Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0405 SEA VIEW AVENUE UNIT #A - Health
405 Sea View Avenue Osterville F A = 138 024 �a f Town of Barnstable Regulatory Services . , Thomas F. Geiler,Director . Public Health Division Teo +�i` Thomas McKean,Director 200 Main Street,Hyannis,MA 02601 Office: 508-862-4644 Fax: 508-790-6304 Installer & DesiQner Certification Form Date: Z Designer: solvu"nInstaller. Address: Z'Park r ;u.a� t.U. is 6Sj Address: �'�`� S -i was issued a permit to install a On l.,-�vl. (date) (installer) septic system at based on a design drawn by (address) Cr J� C e,�, dated 116,410k f e ,. 4/qt (designer) I certify that the septic system referenced above was installed substantially according to the design, which may include minor approved changes such as lateral relocation of the distribution bg and/or septic tank. �s� 'Cer ,t�e5, Cory•�\v�r, y� e `' c"�i W�t� �rl•.Q '.Iawi•� �X�at�A i� A1�1rv�e-� l�c.��-ee� ��tetsL C'E—•�'h'� bu;lclHnSS 5e}.-v��� I certify that the septic system referenced above was installed with major changes (i.e. greater than 10' lateral relocation of the SAS or any vertical.relocation.of any component of tie septic system)but in accordance with State& Local Regulations. Plan revision or ci-tffied as-built by designer to follow. 1 PEM --K7 SUWVAM (Installer's ature) .29 Cam. esigner's ignature) (Affix Designer's Stamp Here) PLEASE RETURNN TO B AWNSTABLE PUBLIC HEALTH DIVISION. CERTIFICATE OF COyIPLLANCE WILL NOT BE .ISSUED UNTIL BOTH THIS FORM A1�D AS- BUILT CARD ARE RECEIVED BY THE BARNSTABLE PUBLIC HEALTH DIVISION. TH.AN-K YOU. Q:Health/Septic/Desiper Certification Form r. 4� TOWN OF BARNSTABLE Ll:)-,ATIOW,n5 �'leA✓ SEWAGE# l f ASSESSOR'S MAP&PARCEL V,tLLAGE QS /►u[ A INSTALLERS NAME&PHONE NO. -� 'SEPTIC TANK CAPACITY 2S LEACHING FACILITY:(type) G` _ (size) 112-7 NO.OF BEDROOMS /0 OWNER PERMIT DATE: (�� COMPLIANCE DATE: Separation Distance Between the: Maximum Adjusted Groundwater Table to the Bottom of Leaching Facility Feet Private Water Supply Well and Leaching Facility(If any wells exist on site or within 200 feet of leaching facility) Feet Edge of Wetland and Leaching Facility(If any wetlands exist within 300 feet of leaching facility), Feet FURNISHED BY //I /B, ,, 3,A -3/, � q,.6-28, v q �Y5 6,6-3z,s $ &-/�--'/7 7,6-�7, 7 � 7,/1 -37,6- B `So, 9. a4, 7 -34 43 a t , 4 m � mv � d • ¢ ten � � r }_ TOWN OF BARNSTABLE LOCATION Z5 lk- I!DNI A V�F SEWAGE # ('VL LAGE ® 8 EMNJ \ V & ASSESSOR'S MAP & LOT O 3 E �� INSTALLER'S NAME&PHONE NO. FAIED t ' SEPTIC TANK CAPACITY LEACHING FACILITY: (type) (size) NO.OF BEDROOMS BUILDER OR OWNER PERMITDATE: COMPLIANCE DATE: Separation Distance Between the: Maximum Adjusted Groundwater Table to the Bottom of Leaching Facility Feet Private Water Supply Well and Leaching Facility (If any wells exist on site or within 200 feet of leaching facility) Feet Edge of Wetland and Leaching Facility (If any wetlands exist within 300.feet of leaching facility) Feet Furnished by No. O'M 5 Fee THE COMMONWEALTH OF MASSACHUSETTS Entered in computer: Yes PUBLIC HEALTH DIVISION. TOWN OF BARNSTABLE, MASSACHUSETTS 01ppfication for Wootal 6peum Conotruction Permit Application for a Permit to Construct( /- Repair(.JjU Upgrade Abandon p pg (/j (� C�Complete System O Individual Components Location Address or Lot No. 1105 S vq� �,z a Owner's Name,Address and Tel.No. Os�ecv;\fie, m1k Katie-VA dV1�.g�n+n,5't: Assessor's Map/Parcel go .ym� S�, 'Nynb f r. 0 Installer's Name,Address,and Tel. o. Designer's Name,Address and Tel.No. am - S�Sl�rr�.n ENi%ee";,! cx Typ of Building: y ; Dwelling No.of Bedrooms 3 Lot Size q k(_ Garbage GrinderWb) Other Type of Building No. of Persons Showers( ) Cafeteria( ) Other Fixtures Design.Flow IN gallons per day. Calculated daily flow It Z-7 gallons. Plan Date I Woo Number of sheets Revision Date gllNics- Title _<AR 1� S i�e Size of Septic Tank 1�706 Type of S.A.S. COAL Clrm6LC-_2 Description of Soil f00 5�I 0-5r ®LAIieel 5-11 A C,AYi:(L ��ti�_oArw� 2.SY 5/y 11-zl" i5 LAYEP- LGAAJj SAW) lot,SAO Zl''-11?_" C L.► ek lypi), V_tgN 2.Sy/(Q jb Nature of Repairs or Alterations(Answer when applicable) Date last inspected: Agreement: The undersigned agrees to nd maintena c of the afore described on-site sewage disposal system in accordance with.the pr sions of Title 5 o n it n m in operation until a Certifi- cate of Compliance has een• ued b s B Sign Date Application Approved b Date !' Application Disapproved for the following reasons Permit No. Date Issued ly Ay No: Fee ,� Q , p THE COMMON WEALTH OF MASSACHUSETTS Entered in computer: Yes HFALTH�DIUISIOI TO IIIN �D°P BAR,f ;ST�QBkE,j A�SSACHUSE'rTS _. ZIP lication for Migooal ztem Couitructi-on ..ermit p f. Application for a Permit to Construct(Repair O Upgrade(/�)Abandon(-� fC-Complete System ❑Individual Components Location Address or Lot No.4105 .SPsA V A2✓lkvv-., Owner's Name,Address and Tel.No. . Assessor's,Map/Pazcel r38 �0 ��ym4a�>'�-. Installer's Name,Address,and Tel No. Designer's Name;Address and Tel.No. Er)y��fe��t� - u Q� � IOS Type of Building: S y c :5 `. cJ r Dwelling. No.of Bedrooms ��`� r� Lot Size-( sq"f� Garbage Grinder - Other ' Type of Building kNo.of Persons Showers( )�#Caria( ) Other Fixtures Design Flowi//DQ gallons per day. Calculated daily flow 11 Z7 gallons. , Plan Date //Z-4 �� Number of sheets ( Revision Date Title Sk ?ka lP-4� ra ld Sit,-- �rdJerLcn�S - `?PVK- Size of Septic Tank 7-506 R Type of S.A.S. 1'Sm&�A- QV144 Description,of Soil?*10 34 1 O-S� O LA7 5-1l A LAYEK SANS`/LoArl Z•S 7 5/ /I-Zl" 6 LAYEK LoAtI SkMZI !0 S (p Z1"-11Z" C Aleg.. ► L). - D Z,S'rle/(P Nature of Repairs or Alterations(Answer when app cable) i~ / Date last inspected: z- - Agreement: / The undersigned agrees tofensure the con,struc�on and mainte a c�of the afore described on-site sewage disposal system in accordance with the provisions of Title 5 oflre�Enwironrrt.�epptfiC de and nox=top cal e_tixe system m operation until a Certrfi- cate of Compliance ha been�issued by this B� h - Sig Date + Application Approved 111 v Date Application Disapproved.for the following reasons Permit No. 51::�kl Date Issued G n ~ -�--- ------------------ ---- -..__ oyTHE COMMONWEALTH OF MASSACHUSETTS 1 BARNSTABLE, MASSACHUSETTS , Certificate of Compliance, THIS IS TO CER'I�FY-` that the On-site Sewage Disposal System Constructed'(I✓YRepaired ( )Upgraded( ) Abandoned( )by (� at qOS Use✓ eve nip Utrv�l�e_ has been constructed 'n accordance with the provisions o,. itle 5 d the for Disposal System Construction Permit No.�Z05/69 dated ,5 Installer s Designer 5 y/h it" The issuance of this per shall not be construed as a guarantee that ttt4fe syste • wil`y�ju�nction a�designe& Date Inspector No._ � 1 -------------------------- �`�'•J Fee 45� l THE COMMONWEALTH OF MASSACHUSETTS PUBLIC HEALTH DIVISION- BARNSTABLE., MASSACHUSETTS ;MigozaY, 6�pgtem cow6truction permit \ Permission is hereby granted to Construct(tom)Repair( )Upgrade( )Abandon( ) System located at qK S� ViW Avenv-Q 0561;k-_ and as described in the above Application for Disposal System Construction Permit. The applicant recognizes his/her duty to comply with Title 5 and the following local provisions or special conditions. / Provided:Construction must be •ompleted within three years of the date f this ''t Date:__'.�._L �S G� _-Approved by °FTHE A Town of Barnstable Regulatory Services BMWSTABLE, * Thomas F. Geiler,Director �4� 6 9. .