Loading...
HomeMy WebLinkAbout0166 PEPPERCORN LANE - Health 1 166 PEPPERCORN LANE I Cotuit A= 004 - 013 - - - - --- - ------ Town of Barnstable P# 31.E OFIKE Department of Regulatory Services BARN�BLE ' Public Health Division Date t�43 _J� 039. 200 Main Street,Hyannis MA 02601 Xj FD AAA't s • l��t S Date Scheduled ° 1 Time Fee Pd. U) o'l Suita ility Assessment for Se e Disposal Performed By: e� Witnessed By: 0, 121 i & GENERAL INFORMATION,,-LOCATION, _ I Location Address l bb 4o-C(7 p- � Owner's Name L o�l4� �[ �n Address 3 b ST 12g n S i �1j Assessor's Map/Parcel: p O HI o2 Y►'' J Engineer's Name NEW CONSTRUCTION REPAIR Telephone# 2(? ,t� s Ii^'► 50 L Land Use `L 7 1 `Ct\ w Slopes(%) tl/`" Surface Stones (J Distances from: Open Water Body ft Possible Wet Area 7,0V ft Drinking Water Well- ft Drainage Way 4* It Property Line ft Other ft i SKETCH:(Street name,dimensions of lot,exact locations of test holes&perc tests;locate wetlands in proximity to holes) Parent material(geologic) ' aL � Depth to Bedrock Depth to Groundwater: Standing Water in Hole: / 0 Weeping from Pit Face /t< Estimated Seasonal High Groundwater I _od Used: DETERMINATION FOR SEASONAL HIGH WATER TABLE Meth ` De th Observed standiT . _ p ng in obs.hole: in. Depth to soil mottles: in. Depth to weeping from side of obs.hole: in. Groundwater Adjustment ft. Index Well# Reading Date: Index Well level Adj.factor Adj.Groun w to evel J. PERCOLATIONJEST Date Time Observation Hole# I 2 Time at 9" Depth ofPerc Time.at.6" Start Pre-soak Time @ �i / 1�� Time(9"-6") End Pre-soak Rate Min./Inch �z!144i Site Suitability Assessment: Site Passed Site Failed: Additional Testing Needed(Y/N) Original: Public Health Division Observation Hole Data To Be Completed on Back----------- ***If percolation test is to be conducted within 100'of wetland,you must first notify the Barnstable Conservation Division at least one(1)week prior to beginning. Q:\SEPTIC\PERCFORM.DOC DEEP OBSERVATION HOLE LOG Hole# Depth from Soil Horizon :Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consistency,%Gravel 04 a ve,6"Ic jiOR,2D,Z 1\ohe 3 5 bVNVA 4 61 t0Af S1- 5Psh►� ba_1z- G F lilt-^m 0., jo R b13 nl ova DEEP OBSERVATION HOLE LOG Hole# �- Depth from Soil Horizon Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consistency,%Gravel) Z s 9n1'Dy .. 9-68 GZ �f � z,� �N b pot- 5 toWe A-t20 Zg DEEP OBSERVATION HOLE LOG Hole# 3 Depth from Soil Horizon Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consistency,%Gravel O-6 eD 6+R hRI C I lb`lA 217- Al he- I S-IS 3 tb wm 5-1 ek A We- �-`(� G r tz v 4 W- . r6 VD DEEP OBSERVATION HOLE LOG Hole# Depth from Soil Horizon Soil Texture Soil Color Soil Other Surface(in.) (USDA) (Munsell) Mottling (Structure,Stones,Boulders. Consistency,%Gravel i b W 2. L P 3 -Zvi 64 Flood Insurance Rate Map: . Above 500 year flood boundary No _ Yes Within 500 year boundary No Yes Within 100 year flood boundary No_ Yes Depth of Naturally Occurring Pervious Material Does at least four feet of naturally occurring pervi u material exist in all areas observed throughout the area proposed for the soil absorption system? �! If not,what is the depth of naturally occurring pervious material? Certification �N� lop I certify that on V date)I have passed the soil evaluator examination approved by the Department of Environ ental Protection and that the above analysis was performed by me consistent with the required training,expArtise and experien a described in 310 CMR 15.017 Signature f Date 1 J Q:\SEPTIC\PERCFORM.DOC 0:12016\2.016-002\SURVEY\WORK'SHEET\2016-8(2 WS.dwg,4/10/201 PM,\\SERVER2012E\SAVIN 9240 PCL --- -- s� R.r iy,108,14 � -J x y \ B� .x b 4 I I lSGEs �\� ,x X x �� `�\�x ! II x x x x \� L . 4(y EASE1fENT lu � " F ,..x•,`` LC.PLAN 11542-1C — + R 1, >i xl � \, •I IIF m , o ; ++ Y s 1- _ e - �e r o -10 a x \ 1 x e I I b s 0 x � x m f iO r, 1 b v lu I. � 1 V ro•• 1 b 1 b � / , C e.�\ l � I IF�E'RCO7� • / 1