.q ><R uTort-wr = �;� r l :J - .�. - i}t 3+ ��r_f�!_� � ire►-��' '�:r' '-w f•:??"�•s _ _ .. '} }- j __ _ •'w SY fti'-. s:-�:.��4-.r��:x ii.r.��4�YeiM�_ ��a'�- t•.�i��i� R�i,� �.x�� r - _.�.' ��J ��-�•"t,f _� ' - .:�- :fr�, .��.}e- 'ram o«'�. - :+.:�.-•:'..ir'{.4-1•r".:•.r�_ - } __r ���•�.c :+;,1.-,;:�c�.:�.�:.'��:.::%�i.�a•' rY'�'sa ",���uJ+z.��:ti..i<�5.:��`- -�'it"�:•:.�-•;._1S..:L:�itt��.�.f �� =+-�= •�..� °•°w TOWN OF BARNSTABLE BUILDING DEPARTMENT 4 r�1°T S TOWN OFFICE BUILDING ` rua 4 � t639' HYANNIS, MASS. 02601 MEMO TO: Town Clerk FROM: Building Department DATE: gl� 2 -3 / I An Occupancy Permit has been issued for the building authorized by BuildingPermit $k........ � 0CK .. ................................................................ . »».....».................»....».....»»»... issuedto »l".....` a� '_................».......................................»»..».»» .....»».»......» »»..»»»»» Please release the performance bond.. Alk c` `8 TOWN OF BARNSTABLE � Permit No. .��1........ BUILDING DEPARTMENT I """ I TOWN OFFICE BUILDING Cash :::::::::::::::: Yl X HYANNIS.MASS.02601 Bond CERTIFICATE OF USE AND OCCUPANCY Issued to Ursula Eichblatt Address 624 PoDotn.essatt Road (Lot #6) Cotuit, MA USE GROUP FIRE GRADING OCCUPANCY LOAD THIS PERMIT WILL NOT BE VALID. AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE BUILDING CODE. March 22 .., 109 .............. Building Inspector # (Of ,FTM� TOWN OF BARNSTABLE 1........Permit No. ........ � BUILDING DEPARTMENT TOWN OFFICE BUILDING Cash :::::::::::::::: YL gp �� 6S9• ♦ A '�ta+uY► HYANNIS.MASS.02601 Bond CERTIFICATE OF USE AND OCCUPANCY Issued to Ursula Eichblatt Address 624 Popone>ssett Road (Lot #6) Cotuit, MA USE GROUP FIRE GRADING OCCUPANCY LOAD THIS PERMIT WILL NOT BE VALID. AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE BUILDING CODE. March 22 .... 199�.............. f �� .. ....... .. .... ....... .. ........ ... ....... . ........ .......... Building Inspector cn -u nD -� DI Z O o O v W IT < r v n D N > � 0 0 CD m m m 90 in Z N. m 30'SPAN 4'WIDE PIER I?t cn O LEVEL DECK @ EL.6.2 D Z Z 4"x 4"RAIL POSTS G) 8"DIAMETER COMPOSITE OR VINYL @ 5'O.C.(TYPICAL) m O 8'W x 18'L FLOAT COATED PILES FOR FLOAT(TYPICAL OF 4) I D o m � N m HINGE RAMP TO PIER 2"x 6"TOP HANDRAIL - -i r SIGN IDENTIFYING HOOP AND ROLLER TO BE INSTALLED &2"x 3"SIDE RAILS 0° Z � nl DEP PERMIT NO. AT LOCATION_ OF 4 PILES _G) 00 FLOAT AT MHW LEVEL = Z p EL.=6.2 FLOAT AT MLW LEVEL n - 30'RAMP r _ MHW=2.Z�MLW DATU�L — — — — - - - Z o MLW=0.0 LMLW DATUMS — — -___ _ EXISTING GRADE_ Ill Cn x ` 3"x 8"YOKE(TYP) I m p � 0 - 2 m - I � m0Zm r _ 2 0Om � o m m U) x O m � FLOAT SHALL BE DESIGNED SUCH THAT THE BOTTOM OF i Z 0 o D THE TUBS ARE AT MOST 10 INCHES SUBMERGED AND ALL PILES DRIVEN A MINIMUM 16' 0 G) v m FLOAT STOPS(CHAINS)SHALL BE PROVIDED TO PROVIDE BELOW THE MUD-LINE OR REFUSAL. ALL PILES TO BE DRIVEN m o A MINIMUM CLEARANCE TO BOTTOM OF 18 INCHES TO A MINIMUM DEPTH OF -n _ 16-FEET OR REFUSAL I cn D Z m2 0 8"DIAMETER COMPOSITE OR I Cn ;u D D PROPOSED FLOAT PIER AND STAIR PROFILE VINYL COATED PILES FOR PIER m (TYPICAL OF 4) cn � p = 2 � — m SCALE: 1"= 10' m m m � x :z U) � . . OZZ D � Z _ � -I m v) m Z m0 U) n � ai Z o T m0 m o m I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. 1/2"GALV.CARRIAGE BOLTS AS NEEDED � II II I I I u u u n u n n FLOAT SHALL BE FURNISHED WITH SOLID PLATE INSTALLED WHERE FOR ANGLE STOPS ON PILES TO KEEP 18"CLEARANCE FROM, BOTTOM OF FLOAT TO EXISTING GRADE. SIDES&ENDS TO MATCH EXISTING PRE-MOLDED HIGH DENSITY POLYETHYLENE SHELL ENCAPSULATED DECKING AND SPACING POLYSTYRENE FLOATS TO MATCH EXISTING 2"x 10"MOUNTS 2"x 10"SKIDS II II II II FLOAT SHALL BE FURNISHED WITH SOLID PLATE INSTALLED WHERE FOR ANGLE STOPS ON PILES TO KEEP 18" CLEARANCE FROM BOTTOM OF FLOAT TO EXISTING GRADE. O Fo i ! I I I I ! I i �• j U- ! NOTE: co FLOATS ARE TO BE STORED ON i SITE IN AN UPLAND LOCATION ! 1 ! I � I i I � I 18 FEET FLOAT SHALL BE DESIGNED AND CONSTRUCTED SUCH THAT FLOAT STRUCTURE CAN WITHSTAND ACTIVE LOADS WHEN COMPLETELY SUPPORTED BY FLOAT STOPS INDEPENDENT OF BUOYANT TUBS HOOP AND ROLLER TO BE INSTALLED 7 AT LOCATION OF 4 PILES FLOAT DETAIL NOT TO SCALE FLOAT DETAIL PARCEL ADDRESS: 624 POPONESSETT ROAD, COTUIT, MA DATUM: M.L.W. = 0.00 FT. PLAN BY: CAPE & ISLANDS ENGINEERING, INC. ELEVATIONS IN FEET 508.477.7272 DATE: MAY 30, 2018 PARCEL ID 007 001 SHEET 5 OF 7 I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. 15'O.C. I 4"x 6"WALKWAY 2"x 6"TOP HANDRAIL 1110"D WALKWAY POSTS(TYPICAL) 2"x 3"RAIL B0IArDS j �PILES(TYPICAL) I I 4"x 4"MID RAIL I POSTS(TYPICAL)-� 4"x 4"MID RAIL POSTS i I I CHAMFER CUT(TYPICAL) COMPOSITE DECKING I I I I WITH 65%LIGHT PENETRATION I 2"x 10"JOISTS @ 19.7"O.C. j L J (TYPICAL OF 3) H 3"x 8"YOKE 3"x 8"YOKE 1/2"THRU BOLTS,WASHER - AND NUTS(TYPICAL) 2"x 6"CROSS BRACE (ALTERNATE ANGLE) EXISTING GRADE POSTS&PILES DRIVEN TO DEPTH AS SPECIFIED IN PROFILE DETAIL WALKWAY & PIER SIDE VIEW DETAIL NOT TO SCALE HANDRAIL WITH POSTS AND MID-RAIL (2)3"NYLON CASTERS 1/4"PLANK s 3' SPACE 1/2"EYE BOLT 30' _ (2)3"NYLON CASTERS RAMP DETAIL NOT TO SCALE WALKWAY & RAMP DETAILS PARCEL ADDRESS: 624 POPONESSETT ROAD, COTUIT, MA DATUM: M.L.W. = 0.00 FT. PLAN BY: CAPE & ISLANDS ENGINEERING, INC. ELEVATIONS IN FEET '508.477.7272 DATE: MAY 30, 2018 PARCEL ID 007 001 SHEET 6 OF 7 1 I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. 3'DECK SPAN 2"x 6"HANDRAIL I I 2"x 3"SIDE RAILS POSTS TO BE CUT AT 15°ANGLE SHED WATER AND SET HANDRAIL I I HURRICANE CLIPS(TYP) GRATE DECKING I j 65%LIGHT j 4"x 4"RAIL POSTS @ 5'O.C. I PENETRATION (TYPICAL) I I k 2"x 10"JOISTS @ 16.5"O.C. (TYPICAL OF 3) ° STAIR SECTION DETAIL POST CHAMFER CUT NOT TO SCALE to 1 1/2"THRU BOLTS WITH 3"x 8"YOKE WASHER&NUTS(TYP.) 2"x 6"CROSS BRACE(TYP) 0 (ALTERNATE ANGLE) 1 o I 4"x6"POSTS -REFER TO \dt, III/, Al' \III' PROFILE FOR SPACING (TYPICAL OF 10) POSTS&PILES DRIVEN TO DEPTH AS SPECIFIED IN PROFILE DETAIL 10"PILES WHERE NOTED CUT AT 150 ANGLE 2"x 6"TOP HANDRAIL 4'DECK SPAN POSTS SHALL BE CUT AT 150 ANGLE TO SHED 1 WATER AND SET RAIL I 2"x 3"RAIL BOARDS I 4"x 6"WALKWAY POSTS(TYPICAL) 4"x4"MID RAIL I POSTS(TYPICAL) j HURRICANE CLIPS(TYP) I COMPOSITE DECKING 2"x 10"JOISTS @ 19.7"O.C. j WITH 65%LIGHT (TYPICAL OF 3) PENETRATION I 1/2"THRU BOLTS,WASHER F = AND NUTS(TYPICAL) p - l - 4"x 4"MID RAIL POSTS °1 ;, ° WALKWAY & PIE R CHAMFER CUT(TYPICAL) ° 1/2"THRU BOLTS,WASHER o I SECTION DETAIL AND NUTS(TYPICAL) NOT TO SCALE 3"x 8"YOKE 2"x 6"CROSS BRACE °1 (ALTERNATE ANGLE) POSTS&PILES DRIVE(//��//�� //��//��//��//��/��/�� TO DEPTH AS SPECIFIED IN PROFILE DETAIL _3.7'0.C. SECTION DETAILS PARCEL ADDRESS: 624 POPONESSETT ROAD, COTUIT, MA DATUM: M.L.W. = 0.00 FT. PLAN BY: CAPE & ISLANDS ENGINEERING, INC. ELEVATIONS IN FEET 508.477.7272 DATE: MAY 30, 2018 PARCEL ID 007 001 SHEET 7 OF 7 I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. /M RK G ' co Q a' PROPOSED PIER LOCUS MAP N.T.S. (SEE SHEET 2)� - y �Y � •r y --I . SALT MARSH ' � � ` ����� SALAMACK, DONALD J& 00 y� � MAUREEN J Zr 614 POPONESSETT RD COTUIT, MA02635 i� •� 2 MLW �y, oo I % O LOT 6 lam. CB/DH FOUND I Y CB/DH - - 47'+/- FOUND . v v� 78 6'09,,W 138.47 FRUITTVLISA J TR Y K TR& N 