HomeMy WebLinkAbout22A-004 Robinson Site Plan 07-22-22AH OJALA SURVEYING
WEST BARNSTABLE 774-994-8032
22A-004
SYMBOL (0 �JJ
0
PLANTING SCHEDULE
PLANT NAME
HIGHBUSH BLUEBERRY
VACCINIUM CORYMBOSUM
PASTURE ROSE
ROSA CAROLINA
AND/OR/MIX
SWEET FERN COMPTONIA PEREGRINA
SIZE
2 GAL
a· o.c.
1 GAL
4• o.c.
2 GAL 4• o.c.
II
15
41
TTL
MITIGATION CALCULATIONS:
HARDSCAPE 0-50'50-100'
PROPOSED: 0 SF 480 SF
REQUIRED MITlGA TlON : 480 x 3 = 1440 SF m.
(1440 SF± PROVIDED)
0
LOCUS MAP
SCALE 1 "=2000'±
ASSESSORS MAP 30 PARCEL 050
LOCUS IS WITHIN FEMA FLOOD ZONE X
(AREA OF MINIMAL FLOOD HAZARD)
ZONING SUMMARY
ZONING DISTRICT: RF
MIN. LOT SIZE
MIN. LOT FRONTAGE
MIN. FRONT SETBACK
MIN. SIDE SETBACK
MIN. REAR SETBACK
43,560 S.F.*
150'
30'
15'
15'
SITE IS LOCATED WITHIN THE GROUNDWATER PROTECTION OVERLAY DISTRICT
*SITE IS LOCATED WITHIN THE RESOURCEPROTECTION OVERLAY DISTRICT
NOTES
1.DATUM IS NAYP88
2.THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TOBE USED FOR LOT LINE STAKING OR ANY OTHERPURPOSE.
3.CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING
DIGSAFE (1-888-344-7233) AND VERIFYING THELOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIESPRIOR TO COMMENCEMENT OF WORK.
4.EXISTING SEPTIC LOCATION PER TIE-CARD ON FILEWITH TOWN.
5.REF: SEPTIC SYSTEM UPGRADE PLAN D. 7 /6/18(WETLAND DELINEATION BY MARSH MATTERS ENVIRONENTAL)
6.ALL BARN ROOF RUN-OFF SHALL BE DIRECTED TODRYWELL
7.SEPTIC TANK SHALL BE MARKED IN THE FIELD SO ASTO AVOID ANY VEHICLE/MACHINE TRAFFIC
8.MITIGATION PLANTINGS ARE FROM THE COOPERATIVEEXTENSION LIST. ANY SUBSTITUTIONS SHALL BE FROM
THIS LIST AND APPROVED BY THE CONSERVATION AGENTPRIOR TO INSTALLATION.
SITE PLAN
OF
1080 RIVER ROAD MARSTONS MILLS
PREPAR ED FOR
RICHARD & MARTHA ROBINSON
JULY 22. 2022
Scale: 1 "= 30'
�---------60 75 FEET