HomeMy WebLinkAbout2021-014-Horiuchi-Solien LS PlanFLU
S
H
T
H
R
E
S
H
O
L
D
FLU
S
H
T
H
R
E
S
H
O
L
DWIANNO AVENUENAN
T
U
C
K
E
T
S
O
U
N
D
TIDA
L
WAY
WAYUPCLRIDGE DNELEV: 19.0'T.O. DECKELEV: 19.5'T.O. SUBFLOOR1A2041A2011A2021A20384'-6"53'-
4
"
21'-
0
"FRONT SETBACK LINESIDE SETBACK LINESIDE SETBACK LINE15'
30'18171716161615141417181919181714151613121615SIDE SETBACK LINE 15'1620'MAIN HOUSEFFE +/- 19.5SHIFTED APPROX.9'-1" TO THE SWDECKFFE +/- 19.0CARRIAGE HOUSE2-CAR GARAGE+16.5GREEN-HOUSEGE
N
(4)HPSTACKEDPOOLEQUIP.5'POOL CABANA+18.018181710'
LAWN
LAWNLAWNLAWNLAWNLAWNLAWNLAWNMEADOWMEADOWMEADOWMEADOWLAWNHANDRAILS WITH LED LIGHT STRIPS(8) POSTS EACH RAIL, CONCRETESURROUNDS WHERE INSTALLED INPLANT BED, CORE DRILLED ANDGROUTED INTO STONE STEPSWHERE REQUIRED(3) PATH LIGHTSSEE PLAN FROM WILKINSONECOLOGICAL DESIGN FORPLANTING WITHIN CONSERVATIONCOMMISSION JURISDICTION2020AGKMH1/16"=1'-0"04.16.21REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:REVISIONS:ISSUED FOR PRELIMINARY PRICING:CONSERVATION COMMISSION SUBMITTAL:04.23.2109.22.2109.30.2111.30.2112.17.2101.24.2201.26.2202.02.2202.07.2202.25.2204.05.2209.12.22KELLEYRESIDENCE554 WIANNO AVENUEOSTERVILLE, MAL4.0ARCHITECTHUTKER ARCHITECTS533 PALMER AVENUEFALMOUTH, MA 02540508.540.0048CIVIL ENGINEERBAXTER-NYE ENGINEERING & SURVEYING78 NORTH STREET, 3RD FLOORHYANNIS, MA 02601508.771.7502GENERAL CONTRACTORKENDALL AND WELCH BULDING AND REMODELING108 PARKER ROADOSTERVILLE, MA 02655508.428.4900ECOLOGICAL CONSULTANTWILKINSON ECOLOGICAL DESIGN, INC.28 LOTS HOLLOW ROADORLEANS, MA 02653508.255.1113PLANTING PLANPROJECT NUMBER:DRAWN BY:CHECKED BY:SCALE:DATE:HORIUCHI SOLIEN INC.P.O. BOX 914200 MAIN STREETFALMOUTH MA 02541508 540-5320FAX 508 540-8651info@horiuchisolien.comHORIUCHI SOLIENL A N D S C A P E A R C H I T E C T SN8032160PLANTING NOTES1.2.3.4.5.6.7.8.9.10.11.12.13.14.LANDSCAPE CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID TO BECOMECOMPLETELY FAMILIAR WITH SITE CONDITIONS.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEENCOMPLETED IN THE IMMEDIATE AREA.CONTRACTOR TO VERIFY ALL UTILITIES ON PROPERTY AND TO PROTECT ALL UTILITIES DURINGEXCAVATION.IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THENUMBER OF PLANTS SHOWN IN THE PLANT LIST, THE NUMBER OF PLANTS SHOWN ON THE LISTWILL TAKE PRECEDENCE.ALL CONTAINER MATERIAL TO BE GROWN IN CONTAINER A MINIMUM OF SIX MONTHS.ALL MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FORNURSERY STOCK, ACCORDING TO THE AMERICAN ASSOCIATION OF NURSERYMEN.CONTRACTOR SHALL REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NOCOST TO THE OWNER.CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROMTIME OF PROVISIONAL ACCEPTANCE.ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS AND THEPLACEMENT SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT BEFORE THE INSTALLATION.ALL DISTURBED AREAS NOT TO BE PAVED OR PLANTED SHALL BE LOAMED AND SEEDED ASSHOWN. SEE SPECIFICATIONS FOR SOIL PREPARATION AND SEED MIX.TWO INCH (2") DEEP, FINELY SHREDDED BARK MULCH WILL BE INSTALLED AROUND ALL TREESAND SHRUBS THAT ARE ISOLATED FROM GROUNDCOVER AREAS AND GENERAL SHRUB MASSES.ALL PLANT MATERIAL SHALL BE INSPECTED BY THE LANDSCAPE ARCHITECT ON SITE PRIOR TOINSTALLATION. THE LANDSCAPE ARCHITECT WILL TAG ALL TREES AT THE NURSERY ANDINSPECT THEM AFTER DELIVERY TO THE SITE. SEE SPECIFICATIONS FOR TAGGING,INSPECTION, AND ACCEPTANCE OF PLANT MATERIAL.LANDSCAPE ARCHITECT SHALL CONFIRM PLANT LIST AND APPROVE SUBSTITUTIONS OF PLANTVARIETIES PRIOR TO ORDERING OF MATERIAL.SOIL MIX: 1/3 PEAT MOSS, 1/3 SCREENED LOAM, 1/3 DEHYDRATED MANURE.