780 56 09,f W wlcrj GARY K MARKOWITZ& LISA J ) QO`v �rO FRUITT REV TR i r_ 37 BAKER AVENUE CB/DH QO LEXINGTON,MA 02421 FOUND GRAPHIC SCALE 50 0 50 TIDE RANGE: ±2.7' LATITUDE 41.610368 LONGITUDE-70.455837 PROPOSED PIER, RAMP & FLOAT PLAN DATUM: M.L.W. = 0.00 FT. FLOOD ZONE ON NAVD88 PARCEL ADDRESS: 624 POPONESSETT ROAD, ELEVATIONS IN FEET COTUIT, MA PARCEL ID 007 001 SHEET 1 OF 7 PLAN ACCOMPANYING PETITION OF PAUL& CAROL EMBREE TO CONSTRUCT, & MAINTAIN A 4' x 60' PIER, Tx 30' RAMP AND A 8' x 18' FLOAT IN AND OVER THE WATERS OF POPPONESSET BAY, COTUIT, MASSACHUSETTS PLAN BY: CAPE & ISLANDS ENGINEERING, INC. 508.477.7272 DATE: MAY 30, 2018 I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. x 2.2 x 1.9 \ x 2.0 x 1.9 ,x2.o . x2.1 2.0 x2.o x 2.0 61�.x x 2.0 (� x2.0 x2.0 x1.9 x x2.1 x2.1 x2.1 x21 2.0 O/cS� x20 x2p PROPOSED 8'W x 18'L FLOAT 92 x 1.9 x 1.7 C� x 1.9 2.0 > x 9_ 8"DIAMETER PILES FOR FLOAT x1.9 l xjq 18' 1 SUPPORT(TYPICAL OF 4) A� x 1.5 x 1.4 0 xs x 1.8 cAj� o0 x1.9 F x1.7 0 0 6) x .3 x x y0', 1.1 co x1.2 1.: x x2.0 �Q� x1.7 x1.5 x1.1 G' 0 u' x1. O x x L8 7 0�0 0 ,�FF�o.s x 0.9 0. x 1.4 �P�JG� x 7 0.5 O x 0. x1.6 "pp x1.3 0.9 x0.9 xpc x1fi ��Q�� 0.3 PROPOSED x0.5 Fj x � 0.2 g� x 0.5 x x 30'x TRAMP 0C x 0.9 '(1.4 1.3 O �. \ 0.0 "0 x G� x0.9 ;,05 PROPOSED KAYAK RACK. SF xos x0.8 x 1.3 9 \ 0.1 S� 1.3 x 0.5 A x1.2 x1.1 x0.8 x0.3 PROPOSED T WIDE /tC,p x0.8 x 10 x x o.3 ��=0 LATERAL ACCESS STAIRS x S',. 0.9 x0.5 ML� 0.4 �G x0.6 x08 x0.6 8"DIAMETER PILES ; ; ; xo.1 0.3 x 0.6 0.2 C� CiQ� x0'5 @ 15'-0"O.C.FOR PIER ' ' ' x0.3 SUPPORT(TYPICAL OF 4) '*�� x0.4 xo.5 x0.1 / ------- x0.5 PROPOSED 4'W x 60'L \ ELEVATED PIER.FIRST 30'DECKING SET AT 1:18 SLOPE.FINAL 30'DECKING' 1 4"x 6"POSTS @ 15"'O.C. ; ;-; SET LEVEL AT EL.6.2 x FOR PIER SUPPORT - - (REFER TO PROFILE&DETAILS) x0.2 .0 (TYPICAL OF 6) �, S x010.o ir. AMH WV 3.2 _ -=�y.`� //� SM-5 .;I;. 7. i SM-4 \ -SM-7� _ ' 4 ALIGN PROPOSED STAIRS IN \\ _ WITH RIGHT SIDE OF PROPOSED PIER ~� �~ -12 - - - - / �S PROPOSED 3'W x 40'L TIMBER STAIRS / 16 \����0\\\\ WITH TOP,MID AND LOWER LANDINGS_FZ %� -18- - �ti\ LANDING ELEVATIONS=17.7, 13.1 &8.7 _-.- 20 3' OF ._ / � i EDGE \\ \ PROPOSED PIER PLAN VIEW GRAPHIC SCALE 20 0 20 PARCEL ADDRESS: 624 POPONESSETT ROAD, DATUM: M:L.W. = 0.00 FT. COTUIT, MA FLOOD ZONE ON NAVD88 PLAN BY: CAPE & ISLANDS ENGINEERING, INC. ELEVATIONS IN FEET 508.477.7272 DATE: MAY 30, 2018 PARCEL ID 007 001 SHEET 2 OF 7 I HEREBY CERTIFY THAT THIS PLAN DOES CONFORM WITH THE REQUIREMENTS FOR RECORDING OF PLANS IN THE REGISTRY OF DEEDS. MATTHEW C. COSTA, P.L.S. v LL 0 M m2 LL a 0 O = W J W _ in J I- E 0 Q cp Q U � Qo U) V wZ5 a 0 m ln (� LL � a cnpZ t J cn � ZOJ Q p � z U O ulQQ v~i0 zu- 2 it a U' � w � �� �a � fn o � d0u0 w A 0f 0 ~ 0 p x a00 `� :- cnXEn w p I W OI w N xa. F- w x u.l pwN 0 a- I J_ z -vcnz inU) p a0Q 0 cn L.L Y Ilw } W20 d W O of aL � g �U) W a z v) z_ O Q � .. M J W m LL W fj QQQ O > I~ M ° in � t(D w �/��� Z �_ VJ o M U OLL �f ~ w o ° I° z (L Q o � rn U) IT x I v O N (n W RIU (nn O a r x Q J EL O w O U) r u- H HS21b W lib U) d w 30 3003 U) O zz N z �/W d Z V N e1' lL - ° v/ Cj N I OI V 0. WrL 'v ? 0 X f11dO MIN L'Z IWZJ � f- J � p � Ii =MHW - U) c)iQ = jw U) L � w 0wwOf aU �' � �a I� vo > Ln OQ OM p co pJ M � U) EL 52OLL I0F= zpO_ ~ a0 z> 0E- I � �- ° OQ m � gfo C"L ( UU baU NuwiwwCL x N m N LL° Q N U) �0�- = W Y I HSZIt1W llt/S_ a 0 a 0 w 30 3043 o N W J Jco N x W dQz� - F- J (D JlnLL J W d Q J I O Q ? Q O � w (a w W 0 W U) W I Ma Ow 0. ° U) 0. 06 MATCH LINE (SEE SHEET 4) aW ~ � w `mow U) (V Q U = r, GRAPHIC SCALE x 10 0 10 (V PROPOSED PIER PRIORLE PARCEL ADDRESS: 624 POPONESSETT ROAD, COTUIT, MA DATUM: M.L.W. = 0.00 FT. PLAN BY: CAPE & ISLANDS ENGINEERING, INC. ELEVATIONS IN FEET 508.477.7272 DATE: MAY 30, 2018 PARCEL ID 007 001 SHEET 3 OF 7 I i z r J- GENERAL NOTES w s • Barnstable g. Dept. 0 ' 1 / \ proved by LOC"IONSAREBASFDONMI NTHEGROUNO•INSMUMENTSURVEYANDEIEVATONSB M '''- �Gi - • e, ONTHENAVD 1988 DATUM.COORDINATE SYSTEM USED ISTHEMAh NLANDCOORDINATESYSTEM, Z4 . r/ [ - - .� • \•��' DATUM:HAD W.UNITS:U.S.SURVEY FEET. W. ., ��.,' �' - -,T•; \ O,� N C. WATER DEPTH INFORMATION SHOWN BELOW THE MEAN LOW WATER LINE INDICATE THE DEPTH OF Q OJ.. : De1'�#'• \J r WATER AVAILABLE WHEN THE LOCAL TIDE IS AT THE MEAN LOW WATER LEVEL.WATER DEPIM 1 MEASUREMENTS OBTAINED FROM HYDROGRAPHIC SURVEY PERFORMED ON IOR/1B USING SINGLE Zd /'' •( ..:�O �' :a / - - +'� BEMI BATHYMETTICDATAfALLECTEDWIMSONMMIMMDTRIMBLERIOGNSSPOSITIONING g Lu TO Y ,- ° - x ' .1• \ SYSTEM WITH MACORS VRS NETWORK CORRECTIONS. a ul . s T ZONING DISTRICT.RF S ZONEXTYIR LOCATED WITHINEMERGENCY MANAGEMENT NAGEMENT AGENCY OF AE(E D INSNONCE WP FF ZOVE%BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY(FEMA),ON FLOOD INSURANCE RATE L1S w5 mw` - MM NO.25001C0]52J,WITNAMM EFFECTIVE PATE OFJULY 16.2014. A Q a ..-, /J/ \':: •'�A / e ', • t .•TIi9L LIESWITDNTHEWINDBORNEDEBMSREGION(MEMILE OMSHORELWE). ^` fuw Z TKS LOT IS NOT MAPPED WITHIN A MESA NATURAL HERITAGE AND ENDANGERED SPECIES AREA - LOCUSMAP NOTTOSCALE A 880 SP J' , y ^4 < ' � ,. 0.EA 5 _. - . GEED REFERENCE.083D524 PG 2]B REFERENCE:PB469FGB2 O•� �j� �o - .. PIJ.N . ,.. '. .: " :'.. ,. �c .«y :. :• ': tea..., 4 .. � . ,r - 03$ F�iFFzOa .. i. ?' CONSERVATION NOTES ,. PRIORTO ANYWORKCOMMENCING.THE DEP FILE NUMBERSHALLBEPOS17E ONABIGN ON THE Sz4 TV ma 300 FEET OFFSET FROM - ,Y .. $e _ STREET SIDE OF THE LOT AND MAINTAINED IN A VISI8LE CONDITION THROUGHOUT THE PROJECT. wz_'� Il�ayaU PROPOSED PIER .. � �-iIU mU LIMRSOFWORKSHALLBE ESTABLISHED PRIOR TO ANY.WORK,EXCAVATOR,CONSTRUCTION OR ^ A « / r ""'• ,. BTLAWThe LIMIT OF WORKWLLCON55T OF ROW OF STAKEDEDMENT STOPOR COMPOST CLEARING _ ROLLWITHSILTFENCESACKING THE SEDIMENT OP ROLL WILL BE REPLACEGAS NECESSMY o€ �pg'a�Yu' w TO BE MAINTAINEDIN GOOD CONDITION TIHROUGHOUTTTE ENTIRE CONSTRUCTION PERIOD.NO FiuOi = oUFzaz . EMAVLLBE AL LOWED TO BE PLACEOAGAINSTIHE LIMROFWORKATANYRME.UPON $ - '' / ;. %. ". '• T ' ,'� \" ` * ^ COPLETIONOF ALL CONSTRUCTOR AND STABILIZATION OFTHESRE,SE.IMENTU_R.U_ �� �w Uu�l s • v W RE D AND PROPERLY DISPOSED. : .... N - ai: 4 • - a. -� 'LLBE MOVE . h • ' r / 20O FEET OFFSET MOM PROPOSED PIER - " e A - "' PRIOR TO ANY WORK COMMENCING.MVANCE WRITTEN NOTIFICATION WILL BE PROVIDED TO NO MOORINGS,NO WAYSIOWATER,NO PIERS OR DOCKS 'iHELOCAL CONSERVATION COMMISSION. A 0 SIGNATEDLI ITOFWORMATERIILL6WILLBESTOREO.EVENTT:MENTANV.OUTSIDETIVE `(NOF4ggsq� F - .4- / -- • r - ^'° - a OESIONATO HE PLFWORK AREA FORTHEHTHE E%CEPTION OF EDUIPMENTANDMATERULLS � . _ . ', �. ,.. x• • � s ''.,'/ q .I •�� � " 0.ENTE0 TO THE PLANTINGS FOR THE REQUIRED MITIGATOR, � U4 L. ✓' „B'DIAMETER PILES FOR THE CONSTRUCTION SITE WILL BE CLEANED ONLY TO REMOVE ANY LOOSE DEBRIS.ALL 5 282 1 y SUPPORT(TYPICAL OF 41 x^0x.V4 •/ ' ^ - " • - •., y \ 35 e;.. .:` k' " TOPRETURBEDAREAS WITHIN THE UMROF BE RK DONE RESTORATION WILLC NKSTA ION W> - - /. •, / w:s _ ySfl OO4TyFy - n u TO PREVENT EROSION.STABILIZATION WILL BE DONE IMMEDIATELY FOLLOWING COMRETION OF a9 � CONSTRUCTION. i r"y [ x+°: r 0 y J 1P O 9 - F e' o r r f VOLUNTARY PLANTING NOTESHDF u$ .. ; - ,SOµ x�p�d`T'QOd' •<. x3`'D M1 x PITSPOSED ll W x 1B'L FLOAT . ' - • / _ _ .S2 r�0 „ 3 !,. _ 1 : PROPOSED MITIGATION PLANTINGS TO BE 2 GALLON CONTAINERS OR LARGER,STAGGERED IN O RAC F LJ]AROPRNERA�"A _• �,_ 1 P ry�v 33 Ja' ^ .