HomeMy WebLinkAboutMcAuliffe mitigation correctedLandscape Mitigation Sketch
John & Dawn McAuliffe
16 Cove Island Road
Centerville, MA
Scale: 1"=20' Date: July 22, 2022
Hamlyn Consulting
690 Thousand Oaks Drive
Brewster, MA 02631
774-323-0603
Plan section from Site Plan
John P. & Dawn M. McAuliffe
16 Cove Island Road, Centerville, MA
Proposed Pool Plan
by J.M. O'Reilly & Associates, Inc.
Rev 9-15-22
Substitutions allowed with prior approval of Conservation Staff.
Locations may be field adjusted.
Temporary irrigation may be used for the first two growing seasons - i.e., drip hose.
Mitigation plantings are to be monitored for three years.
Annual reports are to be submitted to the Conservation Commission by October 15.
Notes:
Northern red oak (Quercus rubra): 2" cal., min 25' on center
Black tupelo (Nyssa sylvatica): 2" cal., min 15' on center
Red maple (Acer rubrum): 8'/10' clump, min 20' on center
Plant disturbed area with sweet fern (Comptonia peregrina), lowbush blueberry (Vaccinium augustifolia), and
wintergreen (Gaultheria procumbens): use 1 gal containers. Overseed with Southern Tier Consulting Northeast Upland
Native/Naturalized Wildflower Mix (or equivalent)