°i Public Health Division ArEo�� Thomas McKean,Director 200 Main Street,Hyannis,MA 02601 Office: 508-862-4644 Fax: 508-790-6304 Robert A. Maginn Jr. March 1, 2005 90 Raymond Street. Cambridge,Ma. 02140 NON-COMPLIANCE WITH STATE ENVIRONMENTAL CODE TITLE V. The septic system owned by you located at 405 Seaview Ave..tiOsterville,=was inspected on, 3/13/2000 by Robert Bortolotti a Massachusetts licensed septic inspector. The inspection of your septic system showed that your system has failed under the guidelines of 1995 TITLE 5 (310 CMR 15.00) due to the following: Backup of sewage into facility or system component due to overloaded or clogged SAS or cesspool. Our records show that the system has been in'a failed state for more than two years. You are ordered to hire a professional engineer or registered sanitarian to prepare a plan of proposed replacement septic system component(s). This plan is to be submitted to the. Town of Barnstable Public Health Division Office (Regulatory Services, 200 Main Street,Hyannis),within (90) days receipt of this letter. The plan will bring the septic system into compliance with 310 CMR 15.00,The State Environmental Code, Title V. You are a lso o rdered t o u pgrade o r r eplace t he s eptic s ystem w ithin s ix months (180) days o f y our receipt of this letter. Any person aggrieved by any order issued by the local approval authority may appeal to any c ourt o f competent jurisdiction as provided for by the laws of the Commonwealth. You have the option of requesting an adjudicatory hearing pursuant to 310 CMR 15.422 Failure to comply with this order will automatically result in a public hearing scheduled before the Board of Health. PE RDER OF T BOARD OF HEALTH T omas A.McKean,R.S., C.H.O. Agent of the Board of Health CC: Board of Health .. 1/failed septic_letters - . Barnstable Assessing Search Results Page 1 of 2 t ' # � � e yc e Home: Departments::Assessors Division: Property Assessment Search Results 405 A V AV E, N UE Owner: MAGINN, ROBERT A JR Property Sketch Legend Map/Parcel/Parcel Extension 138 /024/ Mailing Address MAGINN, ROBERT A JR a 90 RAYMOND ST CAMBRIDGE, MA.02140 M, 2005 Assessed Values: 'F Appraised Value Assessed Value = Building Value: $ 196,100 $ 196,100 :. Extra Features: $2,400 $2,400 �. Outbuildings: $0 $0 Land Value: $3,255,700 $3,255,700 Interactive Property Map: ap requires Plug in: Kq 3 Totals:$3,454,200 $3,454,200 1 have visited the maps before Show Me The Map April 2001 photos available m N Sates History: Owner: Sale Date Book/Page: Sale Price: FOX, ELIZABETH W ET ALS C9739 $0 MAGINN, ROBERT A JR 3/20/2000 C156958 $2,500,000 g WARD, FRANK 5/11/1999 C153074 $2,400,000., } 2005 REAL ESTATE Tax Information: Tax Rates: (per$1,000 of valuation) Land Bank Tax $626.94 Town Fire District Rates Othei $6.05 Barnstable-Residential $2.12 Land I Barnstable-Commercial $2.80 C.O.M.M. FD Tax(Residential) $3,488.74 C.O.M.M.-All Classes $1.01 Cotuit FD-All Classes $1.28 Town Tax(Residential) $20,897.91 Hyannis-Residential $1.52 Hyannis-Commercial $2.39 W Barnstable-Residential $1.44 W Barnstable-Commercial $2.10 http://www.town.bamstable.ma.us/tob02/Depts/Admini strativeServices/Finance/Assessing/A... 2/2/2005 Barnstable Assessing Search Results Page 2 of 2 Total: $25,013.59 Due to rounding differences these values may vary Land and Building Information Land 'Building Lot Size(Acres) 4.08 Year Built 1960 Appraised Value $3,255,700 Living Area 2352 Assessed Value $3,255,700 Replacement Cost$242,147 Depreciation 19 Building Value 196,100 Construction Details Style Modern/Contemp Interior Floors Pine/Soft Wood Model Residential Interior Walls Plastered Grade Average Heat Fuel Electric Stories 1 Story Heat Type Elec Baseboard Exterior Walls Wood Shingle AC Type None Roof Structure Gable/Hip Bedrooms 4 Bedrooms Roof Cover Asph/F GIs/Cmp, Bathrooms 5 Bathrooms Total Rooms 6 Rooms Extra Building Features Code Description Units/SQ ft Appraised Value Assessed Value FPL1 Fireplace i 1 $2,400 $2,400 Property Sketch Legend BAS First Floor, Living Area FST Utility Area(Finished Interior) UAT Attic Area(Unfinished)' BMT Basement Area(Unfinished) FTS Third Story Living Area(Finished) UHS Half Story(Unfinished) CAN Canopy FUS Second Story Living Area (Finished) UST Utility Area(Unfinished) FAT Attic Area(Finished) GAR Garage UTQ Three Quarters Story(Unfinished) FCP Carport GRN Greenhouse UUA Unfinished Utility Attic FEP Enclosed Porch PTO Patio UUS Full Upper 2nd Story(Unfinished) FHS Half Story(Finished) SFB Semi Finished Living Area WDK Wood Deck FOP Open or Screened in Porch TQS Three Quarters Story(Finished) J� ;1 http://www.town.bamstable.ma.us/tob02/Depts/AdministrativeServices/Finance/Assessing/A... 2/2/2005 �4 Septic Inspection Information Data Errtry�Date. 3/20/20 00 Sep yc,Inspect No �� ssessorsMap 138 Parcel 024 mot .._... .F z.: ., %Busmes'se IR 1405 1 Ad, ress Sea View Avenue wGllal 10sterville inspector Robert Bortolotti t�specdate 3/13/2000 System Status F Comment;h Backup of sewage into facility or system component due to an overload or clogged SAS or cesspool `>,Permt 2001319 ,Repa`r�Date "Notif ci anon Dates n ?lrtstaller;? ��� Re air beadlir'e�Date �I t Map 138 I I Parcel 024 405 Sea View Ave Osterville 77 ra J Y S�crcfv" A..a"Itrs U w .,w,.•, �, �'ti. --. l �vw �... ,. . •�, rya, �Q�� w _ 'khakfz ° re i urg a( Ace . Pool Code Fences,v §ut;�,re — .� NOW inn ,nJsc� �a - - 18 x 36 Pool/ pa pQT u � rn 3' ` �€ sz ,La-�c7rnrga Y�dFt�s tt e,f,...✓ b A I' S .r .. r. Dartmouth Pools & Spas Designed by: Designed for: Maginn Residence 880 Mt. Pleasant Street Norry Alves New Bedford MA02745 11/22/2018 Signature: �1 TOWN OF BARNSTABLE 0 1 5 St Ei �'1o ✓ flt-�. SEWAGE#2C1bS��0' LLAGEQ5,(PA i» �� ASSESSOR'S MAP&PARCEL ' INSTALLERS NAME&PHONE NO. SEPTIC TANK CAPACITY j LEACHING FACILITY:(type) l (size) //Z 7 C:J NO. OF BEDROOMS OWNER PERMIT DATE: S (� COMPLIANCE DATE: Q' p Separation Distance Between the: Maximum Adjusted Groundwater Table to the Bottom of Leaching Facility Feet Private Water Supply Well and Leaching Facility(If any wells exist " on site or within 200 feet of leaching facility) Feet Edge of Wetland and Leaching Facility(If any wetlands exist within 300 feet of leaching facility Z Feet FURNISHED BY Z Q � J C, I �Z _AZI a a l -C-7s ' ; o p � -411 - I o q THE ��P�-t�♦�, eJ�� eJi%CG1 J2ika ceyppe,1639• 367 MAIN STREET. HYANNIS, MASSACHUSETTS 02601 TOWN OF BARNSTABLE - EMERGENCY ORDER FOR WORK UNDER MASS'. G. L. Ch. 131 Sec. 40 AND TOWN OF BARNSTABLE BY-LAW ARTICLE XXVII' TO: Mr. Gordon LeBlanc c/o Marney & Lahteine 44 Warren Avenue Osterville, Mass. 02655 Project Location: 405 Sea View Avenue (property of .Elizabeth Fox) Osterville, Mass.` Date: March 17, 1983 Pursuant to the authority of-G. L. Ch. 131 sec. 40 and Article 2� of the Town of Barnstable By-Laws, emergency -work necessitated by the need to excavate and repair a broken drainage pipe which has' caused flooding of the road,constituting a public safety hazard, may proceed, to 'alleviate the existing flooding condition. A Notice of Intent shall be filed for the entire project within two weeks of the. issuance of this Emergency Order.. The Emergency Work permitted herein shall be accomplished -within 30 days from the date of this Order. Chairman, Conservation Commission j AL 12.69 AC. 21• .. 1 AL �� \ 2 AL \� 1LL�\ \/'•J by0 . ...o562 � ;_ •� 1 ' ire •' Tel s Y4 tla - ;1(,y,., i �`'�^��'.��•• -=.tee' _ �. • y Pam-'vi. ze°'S 2� ' - k e+ C .aw p tiys � Sm THE 4✓J DIRECTION OF . 7NE IR E UNDER PREPARED F ASSESSORS ' SARNSTABLE BOARD O INC. - '� n n tLVIS AIRMAP it (f-e- dm 0/ 00xr4WM49. ANTHONY D. CORTESE Sc. D % e�ion ARomlissoner19q' X#&I, Yak", 013116' PAUL T. ANDERSON Regional Environmental Engineer .947-123-1, ,Ooz;. 