�/" 3 '�_/-_ r AREA. ON AND PIANTF.D3FEET,ON CENTER OR AS NECESSARY TOMEDUATELY RE VEGETATE CML. y I�_. •., x33` A'.�n 3 o xy 'A PROPOSED 30'RIWP I PERPENDICULAROGNO s. gO18 �0 4�C PROPOSED KAYAK PACK .y 'a - PROPOSED PLANTINGS INCLUDE: T RE � , I ES PROPOSED 3'WIQE LATERAL ACCESS EXISTING PRIVATE PIER ��'���JJJ 'V' _ - a : - • • ARROWWOOD(Y�pumum tlenMWm1 AND INI®ERRY(IIez GWPrea) " w - ATOORW pW PoSf2 PIE x3 .3 •`e Al x3c .A 1/ // STAIRS PROFILE 6 DETAILS) M4 POPONESSETT ROM b '• " -]B2T ' TER,PI R T a / cAa .II API•LICANT OR APPLICANTS REPRESENTATIVE SHALL HAVE AN ONSTIE MEETING WITH CONSERVATION w FEET DISI a .. ERS Oqp ;T� ' •3° e y • AGENG-PRIOR TO INSTALLING TOSSPLANTS TOREV B LOCATOR OFSPE ENPRID SPECIES.My OrOWA By. r RLR e r o-ANCE TO OPPpgI�,C1GRA PS xn. x 4 ,p b t., xc•A•..o �. - CHMG-S IN PVaNT SPECIES TO BE APPROVED BT CONSERVATION AGENT PRIOR TO INSTALIATON Ch-1ked By. MC T I., R342f CLO6E5T PIER 6TRU(.TURE I - _ G EALTH ANDS INDA ESSM Y . I.. --_� , • e• J } • x TO PROPERLY ESTMUSN VEGETATION.OD COASTAL BEACH .. � NEC � 's. ", ` -'" I � I ~__ � -�, o . 3• AM1Yi-� - -� " _-_-- _ � PLANTS TO BE MAINTAINED IN GOOD HEALTH AND REPLACED AS NEEDED FOR GROWING SEASONS. ` J v x / - r a PLANTINGS SHALL BE INSTALLED PRIOR TO COMPLETION OF CONSTRUCTOR ACTIVITIES.OWNER e Ov '« 3 TP.c3 `•• / - W MHN�-a SHALL NOTIFY CONSERVATION AGENTFOR FINAL INSPECTION WITHIN 3O DAYS AFTER ALL PLANTINGS x•J 1 J'• j. - �IfNW�. A 0. 6Ma Y H.... I 4" M10 c • __ - STALLED. _ / �: eta,tiM'3A- 4 13M-8- SM-1. HAVE BEEN IN If I ; B'OIAMETER PILE87A•,•--9"�� - „p:" { t !P 41� 6 6, ®d..w4 13M-4 B. /` ®15'-0•Q.D.FQR PIER {j/ 1 ^ 4' 4'"X•l - { '4. FEMA ZONE AE(EL{21- _ _ a .3•ry` •. B. SUPPORT mPI;oO�F 4) c x�. ,r••\ B•6• ®O,AFL --.2-- ..L ZONEX --�4 E%IBRNG TIMBER STEPBTO BE - - Np"' 3 •a 't a. 'F_%GTWGMCORAGRESERVED-�0 I, .. ,. . •FO.i p624 MPONPSSETTROM `'V:]•9.A -`x`P -•CB-�__�-- •_ I AEAR PLAN�NOT EBOATS,RAMP.KAYAKS,CANOESORMYOTHEROBJECTSBE O A oy c3 \GnIL O2A 6. 1P C.-� REMOVED AND REPLACED WITH ,,- G. 1 " \ �� P 1• �,,,���,,., P' ---- B' 4'WIDE GRANNE STONE STEPS ` / `• • L+HABS ®- • B' STORED DIRECTLY ON THE SALT MARSH,COASTALB E SK L BORDERING ED ACRETATED K r, „ - $ `xTx'V x'Ax'3x'��'":� - t cS 3 f:\�,4Yc.Y:� `B•i V0 OF' - \ 8• MARSH R BORDERING RMIP.BOAT.KAYAK OR CANOE SHALL DE DRAGGED ACR;tC_THE SALT B. 'T + y _i 5 "' x': rti,•Po,e Yam_ •p3f /v SM3 V .?I<-•.Y: 0' B' -FJRRTME PATIO TO BE MARSH OR BORpERING VEGETATED WERAND ATPNY TIME. 1 V Ar]•A,nP•.3 A° ( i er 12' �1 ®16'\ g. RECONSlAUL1W WffHIN O n,9 Y+rYro1 F / .N� ® 0 THE SAMEFOOTPRINT .. - C`3`•�.,,_M1N -�`V,x� ,,..,,° •. F o•,, i022 \74 2.THE PROPOSED PIER IS INTENDED FOR THE UBE OF NON�MOTORIZED WATERCMFTS. �. PROPOSED 4•w u6VLELEVATEDPIER-"3c `�AV'A �F - ':•1�, /' /., f.,,.ry E%ISRNG COMPORT y'3.n2•x1DKAYAK PACK SHALL BE INSTALLED ON THE OUTER 510E OF THE WALKING SURFACE OF W A .M -- -" - • • FIRST3V DECKING SET AT I:IBSLOPE '� >l'- y S ♦' •• U 1B•• ,I. Z' BIN AND GOLF MATT THE PIER SUPPORTED ON ONE END WITH ATIMBER PILE- .IP FINA:..3P'DECKING SET LEVEL AT EL 45 ✓`. +"' . y M-] :: / U, jf.uh BRICK y<p till,\ 2O TO BE REMOVED _ e - - . s -- -915FER'TO PROFILE S DETAILS) ,°•9 x I ' / 1q- - l ? FATO ✓' N A•+ PARCEL 4.MERE IS AT LEAST ISFMT SETBACK PROVIDED FROM THE PROPOSED PIER TO PROPERTY LINE. W ` •: \ " 't ' x`9 x•P2 •` x`, e1 4 w'J" <j< " �. >m` 0070D2 '� K " • • • , .PROPOSED 3•Wx40'LTMBER STAIRS : V'� ` " rn L / / ® f� E MO AND FLO WITHIN OPO D PIER. " qI Vr ` -aJ. % +�• 5.THERE ARE 1W0 WN PIERS ATS WITH 00'OF PR SE P x O ° - \ WITH TOP.MID AND LOWER LANDINGS . \ /I \ w TATI SE O N •`>:;x^ ey I �'. ••,6.THERE IS ONE PRIVATE MOOWNGASSIGNED TO THE SUBJECT PROPERTY WITRIN.100 FEET OF LANDING ELEVATIONS=16 D,11 46ID G • : \+ MEFERTOPRO;ILE6OETMLS) , ""- '.'�1/ SM8 - ,�L,p 2'• THEPROPTHINZQER.THEPEMENDPIEFL KNOWNPIERS.FLOATS,MOORINOSANOWATER _ :. " .♦. x^. '..`� `) u _- •� S' ' e; ( r _ drS�^''!1, .. RAMPS WITHIN 20P OF THE PROPOSED PIER Q � 9 ;^ S� SD FEET BUFFERZONE 7,,TIERE IS NO KNOWN EEL GRASS BEDSWRHIN20DOFPROPOSEDPIER: >`l .'w�) ,C p m-�ACC�q� 'PROM COASTAL BANK _r,. •'"\ R'^ , "''.. x` "`+ ".,rA 8.THE CLOSEST WATER ACCESS STRUCTURE TO THE PROPOSED PIER IS AN EXISTING PIER r+. • �.-,46 • T 1 x` i n r �I ` )3 ® •S / tP A - _ LOCATED APPROXIMATELY227SOUMONN2BPOPPONESSETROM. A, - S v 4' BULKHEAD f� R 9.THE CLOSEST PUBLIC LANDING TO THE PROPOSED PIER IS LOCATED APPROXIMATELY B50 FEET . \ : a.- 'y \ a+'4 .• xc3 / '.I ni • O / BRICK ✓' STONE TOTHESOUTHON9]55SANTUITROAD.W.IPA a 1B .DRIVEWAY ^4 - -i:.. .. F - .. -., :t",. .. •� _ e ,P: A 4- C)1�� CI -i 1� • • IBl]ETERMINATON OF MEAN LOW WATER:..: '... I. '\ ^,.' •�. x`3 •co , /p/p ] •-, B \ / ?_ ,i; CONSTRUCTION ACCESS TO REMAIN FROM THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION(NOAA) - - {' - • / 8/ ltr WITH IN EXISTING GRASS AREAS-NO - .. ]+ 2P EQUATION FOR DATUM CONVERSION:MLW-NAVOBee 1:fiB(IN FEET) n EXISTING FOOTPATH TO RE x`,.. , ; O4• I \ 4. �/��-��' • 1V, 'x CLEARAINGNECTOR SHALL INSTALL SEDIMENT :,: .. •. \ n ; .\ ABAN00RED AND PLANTED 2 t)•' `/ 1B•. 2': STOP ROLLAS LIMITS OF WORN ALONG PRO.IECTSTATISTICS... - . ITH NATIVE SHRUBS(150BF.) " •«a� 4` "�'0' / .,r* ` • -.®. �....W .� 3 E L ..O B•.. (dam / ®2�- 6 ` EDGES OF MISTING GRASS. - : - c Z .. � �'y'IOl t • ° •.. e:� „ �' '- m 14• O to '� 37,42 SOF�UPIAND) 1.PR PERTYWIDTHATMEANLOW WATER(MLW), 376 FEET. 0 • • ° -2.19 OF WATER FRONTAGE WIDTH AT M.LW.: - -FEET H a• �``•'` 13.200x S.F.IWETLANDI' -. < _ U . ., a �. _ \.\. / / , B./, © s• 1D. 6.� 50,618x S.F.TOTAL 4X4. CBIDH .. O rn / e /, © •. © O 3,0 - _ -FOUND - 3.TOTAL NUMBER OF 4'x 4•POSTS: 4POSTS• (Z14S.F.) E%TENOED PROPERLY LINE ®td•.. _ 4.TOTAL NUMBER OF4•x6'POSTS: 18 PORTS- (214 S.F.) PERPENDICULARTOSHORE- .`5 yo 1 r / - 0. WDATE _ �30 F f346q is 5.TOTAL NUMBER OFW OWAETER PILES: ' 'BPILES -,(2BOS.F.) y F- „ M10 /T •, ©12• - ry •3%L LBERICHMARN: ° 6.TOTALLENGTHOFSTAIRS•PIER.RAMPANDFLOAT 135 FEET .. V. a W O ' �•1F. \1 R 1� CONCRETE BOUND 7 LENGTH OF STAIRS AND PIER OVER CO 42 FEET LEGEND oos CBIOH-1 0 1J6.�7• `SO FEET BUFFER ZONE q�Obr QC�EL.=2SB2 NAVDBB Yr r4 B.LENGTH OF PIER OVERSALT MARSH: MT� � 27FEET ? N Q (J \ .. a,� .:. CB-- CONCRETE BOUND o-. `° FOVNE. N78°5�09,W 'FROM COASTAL BANK'r, 0�1\ [- _ EL.-25.50(MLW DANM) 9.lENG1H FROMMEAN HIGH WATER TO END FLOAT: - 84 FEET Z Q G_ W w r(y .._...._UTILITY POLE + -"4 '�A Ze- - -� O S�� , - 1D.LENGTH FROM MEAN LOW WATERTOENDOF FLOAT, - 33.MET O 2 .: .- PARCEL CONIFEROUSTREE ° - - N : - • _A j �C(nJ�'P�\�P '•II.AREAOF PREEMINENT DISTURBANCE IN BUFFER ZONE: OS.F:•r 0. = Z 00 m¢ OOfi019 12' ' © -+DESIWOUSTREE 'T yr t, .' - 5- -• 12.MFA OF PREEMINENT DISTURBANCE IN COASTAL BANK 0I.GO27 S.F. = O Q Q A " - p QO� \�'^"'� '' 13.ARFA OFPREEMINENTDISTURBANCEINSALTMMSH: D2T S.F. V V 6 Q• MHW MEAN HIGH WATER - 'VR - v GUY WIRE t4.MEA OF PREEMINENT DISTURBANCE INC'ASTAL BEACH: 141 R.F. a, MLW MEAN LOW WATER Y • O¢ �, - CB+DH P \ " t t5.MEA OF PREEMINENT DISTURBANCE IN LAND UNDER OCEAN,. 'IAOS.F. a 0 TREE LINE n I ° O - ''y FOUND O Z - .