Loading...
HomeMy WebLinkAbout0741 POPONESSETT ROAD '7y 7'o Pon sse �e Doi Cl i i i Town of Barnstable Post'This Card So That it is Visible From the Street Approved,,Plans Must be Retained on Job and this Card°Must be Kept BrARM Posted;Until Final 1'nspection Has Been Made , Permit ® P Y�p� g p_.__ „ p .. _... :made. Where;a Certificate-of Occu anc Is Re"uired,such Buildin shall Not be Occu ied until a Final Ins ection has been r Permit NO. B-19-2824 Applicant Name: Henry Cassidy Approvals Date Issued: 08/30/2019 Current Use: Structure Permit Type: Building-Insulation-Residential Expiration Date: 02/29/2020 Foundation: Location: 741 POPONESSETT ROAD,COTUIT M Map/Lot 006-039 Zoning District: RF Sheathing: Owner on Record: DOYLE,TIMOTHY C& KATHLEEN M -Contractor Name: E CASSIDY Framing: 1 Address: PO BOX 1620 Contractor-License GCS=400988 - 2 COTUIT, MA 02635 � Est Project Cost: $430.00 Chimney: Description: Insulation/Weatherization 1 ermit Fee: $85.00 Insulation: Fee Paid:, $85.00 Project Review Req: Final: Date ,, 8/30/2019 Plumbing/Gas Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within#six months after)ssuance. All work authorized by this permit shall conform to the approved application and thegapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by'-laws and codes. Final Gas: This permit shall be displayed in a location clearly visible from access street or,road and shall be maintained open for;public.inspectionfnr, the entire duration ofthe work until the completion of the same. -x Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided orrthis.permit. Service: Minimum of Five Call Inspections Required for All Construction Work:] 1.Foundation or Footing Rough: 2.Sheathing Inspection �.,:,.�R. .mow, s .- •_.--� ..•, ""` 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) — Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site V. Final: All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT O **L_1 �S