680-684 March 25s 1983 'This Departn*nt is in receipt of the fol1mtinr application filed in accordance With the Wetlands Protection Act, 'General La�-rs Chanter 131, Section GD ("the Act"): . Hamm — `i+ho Ntarrr� * , rxaxiaa 7 LeBlanc 4IL l.tprr-an AvPnng, (3c•t ti'v 1 1 wCn^�eR }� ,G f.3 _, 65�+ Owner of Land Fri 7the��th F'a City/To,,m Ra ►R gable Location 4o5 $ea .'T ew Ayai to This project has been given the follc4inC t4etiands file nurber in accordance with the Act,- 5 The following inforr::ation is rAssine and must be fongarded to this office for a, complete filing in accordance vji th the act { ) Notice of Intent ( ) Environmental Data Fora ( ) Locus Map ( ) Plans { ) The plans for the s&eage disposal system appear not to rreet the requirements of Title 5 of The State Environmental Code for the fo.11awing. reasons(s) : Revie;W 11i-h the board of Health. (xxj Coastal 'Petlands Regulation 27, 32 should be reviewed prior to hearing. - A Chapter 91 License or Pernit is not required by the Division of Watenjays. { ) Application has been forwarded to the Division of 91aten^says to deters i ne if a Chapter 91 License or Pemit is renuired. . A decision regarding Chapter 91 jurisdiction will be i�ss ued by the Di vi s fon of 'latervtays no- later than (x34 Was pipe installed by Mosquito Control Project? Issuance of a file number indicates only completeness of the file and not approval of the application. i For the Commissioner er� � •ac�an ob cc: Conservation Cormiission Deputy Regional Environmental Engineer . ( ) Board of Health ( ) Coastal Zone -Management . f. WETLAND PROTECTION ACT ENVIRONMENTAL DATA ORM 1. All parts of this form are to be.filled out by the applicant or his agent under the provisions of G.L, C. 131, S. 40. 2. Where a section is not relevant to the application-in question, the words "Not Applicable" should be entered on the appropriate line. NAME OF APPLICANT Elizabeth Fox ADDRESS OF APPLICANT 9 Bayberry Rd New Canaan, Ct. 0.6840 .MUNICIPALITIES WHERE ACTIVITY IS PROPOSED AND NOTICE IS FILED Town of Barnstable DESCRIPTION OF PROPERTY INVOLVED IN APPLICATION (including the dimensions of any existing build- ings, decks, marinas, existing cesspools) Approx. 2z acres of land w/single family house DESCRIPTION OF MODIFICATIONS PROPOSED ON THE SITE, including grading, dredging, removal of vegetation, etc. " Uncover existing swamp drainage pipe,locate break & repair to original con- A. SOILS dition . 1. United States Department of Agriculture Soil Types (show on map) Unknown 2. Permeability of soil on the site. (Dates of testing) 3. Rate of Percolation of Water through the soil. (Dates of testing) N/A B. SURFACE WATERS 1. Distance of site from nearest surface water (date of measurement) 25 ° 2. Sources of runoff water Swamp 3. Rate of runoff from the site ' r Unknown 4. Destination of runoff water Ground & ocean 5. Chemical additives to runoff water on the site None C. GROUND COVER (please use To or number of sq. feet) 1. Extent of existing impervious ground cover on the site. Unknown 2. Extent of proposed impervious ground cover on the site. 3. Extent of existing vegetation cover on the site. Beach grass , 4. Extent of proposed vegetation cover on the site. We will attempt to replace in .original ,order- 5. Total area of site. We will excavate an area of approx. 5°x5 °x5 deep to locate pipe & hope- tully locate break & repair. until we dig in tne area, we wili not know the amount of total. area disturbedPage 3 r / • I. BOAT YARDS, DOCKS, MARINAS 1. Capacity of marina (number of boats, running feet) N/A 2. Description of docks and floats (site dimensions) } N/A F 3. Description of sewage pumpout facilities (type of waste disposal) ; N/A 4. Description of fueling facilities and fuel storage tanks N/A 5. Description of fuel spill prevention measures and equipment N/A J. IMPACT OF PROPOSED ACTION APPLIED FOR 1. Effects on plant species (upland and marine) , Minimum-only temporary 2. Effects on marine species (shellfish, finfish) None 3. Effects on drainage and runoff Improve drainage & runoff 4. Effects on siltation of surface waters _ Improve _ 5. Effects on groundwater quality None 6. Effects on surface water quality None *7. Effects on wildlife None *S. Effects on recreational interests None 9. Effects on aesthetic interests Improve K. ALTERNATIVES TO PROPOSED ACTION 1. Describe alternatives to the requested .action None 2. Describe the benefits of the requested action-over the alternatives and why it was selected We wish only to repair an existing swamp drainage pipe *Questions relate to interests of Ch. III .Art. NXVIII of Town of. Barnstable By-Laws Page 5 l A .. eJ�ze Uamarca�iu�eaCGh a/.////a6Jar 7eedelt/6 Ala le LLLma/LQ'1'L e../UOa!LL A 1 CAPE COD MOSQUITO CONTROL PROJECT CAPE. COD CIVIC BUILDING - COMMISSIONERS: _ 149 FALMOUTH RD. CHESTER E. CROSS, PH.D., SANDWICH HYANNIS, MASS. 02601 CHAIRMAN TELEPHONE (617) 775-1510 775-1668 ARNOLD W. DYER, FALMOUTH VICE-CHAIRMAN OSCAR W. DOANE, JR. GENE MCAULIFFE, FALMOUTH SUPERINTENDENT rs SECRETARY-TREASURER JOHN W. DOANE ASSISTANT SUPERINTENDENT - October 19 , 1982 Barnstable Conservation Commission Town Hall Hyannis, Massachusetts 02601 Re: Fox Property, Sea View Avenue, Wianno To Whom It May Concern: I would like to bring to your attention that the '' drainage culvert that goes under Sea View Avenue through the .Fox. Property into .Nantucket Sound hats recently broken in two places. Both of .the places are on the beach and a hole is beginning to develop' on the beach from the sand washing down into .the pipe. It is my understanding that Marney & Lahteine. will be representing the Fox family .to get the necessary work done to repair the drainage pipe. Our records show that this system has functioned without any major difficulties since the early . 19301s. We do support the efforts of" the property owner in the repairing of the culvert , and we would hope that this mat- ter. would be acted upon favorably by your cominissiori- If we can be of any help to you, please' do. not hesi— tate to contact us. - Sincerely, X�_ Jo-hn W. Doane Assistant Superintendent JWD/ml cc : Marney & Lahteine OCT 9 � 1 _ \\ \1 ram! u '��.�.7,:;t' / ,� '� L�,yi .4` • Parke��(• / Neck p Pond .n Q 'IF� �� 7 ski�l' _ o°S f.• 1 G'oif / 4608• . { '• C e c-•_W13I1�10 ,r ' •t'.} it ��'�. .•� O /i '/ �I• Q a_1);\ •-., '�-.',' nor, r �'.; rI Ix \�11 II I<I � tilt'-��•:::.� j n it Flai'.��/(" o ♦ ' � n v� ��r:��' .�\� � ��::� ;•�'/� •//it • It_ • ✓ � � A�- ` I.,OGVS Beach — e d Light 4 ^ 2 4606 . .. 11 I I 4605 27 3 5, 4604 /7 •( 20 - A L - F _ i - /8 s � -s � ��8 7 ,Q v 3 --A -3 / 3 .6 —3?e d `fA — q/ grb-z8o D I &.f '/7 7, ,617. 7 Z M �-37, s~ 1'4 �o. —3 D p ' a6, 7 ib,l� I� - 0 �. 5 � 10 r - _ _ FAILED INSPECTION MAR 1 1 6 2040 , BORTOLOTTI CONSTRUCTION, INC. 45 INDUSTRY ROAD,MARSTONS MILLS, MA 02648 41 508-771=939 508-TiON 8-8 6 FAX: 508-428-9399 FAILED IN%', C SUBSURFACE SEWAGE DISPOSAL'SYSTEM INSPECTION`FORM PART A \ CERTIFICATION Property Address: Date Of InspectionOU Inspector's Na e: O ner's Name and Address: 0/ ' cERTIFI(''.AION TATFMENT: I Certify that I have personally Inspected the Sewage Disposal System at this address and that the infor ma- tion reported below is true,accurate and complete as of the time of Inspection. The Inspection was perrorm- ed based on my Training and Experience in,the Proper Function and Maintenance of On-Site Sewage Dis- posal Systems.The system: Passes Consubmit ditionllP s, . z , Nealuati B' the Local Approving Authority Fa Inspector's Signature Dater The System Inspector sopy of this Inspection Report to the Approving Authority with Thirty (30)Days of completing this Inspection. If the System is a Shared System or has a Design Flow of 10,000 gpd or greater, the Inspector and the System Owner shall submit the Report to the appropriate Regional Office of the Department of Environmental Protection. The Original should be sent to the System Owner and copies sent to the Buyer,if applicable and the Approving Authority. INSPECTION SUMMARY: A) SYSTEM PASSES: I have not found any Information which indicates that the System