-'Y.:.. -WET WETLAND LINE _ 2 ��.. " ¢ - _ FZ _---FLOODZONE _ - '. . .---CB-__COASTAL BRAN -e A f: 'd¢ a+. a. SAJ /�i`v� • ' N POSTS RAIL FENCE w a, ` ...-G---O- --STOCKADE FENCE .. 0 '.3O .-GU BOO of - • , p. BaYy�^•,. Y -x PICKETROW �O u <� _XX_XX CHAINLINK FENCE ° ' LL " EXISTING WATER ACCESS STRUCNRE V U _ ,. .�cungoRAIL +. SCALE:V=.30• 446 .,. I ,:. Xfi29 POPONESSETT ROM ' f, LOW--_-LIMITOF WORN 1 S• c.: {: .� ::I ,,. • :.'.: - _ '�'�'d"� o."' .,.� DatO:. MARCH 27.2018 Ig o� P / A• 3 II n. , e - ' , y: .?•'. , .. -. ^ '� ,.: x' ._ - .. by T' r a ° ,4ro b • , .-: � of- ,. - :: , ::... .' c T t e • .Y I 9 ll' 4'x13 6 POSTS®Is.O.C. ; • I L ZE, OLL "� 'r' •�Y r q Ay FOR PIER SUPPORT / F • _ 5 i LIMIT OF WORK I �' - --_ by 4 - " '(TYPICALOF6) I / B f • 11 Cy1 r PROPOSEDTWIDE 'i r PIRST3 4'WN ETAT ,SLopR 8' •EXISTIN AIM ..I ))pp)j{ G BER STEPS iO tU' 1 BE .v • NALw00ECKING SETAT I:IBSLOPE �TRSDIEFLES3 `X" 1Y REMOVED ANDANI REPLACEIJ WRH \ OSTRUCTEOTO BE - .9 FINAL 30'OECKING 6ET lEYEI AT El4.5 STAIRS(REFERTO fi' 0- C 4'WIDE GRANITE STONE STEPS '�RECONSTRUCTEG WITHIN x ",Ip IREFER TO PROFILE So TAILS) 'PROFILE80ETAIL51 I I THE SAME FOOTPRINT AIRS WTT� B'DIAMETER PILES y /' C - RIGHT SIDE OF PROAL q PROPOSED TPOSED PIER I / BJ> ' \ I. WS 150'O,C,FOR PIER SUPPORT(TYPICAL OF 01 V7 ADDITIONAL BUFFER PLANTS N524 \ 1 STORY PROPOSED B'W.1B'L FLOAT ® \ F Ow JX4 % I / NATIVE SHRUBS(350 S.F.) .DWELLING 0 " B.a `coA3TAL BEACH- /W / ) B, Bu. �y14• THRESHOLD M1 c PROPOSED KAYAK RACK { 1 15 TOP / pROPoSE. I W.4a L TIMBER STAIRS \ m • PROPoSE030 RAMP IS UWBING�-` - - 1 LANDING. / WITH TOP.MID AND LOWER LANDINGS . F to MIDLAND NG f f-�T ,, (REFELANDIR TO PROFILE D DETAILS) BT.D! \ I!' W� w O ....-... ... •... (REFER PROFILES DETAILS) I '` G, ...................... .-...--•---......... .. UQ ....- .-.-. . g 4 .................•--.. ...----- --- •---f-- •• I \ - s m 4a � 3a RAMP Ja PIER$PM•EL 33 5 ]a PIE-OVER 2T OVER MARSH '( �. -� �114• I \ \ �- � III JJ' �iy, PROPoSED BEACH ACCESS DEP TOP OF COASTAL BANK• j r I •y3' ,0 -5' S71RSD'W111L 11 (\1/ COASTAL BANK +ly" \ \ \ TOWNTOP OFCOASTALBANK - \ \ I I I _I W DIAMETER PILES FOR FLOAT)//9 I oy \ I 1, _ 1 S �,,,���...1 \ � 1'1S%SLOPE) \ \ 1 9 SUPPORT(TYPICAL OF d) S' h• I ; +R' ++�, U `\ . I�J - o s3aR nIRFAos=].S 1r ( Lk4 U FUp? w� STAIR RISE R9= I + tt Y - - + E%ISTINGPATHTOBEABNJOONEDANDAREA `, BULKHEAD \ -I. I, -W MEAN HIGH WATER(MHW) ` \MEAN IOW WATER(MLW) TO BE PL N 50 ANTEDWITHNATE SHRUBS. 111 l ` C �M��RJ��yGa SOUNDING(OEPM BELOW MEAN IOWWATER m &u-ttPICAL) r ( UMITOFWORI( \ 2 + , L �1B• I 1- \ 2IFo0 � io3s? yliy PROPOSED PIER PLAN DETAIL ` FI SCALE:1•=10. �-] VERAICAL DATUM NOTE: Y. PROPOSED 3'WIDE STAIRS ALL ELEVATIONS ON PIER BASED ON THE NORTH AMERICAN VERTICAL GATUM OF INS(NAVOBB) - PROPOSED X WIDE ST.RM--� COWERSIONFORMUUFORMEMLOWWAMR(MMDAMM:MLW-NAV08B+1.T - - THREAD(TYPCAL) TS' 4'ad'PJUL PGST6(TY%CAL) - . PROPOSED PUBLIC LITERAL - aWIGEENBA DIORSIDES) 47 STAIRBIANDING33'WIDE DECKING BtTTWEENBMp10 RISERS x ACCESS SIGN(SEE UETgK) O.C. 15'O.C_ TO REACH BEACH LEVEL d'PIIR - � - 2'x 10-STRINGERS 3a ' 3V SPAN 4-WIDE PIER -2SLORNG1a SPANS r '- (TYP,OF 3) HANDANDMIDRAKS - LEVEL OECK®EL.4.E -0➢1:124'WIDEPIEROECK 'GC- 'O.G. Ia O.G - rI� - El=16.0 I '.4'RAKFOSTS 150.0 PROPOSED 3'WIDE STAIRS TS' - B•DWAETERCOMPOSITEORNNYI ®SO.C.(T'PICALI PROPOSEDSDE - - r STAIR DETAIL - - FBSERS%11•THREgD(rvPICAL) e'W.IVIFLOAT-I COATED PILES FOR FLOAT(TYPICAL OF 4) I STAIRS(SEEDUAR) x4'PO5T®ZOC. 1-=„ '1({ - NOT TO SCALE EL=45 HINGE RAMPTOPIER Y.B'TOP HAND NAIL _ SIGN IDENTIF'1'ING DEP HOOP AND ROLLERTO BE INSTALLED 8YxS 51BETWLS +/ ~T 2'x6•CROSS BRACE(TYP) _ PERMR NO.(SEE OETAR) � AT LpCgTON OF4PRE3 EL=].0 •x 6•POSTS FOR STAIR - FLOATATMHW LEVEL ' SUPPORT.SPAGNGAS ' L..s EL. sI q• _ NOTED PIw.oF,o) CONSERVATION NOTES FLOAT AT MLW LEVEL - 3 P fn1Y' I LL611RAfZE ROMOEDTWIDESTAIRST5' PRIOR TO ANY WORK COMMENCING,THE DEP ME NUMBER SHALL BE POSTED ON A SIGN ON THE STREET =2]}MLW IZgTUML___ ___ _______------- ---- -- __ ,) RISERS.11•THREAD(TYPICAL) MHW-Ta(NAVOBB) � A '� " SIOEOF THELOTANDMAWMNEDINAWSIBLELONDNIONTHRWGHOUTTHEPROIECT. DrdWn By. RLR EXISTING E 3'.B•YOKE(TYP) _MLW=O.Q,LMLW DATUMl___ ..i-.:.. ------------- Z F MLW=-LT(-KnaBj I,6' - BRACE OSS <m ALL STAIR POSTS DRIVEN OR SET TO A MINIMUM DEPTH OF 4' THELIMITOFWORK WILL BE INSTALLED PRIOR TO ANY WORK EXCAVATION,CONSTRUCTION OR CLEARING COBOk80 By. MC ....... s om z -O.Bx. BEACH GRADE -0.Tx a SPACE ) 3� -itt IF SONO TUBES ARE USED ALSO SET TO MINIMUM DEPTH OF A' OFVEGETATIORIN ORDERTOPREVEN OD GETOTHENTERESTSOFTIEACTANDBYUW.TELUT IuWw ` 3'.8•YOKE(TYP) ALLPIERPOSTS '� ' ,y OFWORKWILLCONSISTOFA ROWOFSTAKEDSEOIMENTSMPORWO OSTROLL SALTATION r (r - INSTALLEOTOA 2d_ w Yx10'JOISTSQ18.5'O.C.FOR PROPOSED STgWS(TYPICALGFJ) FENCE CoDoCACKING.THE SEDIMENT STOP ROLL WILL BE REPLACED AS NECESSARY TO BE MAINTANED IN MIRDIFTHOFE I YA,a JOISTS®IS.T'O.L. •x6'POSTS QIS'-0.O.C.FOR ELEVATED PIER SUPPORT(TYPICAL OF 6) GOOD CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD.NOFRI WILLBEg %,W OBE m ' FOP PROPOSED PIER PULED AGAINST THE LIMOOF WORKATANY TIME,UPON COMFLETroN OF ALl CONSTRUCTION ANO BOATSHALL BEDESIGNEDSUCHTHATTHEBOTTOMOF �RVPICALOF3) I - STABIlIL1TON OF THE SRE.SEDIMENT STOP ROLL WILL BE REMOVED AND PROPERLY DISPOSED OF. _ 2'.1 a STRINGERS(TIP.OF 3) THE TUBS ARE AT MOST 10 INCHES SUBMERGED AND ^AU. I ESDRNENAMINIMUM1W IALL 473PANOVER LOA9TILLBMIXFLOAT STOPS(CHAINS)SHALL BE PROVIDED TO PROVDE BELOWTHEMUILUNEORREFUSAL PILES TO BE DRIVEN ONMETER TAMPoSRE OR SETWRH4FEETMINIMUM -~ PRIOR TO ANY WORK COMMENCING.ADVANCE WRITTEN NOT1FiCATONWILL BERtDVIOEDTpTHE LOCAL 'x4'POSTS FOR BEACH ACCESS A MINIMUM CLEARANCE TO SOTTOMOF 15 INCHES: TOAMINIMUMDEPTHOF VBIYLCOATEUPILESFORPIER LLEARANCEOVERSALTMPASH - CONSERVATION COMMISSION. w STAIRS SET A MINIMUM OF 4 FEET I&FEETORRFFUSAL (TYWCALOF4) DECKING OVER SALTMANSH - LL BELOW GRADE(TYPICAL OF 4) SHALL PROVIDE 65%uG PENETRATION NO DEBRIS.EOUIPMENT OR MATERIALS WILL BE STORED,EVEN TEMPORARLLY,OUTSIDE THE OESIGNATED CI _ - LIMB OF WORK AREA WITITHE EXCEFTON OF EOUIRMEM AND MATEXWSPEUTED TO TIIEFLNdfIDK,s LU FORTH REQUIRED MITIGATION. BEACH ACCESS STAIR DETAIL PROPOSED FLOAT,PIER AND STAIR PROFILE C, SCALE:1'=1G• - /Y 12-GALV.CARRIAGEBOLMASNEEOED THE CONSTRUCTION SITE WILL BE CLEANED DAILY TO REMOVE ANY LOOSE DEBRIS. o NOT TO SCALE IJI e. 1 ALL DISTURBED AREASWITHINTHE LIMITOFWORKREOUIRING RESTORATIONWILLSTABILQEDTO a 1-1-WHERE NOTED PREVENT EROSION.STABIL VATON WILL BE DONE IMMEDIATELY FOLLOWING COMPLETION OF O _ CUT AT IS ANGLE' CONSTRUCTION. x - (REFERTOPROFILE) I' _,r Q.c._ _ - _ _ �_ �DECK@PpN -� r.6•TOPHANDRAIL q ECKSPM PIER CONSTRUCTION NOTES o W r YaS WWDPNL POSTS SHALL CUT - .FLOAT SHALL BE FUPNIS11Ep wIM 5040 t.ALL CONSTRUCTION SHALL MEET gPFLICABIE BUILDING CODES. - ' gTIVAN.LETo SHED PLATE INSTALLED WHEREFOR ANGLESTOPS = K 2'a3'91GE RAILS WATER AND SET RAIL 3•x3-RAIL BOARDS 2.WALKWAY WIDTH SHg OT EXCEED 4-FEET. w POSTS TO BE CUTAT tS'MGLE i ON PILES TO KEEPI FFORANLE FROM O ' 2'x B'TOPHMDRAIL IIf O'D WALKWAY. SHED WATER AND SET HAND RAIL d'.SWALKWAY BOTTOM OF FLOAT TO EXISTING GRADE. - x a•x6•WALKWAY 3.PROPOSED STRUCTURAL TIMBER CONSTRUCTION SHALL BE