Loading...
HomeMy WebLinkAboutMcAuliffe mitigation correctedLandscape Mitigation Sketch John & Dawn McAuliffe 16 Cove Island Road Centerville, MA Scale: 1"=20' Date: July 22, 2022 Hamlyn Consulting 690 Thousand Oaks Drive Brewster, MA 02631 774-323-0603 Plan section from Site Plan John P. & Dawn M. McAuliffe 16 Cove Island Road, Centerville, MA Proposed Pool Plan by J.M. O'Reilly & Associates, Inc. Rev 9-15-22 Substitutions allowed with prior approval of Conservation Staff. Locations may be field adjusted. Temporary irrigation may be used for the first two growing seasons - i.e., drip hose. Mitigation plantings are to be monitored for three years. Annual reports are to be submitted to the Conservation Commission by October 15. Notes: Northern red oak (Quercus rubra): 2" cal., min 25' on center Black tupelo (Nyssa sylvatica): 2" cal., min 15' on center Red maple (Acer rubrum): 8'/10' clump, min 20' on center Plant disturbed area with sweet fern (Comptonia peregrina), lowbush blueberry (Vaccinium augustifolia), and wintergreen (Gaultheria procumbens): use 1 gal containers. Overseed with Southern Tier Consulting Northeast Upland Native/Naturalized Wildflower Mix (or equivalent)