violates any of the fail- ure criteria as defined in 310 CMR 15.303. .Any Failure Criteria not evaluated are indi- cated below. B) SYSTEM CONDITIONALLY PASSES: _ __One or more System Components need to be Replaced or Repaired. The System,upon completion of the Replacement or Repair,Passes Inspection. Indicate yes,nor,or not determined(Y,N,OR ND). Describe bases of determination in all instances 1f"not determined",explain why not. .. .The-Septic Tank is Metal,Cracked,Structurally Unsound;shows;Substantial Infiltration or exfil- _. .tration;or Tank Failure is imminent.'The System will Pass Inspection if Existing Septic Tank is Replaced with a conforming Septic Tank as tkpproved by the Board Of Health. Sewage Backup or Breakout or High Static Water Level observed in the Distribution Box is due to broken or obstructed pipe(s)or due to a broken,settled or uneven Distribution Box. The Svstem. will pass Inspection if,(With Approval of the Board Of Health): _ 1 _ w . SUBSURFACE- SEWAGE DISPOSAL SYSTEM INSPECTION-FORM PART; A:' `CERTIFICATION (continued) . )) Broken pipe(s) replaced 4 Obstruction is removed Distribution Box is leveled or replaced The System required pumping more than four times a year due to broken or obstructed pipe(s). The System will pass inspection if(with approval of The Board Of Health): Broken pipe(s)_are replaced Obstruction is removed. C) FURTHER,EVALUATION IS REQUIRED_BYJH.:F,,.BQARD OF HEALTH Conditions exist which 'require further evaluation by the Board Of Health in order to determine if the System is failing to protect the Public Health,Safety and the Environment. . 1) SYSTEM WILL PASS UNLESS BOARD OF HELATH DETERMINES THAT THE SYSTEM IS NOT FUNCTIONING IN A MANNER WHICH WILL PROTECT THE PUBLIC HEALTH AND SAFETY AND THE ENVIRONMENT: Cesspool or Privy is within 50 Feet of a Surface Water Cesspool or Privy,is within 50-Feet of a bordering Vegetated Wetland;or.a Salt Marsh. .2) SYSTEM WILL FAIL UNLESS THE BOARD OF HEALTH(AND PUBLIC WATER SUPPLIER,IF APPROPRIATE).DETERMINES THAT,THE SYSTEM IS FUNCTION- ING IN;A.MANNER THAT,PROTECTS THE PUBLIC HEALTH AND SAFETY AND-TH F, ENVIRONMENT: _...__. . The system has a Septic Tank and Soil Absorption System and is withiny100 Feet'to-a'Surface Water Supply or Tributary to a Surface Water Supply. The System has a Septic Tank and Soil Absorption System and is with a Zone 1 of a.Publie Water Supply Well. The System has a Septic Tank and Soil Absorption System and is within 50 Feet of a Private Water Supply Well. The System has a Septic Tank and Soil Absorption System and is less than 100 Feet but 50 Feet or more from a Private Water Supply Well,unless a Well Water Analysis for coliform bacteria and volatile organic compounds indicates that the Well is from pollution from the facility and the presence of ammonia nitrogen and nitrate nitrogen is equal to or less than 5 ppm. D)SYST� FAILS: I;have determined that the System violates one or more of the following Failure Criteria as defined in 3.10 CMR 15.303. The basis for this determination is identified below. The Board of Health shout be contacted to determine what will be necessary to correct the failure. Backup of sewage into facility or system component due to an overload or clogged SAS or cesspool. Discharge or ponding of effluent to the surface of the ground or surface waters due to an overloaded or clogged SAS or cesspool.. Static liquid.level in'thedistribution box'above".outlet invert due;to an overloaded or clog ged SASor cesipooL 'f d „es -'7'" 111t. ;:,.... .,.., °i _.'r•q- e: ... = Liquid'depth in cesspool is less than 6"below invert orcavailable:volume is,less than 1/2 day flow. F °'Required pumping more than 4 times in theaast year NOT due to clogged or.obstructed pipe(s). Number of times pumped - 2 - r SUBSURFACE SEWAGErDISPOSAL SYSTEM, INSPECTION FORM _ . . PART A CERTIFICATION,(con hnued) ry Any portion of the Soil Absorption System,cesspool or privy is below the high groundwater elevation.. > , Any portion of a cesspool or privy is within 100 Feet of a surface water su`sply.or tributary to a surface water supply. Any portion of a cesspool or privy is within a Zone 1 of a Public Well. Any portion of a cesspool or privy is within 50 Feet of a private water supply well. Any portion of a cesspool or privy is less than 100 Feet but greater, than 50 Feet from a private water supply well with no acceptable water quality analysis. If the well has been analyzed to be acceptable,attach'copy of well water analysis for:eoliform bacteria,volatile organic --- compounds,ammonia nitrogen and nitrate nitrogen. E) LARGE SYSTEM FAILS: , The following criteria apply to a large system in addition to the criteria above: The design flow of a system is 10,000 ggd or greater-(Large System) and the system is a significant threat to.public health and'safety and the environment because one or more of the following, conditioris'ezist:,- The system is withint400 Feet of a surface drinking water supply The-systefir is,within 2001 eet of a tributary to`a surt`ace drinking water supply The.system is located in a nitrogen sensitive area Interim Wellhead Protection Area" - (IWPA)or a-mapped Zone•lI'of ipublic water'supply well. + The owner or operator of any such system shall living the system and facility into full compliance with the . groundwater treatment program requirements of 315 CMR 5.00 and 6.00. .Please consult the local regional office of the Department for further information. SUBSURFACE SEWAGE DISPOSAL SYSTEM INSPECTION FORM PART B CHECKLIST Check if the following have been done: l�Pumping information was requested of the owner,occupant,and Board of Health. �L.-'None of the system components have been pumped for atleast twoweeks and the system,has been receiving normal flow rates during that period. Large volumes of water have not been / introduced into the system recently or as part of this inspection. V As-built plans have been obtained and examined. Note if they are not available with N/A. _ The facility or dwelling was inspected for signs of sewage back-up. _ The system does not receive non-sanitary or industrial waste flow. L/ The site was inspected for signs of breakout. All:system components,-excluding the Soil Absorption�System,have been located on site. The septic tank manholes were uncovered,opened,and the interior-of the septic tank was in- '�:_" spectedfor condition of•baffles or•tees,-material of construction;dimensions,.depth�of liquid,• depth of sludge,depth of scum. t The size and location of the Soil-Absorption.System on the site has..been determined based on. existing information or approximated by non-intrusive methods. - 3 - .. - 6"v"#'��rs�6:-rra�.Y�,3, 5 fii1..{•:•�'r"�«tK M���t .. {{. i SUBSURFACE SEWAGE' DISPOSAL SYSTEM'INSPECTION.'FORM PART a The facility owner(and occupants,if different from owner)were provided-with'information on, the proper maintenance of Subsurface Disposal'System. SUBSURFACE SEWAGE DISPOSAL SYSTEM INSPECTION FORM PART C SYSTEM INFORMATION FLOW C)NDITIONS RESIDENTI Design Flow: gallons Number of Bedrooms::_Nu er of Current Residents: 2)a& /j� Garbage Grinder:�� Laundry Connected To System: Seasonal Use: Water Meter Readings,if a ilable: . Last Date of Occupancy:. COMMERCIAL/INDUSTRIAL Type of`Establishment - Design Flow:- -gallons/day- Grease Trap"'Presenir`(yes or no)- K Industrial Waste Holding-Tank Presents _..... Non-Sanitary Waste.Discharged To The Title V System: Water Meter Readings,If Available: Last Date of Occupancy: OTHER: (Describe) Last Date of Occupancy: GENERAL INFORMATION PUMPING RECORDS any source of information: Ii i System Pumped as part of inspection: f yes,vhfume pumped: gallons Reason for. Pumping: TYPE OF SYSTEM: _____Septic Tank/Distribution Box/Soil Absorption System ingle Cesspool - Overflow Cesspool Privy - Shared System(If yes,attach previous inspection records,if any) - Other(explain): AP ROXIMATE'AGK f all con onents,date-installed- if known and source of-information Sewalvodorg detected when arriving at the site:/ - _4- SUBSURFACE:SEWAGE :DISPOSAL SYSTEM..,INSPECTION.FORM PART: C GENERAL.INFQRMA`I'lON (continued) .SEPTIC TANK:,z9tr__,< e Depth below grade: Material of Construction: •concrete metal FRP,_. Other (explain) Dimensions: Sludge Depth: Scum Thickness: Distance from top of sludge to bottom of outlet tee or baffle: Distance from bottom of scum to bottom of outlet tee or baffle: Comments: (recommendation for pumping,conditioin of inlet and outlet tees or baffles,depth of liquid level in relation to outlet invert,structural integrity,evidence of leakage,etc.) y t GREASE TRAP: /f Depth Below Grade: Material of Construction: concrete metal FRP Otlier. (explain): .