OF NO./OR BETTER PRESSURE TREATED O m POSTS ITYPILAL) YxJ'PAIL BO�i0.S I jPILES(TYPICAL) POSTS(TYPICAL) - - SIDESBENDSTOMATCHEXISTING 90UTHERN PINE. - HNIRICANENPSRYP) 4•a4'MIO TWL PREMOLDED NIGH DENSitt m -- 4'.d'MIDRAIL GRAMDECKING PoSTS(TYPICAL) HURRICANE CLIP3RYP) POLYETHYLENE SHELL ENCAPSULATED 4.NON-LEACHING WOOD PRESERVATIVE MUST BE USED FOR WOODS CONSTRUCTION MATERIAL. ' 1 ' COMPOSITE DECKNG DECKINGANOSPACING POLYSTYRENE FLOATS h 4'x4'MIp RAIL PoSTS I✓ POSTS(TYPICALNG I 4' 66%LIGHT TO MATCH EXISTING STRUCTURAL TIMBER LARGER THAN 3'THICNNESS MAY BE C.CA PRESSURE TREATED.SMALLER - CHAMFERCUT(IYPIM)BSTS COMPOSITE DECKING ' .4•RAIL POSTS®SO.C. 1 PENEIRNTON rx1a JOISTS QJ 19.T O.C. I WpENETRATON L10 MOUNTS 2.tO SKIDS TIMBER SHALL HAVE NOKC.CA PRESSURE IREATMENf. �WIT1fi5%LIGHT PENETRATIONi' (TYPICAL) I O CAl OF 3) 12'THRU BOLTS.WASHER �%• - - 6.ALL 4.8 POSTS SHALL BE CCA TREATED FOR AMINE CONTACT(gWPA UCSA). ' Yx10•JDISTS®19,-O.C. I' T ANDNUTS RYpICAL) b _ (TYPICAL OF J) �i Y.10'JOIST5�18.5'O.C. - Y� B.ALL STRINGERS,YOKES,CROSS BRACING,HMOAND MIDWJLS SHALLBENONCCA TREATEpIIMBER (TYPICAL OF 3) AWPA UC5A:0.00 AGO.0.31 CA OR EOUAL. 4'.d'MID RNL POSTS - - 3'.B'YOItE 3'x8'YOKE POSTCHAMFERCUT CHAMFER CUT(TYPICAL) �"��V T.PIER DECKING SHALL PROVIDE AT LEAST SIG INCH SPACING BETWEEN DECK BOARDS.DECKING - - 3'x B'YOKE 11r THRU BOLTS,WASlIER FLOAT SHALLO ANGLE STOPS SOLID TO PLATE INSTALLED SPANNING OVER SALT MARSH SMALL PROVIDE 85%LIGM PENETRATION. - 12ANDN S(rYPIAL) WASHER BOLTS WITH MD NUTS(TYPICAL) - WHERE FOR ANGLE STOPS ON PILES TO KEEP I B.EXCEPT AS NOTED.THE CONTRACTOR SHALL INSTALL THE POSTS AS SHDWN.DRIVE POSTS ToA MONUTS(fYPICALI� -• WASHERS NUTS(rvp.) - - - CLEARANCE FROM BOTTOM OF FLOAT TO EXISTING GRADE. MINIMUM DEPTH OF 6.OR UNTIL REFUSAL.DRIVE PILES TO A MINIMUM DEPTH OF to OR UNTIL REFUSAL. Tn Y x 8-CROSS BRACE • - T J_a-YOKE (ALTERNATE ANGLE) BRACE w _ - - L�J S.GALL POSTS AND REATESTEXMNLINGSSLE.RENSHOLDINSULHq WAY ASTOMINIMI2ETURBDITYIOE Q ) Yx6'CROE ANGLE) - - ICI ! 1 GREATEST EXTEM POSSBLE.PILES SHOULD BE INSTALLED BY POUNO!NG TO CREAIEaNOLEANO LU EXISTING GRADE �. (ALTERNATE ANGLE) 2'x 6'CROSS SPACE _ (gLTERNgiE ANGLE) _ THEN VIBRATED TO PPPRORi1gTE DEPTH. W . �./i./i ./�.n/� i.t n�/.�✓n t./�.i./n/�. ../ d, I JI eIb. II aleAil-, h ,�I.,Ih, ,L o it 6'POSTS-REFERTO ,iJ ,� a I - IO.CUT OFF POSTS AT THE ELEVATION INDICATED HEREIN. ' Q UI pD + POSTS.PILES DRIVEN n PROFILE FOR SPACING TODEPTH AS SPECIFIED (TYPICALOFIO) //' \////\//.\//\//\//\ //\� �////.\ \/�\//\//\//✓�`//\ 4 1 II.ALL METAL FASTENERS SHALL BE HOT DIPPED Gg VANMED STEEL. fY W U W - INPROFILEDETAIL POSTS 8 PILES DRIVEN '.NOTE: 12ALL BENTS SHALL BE FASTENED WITH I2-DIA.THROUGHBOLTS WITHADOCKWASIIERON EACH END. (HL� TO DEPTH AS SPECIFIED ' FLOATS ARE TO BE STORED ON x a WALKWAY&PIER SIDE VIEW DETAIL PosTse PILES ORNEN _S w suRFgcE of THE wER ,.ONj z (Jai I . ..d IN PROFILE DETAIL. _ 1 SITE IN AN UPVJ4O LOGTON 13.2'n 10'KAYAK RACK SHALL BE IrvSTALIEO ON THE OUIEfl 8DE OF THE WAM(ING MOTTO SCALE TO BE - - SUPPORTEDONONEENO WITHATMBERPILE. yy IN PROFILE DETAIL - Z Q Q _ 14.FLOA1 SHALL BE PROVIDED6UCHTHATTHEBOTTOMOFTHE FLOATTUBPRGVDES CLEARANGEOF IB O W ® '' INCHES MINIMUM TOTHEBOTTOM WNENTHE FLOAT IS OCCUPIED(LOADED)AT MEAN IOW WATER. D_ ti STAIR SECTION DETAIL'' WALKWAY&PIER SECTION DETAI O 5 z Q. HAND RAIL WITH POSTS MOMIDRAIL (2)J'NYLON CASTERS NOT TO SCALE + _'NOT TO SCALE 18 FEET 1S CROSSES EDGED FMEANHIGH FOE PROVIDED R PUBLIC UTERALACCESSAT LOCgTIONS WHERESTRUCTURE O_ !po-. O , FLOAT SHALL BE DESIGNED AND CONSTRUCTED SUCH THAT FLOAT te.DOCK MARKING:A SIGNTO INCLUDE CHAPTER DEPLICENSENUMSERANDPNOPERTYSMEETADDRESS 0 1/4'PLMK STRUCTURECANWRHSTMDACTIVELOgBSWHEN COMPLETELY IS REQUIRED,SEE DETML.IOENTIFICATON DISPLAYS MUST BE MAINTAINED TO BEVISIDLE 0L - - b 3' SPACE { SUPPORTED BY FLOAT STOPS INDEPENDENTOFBUOYANTMBS 1HROUGHOUTTHE OWNERSHIP OF THE DOCK RAMP MDFLOAT. - - Z 0 r //Y EYE BOLT . 1T.ANY LIGHTING SHALL CONFORM TOTIIETOWN OF BMNSTASLE CONSERVATION COMMISSION LIGHTING - HOOP AND ROLLER TOBEINSTALLED REQUIREMENTS.LIGHTING.IF INSTALLED.SHALL NOT EXCEED A 25 WATTINCANDESCENT BULB,BET A p �- ATLOCATIONOF4PILES MINIMUM OF12 FEET APARTAND AMA)UMUM OF TING FEET HIGH FROMTHE WALKING SURFACE.THESE VT LIGHTS MUST BE BAFFLED OR SHADED TO DIRECT LIGHT DOWNWARD ONLY,THE LIGHISCMNOT .. FLOAT DETAIL UTILIZE TIMERS AND SHOULD BE SWITCHED AT BEGINNNGAND ENDOF DOCK UT (21 a NYLON CASTERS .. MOTTO SCALE Q - . RAMP DETAIL j - .. DOIO: MARCH27,2018 ' NGTTO SCALE - { SHEET 2 x ` ,yo / 18" i A I , LL ti x x O O zG = ,yo xti x. �h 4"x 6"POSTS @ 15'"O.C. ? i LIMIT OF WORK \ i M g N fe x xo°' x°`? FOR PIER SUPPORT I I { a 4 C) x� xoa (TYPICAL OF 6) 8^ m Lu J n / 81 PROPOSED 4'W x 60'L ELEVATED PIER PROPOSED T WIDE 6 _ -� 10" I 8^ U EXISTING TIMBER STEPS TO BE x�• FIRST 30'DECKING SET AT 1:18 SLOPE LATERAL ACCESS " 2X4" I 12" REMOVED AND REPLACED WITH ` `,,``' z r` co EXISTING PATIO TO BE •._ ,_ .. � Z f ti FINAL 30'DECKING SET LEVEL AT EL.4.5 �� STAIRS(REFER TO z r.-_ 6 1r3 U- 4'WIDE GRANITE STONE STEPS RECONSTRUCTED WITHIN °� U /� THE SAME FOOTPRINT z 0 xti. o (REFER TO PROFILE&DETAILS) PROFILE&DETAILS) (3-- °D x o �- ALIGN PROPOSED STAIRS WITH /�8 ! W to x�• x 8"DIAMETER PILES Q y RIGHT SIDE OF PROPOSED PIER 1 ° / E • 15'-0-O.C.FOR PIER SUPPORT TYPICAL OF 4 Q fo I G ADDITIONAL BUFFER PLANTS #624 �') PROPOSED 8 W x 18 L FLOAT @ ( ) LL / 3X4" ;Q z t 1 STORY !- > xy4 8.0' /O j , ` 40 / NATIVE SHRUBS(350 S.F.) DWELLING e o _. o ,� \-COASTAL BEACH W :9 xti' . x °, O q N O �J 14" THRESHOLD Z o o x� xo' . 4 J Q SM4 ttr / \ EL.=23.7 ` z. W xtio xtio xti O x°h x°° : `�' o I �/ _i J 5. x ' ° PROPOSED KAYAK RACK U N � 15°TOP / PROPOSED 3'W x 40'L TIMBER STAIRS i PROPOSED 30'RAMP ! r ' 5'LANDING:, , LANDING / WITH TOP,MID AND LOWER LANDINGS 1 low <000 0 0 E s 10 MID-LANDING, z d X cv ,v N LANDING ELEVATIONS=16.0,11.4&7.0 W u p=o rn K O ...,"_==..n.."........ ..............."....... ....._.._.._.__....__=_ _..... "_.."_____- " • _ . _ _ _ _ , (REFER TO PROFILE&DETAILS) a,W w l-2 Ut W .................... .._._.......,. `- _�_._.__ .<......._..._=_.,........ ..........q......"..... ..... .. � Q ( �0 a°> - - "-.' -- - _ J CL 60 . ......................... vv.v...vv.vvvvvvavvvvvv vv v....ay.vv vvsv.v=av xti xti xL O O x,y. xq. O LL x.°j x'U 'L 30`RAMP 30'PIER SPAN-EL.3.2 3V PIER @ 1:12 SLOE 40" V - o o �^ 2T OVER SA MARSH 1 V)05 2 95' N ` ,14" N , U. m 33, z_ \ U U Z J J xti° ��� PROPOSED BEACH ACCESS 1 DEP TOP OF COASTAL BANK p w c7 z a z u' w x�o xryo x\a \° xtio xti STAIRS T W x 10'L 1 m COASTAL BANK + tp� ` TOWN TOP OF COASTAL BANK I ,,I _ a w ti x xo'� I L'° + �� , (>18%SLOPE) to cn SM-6 i J W O o w cn 8 DIAMETER PILES FOR FLOAT 2i _UZ SUPPORT(TYPICAL OF 4) x _ 5 O� ",+ Co ra i o a W w z w a w y Z x o �� STAIR RISERS-7.5" !z p {�+ + q U W' o =x o (� STAIR THREADS 12 W x° x°� + + EXISTING PATH TO BE ABANDONED AND AREA BULKHEAD ; i a Q-1 =a z o O w a L !�' In x�9 MEAN HIGH WATER(MHW)' \ + + \ - TO BE PLANTED WITH NATIVE SHRUBS(150 S.F.) IL m z y�Q a 0 U Q a x •. y. + N 1p-�� OW W -�QWJ�LLU o0 Z x`L x MEAN LOW WATER(MLW) + `L 80 SOUNDING(DEPTH BELOW MEAN LOW WATER-TYPICAL) z a z 0 w w O z `L •. ry. s h !L I ?