__ °.. ,,• , r•,, Dimensions: Scum Thickness: . Distance from top of scum to top of outlet tee or baffle: , Comments:.(recommendation for.pumping,condition of inlet and outlet tees or baffles,depth,of li-quid level �.._... in relation to.outletinvert.,structural integrity;evidence of leakage,etc.) - TIGHT OR HOLDING TANK: Depth Below Grade: Material of Construction: concrete` metal FRP Other (explain): Dimensions- Capacity: gallons Design Flow: gallons/d:iy.. Alarm Level: Comments: (condition of inlet tee,condition of alarm and float.switches,etc.) DISTRIBUTION BOX: Depth of liquid level above outlet invert: Comments: (note if level and distribution is equal,evidence of solids carryover,evidence of leakage into or out of box,etc.) PUMP CHAMBER: Pump is in working order: - _.• . _. �_.. . _.__. Comments: (note condition of pump chamber;condition of pumps'and appurtenances,etc.) F. '',�F l�I •-R' Ih�� :k#li R r3 .,:.r Y ,§ 'r!"'� F • ' SUBSURFACE SEWAGE DISPOSAL SYSTEM INSPECTION FORM PART C. , SYSTEM INFORl1•IATION(contimued) SOIL ABSORPTION SYSTEM(SAS):4�; (Locate on site plan,if possible; excavation not required,but may be approximately'by non-intrusive methods) If not determined to be present,explain: Type: Leaching pits,number: Leaching chambers,number: Leaching galleries,number: Leacahing trenches,number,length: Leaching fields,number,dimensions: Overflow cesspool,number: Comments:(note conidtion of soil,signs of hydraulic failure level of ponding,condition of vegetation,etc.)_ { CESSPOOLS: 1 Number an4 configuration: Depth-top of liquid to inlet invert: ' Depth.of solids layer: Depth of scum layer: Dimensions of Cesspool: W Materials of construction: $" Indication of groundwater: Inflow(cesspool must be pumped as part of inspection) Com ts: (note condition of soil, igns of hydraul• failure,I el of ponding,c7dition of vegetation, etc. 'Lc�X 07' PRIVY: Materials of construction: Dimensions:_ Depth of Solids: Comments: (note condition of soil,signs of hyddraulic failure,level of ponding,condition of vegetation, etc.) _ 6 _ SUBSURFACE..SEWAGE, DISPOSAL SYSTEM INSPECTION TFORNI PART C SYSTEM INFORMATION.(continued) SKETCH OF SEWAGE DISPOSAL SYSTEM: t Include ties to atleast two permanent references,landmarks or-benchmarks.' Y �` Locate all wells within 100 Feet. 001, . DEPTH TO GROUNDWATER: Depth to groundwater: ' b Feet Method of Determination or A prox'mation: T17 �l D5 - 7 SHEET INDEX A 000 dOVER�gHERT A 001 PROJRdf INRROORMATION A 101 PROPOSED ITR PUN A 301 PROPO D UNDATION PLAN A 302 PROPO ED PI� FLOOR PLAN A 303 PROM D �ECOND FLOOR PLAN A 304 PROM ED ATTId FLOOR PLAN A 305 PROPO RD ROOF PLAN A 401 PROPOSED ORTH ELEVATION A 402 PROM ED 0 ELEVATION A 403 PROPO ED ELEVATION A 404 PROPO ED ELEVATION A 601 PROPO ED R ION #I A 602 PROPO ED ION /2 A 711 DETAILS A 712 VIETA$ P Q�gN P1Aq 2JjEDU A d FLOCP TES R PLAN, HEDU�� &S 2OF PIAN, SEar10N1 as DRTA110 Lu HIM 00 DO 5 t 3 405 SEAVIEW AVENUE - OSTERVILLE, MA `a"t Ling Chai _�w n(�NN aoOct 405 SEAVIEW AVENUE, OSTERVILLE rom N.T.S. 1 6 9oRaymondsmeet No B�cHI�FET �'rls� 1111s14380 3: aA-000 4. 9. Cambridge,MA 02139 arrlJEe��m COVER SHEET, SHEET INDEX o6.lo.oe ThkVSowStreet A-02143 Ptnee:(617)62S8M F-(6M629.8201 P a WALL TYPE GENERAL REQUIREMENTS: LEGENDS TO NOTATION: Q� 0.GENERAL CONDITIONS 7, THERMAL AND MOISTURE PROTECTION 17. HVAC NOTATION SYMBOLS A Scope of Hark reds ndede but not M to In$WaflL'w In accordance Man the A. NE*3D YEAR ARCHITECTURAL 9eNfAE ROOF OVER FELT U4-vMENT TO COOL A�QESDN a"Br suBCGNTR 7W TO INCLUDE TIE FOIL G: � ROOF TYPES R/ .chilectura droflngs prepared by Baps- TXGe AWrllecte G.oge dena0tlon oM the 11A 1 VELOatt AW W TM ONE W FOR THE-UT LIT AND FOIST R /J� GRAPHIC SYMBOL TYPE ROOF TYPES removal of d1 debrTe canslnclion of the�otbn and the construction o/IHHI Wsdng m fl SYSrE1/A7 ALL MT ROOF:USE TAPERED INSULATION TO ACHIEVE PITCH TO GRAN AT tHE SECOtP T FOR TIE SE FLOOR EACH FURNACE ro HAVE A BULLY.4 Itl phER Per the eroflkgp and the reu9utra.a IM landscaping after the busalng Project is UPIE T -_ALL�AS REOUIREB.M UZ FOR SOUND ZTROL AND HEAT Loss UNIT 1 complNM ALL OUTETS M�W vl00RS ro BE BLACK CAS s+ON Br REGDIO REGISTER.92E5 �. C CUTTERS AND D0�1(SPOuTS rrPDAL AT ALL DECKS AND EAVES. DRIP EDGE AS REOUNED. xax ROOM TAG a6S-0' ELEVATION DATUM TO BE u -Mc DESI.Ck FURNISH AND INSTALL COMPLETE FUNCTIONING SYSTEM, fl SmVMs to be sbrnlltod I.aranilecl/o(per aperold ors the leloflng-AD building Sk q - VENTS PROVIDE A• OALvA42ED DUCTS PITCHED TO DRAIN ro OUTSIDE AT EACH DOOR TAG Led Irks, Inlp eoork.o R redl NYlgaa,pant semalea an aslwea an n.dfl.e end as D. ALLEY RAgsNGS tp BE LEAD COATED COPPER. ICE AND*ATER SHIELD AT ALL EAVES BA lkvs+rs teal flis w e.cia& krng the co structlan Prone VAu VS AND ROOF ABurYENTS e. FURNISH AND INSTALL DRYER YDN7, r O(pv.supplied nerve The canlreelor Is responsible far the nsla t lollm of per the E. CUT i FURN AND D INSTALL CONTINUOUS ROOF RIDGE AND SOT VENTS- ,�\1 SECI70N MARK monulaclreri nslnplaHI of an eflnar supplied item. F, PROVIDE VAPOR BARRIER CONTINUOUS OVER EXTERIOR 9JRFACES TAPeto ALL JOINTS I& PLUMBING SYSTEM #� ` roT PROPRETAItr TAPE A PLUMBNG SYSTEM r0 BE OE9(�N/�Kp Br pLUMq�p SUBCONTRACTOR. THE WINDOW TAG D.Sit*Foc011ec The contractor Nan prolbe lh k ofln phone and I"foe011ea Electric CONTRACTOR IS TO FURNISH A CONPLEIE CODE COMPLTNT'NNGG UBCONTRAL PWMTHE SYSTEtIt REFERENCED poRer e0 be ban the a hing house and supplied by the Mner• a ALL JOINTS TO BE LAPPED TO DRAIN SHINGLE SINE. CUT IN ALL DRIP EDGES CONTRACTOR TO FCLLO PLANS FOR ALL nxaURE LOCAICNS - 04 NOTE MARK E.Protection of Rork and enalerlo a As d&r iS of Bark Gee npterfas Nan n enclosed flflh 'GAL D# IY AND DOOR HEADS,ELECTRICAL OUTLETS ETC,TO BE SEALED f TH EXPANDING B. PROVIDE O iROST PROOF HOSEBIBS AT \J BUBBLE�� poly or other suitable moleriaH m necovea y a Protect lean eyosre to fleother or other T T• DRA�INGS) BUILDING PERIMETER(IDr INDICATED ON sources of damage awng sl.age and conalructian. Lneflbe the eanuoclo,am Project the -' - aeNU- erisl neap hoes eanswelRon rooted due to covstnafon actMls.or d MSUTAn01r _-- ELEVATION MARK a� darrrege _AT ROOF R 3B C. C. PROVIDE NEVI 1'COPPER SUPPLY TO HOUSE. INSPECT SEER PIPE US►NG CAMERA # ban#Cotner dernq eonslruclian. TECHONOLOGY REPLACE s REOURM AT EXISTING St R-13(W), DETAIL TAG -ALL Y 0 ro BE COPPER. -AT% z d ALAS R-t9(5.5") -ALL ( PIPING ro BE PVC F.aeankvq:The)m eft Nan n bo.n CCaned.wry Loy _Ar 2�DNT R-24 A7 r ALLs R-13. `-----= OR A AT�BA S G AILS RE ADJOd*O AIpTIER BEDROOM. # -PROVIDE A5'ACOUSTIC BA TT 1101E PROVIDE PROPER vENT BAFTLES AT ALL 0.PROVIDE ONE+'RADFEADER FROM MT ROOF AT TOP OF BUILDID(NOT INDICATED ON DRAWINGS). ran x INTERIOR ELEVATION a A sarem y than be provided by Ip c 1-1.lor mot.ae one Aorkmaunq 1.Ip prlod �ATKF@]PIRRAL00 FCEHUNGS AS RE D. D e B MARL{ =oI one year ban s,mtanta complettea This des ant sup.sen any maluteetwa's -SVSFLTEAL AIL NEIM BA. ENr�ALLs.*TM TUFT-4-DRY BASEMEN*11M +oOFNc E.TIAS_S E D�ASIER d5P03AL,/dp ICEMAKER AT iROGE. STEAM UNIT A7 MASIER I-that on la long.In-one p.. M. BA IROOM fl FINISH CARPENTRY F. x WALL TYPE C H. the CeHraf Contractor Nan YeAly oed cheek an dfm.rdom prfPr to conslnxifon,eM PTIWsDE GAS i0 ALL S 1l01HG Tip H07 ATER RANGE AND rxwsrlw+I�e notify the .GeReel of any discrepancies prior to eonsbueltoa A ALL INTERIOR Alm EE O ,TO BE FRONT ANp,BACK PRHMED PRIOR TO DRYER i0R SADd00�1 iUc S SEE X�11CL1INE 5171E A9HIN0 T HAVE . INSTALLATION. E% 1.4 ro BE Elp PRAIED pN ADDITION. RECESSED ORGANIZER-*NTH SHUT-OFF. - e CEILING/FLC)OR/ C FLOOR MATERIAL ROOF TYPES TRANSITION I. DEMOLITION fl *IO0r1 1Rp�1:PROVDE 2'HISTORICAL SILLS�IM PROJECTIONS FOR 3-1/1'TRIM G51(GS Q.hRr�rAIER PIPING r0 INCLUDE A LOOPED SYSTEM ro CONSTANTLY aRcvuTE HOT � Tom` A ALL MATERIALS SCHEDULED FOR DEMOU"TO BE LEGALLY DISPOSED OF OFF SITE AND BALK (SEE DOORS AND NDaMS). 1MA 19. .FIREPLACE C.14TERXT I Tay TO yttUDE 7-1/2 BASE AT t Roe+ROOMS 5 1/2' A Der OAR Br ALLOAANa of umO Mcwo/Nc Booc AND PARTS 2.EXCAVATION SPEED BASE AT ALL SEt01p FLOOR ROOMS Alp CRONE yOULDDNG AT E4 In FSRSr FLOOR INST=rBr e�NER)(L'CONTRACTOR A EXCAVATE FOR ALL 1 BASEMENTS FOOTINGS ETC AS REWIRED. CdNSERVE REUY e TOPSOIL FOR SITE 0.FLOORS:SEE FLOOR PLANS &EXCAVATE FOR NFYf UTILITY LINES INCLUDING: ELECTRICAL SERVICE.1'�ATER Lef.1/2' ;•.� THROOMS*L RECEIVE MSS AT EACH Sept TO BE TRIMMED OUT SIMILAR TO �$B] 7�A,I,�ONS rrvs K. sE*ER LnNE.FOUNDATION DRAIN up OUTFALL RAeN LEADER GRAY(OUTFALL, IINDgIS a AIR F.'Au NTEAnf+dslp PACKAGES TO I�NeLWE+-1/2'BELLY CASINOS,CORNER P UITHS. C.20 E*TH otp[R TRADES AS REOUIED FOR cO1plETE INS7ALLAndN OF Dim BASE PLINTHS saLs AND APP04S AT NRPo((s A°°us acous i ED mdde�er U1WT[S a ALL BASEBOARD TO BE 5-1/Y SPEED BASE. APPLY SHOE AT ALL*ODD FLOORS ASTER � � able iosul finisfiOO � 2.SITEWORK FLOOR MSTALLAVION. Jam janitor . K EXTERIOR BALUSTERS,To BE CUSTOM WLLED(711pKflRG5)FROM FULL 2-1/Y STOCK. t joint A Tops lb The contractor shall remove ml"filing vegatottan Impacted by the STAIR RAIL TO SELECTED BY O"R PRIOR TO 14STALLATdON n construction. ' 1 EXTEROR BAYS T�q BE TRIMMED AS FOLLOSi MOD OVER ENTIRE BAY, 5/+%6 AND O/+z+ L B. Eorth*o.k: Eorthfl.k ohm nctude all escovoll.I required for building and FINE OR EXTERIOR AfDO TRIM APPLIED FOR RAZE'OTH ADDITIONAL PANEL MOULD a/+'X � � hbor foundation drop and allbockfIDng,compoctlon,and rough and Re HCA Final grading 2'AND PANEL 14MKR tyPL repured by the consWctian, ban beam hlv hllalory K. ALL EXTERIOR uyryTS,�y�gERR/DRYER yEN7S ELEC PANELS Alp MlscaLANEOUs C. Topso➢t The cantractor shag save ma stockpile my topsoil far redistribution at PE�TO BE YQRNTED CAN PL4-S SIZED f0 SUT ITH DRto CAP ETC AS C ChH�tepet me➢ m0® ' the eomaelbrl of Cob cabinet MeCh TT iwl D. C.npaclt.X Compact backfal n 6'layers to 951L emppetion according to 9. XTEaORAA1NDppOORS AND VANDD CC OeNQbamIQ mfr Tpem>Fecp¢EF standard Droelka A' iE 1t10n Alp pK1EROR APPLIED DOORS TO BE POL M ABLE LO E D � � � E. Regrading; Regrading*Ithn Ova feet of the building gape*flay from the *Npp* b hang, It THREE P0IN7 LOCK140 SYSTEM AND POLISHED BRASS KAROARE AT FRENCH DOORS d8 Txffigg -IF Top dressing: Finish grating shoo Include the redistribution of the e:btng C. PROVIDE 2'HISTORICAL sus#HH PROIECTDNS FOR 3-1/2 m 'CAS140S AND BAMAND. can 000cmmmmyMR MC not In topaoll.raked snooth. TMth all debris removed.Boos to be seeded. 001 cohimn ro m®ber 0. 9Ho7r P WA#NGS INCLUDING 1/e'SCALE OF EACH LOT NDICATNG MuNTNS. GENERAL CONSTRUCTION NOTES: oowomcm NTS ant ID Scale A.CONCRETE E owo A NE*ID'FOUNDATION*ALL#LL BE EXPOSED. wsngG�CONDITIONS: GEkxRAL CONTRACTOR 9ALL er Alp FAMsIAa:E t OR HERsru cot g�mom OC womoer NTIL,HE "DDa (IN TIE FBD ALL E GO1�heat gD m,HE 11 OR air Omer OD OUW&&M*f A Concrete flak Nall oMIMn to an recuren cots of Act 301-99.Specifications fa Sbuctwol 10. INTERIOR DOORS 1S PRIOR ro BEGgNi»(g ANY AID ALL Cm.eta s cool m rammed by the SCpplemena Regui-ts belofl.Supplemental A. SEMI-SOUR MASO iTE FOUR PANEL DOORS PER SCHEDULE(CRAFTMASTER OR SOLAR)IN Ok motasmk OFCI owrcrfmm�ed, Reoulremerte 92E5 epKAIED. CARRY$OO PER PASSAGE SET PW HAROARE DISCREPANDES` 11[ -CONlibignR BRING ro TIE ARae1ECf'S ATTENTION ANY pppggg(py�gggd ^ a Concrete shed oudn a mnknrm oompurw strength dSOIEPANDEs MAID BE N n[Axo.TEcrs oRA jyGs up FEUD CONDITIONS, diander.gth of+DOD PST el the and a 20 I f, KITCHEN CAST rs PERV AND APPROVALS TIE GDNrnA mkNTRACTG R%*4L fOR DETERM OP � OFOI ew�i a emote efwo now o mmnum aggregate sped a s/+'.and ok canted a mF one o A FUR149Eo ev D ER BY Auo*ANeE aF s9ooa INsrAUEO BY GENERAL RE�a4 oD�TSYANe up SEweI(G ALL NEasS PrnMT.�ALs DP tommin sump of not m.a than 5'. Contract.to submit rropmed mte Prop.tio s to CONmAt W, vANg s tvRNI9IE0 BY odkNER BY ALLgM(ANLE INSTALLED BY GENERAL RE AunlOe HAVING Jre501C BVER TTE 11aac THE (am bwmeoo EnnoptMnees,er f..00 of 1-1 Me fleck Drfar,to construction. CONTRACTOR, 004TRACTOR SKALL E RESPONSIBLE FOR THE uD ooaUPA11Cr O TKE P P� a RakllPrcnq sled YIOII cenlorrrn to ASTM Aalq Gods f,0, 12. CWNTERTOPSR SHALL ARE TI[��jEEEISSSARY ALvIICAIIONS T9�r WSED BANS Mp� �8p dTBpenaPf P P I PIeflde a mfnle um de.cola of 1 1/2'over an reinforcing Cted,union noted ,A NRNI9E0 ar I By Br Auor(ANCE vu l[S FURNISHED BY er ro aer wa P n IN A GGIALLr 4AINNER PAr ALL FEES Alp IN da down pf PW pressurc hod otn.flise _ CE.1NST By ITENERAL TRACT tXRiNECTKIN TIILTE M p,(, a Lop spaces of a+.A and AIR rears Nan be 20'.2+-.and 30-N:9 remCctlwly Jvu' SCALING DO NDT SCALE OF DIM DRA .. 1.Conant!shelf col be ' *I-the.,,ek,1 tonperojwe 1s a.odOVy+0 F and 13, BLUEBOARD AND PLASTER*ONDERBOARD falling. Contractor Has. y AC 311 prowbi s t.cold ar hat fl'eaher concreting A USE 1/2'BLUEBOARD AND S W COAT PLASTER THROUGHOUT. CODES AND RE.%1fEUEN15: THE ORAL CONTRAC, .4 RE 040E FOR AMOM O THAT m each R is" m reWYM ASEV 4 ALL TRADES COHfa9r TO ALL APR1GIflE CODES AID AEpp/�RpOA�TINITS �eC a(Od11C8( TOW I�fQDed ? An form flak Nan remain n placrr for o mninam of 2e hwra Ie An-*to fl USE 5/B'FOE CODE AT BASEMENT CEILING flprk sea be me r-wi Yt.olaa SCHEDULING AND COORDINATIOk- THE TRACTOR 9aLL BE FOR THEelevation fagd fl All doer spGel.rap n directed to IIn.vpT eo m C lP 1//2�'-*ODERBOARD AS TILE BACKER AT ALL*ALL TILE& USE 3/e'*ODER90ARD AS COORD+ no�l O NcES AND SOICK ES AND THE ACTUAL INSTALLED LOUT 04RE l�E eq *goal Tesl�' ..sr by an underground PVC P%m UNDERMYKN FOR ALL FLOOR TILES INTERF IRE e9mP p F . This pipe epo cool be.-fed to the.sreron and Nan be o sea pus to the street. C. NLIY In'iD01pATI0N*ALL�MOL BE EXPpSEB, am allied 0. SCREE(ATTACH ALL*GNGERBOARD AND BLUEBOARD. LpN GUAGe TIE USE O THEM WOVW W VROYOV uN(ECTION NTH ANY REM � loffi l� �,� µ, TILES SPEOFIED QRN.W�ATm�AEAk SS oT=1(p r 991�OGH�ITH SRAALL�BF�TH - svotaffication r� MASONRY A ALL TILES TO E LARKED AT E6 PER SQUARE PORT. MORTAR AND ADHESIVES AND ALL ^'+"aIFED AaESSdKSuA1pp 0 C1� R[OIISED.'fE ARdsiEtT SIULL BE 111E q- A 40*GRK THIS AREA REQUIRED INSTALLATION ACCESSORIES TO BE CARRIED IN BASE PRICING SOLE Ned FeIAL JUDGE O MAT CO(snalE�'AN ACCEPTABLE y(Tok FE f = � TEMPORARY UTILITIES ilE aIERRAL CplmAtTO R 9HALL PROVIDE ALL 160MARY UTILITIES FE � � . AS Re.FOR THE 't BtIPWN PBC fire cabmtd tdd ahndEd 6, RO�uGH FRAMING 15.BATHROOM ACCESSORIES Caltz E T' FFE finish ROOF d"don all tPoe) -A. IMR1/ARY FRAMING Is 60CATED ON THE DRAT 4G& A FUR4SH TALL BATHROOM ACCESSORES fso PER BATHROOM PUBLIC ACCESS 5(gE�AIU:S Ab STREETS USED FOR DEuvERY.ACCESS To THE FOC fitceofooraete B. ALL on[ RE01WEB FRAMING FOR A COMPLETE CODE COMPLYDRG d�TALLATTI�opkN�Hs ro BO O °�Y �' 9�I AL C a PART,O THE CoNsTRuc SITE PROTESTED pOF APeoffmreh T