� + + �Qa Onzapwa ti x z Z ` � � + + 1 � LIMIT OF WORK a�z ENO}x�o i 2 x x x x S- + + + � zwx zO�wax + + + logy Chi " vag�W wwU�aaz � ? 01reP zi- OLLOxz O W + + \ Zf-u_O 0 zoUrw PROPOSED PIER PLAN DETAIL x`y ° x°y �' \ SCALE: 1" =10' uM 7 �� \ 11"MIN. VERTICAL DATUM NOTE: ALL ELEVATIONS ON PIER BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988(NAVD88) PROPOSED 3'WIDE STAIRS CONVERSION FORMULA FOR MEAN LOW WATER(MLW)DATUM: MLW=NAVD83+1.T 7.5"RISERS x 11"MINIMUM-~'•� 4"x 4"RAIL PGSI'S{TYPICAL) THREAD(TYPICAL) 7.5" 3'WIDE STAIRS(BOTH SIDES) PROPOSED PUBLIC LATERAL- 3- STAIR&LANDINGS T WIDE DECKING BETWEEN 8 AND 10 RISERS ACCESS SIGN(SEE DETAIL) - --TO REACH BEACH LEVEL 4'PIER 5'O.C. I� 15'O.C. 30'SPAN 4'WIDE PIER 30'-2 SLOPING 15'SPANS 2"x 10"STRINGERS \ HAND AND MID RAILS LEVEL DECK @ EL.4.5 - @ 1:12,4'WIDE PIER DECK �� 5'-O.C. 5'O.C. 10,O.C. _i , A - _ EL.=16.0 4"x 4"RAIL POSTS I 15'O.C. _ STAIR P ROPSOED T WIDE STAIRS 7.5" 8"DIAMETER COMPOSITE OR VINYL @ 5'O.C.(TYPICAL) PROPOSED SIDE ', STAIR DETAIL RISERS x 11"THREAD(TYPICAL) 8'W x 18'L FLOAT COATED PILES FOR FLOAT(TYPICAL OF 4) I STAIRS(SEE DETAIL) 4"x 4"POST @ 2'O.C. L.=11.4 l� :, HINGE RAMP TO PIER 2"x 6"TOP HAND RAIL t I I NOT TO SCALE EL.=4.5 &2"x 3"SIDE RAILS - -� 2"x 6"CROSS BRACE(TYP) " SIGN IDENTIFYING DEP HOOP AND ROLLER TO BE INSTALLED PERMIT NO.(SEE DETAIL) AT LOCATION OF 4 PILES EL.=7.0 -4"x 6 POSTS FOR STAIR 7. FLOAT.AT MHW LEVEL / • __-- ..--_-• SUPPORT,SPACING AS EL.4.5 EL. 4. 1 i - NOTED(TYPICAL OF 10) CONSERVATION NOTES FLOAT AT MLW LEVEL 4 30'RAMP � � "CLEARAN„E PROPOOED 3'WIDE STA(RS 7.5" _MHW=2.7 MLW DATUML _ - - - - - - i '�` u RISERS x I I"THREAD(TYPICAL) PRIOR TO ANY WORK COMMENCING,THE DEP FILE NUMBER SHALL BE POSTED ON A SIGN ON THE STREET - - - 1 SIDE OF THE LOT AND MAINTAINED IN A VISIBLE CONDITION THROUGHOUT THE PROJECT.MHW=1.0(NAVD88) EXISTING G E , . MLW=0.0 MLW DATUM - �„ 3"x 8"YOKE(TYP) Drawn By: RLR - - - _ _ - - - -)- - - - - - - - --- - - - - - - - - - _ 2"x 6"CROSS ¢� I ALL STAIR POSTS DRIVEN OR SET TO A MINIMUM DEPTH OF 4' THE LIMIT OF WORK WILL BE INSTALLED PRIOR TO ANY WORK,EXCAVATION,CONSTRUCTION OR CLEARING Checked B MLW=-1.7(NAVD88) 1 6' a BRACE(TYP) it �> G�!Q Y MC -0.8x -0.7x ' o g J¢ c:g IF SONO TUBES ARE USED ALSO SET TO MINIMUM DEPTH OF 4' OF VEGETATION,IN ORDER TO PREVENT DAMAGE TO THE INTERESTS OF THE ACT AND BYLAW.THE LIMIT BEACH GRADE 3"ac 8"YOKE(TYP) ALL PIER POSTS ►- x Mzo �F- " " OF WORK WILL CONSIST OF A ROW OF STAKED SEDIMENT STOP OR COMPOST ROLL WITH SILTATION INSTALLED TO A w N N� ;( 2 x 10 JOISTS @ 16.5 O.C,FOR PROPOSED STAIRS(TYPICAL OF 3) FENCE BACKING. THE SEDIMENT STOP ROLL WILL BE REPLACED AS NECESSARY TO BE MAINTAINED IN Co J Lj MIN.DEPTH OF 6' I 2"x 10"JOISTS @ 19.7"O.C. -t x 6"POSTS 15'-0"O.C.FOR ELEVATED PIER SUPPORT TYPICAL OF 6 GOOD CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. NO FILL WILL BE ALLOWED TO BE 1 FOR PROPOSED PIER @ ( ) PLACED AGAINST THE LIMIT OF WORK AT ANY TIME. UPON COMPLETION OF ALL CONSTRUCTION AND ,(TYPICAL OF 3) STABILIZATION OF THE SITE,SE'MMENT STOP ROLL WILL BE REMOVED AND PROPERLY DISPOSED OF. FLOAT SHALL BE DESIGNED SUCH THAT THE BOTTOM OF - " THE TUBS ARE AT MOST 10 INCHES SUBMERGED AND ALL PILES DRIVEN A MINIMUM 16' 2T-BOTTOM OF STRINGER 42'SPAN OVER COASTAL BANK 2 x 10"STRINGERS(TYP.OF 3) FLOAT STOPS(CHAINS)SHALL BE PROVIDED TO PROVIDE ' BELOW THE MUD-LINE OR REFUSAL. ALL PILES TO BE DRIVEN 8"DIAMETER COMPOSITE OR ' '` TO A MINIMUM DEPTH OF VINYL COATED PILES FOR PIER SET WITH 4 FEET MINIMUM CONSERVATION COMMISSION.COMMENCING,ADVANCE WRITTEN NOTIFICATION WILL BE PROVIDED TO THE LOCAL 4"x 4"POSTS FOR BEACH ACCESS A MINIMUM CLEARANCE TO BOTTOM OF 18 INCHES PRIOR R ANY WORK SSION. STAIRS SET A MINIMUM OF 4 FEET 16-FEET OR REFUSAL (TYPICAL OF 4) CLEARANCE OVER SALT MARSH w DECKING OVER SALT MARSH a NO DEBRIS,EQUIPMENT OR MATERIALS WILL BE STORED,EVEN TEMPORARILY,OUTSIDE THE DESIGNATED BELOW GRADE(TYPICAL OF 4) SHALL PROVIDE 65%LIGHT PENETRATION . 0 LIMIT OF WORK AREA WITH THE EXCEPTION OF EQUIPMENT AND MATERIALS RELATED TO THE PLANTINGS W FOR THE REQUIRED MITIGATION. ~`'R 1/2"GALV.CARRIAGE BOLTS (L BEACH ACCESS STAIR DETAIL PROPOSED FLOAT, PIER AND STAIR PROFILE ; AS NEEDED THE CONSTRUCTION SITE WILL BE CLEANED DAILY TO REMOVE ANY LOOSE DEBRIS. O SCALE: 1"=10' a NOT TO SCALE j ,I r ALL DISTURBED AREAS WITHIN THE LIMIT OF WORK REQUIRING RESTORATION WILL STABILIZED TO N L- - -"-�'--- 10"PILES WHERE NOTED � I I I' ' PREVENT EROSION. STABILIZATION WILL BE DONE IMMEDIATELY FOLLOWING COMPLETION OF O CUT AT 15°ANGLE 11! !t " I CONSTRUCTION. 2 (REFER TO PROFILE) PIER CONSTRUCTION NOTES z 2 x 6"TOP HAND RAIL - _ - 3'DECK SPAN 4'DECK SP/1�1 Ill POSTS SHALL BE CUT LFLOAT 1. ALL CONSTRUCTION SHALL MEET APPLICABLE BUILDING CODES. o2"x 6"HAND RAIL SHALL BE FURNISHED WITH SOLID .. W i AT 15°ANGLE TO SHED I fz t I PLATE INSTALLED WHERE FOR ANGLE STOPS - i I 2"x 3"SIDE RAILS I WATER AND SET RAIL I BOARDS 2. WALKWAY WIDTH SHALL NOT EXCEED 4-FEET. O 1 2"x 3"RAIL BO: ON PILES TO KEEP 12"CLEARANCE FROM N = f POSTS TO BE CUT AT 15"ANGLE I 1 1 ' BOTTOM OF FLOAT TO EXISTING GRADE. 2"x 6"TOP HAND RAIL 1110-D WALKWAY SHED WATER AND SET HAND RAIL I i 4"x 6"WALKWAY 3. PROPOSED STRUCTURAL TIMBER CONSTRUCTION SHALL BE OF NO. OR BETTER PRESSURE TREATED � � 4"x 6"WALKWAY " t 2"x 3"RAIL BO OS I I PILES(TYPICAL) I I POSTS(TYPICAL SOUTHERN PINE. POSTS(TYPICAL) FIZ 1 SIDES&ENDS TO MATCH EXISTING PRE-MOLDED HIGH DENSITY HURRICANE CLIPS(TYP) i 4"x 4"MID RAIL f o° F-- t HURRICANE CLIPS SYP POLYETHYLENE ENCAPSULATED - r " " GRATE DECKING I POSTS TYPICAL I ( ) POL ETH LENE SHELL E C D 4. NON-LEACHING W000 PRESERVATIVE MUST BE USED FOR WOODS CONSTRUCTION MATERIAL. � x 4 MID RAIL 1 I (TYPICAL) m r� DECKING AND SPACING POLYSTYRENE FLOATS 4 I I ° I I c,OMPOSITF DEC!<� ,-._., .,. I I 65/o LIGHT STRUCTURAL TIMBER LAR aG!2 THAN 3 THICKNESS MAY BE C.C.A.PRESSURE TREATED. SMALLER u j POSTS TYPICAL)) f I I ° TO MATCH EXISTING " ( I „ " " ' WITH65/oLl(Ile i 4"x 4 MID RAIL POSTS I I ,' 1 4:x 4 RAIL POSTS 5 O.C. 2 x 10 JOISTS @ 19.7 O.C. I � 2x10 MOUNTS 2x10 SKIDS TIMBER SHALL HAVE NON-C.C.A.PRESSURE TREATMENT. 1 I i 1 @ f PENETRATION CHAMFER CUT TYPICAL COMPOSITE DECKING 1 f I (TYPICAL OF 3) PENETRATDI ( ) i I 65%LIGHT PENETRATION 11 (TYPICAL) I I 1 t I WITH `- -' n �� 5. ALL 4x6 POSTS SHALL BE Ci�>`�TREATED FOR MARINE CONTACT AWPA UCSA. > f I= = 1/2"THRU BOLTS,WASHER p _ - . / ( ) t 2"x 10"JOISTS 19.7"O.C. i I AND NUTS(TYPICAL)-�� p . ;,.- ,% 6. ALL STRINGERS,-YOKES,CROSS BRACING,HAND AND MID-RAILS SHALL BENON-CCA TREATED TIMBER, @ I 2"x 10"JOISTS @ 16.5"O.C. f" � � (TYPICAL OF 3) �, .+ (TYPICAL OF 3) ,., 0 4"x 4"MID RAIL POSTS o o AWPA UC5A:0.60 ACQ,0.31 CA OR EQUAL. � , _ - ---- ° CHAMFER CUT(TYPICAL) °I --- - ° _ _ -"' POST CHAMFER CUT \f 7. PIER DECKING SHALL PROVIDE AT LEAST 3/4 INCH SPACING BETWEEN DECK BOARDS. DECKING _ 3"x 8"YOKE 3"x 8"YOKE _= i o o SPANNING OVER SALT MARSH SHALL PROVIDE 65%LIGHT PENETRATION. o 3"x 8"YOKE 1/2"THRU BOLTS,WASHER o 1 FLOAT SHALL BE FURNISHED WITH SOLID PLATE INSTALLEDJ o --112"THRU BOLTS,WASHER 1/2"THRU BOLTS WITH AND NUTS(TYPICAL) WHERE FOR ANGLE STOPS ON PILES TO KEEP 12" WASHER&NUTS(TYP.) CLEARANCE FROM BOTTOM OF FLOAT TO EXISTING GRADE. 