file eE N D q�IETIER W Nan SPECIFICALLY 04WATED ON THE DRA NCLLUIWtlNG Bui SHALL NOT BE usEDrosTaRE IN TaUc T T.ALL POM face of tel NOi T:D rOK A 16. ELECTRICAL SYSTEMS GENERAL��TM SHALL�FA y�,, ED %ALL FRAWNO TO MEW urouTS aEaDIREB A ELECTRICAL SYSTEM 7O ap�gGN/BU LD er 4ELEEctRIuL suecONmAeraR, TIE ANr LaNST iicTToN u iEDEAN DAMAGE ro nEst AREAS FOS boll Off TIC tap ofcwb AND DUFFS FORGALS AND DUC cONTRAcrW 5 i0 F1RRNI91 A COyPLErE cOOE Cg1PLrING FIINCnDINAL ELECTRCAL SYSTEM EMOUn TIE B faotatat T✓rj ®d r�onHc q pN GENERAL CONIRACTOR OWL LEGAIlr OHSP06E O All OEMm14ED ta0gue ®Dove X.S.N.AT ROOKS WTERULS g1T9TE Ted pf -BLOCKING FOR KITC ENS T 5 ETC fl CONTRACTOR TO FGajR0 ELECTRCAL pLA1� FOR ALL FIXTURE LOCATIONS SUPPLEMENT Bg fooh➢B P➢F 95TF7RINC RE G i(5 REQUIRE r0 ACCOMMODATE PIPE RUNS AND CHASES Err FIXTURE$E REQURED FOR'('ODE COMPLIANCES K I n1E PUBl1C RIGHT OF�AY: TE Q/NLRAI CONTRACTOR SHALL OOORDa(AIE Is5/IIEIt f� fmlag is e oNCLUmyc RE��c ue AND 9Ho�ER D RAys C. PROVIDE NE)t(200 AMP SERVICE ro HOUSE. SERVICE TO BE OMOMROU40 tnE A%F%E IaaDKACE O µr welt STR[Er m SOEiALX�InH n[err typ typical C. PROVIDE 3/+' PLvROOD SUI6FLOORS INCLUDING AT ALL BATHROOMS(NOTE s/B' -PHONES USE CAT- *R6P FOR ALL PHONE LINES O uP ANY AND Au oTHIR nsc AGENCEs HAVeNc.FsesolcTUW gijygPbPd RBOARD r0 BE USED AS TILE UNDERLAYMENT AT ALL TILE FLOORS) - LIIES TO BE CONSTRUCTION AREA. THE CEypR C047 ��W SHALL MAINTAIN TIE ml�sTaeT(al(AREA IN '@nbbar unfia memisbed 11°NoE -RUN ALA ueLE TV OUTLETS TO BASEMENT AS HOME RUNS(No MORE THAN ONE HOME RUN A OE,W AND OMMY OOIpnON,Yp SHALL REyoyE AND LEGALLY"SHE ANY INstE GW Watin nFarpLatO UON Tmlawol6mwiaenoted D. AT SKVUGH M- TRIM CUT AS REQUIRED: PER ROOM). OT'9 GWB gypsedin boDd - -ALL SKYLWTS TO HAVE ANGLED RETURNS AT+5 PEWEES ADJUST ROUGH FRAMNG TO D. PROVIDE CA1�tETE HARD- D SMOKE ALARM SYSTEM.*RED TO BASEMENT PREPPED CONDITIONS OF COMPLETI THdN O 7Ie5 RIO,ECI.M�ENLRqCpR TRACTOR vat Vff&dl SLIT. FOR sECIIRITr OTORING 9d11 nHoaotHnILr OOnuD�.EFLOW BASS. IOaW Alp Ex1EaW FADE HB ban bib Trot vhodampceiuottk OAss,µp ALL gu[aRE HµT�/µSyINsrAyED CTED IzrotG nK C04STMXTCIC wpW m � NOTE APPLIANCE REQUIREMENTS NaUONG MCR0IYAVE DISPOSAL-D19HhASIER RANGE(GAS) nADMIG TIE SPACE Opt f0 THE OANDL PPS ro p'QERNN ',�RHOOPKxUOPV3�(E 1.HEµAttLININ FL7RN S 5/NjLRU�NITS(Au Bu¢DING gA9s PERFORM CE: THESE DRA AR PROVIDE THE BASS FOR THE hd w/C water closed ERooH F,IA�yMREELLr Root' HiITatEN yASOT R e FaBewoO11R ANp Au onEx 1�ROWI DINING ��IpQpHH O A r TarTN/pqgtIEpCESSARY ANrOI NYENO�EOK.MY s>,7 FWT T HM hanowDmmlz WC wood Mona OETEF.-SOtM rV SYSTEM INCLUDING MONITORING ALL EXTERIOR DOORS AND FIVE OEAEpR���9WLLL INaNI1Om WM hOa hOixoml w/o wuhOO nONs uCE SIN GENERAL mR MAssAallUSE�E T Ned ALL 9000NTRACTORs OWL a r HVAC h wt weight ro THE Ipe SPEaTED NO"IN THE CITY O r.WeROM F. LIGHT FIXTURES BY o(y(ER By p(yANCE ALL RECESSED CAN BY ELECTRICIAN(NOTE Ap Sr TE O T REQUIREMENTS FOR LO*VOLTAGE RLECESSE air O-dNod* D uNs> f� doll project j,e m ealo revslons Yea nh Ling Chai 405 SEAVIEW AVENUE, OSTERVILLE N:T.s. 1 rAdQ B( YES- AT ON2. 90 Raymond Street �. AF�CH 1�'EC__ ,�. 14380 Idd.blood I a A001 Cambridge,MA 02139 archlteatse PROJECT INFORMATION 06.10.05 5. ,o. Thrly Bow Steel Somerville.MA-02143 PhOW(617)629.OM Fe:I:(6i7)629=i Lot D1 (Remoinder) 1 Elizobeth/Wells Fox 4 03 c t f 9739 0 f'1 J F 4, S H �+ Fnd C8/DHA46jvc `y Fnd l �j, oyJ / /. Wetlond Limit Lot 10 LCC 1748-S Fnd \. J Pipe IP F �' /I e Fnd o Oa E� ellSC \ c Cp Q � t � d a IP j `\` .., O T 31 4 N Fnd cu cv(m 19,559±SF �f �, Q Centerline ofcr) ` 58,�, Ofds oyout) �. ° p �S• sn00 �39� 00, (p 5 I`s2 sf�'P 0 = 00 30'05" 06- L 10.7 , \ 1 2' i m Wetlond Limit IF j0 71.00' Frobk Word ;' J 87. W ulvert [ t Pipe 1 h t . Ditch f Sfyj:. ----------------% N 285.93' lb r� 1 .4' sty r Di'Oh � Care C 05 Lot 9 a y .o vo c co #4 2.13' CC 174 3 Roof a Deck Over ng f ,1N37j ,, oWe//in9 ' • n F► ctt.t noOct bD- .00r .DrbbDs mrt.a Ling Chai BO S���TA7,SSOoN 405 SEAVIEW AVENUE, OSTERVILLE 1°=20' 1. 6. 90 Raymond Street �: ARCH ITEC"�S 14380 �,� 3; & A 101 ` t111e Cambridge,MA 02139 eta+ • PROPOSED SITE PLAN 06.10.05 o. 7hbty Bow Street So 111e,IM-6Y143 Phor�e:(817)829-8200 Fex:(617j 62982p1 y.L rr-o• I�I I I L_J L_� r--------------------------------------------------- i'=----------- ------------� L------- Ir--------------------- -------------------------------------- ------ l I I 1 L———————— �v 1 I I — - - - - - - 1 I \\ \ I I I j I J I 1 I / I i I - _ _ --.-- r--- n I I 18•-M I I f9'-d5' fe' f• 6'-11• 6'-11�• S-7h• I o . i I I I I L—J I I I I I I \ I L---_J L____J 7w.terland Protection Border z I I I L_J L_J L_J i i - �, 9'-1• � �'9'1• � 8•-61}• .� B"-7)f• �. 6-Z1S � 8•-61j• �, �•-�+ � 16'-6• � , dENERAL NOTER: PROPO ED FOUNDATION PLAN ° z e ,.SEEsmuenrw a+A FOR ceras i IE 1/4"- 17-8. pdALE: 1/4" = 1'-0" 4. Ling dhai _ 405 OEAVIEW AVENUE, OSTERVILLE ""v4-=�-0• 1 6. 7. 90 Raymond otreet r. I � Q 14380 s. MA 02139 � ago 11W � �.soee �. s. A-301 G�ambridge, PROPOSED FOUNDATION PLAN a: 10, /- Thuty Bmv Street Somerville.MA-02143 Rrone:(817)8238200 Fez(817)829$01 - - - �t+j ly-0' ZY-3' 16•-6' 12.0' ❑ io® 0 ® 5 b Entry Porch 6'-11• T-6' T-6' �• 9' T-6' Y-16' .1 - (I> m 1 I I � I o 1 1 I � ° i 1 I J ® Powder m Bathroo M -_-_-_ 7n ndr ___ Nall - O 14- _I1 II II II I II M - , —Fdving Ruexr— - - —t 1j. 13 0• b III'-o• _ b B- _o. ._fly. B Oun Room I I kt II I flr-o• 13-s' 1 12 3 Bedroom I - Porch Deck 9-5:0_ . S-0" Stone Retoining Wall Room - �'-0' i-' 0 -6 'r6 6 �'-M .'-6' '-0' �•_-�i' '-21y 6•-2' 3-f0' Tub ---Tub Woterland Protection Border 1 st. Flo-ar'r = 1985.60 sf. (71 PROPOOED FIROT FLOOR PLAN 0 2' a e - A PULE 1/4- = 1'-0' ROALE: 1/4" = 1'-0" Ling dhai _ L�>KI 405 SEAVIEW AVENUE, OSTERVILLE v4"=,-0• ,"" B. 90 Raymond ptreet oil 1 .14380 „v,� i a { dembridge, IAA 02139 �..�� arc111EeGa/. I"� PROPOSED FIRST FLOOR PLAN - o A-302 /, TAuy Bow Street S.e M[1%MF-02143 Ph—:(617)629-M F.:(617)62f-Mi 7r-r I I I I I I I I I I I I 8'_I1• T-8• 12'-Y ]'-9• 7-9` 12'-Y Y�6'. tl'-fl` e e � I mw � ante I O Laundry ethrooma OBathro m I �S Hall - _ ---- - DJ +hl'11'/dlopet� _e- 6•_0- II 1+•Q• O I Bedroom 3 I I + m - � I II n I I Mauer r Bedroom 3 I Beldroom 2 Bathroom I i Bedroom 4 I I � I ? Deck Balcony 011111 I> Deck I I 3•-cr, W-3r a'-S o'-7' + s• 2nd. Floor = 1830.20 sf. a 0 2• 4• O' PROPONED OECOND FLOOR PLAN 1 00AIS 1/4• = 1'-0' . OdALE: 1/4" = 1'-0" coe.f Lin Chai — xopel kem �1�4'=1'-0' 1, B meefm 90 Raymond Ptreet � �, yx 1 405 EAVIEW AVENUE, OSTERVILLE 14380 1 7. a A-303 dambridge, MA 02139 ELVA o � PROPOSED SEdOND FLOOR PLAN O r: +o. ThkVBow Street Som H%.MA-02143 Ph—:(6M6294200 F-(617)628A20f : i i Attic = 1155.00 sf. ,a'-a!S• r_s• W-2 +'-s• Is.-Wy i (63% of 2nd. Floor) ----------: -' i i Y-!• 1-3 Y-b• Y-S i..............: •......................................................_-----------------. - E -- ------------------- ------ --------J_-----_----- i 2nd. Floor = 1830.20 sf. :----------------------------------------- o IL L, Bath m y, ;.---.................—......................................... • 1n LJLJJ --'-----•-- I � Play Room I e 1st, Floor = 1985.60 sf. I II m +o I II m 61tud ---------- ------------ -» Otudy - - — i y — / - r- ---- i" 1�ed1a+Room r ----- ------ '� I I Deck II II I r II I II II II I � I II I I 1 �•-,g' s-s �•-,K I •_1,15• s-u• S-n• s-uk � ••-,$• . �— —————— —————————— i I Attic = 1155.00 sf. (63% of 2nd. Floor) a PROPOOED. ATTIC PLAN ° z' a e I 9 AL¢ 1/4• = 1•-0 . Ling Chai Y d.>K, �� ,�. .. = 405 EAVIEW AVENUE, OOTERVILLE +i4•=+•-D• ,. 6. 90 Raymond �ltreet r��s �O �i-r�� t�r� 14380 ,,,,,,m i a A 304 dambridge, 9A 02139 architactsY .