8. EXCEPT AS NOTED,THE CONTRACTOR SHALL INSTALL THE POSTS AS SHOWN.DRIVE POSTS TO A o AND NUTS(TYPICAL) =__= MINIMUM DEPTH OF V ORUNTIL REFUSAL. DRIVE PILES TO A MINIMUM DEPTH OF 16'OR UNTIL REFUSAL. 0 07 -�2"x 6"CROSS BRACE 3"x 8"YOKE J (ALTERNATE ANGLE) 2"x 6"CROSS BRACE(TYP} rol Fol 9. ALL POSTS AND PILINGS SHALL BE INSTALLED IN SUCH A WAY AS TO MINIMIZE TURBIDITY TO THEALTERNATE ANGLE o f 2"x 6"CROSS BRACE o GREATEST EXTENT POSSIBLE.PILES SHOULD BE INSTALLED BY POUNDING TO CREATE A HOLE AND }-- EXISTING GRADE ( ) (ALTERNATE ANGLE) THEN VIBRATED TO APPROPRIATE DEPTH. W /i. /i✓i.�/i\/i✓ice , .ail, , , ,►II, ,III, ,Ilr, ,I►, ,III, , , ,III, ,II/, ,, , III, II o 4"x 6"POSTS -REFER TO - _--- 10.CUT OFF POSTS AT THE ELEVATION INDICATED HEREIN. POSTS&PILES DRIVEN --------------- PROFILE FOR SPACING \ TO DEPTH AS SPECIFIED (TYPICAL OF 10) ��/.\ \�/.��/.��/,��/,\,�/.��/, ��/,�� � ,� , � ,� ,� . �� . .\ 11.ALL METAL FASTENERS SHALL BE HOT DIPPED GALVANIZED STEEL. ~ W W IN PROFILE DETAIL w U) U POSTS&PILES DRIVEN LL NOTE: 12.ALL BENTS SHALL BE FASTENED WITH 1/2"DIA.THROUGH BOLTS WITH A DOCK WASHER ON EACH END. = Oa.. V- + TO DEPTH AS SPECIFIED co FLOATS ARE TO BE STORED ON W WALKWAY & PIER SIDE VIEW DETAIL POSTS&PILES DRIVEN IN PROFILE DETAIL -__.�_ SITE IN AN UPLAND LOCATION 13.2'x 10'KAYAK RACK SHALL BE INSTALLED ON THE OUTER SIDE OF THE WALKING SURFACE OF THE PIER Q Z TO DEPTH AS SPECIFIED --,._ SUPPORTED ON ONE ENO WITH A TIMBER PILE. U) Z to Q a NOT TO SCALE W to IN PROFILE DETAIL 3.TO.C. _. Z 14.FLOAT SHALL BE PROVIDED SUCH THAT THE BOTTOM OF THE FLOAT TUB PROVIDES CLEARANCE OF 18 W lu INCHES MINIMUM TO THE BJ'iTOM WHEN THE FLOAT IS OCCUPIED(LOADED)AT MEAN LOW WATER. d F- STAIR SECTION DETAIL WALKWAY & PIER SECTION DETAIL o 5 z o- HAND RAIL WITH POSTS AND MID-RAIL NOT TO SCALE NOT TO SCALE 18 FEET 15.PROVISION SHALL BE PROVIDED FOR PUBLIC LATERAL ACCESS AT LOCATIONS WHERE STRUCTURE 0- F- 0 0 (2)3"NYLON CASTERS- CROSSES EDGE OF MEAN 4ilGFl WATER. co OFLOAT SHALL BE DESIGNED AND CONSTRUCTED SUCH THAT FLOAT 16.DOCK MARKING:A SIGN TO INCLUDE CHAPTER DEP LICENSE NUMBER AND PROPERTY STREET ADDRESS 1/4"PLANK STRUCTURE CAN WITHSTAND ACTIVE LOADS WHEN COMPLETELY IS REQUIRED,SEE DETAIL.IDENTIFICATION DISPLAYS MUST BE MAINTAINED TO BE VISIBLE THROUGHOUT THE OWNERSHIP OF THE DOCK,RAMP AND FLOAT. OZ 0 y 3 SPACE SUPPORTED BY FLOAT STOPS INDEPENDENT OF BUOYANT TUBS � � 1/2"EYE BOLT HOOP AND ROLLER TO BE INSTALLED 17.ANY LIGHTING SHALL CONFORM TO THE TOWN OF BARNSTABLE CONSERVATION COMMISSION LIGHTING CC CL AT LOCATION OF 4 PILES REQUIREMENTS.LIGHTING;IF INSTALLED,SHALL NOT EXCEED A 25 WATT INCANDESCENT BULB,SET A 0 A MINIMUM OF 12 FEET APART AND A MAXIMUM OF TWO FEET HIGH FROM THE WALKING SURFACE.THESE C L 30' _I FLOAT DETAIL UTILIZE LIGHTS TIMERS AND SHOULD BE SWITCHED AT BEGINNING AND END OFF DOCK. UST BE BAFFLED OR SHADED TO DIRECT LIGHT DOWNWARD ONLY. E LIGHTS CANNOT N (2)3"NYLON CASTERS NOT TO SCALE Q RAMP DETAIL Date: MARCH 27,2018 NOT TO SCALE SHEET 2 swarnstable Dept. Approved by: Permit#: Z z - Z O� W Nrn GENERAL NOTES w w, ti LOCATIONS ARE BASED ON AN"ON THE GROUND"INSTRUMENT SURVEY AND ELEVATIONS BASED g6 u) ON THE NAVD 1988 DATUM.COORDINATE SYSTEM USED IS THE MA-MAINLAND COORDINATE SYSTEM, ` Co DATUM:NAD 83,UNITS:U.S.SURVEY FEET. W W it WATER DEPTH INFORMATION SHOWN BELOW THE MEAN LOW WATER LINE INDICATE HE DEPTH OF 1 WATER AVAILABLE WHEN THE LOCAL TIDE IS AT THE MEAN LOW WATER LEVEL. WATER DEPTH l �� MEASUREMENTS OBTAINED FROM HYDROGRAPHIC SURVEY PERFORMED ON 10/2/18 USING SINGLE Z� SYSTEMAWITH MACfORS C DATA VRS NLETWORK OLECTED IRRECT ONS TH ITE AND TRIMBLE RI GNSS POSITIONING � z J g. Cn ZONING DISTRICT:RF 0e$w t ofQO o p CL c?8 LOCUS 1 / , 1! PROPERTY IS LOCATED WITHIN AN AREA HAVING A ZONE DESIGNATION OF AE(EL.12)&NON-HAZARD W Z r, p x Q r ``may 1 �I M ZONE X BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY(FEMA),ON FLOOD INSURANCE RATE g a W W W w r_ \ y \ °'°' >"r j MAP NO.25001 C0752J,WITH A MAP EFFECTIVE DATE OF JULY 16,2014. I, >I g W m IUUI of THIS LOT LIES WITHIN THE WINDBORNE DEBRIS REGION(ONE MILE FROM SHORELINE). 1 a 0) Z THIS LOT IS NOT MAPPED WITHIN A MESA NATURAL HERITAGE AND ENDANGERED SPECIES AREA. I co COO, c LOCUS MAP NOT TO SCALE / LOT AREA=50,618±S.F d' )z L DEED REFERENCE:DB 30524 PG 279 z a°z z � wzz (9ma2¢ (r >-w 0 i_Oaw (n iLu ¢Omo / \ PLAN REFERENCE: PB 489 PG 82 o m z z z-<LL g a Q uj ri) uj / / \ CONSERVATION NOTES ~}w d W-- N onoa��=Z � z E_(L ~¢ W / \ PRIOR TO ANY WORK COMMENCING,HE DEP FILE NUMBER SHALL BE POSTED ON A SIGN ON THE W¢N u w CO o z a ¢ / 300 FEET OFFSET FROM STREET SIDE OF THE LOT AND MAINTAINED IN A VISIBLE CONDITION THROUGHOUT THE PROJECT. Co z"a u)n m a v U ¢ / PROPOSED PIER \ Zia F-Zaww z m Z LIMITS OF WORK SHALL BE ESTABLISHED PRIOR TO ANY WORK,EXCAVATION,CONSTRUCTION OR }w 60 w - U CLEARING OF VEGETATION,IN ORDER TO PREVENT DAMAGE TO THE INTERESTS OF THE ACT AND a~z o rn O Q= z F- 2 / / \ BYLAW. THE LIMIT OF WORK WILL CONSIST OF A ROW OF STAKED SEDIMENT STOP OR COMPOST Z�= a Z p�w a� � W ROLL WITH SILT-FENCE BACKING. THE SEDIMENT STOP ROLL WILL BE REPLACED AS NECESSARY w g o~ Q of a z°W w TO BE MAINTAINED IN GOOD CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. NO tJ a 02 w w<w E z a z >- ? �=cn°x Wm zwc� a c� 00 z O O x WED TO BE PLACED AGAINST THE LIMIT OF WORK AT ANY TIME. UPON O x�F- z i-- 2 FILL WILL BE ALLOWED w L z~a0 �<nzo°t- U W COMPLETION OF ALL CONSTRUCTION AND STABILIZATION OF THE SITE,SEDIMENT STOP ROLL WILLSE REMOVED AND PROPERLY DISPOSED. / / \ 200 FEET OFFSET FROM PROPOSED PIER PRIOR TO ANY WORK COMMENCING,ADVANCE WRITTEN NOTIFICATION WILL BE PROVIDED TO NO MOORINGS,NO WAYS TO WATER,NO PIERS OR DOCKS THE LOCAL CONSERVATION COMMISSION. NO DEBRIS,EQUIPMENT OR MATERIALS WILL BE STORED,EVEN TEMPORARILY,OUTSIDE THE / \ DESIGNATED LIMIT OF WORK AREA WITH THE EXCEPTION OF EQUIPMENT AND MATERIALS RELATED TO THE PLANTINGS FOR THE REQUIRED MITIGATION. + .�:+ I+,�+(I'I,tC� C.xryo a1� , l :+� c o \ THE CONSTRUCTION SITE WILL BE CLEANED DAILY TO REMOVE ANY LOOSE DEBRIS. / 8"DIAMETER PILES FOR FLOAT } F e0 xti•x�0 / G SUPPORT(TYPICAL OF 4) x 0 x a \ ALL DISTURBED AREAS WITHIN THE LIMIT OF WORK REQUIRING RESTORATION WILL STABILIZED 5 \ ��o x,� ' A x o " g CTO ONS TEVENT RUCTION.EROSION. STABILIZATION WILL BE DONE IMMEDIATELY FOLLOWING COMPLETION OF N ii 4 t M. I / 0� �� ��Q`� x^ x x11 ° QQ 0 4j-0 d`Pg� ,tix'L�x`L° x'`6 x` x'`� x�1 \ l 0" �� JC�O PC, GJ�C x"� X., p x""1 x��O O x,�p co �.OJ x X,ti'L x X y� xx x XN x°y b P VOLUNTARY PLANTING NOTES OFnc� ti o o x PROPOSED 8'W x 18'L FLOAT , 2 RAUL G / xti• xti. xti. xti. `� L(7ARpl-FtNERA m �� ��Q� ti x�° o o xti° x ^,ti PROPOSED MITIGATION PLANTINGS TO BE 2 GALLON CONTAINERS OR LARGER,STAGGERED IN ti a o FORMATION AND PLANTED 3 FEET ON CENTER OR AS NECESSARY TO ADEQUATELY RE-VEGETATE ° CIVIL P ti � xryox o xti xti- ll4x x'`' x'`' o EXTENDED PROPERTY LINE AREA ° titi ° No.468450 V� PERPENDICULAR TO SHORE o�o� GIs \� x�, x'ti� o xti,�� x ti° x'ti� �ti x 'xo°' PROPOSED 30'RAMP ' x�xti? xL x o x o x,�a x x PROPOSED KAYAK RACK PROPOSED PLANTINGS INCLUDE: SS A ' NO R20 , xlti xl�ll x'L' x'ti' o xo9 x°� PROPOSED T WIDE LATERAL ACCESS G EXISTING PRIVATE PIER MOORING 0 FROM p o xti .y4 x'`� xo0 STAIRS REFER TO PROFILE&DETAILS I ARROWWOOD(Viburnum dentatum)AND INKBERRY(Ilex Glabrea) l I S, Wgys T ROPOSE xL so �. x o °° ( ) I #614 POPONESSETT ROAD 762+FEET O wgTFR,�'FRS x`tio xD PIER x ti° x�� o X .0 x�� xo x xo° AGENIT PRIORCANT TO P INSTALLING PLANTS TO REV EW LOCATION O SPEPLICANT'S REPRESENTATIVE SHALL HAVE AN ICIF C PLANT SPTE MEETING IECIES.TH NANYVATfON Drawn By: RLR DISTANCE TO OPPOSITE 1p I I OBIT �ROOCKS xti -' x xry� x~Nob xlP x°6 x x 5 x°h j CHANGES IN PLANT SPECIES TO BE APPROVED BY CONSERVATION AGENT PRIOR TO INSTALLATION. ESHORE ° xti• x xo• Checked By: MC x'ti' ox o, x °• °; x R342't CLOSEST PIER STRUCTURE xrys o xti• x'�' x xo o x o� 1W PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH AND SHALL BE REPLACED IN KIND AS NECESSARY I I x`ti o h .. °' - M TO PROPERLY ESTABLISH VEGETATION. >+ xti' ti xti' x'`� x° COASTAL BEACH---,,, m xti° o � o• ___-_ x'`' x°o I o � PLANTS TO BE MAINTAINED IN GOOD HEALTH AND REPLACED AS NEEDED FOR 3 GROWING SEASONS. 1 xry,� x,V ° _. ..._. ._. -._ ... .. _.. PLANTINGS _.. - � _ -- ��" '� J PLANTINGS SHALL BE INSTALLED PRIOR TO COMPLETION OF CONSTRUCTION ACTIVITIES OWNER I p4 x� .y.x'ti�xy? o x`ti~ xs __ MHW---MHW----_ SHALL NOTIFY CONSERVATION AGENT FOR FINAL INSPECTION WITHIN 30 DAYS AFTER ALL O Q� x xti' ti 5 9 .� MHW '0 SM-2 4"gH ""`- HAVE BEEN INSTALLED. W ZI xti xti o x1_ o S R5� ,�4--13M-�--4" 13M---A SM-1 I x " � � xti xti° 8"DIAMETER PILES .y. �, � Xo`•' x � , •, '' �P �d, �=`� 6„ 6" 8 Q�4 D- @ 15'-0"O.C.FOR PIER x x'`' g o -g P�'� Y� 4� 8 _ _-:Q 4 FEMA ZONE AE(EL.12)-- -.. - - W SUPPORT(TYPICAL OI a) x° x y ;' ••, 1;"/ -- Fz__---Fz-----Fz-- PIER PLAN NOTES cn 1 p o xe• x°' gyp ' ,-�- ZONE X - 4 EXISTING TIMBER STEPS TO BE O EXISTING MOORING RESERVED xti• o �A o• 6" x`ti- a x �� o x - 2X4" / 10" REMOVED AND REPLACED WITH D- FOR#624 POPONESSE-TT ROAD x'�'x.�� o o x x xo xW ,� SM-5 fi / 6 y CB Cq'- 1. AT NO TIME SHALL FLOATS,BOATS,RAMP,KAYAKS,CANOES OR ANY OTHER OBJECTS BE ti °' / �• :. / 18" - 8" 4'WIDE GRANITE STONE STEPS O x ti �, x / / GRA 8" STORED DIRECTLY ON THE SALT MARSH,COASTAL BANK,AND BORDERING VEGETATED W_ 1 ,y°x��xti X'L° '`x`� x`Lo '` x xti �0 1 x°' e y 10 8, 6 G� OQ �\ x x'L x`b x ' 6 xo. r .1, 8" t 8" WETLANDS.NO FLOAT,RAMP,BOAT,KAYAK OR CANOE SHALL BE DRAGGED ACROSS THE SALT O o xti s o x e 3X4" F EXISTING PATIO TO BE 1 \ xti• xti'xti• o o A x ,`? ®' z y� � . � �G 18" 16„� MARSH OR BORDERING VEGETATED WETLAND AT ANY TIME. a xti'xti•x` s°' o ,I x x.•x�� 09 e 'SM-6 ",. , x'�• �. x x`ti' �. ° x , ,; 12, , � � � g� RECONSTRUCTED WITHIN _ xti x x x'`�x�.ti x�6x�6xs°x.�'?x.`�x'`oxo0 Q'xo�x°, ,-Q22" <o \14� THE SAME FOOTPRINT 2. THE PROPOSED PIER IS INTENDED FOR THE USE OF NON-MOTORIZED WATER CRAFTS. F_ \ x xti xy9 x y9 EXISTING COMPOST 3. AT x 10'KAYAK RACK SHALL BE INSTALLED ON THE OUTER SIDE OF THE WALKING SURFACE OF Z PROPOSED 4'W x 60'L ELEVATED PIER x�4 x�% o x^9 o ¢� 18" FIRST 30'DECKING SET AT 1:1$SLOPE xti. ° ° N ,,,: , �� f �- ` ? BIN AND GOLF MATT THE PIER SUPPORTED ON ONE END WITH A TIMBER PILE. -� �.• �` s• BRICK .\ 20 TO BE REMOVED 00 W \ FINAL 30 DECKING SET LEVEL AT EL.4.5 o a x x�e x x ' x xti µ ti� I M-7 -,. ,• .' U " ( a PATIO \ N PARCEL 4. THERE IS AT LEAST 15-FEET SETBACK PROVIDED FROM THE PROPOSED PIER TO PROPERTY LINE. REFER TO PROFILE&DETAILS �'x° �� xo r 1 , \ N w ~ \ xti x 1. XNI x�' O ° / p�, \ o 007002 5. THERE ARE TWO KNOWN PIERS AND FLOATS WITHIN 300'OF PROPOSED PIER. S PROPOSED 3'W x 40'L TIMBER STAIRS X X, ,�a m �°� WITH TOP,MID AND LOWER LANDINGS X, x c a x LL ` RINSE ASSIGNED TO THE SUBJECT PROPERTY WITHIN 100 FEET OF O �Z 6 THERE IS ONE PRIVATE MOORING 1 \ LANDING ELEVATIONS=16.0,11.4&7.0 x�`? ^ xo ti �. I �16 STATION '1 2" s HE PROPOSED PIER. HERE ARE NO OTHER KNOWN PIERS,FLOATS,MOORINGS AND WATER ap (REFER TO PROFILE&DETAILS) - x1' m Xo. SM-8 J C' ���-L O �q`5 RAMPS WITHIN 200'OF HE PROPOSED PIER, m \ ^o x,� xe51 x x� ��, �A a xo xo. I 16 ^5��,O4r, S G+9 50 FEE-FT BUFFER ZONE 7, SdERE IS NO KNOWN EEL GRASS BEDS WITHIN 200'OF PROPOSED PIER. ,,pp X, x xe• XN x°. C �) FROM COASTAL BANK o x�� X J L l ��� `'S 8 LOCATEDTHE SEST WATER APPROXIMATELY ESS 27 SOU HTURE TO THE ON#6 8 POPPONESSETD PIER ROADIS AN EXISTING PIER m / x� i � 1d" x'�' x°' i y q 16 ' BULKHEAD 14" 9. THE CLOSEST PUBLIC LANDING TO THE PROPOSED PIER IS LOCATED APPROXIMATELY 850 FEET WALK!PATT Q STONE TO THE SOUTH ON#755 SANTUIT ROAD. x�. x�a ° SM-9 �' ✓ 8 1�' 18 DRIVEWAY o � 10.DETERMINATION OF MEAN LOW WATER: o e° x o 4" C8� \ x CONSTRUCTION ACCESS TO REMAIN FROM THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION(NOAA) s'� 00 h WITHIN EXISTING GRASS AREAS-NO x ' x xo• 10" 20" EQUATION FOR DATUM CONVERSION:MLW =NAVD88+1.68(IN FEET) n \ \ EXISTING FOOTPATH TO BE .01 Q / 4" 10", CONTCLERACTOR SHAING LL INSTALL SEDIMENT Y. o \ ABANDONED AND PLANTED 2 4• ?', 12 18" 2" STOP ROLL AS LIMITS OF WORK ALONG PROJECT STATISTICS Z- \ \ WITH NATIVE SHRUBS(150 S.F.) x'`y / 4 U �" 8"" Q 20" LOT 6 EDGES OF EXISTING GRASS. z N12'� (W 14 O , 18" 37 420±S.F. (UPLAND) 1. PROPERTY WIDTH AT MEAN LOW WATER(M.L.W.): 376 FEET -- � 13,200±S.F. (WETLAND) 2. 1/2 OF WATER FRONTAGE WIDTH AT M.L.W.: 158 FEET Z F- V 8" e e 8" 10" 6" a 501618±S.F.TOTAL 4X4" r FOUND 3. TOTAL NUMBER OF 4"x 4"POSTS: 4 POSTS (0.34 S.F.) O �- Q / g 2� 4. TOTAL NUMBER OF 4"x 6"POSTS: 16 POSTS (2.14 S.F.) F- w d \ EXTENDED PROPERTY LINE i 14" PERPENDICULAR TO SHORE � xoyxo� ° 0 0" WATER s s2°26'oe"E 124 69, 5. TOTAL NUMBER OF 8"DIAMETER PILES: 8 PILES (2.80 S.F.) � j Q h ti x° x M-10 12" GATE 3X, x� _ Q h BENCHMARK: 6. TOTAL LENGTH OF STAIRS,PIER,RAMP AND FLOAT: 135 FEET V D- U) Z \ x O 10" ' 7. LENGTH OF STAIRS AND PIER OVER COASTAL BANK: 42 FEET C0 Q 0 h O ^Y AAO CONCRETE BOUND z LEGEND \ x'`' �° Z¢ CB/DH 13g.47' 50 FEET BUFFER ZONE` i� p Qr_ EL.=23.82 NAVD88 8. LENGTH OF PIER OVER SALT MARSH: 27 FEET to z to ¢ Q (� x Z FOUND N 78 FROM COASTAL BANK �' i� �� EL.=25.50(MLW DATUM) 9. LENGTH FROM MEAN HIGH WATER TO END OF FLOAT: 84 FEET Z Q Q- W W O CB - -- CONCRETE BOUND � x'`� J "5�Og"VV v J� IO.LENGTH FROM MEAN LOW WATER TO END OF FLOAT: 33 FEET 2 Q `7Q - ---- UTILITY POLE J z PARCEL 1 - GUY WIRE C� GG� �P'(�G Co¢ 006019 `2" �, lCjJv �\ 11.AREA OF PREEMINENT DISTURBANCE IN BUFFER ZONE: 0 S.F. Z a 0 - - - -- CONIFEROUS TREE a CO 67 V Q 12.AREA OF PREEMINENT DISTURBANCE IN COASTAL BANK: 1.60 S.F. a 1-- O �- e --- DESIDUOUS TREE f-++� _ AO" y ov 13.AREA OF PREEMINENT DISTURBANCE IN SALT MARSH: 0.27 S.F. d O 1- W Q MHW MEAN HIGH WATER GUY WIRE P# �0 `p�0 14.AREA OF PREEMINENT DISTURBANCE IN COASTAL BEACH: 1.40 S.F. � U W MLW - MEAN LOW WATER O¢ CB/DH r.. TREE LINE 0 c�x�i FOUND 15.AREA OF PREEMINENT DISTURBANCE IN LAND UNDER OCEAN: 1.40 S.F. F ¢ O Q z WET WETLAND LINE w v 2 U) -- FZ- - FLOOD ZONE ) O --CB-- COASTAL BANK o m O POST&RAIL FENCE o (A r, r, STOCKADE FENCE 0 30 60 100 0 ¢ w JEn o w c�i- Q x x x- PICKET ROW w z xx xx CHAINLINK FENCE ,� _ *# EXISTING WATER ACCESS STRUCTURE U= GUARDRAIL SCALE: 1 - 30 #628 POPONESSETT ROAD to I }o O� " "LOW LIMIT OF WORK I Date: MARCH 27,2018 zI SHEET 1 -T