� PROPOSED ATTIC PLAN O & to. Thirty Bow Street Som wille,MA-02143 Phone:(617)629-8200 Fm:(61'7)629-8201 I I 1 t Vent ° OVERLAY DISTRICT. AP - Aquifer Protection District As Shown on Plan Entitled ,4r � •; •�dy.F.C. Risers&Cover To Gr d` _ "Revised Groundwater Protection E F.F.EL 13 Overlay Districts" - April, 1993 tana�o' F.G.EL. 7.5 \J 7! ? EC 9.0(Am) ALN [i Propose r ..... Proposed 2500 Golron Proposed 2000 Gallon - Proposed - -. _ - FLOOD ZONE. -` p'EL 9.5 • 580, is S • /:r.. optic Tank Pump Chomber Fidw E ullf H_Ch r`, Qo p`•••' �OQ ' .,r _ p O . •.•• j 01G EL 4 S Leachfn Chambers o ,°• H-20 H-20 Zones: B A13 (El 12) t \I �• .: 2)Cools of Haar d s Woteoats f A Srof-t ' A 13 (El 1'3), V 17 (El 1'4), a s e'`4• '� - � or w/Two Wa core:of Approved Sealant ./Two(2)Crab of a` © :- O MOM I Community Panel No. a•ra'o,0♦"0, 4 nj #250001 0016D : ^' Developed Profile of Proposed Septic System Ad'xfed Graundw- o EL 2G July 2 1992 Index well 0. - one A , + ��� e J Gr_deenf March 200.5 & LOMAR Case # 96-01-009P t o ,:�i� L Not to Scale GrWndroler O EL.1.1 Finished Fram Sepek onk iinl,h(lade ZONE: LOCATION MAP Gode Cover - 24'I chin Above For 1 For Groin Fa FIWt Support rome over 3�Yox, II I, III 1 FBfer RF-1 1 -2,0001 Wte Jrnefton Box ' ' - Fabric e1 , Conduit ru amber For Outside of Tonk 9• '" Compacted fdl rwK ,We sae, - Area (min.) 43,560 SF I Emer enc star To D-Box 1/B•-1/2• ume Win.2'Cover Pum Power k Float Control `\ v, Pea Stone e, d°` ° Loca Frontage (min) 20' weaar J,�f Pm _ _ - ( ) ' ASSESSORS REF: warm 0n El, . SwitMe, With Bldg. at State Loco ! 0 , W�(J t(f min 125 eo Bldg.Q E/ec.Codes ♦ /.� Pum EEl.0.0 A. 3/4'- 11/2- Setbacks: Pum,GJr E.-G.TS tEAQWNG DWbre Washed Map 138, Parcel 024 rook.SM.s0 PVC CHAA+B£R. Stone Front 3D Securs P' o! T $ ?•/ead 40 PVC H-20 o am o ° 7hreoded Pipe - Prernst Pum Bottom El. -2.5 �O°' 10, Side 15' ' Rear 15' Pump Chamber Plan View Detail ' '•M" 4• °• �...4'Max Stone Min. Pump Chamber Section Detail Not to Scale Leach Chamber Cross Section Not to Scale Not to Scale 3 a PERC TEST: 10,941 PERFORMED BY SULLIVAN ENGINEERING / \\ WITNESSED BY DONALD DESMARAIS,R.S. APRIL 11,2005 TEST HOLE- 1 EL.9.5 TEST HOLE-2 EL.9.8 - _ 2 C LAYER l OYR 3/3 O LAYER I OYR 3/3 SOY f { (rCB < (l I 1 (7� Q Sn DARK BROWN 9.1 6" DARK BROWN 9.3 '-I' I " I L=3 fasr A LAYER 2.5Y 5/4 A LAYER 2.SY 5(4 j Fn ` -\\ __// _x ` t i �•o° LIGHT OLIVE BROWN LIGHT OLIVE BROWN J7o,, 11" SANDY LOAM 8.6 13" SANDY LOAM 8.7 j ° \ \ \ B LAYER I OYR 5/6 B LAYER I OYR 5/6 F \ \ \\ \ L \ To Pump YELLOWISH BROWN YELLOWISH BROWN / �B DH �t 1\ \ \\ am 21" LOAMY SAND 7.8 20" LOAMY SAND 8.1 110-11 `' \ -'/ �• \Fn d t \ \ \ C LAYER 2.5Y 6/6 C LAYER 2.5Y 6/6 Fn t \ Q Leachln Area Plan View BROWNISH I I d i � �/ � � \ 9 YELLOW BROWNISH YELLOW r ��J '\ \\ I \\ \6' \ MED.SAND MED.SAND \ Not to Scale Ln PERC TEST 6.1 104"GROUNDWATER ENCOUNTERED 1.1 / i / 25 GALLONS IN 16 MIN. 112" 0.5 _ / J/y�, //C �j� 1 \ \ 4. " <2 MINANCH 7.2 Vent >�eserve y"\ \� /\ \ d \ \ \\ \ ! \� Wetland Limit NO GROUNDWATER ENCOUNTERED -13 - ' 7 o�A /I \ \ \V \ By ENSR 1 tProposed '4q o ff/ r \\ \\ `\ \� 05119199 Ceoching Field 32 \ t Fnd Korkin> Min. /P / \ 4 MN t \\_ \ b•-- -4� = Pipe DESIGN DATA Fn - - _ t ,� ��2 `\`\, � OLebch Pitt '`• / � \\ \\ Single Family-4 Bedroom Upgrade - / Proposed �` ` 1 - Roof ! 6BedroomNewConstruction 8, �2� , Accessory Stu cture Runoff i �`4 \\ •\ \ ��--- g F F 0 TH-1' .•� - --- _�� \�\ \\�\ \--- \ �•� /�.i� Daiil Fllow=110x10ae1100GPD ��\ rC Septic Tank:1100 GPD x 200%=2200 GPD Use 2500 Gallon H-20 Septic Tank /, �� � •```` i� V` ..`..fie �° LEACHING AREA 1 TO -0p jr i y Lo "t � `(� \\ _ \ Primary:1100 GPD/0.74=1486.5 SF Required k _ -1.0 Sidewall=2(161.5)=323 SF 0/ �i- , - \ 'Q�• O /�w /(a VCR/ O "'• -___\ h H Bottom Area_ 1200.2 SF 1P ./ _0 811ffer--fir ��o ri` a.. ...,,... _ \ 1523.2 SF Total Provided r r ,-l�emaln Und/stu-rbe�' ��/� / t`\ \/yam e to ffy Reserve:660 GPD/0.74=891.9 i - Fnd r•. _AH Tregs_:f�-Stlown) To Remain , Po - ,...,� Sidewall=2 e sin \ � .� ,\ t (132.6)=2652SF %Wstall fit--R`eit-Fer+ce `\`` �t - \ Equiprrben \, b' ,7, \`\ sottomArea=629.25E \ H 894.4 SF Total Provided ..� •� ,� Alofih Proper_y Line \_,_................... O , y o. \ \ / " °Fare , :. ` �& Wor�L l t_ TO l Oo t�Pa th \ ` \ :\ - F LEACHING CHAMBER DESIGN ' - -__ \ \ _ / ---�� �O _N All Pipes to be Schedule 40. Use / // ' / /i' ` \ \ _ 4 0 Ho '0� 9-500 Gal.beaching Chambers in a ° Washed Stone Field as Shown. I � / � •� �'� \ Plcxn# With �_ - t I � _, Dative \I egatation O. '.•n„ �eblker ��� � \\ \�Aoprox. \200 SF : ' ,Pro P W t \ �3D. 0, ` \ 1 ' '�' Note ` \, .. \ o t N 0 000 Pool To Be \ a :urnp _ \ t 4 Ozone Injected \ \\ /e 24 o Char�b \ n L = 10: 7 `, _$ ' n, SEPTIC NOTES l i .--•-has• '' Or Approved Equal +\\ \ ��; ` \ Propose \`� • 1.Water Supply For This Lot is Municipal Water. \ 100 / -- O -Sel:)t l 4 / �� \ /� 2.Location of Utilities Shown on This Plan Are Approx. TO, At Least 72 Hours Prior to Any Excavation For This �l Project the Contractor Shall Make the Required \\ \t Leach Pit �' \t \� (/ Notification to Dig Safe(1-888-344-7233) Wetland Limit I For Pool ,. � L / � 3.The Contractor is Required to Secure Appropriate \ \ Permits From Town Agencies For Construction \ By ENSR �\ Drowdown; Remove GraJUe/ Drive \` i J \ g 1 ` 0511"919 9 t \ If' An l aryt L a wn I \i\ Defined by This Plan � \ l r , � � 4.Install Risers to Within 12"of Finished Grade. » 5.All Structures Buried Four Feet or More or Subject \ \ \ 4 0t House Existin / ` \ to Vehicular Traffic to be H-20 Loading. 1 \ le veer Stone D �ie � /' ` \ 6.Septic System to be Installed in Accordance With \ f 310 CMR 15.00 Latest Revision,the Town of I Ilk \\ \ \/ / / ` \ & Par if;g ) Barnstable Board of Health Regulations,and / tf;� 248 CMR 2.00. W t J ...........� ` ...... I' - \ \ D 7 All Pinion to be Srh.4(t PVC. \I 1 1 St \,, -- ! I \� ,/ 8.Wherever Sewer Lines Must Cross Water Suply Lines,Both Pipes Shall be Constructed of Class 150 '/ _ f,••' / \ � // \ Pressure Pipe and Shall be Pressure Tested to Assure \ >_- $ \ / Watertightness. \ / / \ 9 9.Inlet Tees Shall Extend a Minimum of 10" q /S �/ Below the Flow Line. }/ t \\ i ` I fo 10.An Outlet Tee Shall Extend 29"Below the Flow Line. y\\ Sty yr�F r /'/ I\N I\ I\ / � � `�10 J ^ 11.Existing Septic Pumped and illedystem toWith Clean Material.� or I \J \ #40 Lot 9 `t po / \ \ \ I Deck �\ S / / �U CC 174 Z o r► \\ i \\1 \\ \ we�n , \ D 9 \ �v / 0 e / \ o \ t \ ck \ / s � \ o ,r/ P O \\ \ \\ \ _ O/O \ t #3 DH,e/ ty + \ `\ Edge of/L`�wn \\ �\\ \\ �\ _ _ \,•� • / // � � '\\' � I h cn \ + 1 \ ip \ a \sd, \ CC 1 t (Wetland Limit , / // l/ /. 9 i� //L\�, \\ \\ \\ QJ N. \ I 1 \ / i l / \ �\ Jp 00 112 Styr; o�J I ti Dwelling t I \ - - ,00�h i r H / \- �- Fnd s / 0/ - -- -- r: _ - is % Grass & Dune __- ----- \�\\ -- & punk ---- --- ----- \\"�� Grass - - ------ r_--- - 5 - - - - ✓ v _ Beach �'-- �n \ I _(E_4) MNW VV MOIL /' 29733 t t t I CIVIL tucketQun an 04114105 Revised House & Add Septic Upgrade 09118101 Added Con. Comm. Comments 08123101 Revised Deck Layout & Increased to 5 Bdrm. ate_. Revision 06126101 Added 2 Decks At Rear of Cottage Title: PREPARED BY. '.hEPARED FOR: Notes: Site Plan Proposed Site Improvements CapeSurv1.) The property line information shown was Sullivan Engineering, Inc. compiled from available record information. QQ �+ �+ Robert A. Ma inn, Jr. OC Septic System PO Box 659 7 Parker Rood g Osterville, MA 02655 Osterville MA 02655 > 2.) The topographic information was obtained At _ 90 Raymond Stree t 405 Sea View Avenue (508)428--3344 (508)428-3115 fax (508)420-3994 (508)420-3995 fax from an on the ground survey. PSullPE@ool.com copesurv@copecod.ne. Cambridge, MA 02140 3.) The datum used is NGVD '29, a fixed mean arensta le, (Ostervilie) Mass. sea level datum. Draft: JOD Field: WHK/MDH - ~' 30 0 15 30 60 120 Date: Janaury 24� 2�01 Comp/Review: PS Comp/Draft: MDH/RRL Pro j. # 20016 Pro j. #