Permit NO. B-20-1931 Applicant Name: W. Ray Colwell Approvals
Date Issued: 07/30/2020 Current Use: Structure
Permit.Type: Building-Insulation-Residential Expiration Date: 01/30/2021 Foundation:
Location: 303 HUCKINS NECK ROAD,CENTERVILLE Map/Lot: 252-127 Zoning District: RD-1 Sheathing:
Owner on Record: DAVIS, BARRY L Contractor Name: 5C Energy Framing: 1
Address: 303 HUCKINS NECK ROAD Contractor License: 194390 2
CENTERVILLE, MA 02632 Est.-Project Cost: $6,204.00 Chimney:
Description: Insulation;See Contract Permit fee: $85.00
{ Insulation:
r Fee Paid: $85.00
Project Review Req:
Date: 7/30/2020 Final:
Plumbing/Gas
=. Rough Plumbing:.
Building Official Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within'six months after issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
- This permit shall be displayed in a.location clearly visible from access street or road and shall be maintained open forpublic inspection for the entire duration of the Final Gas:
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
Minimum of.Five Call Inspections Required for All Construction Work:— Service:
1.Foundation or Footing
2.Sheathing Inspection Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT !�
1
S •
. � To Barnstable
wn of to e
• � ""'"�""s
Post This Card So<That it�s Visible From the Street Approved Plans Must be Retained on Job a M ep
Poste&Until„Final Inspection as Been-Made y x E ' Permit
�r�,�a Where a Certificate oflOccupancy;is Required,such Building shall Not�be Occupied until a Final Inspection has"been made
Permit NO. B-20-776 Applicant Name: W. Ray Colwell Approvals
Date issued: 03/12/2020 Current Use: Structure
- Expiration Date: 09 12 2020 Foundation:
.Permit Type: Building Insulation Residential p / /
Location: 303 HUCKINS NECK ROAD,CENTERVILLE Map/Lot. 252 127 Zoning.District: RD-1 Sheathing:
Owner on Record: DAVIS, BARRY LContrictor Aame - 5C Energy Framing: 1
Address: 303 HUCKINS NECK ROAD .; :Contractor License: 194390 2
CENTERVILLE,MA 02632 Est Project Cost: $6,204.00 Chimney:
.Description: Insulation;See Contract PermitpFee: $85.00
Insulation:
.Project Review Req: Fee Paid: $85.00
3/12/2020 Final:
!; 1-i ,
Plumbing/Gas
r
� x ✓, �^ _
�r 3, _ Rough Plumbing:
.A,, .Building Official
' Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authotized byAthis permit is commenced within siNn6nths after issuance.
'All work authorized by this permit shall conform to the approved applic on a d she approved construction documents for which h s permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structuresjshall:be in compliance with the local zoning by lawsand.codes.
z Final Gas:
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same. -
T r , , Electrical
The Certificate of Occupancy will not be issued until all applicable signatures'by the Building and Fire Officials are providedEon this permit.
Service:
Minimum of Five Call Inspections Required for All Construction Worka
1.Foundation or Footing
2.Sheathing Inspection w - _ �� Rough:
_ �..:�
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
/ Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT
t
i
Town of BarnstableBuilding
ewaat aat� PoshThis Card So That it-is`Visibl :From the Street-Approved'Plans Must be Retained on Job andahis Card Must be Kept .
Posted Until:Final Inspection Has.Been Made - '
° Where a Certificate of Occupancy:is Required,such Building shall Not be Occupied until a Final Inspection has'been made ermi
Tcup � ... . A . ... .. ~ � a� s -
Permit No. B-18-402.7 Applicant Name: Barry Davis Approvals
'Date Issued: 01/11/2019 Current Use: Structure
Permit Type: Building-Alteration INTERIOR Work Only- Expiration Date: 07/11/2019 Foundation:
Residential Map/Lot: 252-127 Zoning District: RD-1 Sheathing:
Location: 303�HUCKINS NECK ROAD,.CENTERVILLE '
r Contractor Name`: Framing: 1 JS
Owner on Record: Davis, Barry Contractor License 312t
It
Address: 303H11CKINSNECKROAD ° Est Project Cost: $40,000.00
Chimney:
CE�NTERVILLE, MA 02632 PermitFe�e: $254.00 ,
Description: Remodeling the master bedroom and bathroom Remodeling the Insulation:
Fee,Paid:� $254.00
kitchen and dining room space_ Date 1/11/2019 Final
Project Review Req:
sZ, Plumbing/Gas
f _ Rough Plumbing
Building Official
..Final Plumbing:
Rough Gas:
This permit shall be deemed abandoned and invalid unless the work authonied by�this permit is commenced within six months after issuance. -Final Gas:
.All work authorized by this permit shall conform to the approved application and the=approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures=shall be in compliance with the local zoning by laws and codes.
,,r Electrical
This permit shall be displayed in a location clearly visible from access street or roa,a&bnd shall be maintained open forpublic mspectlocrfor the entire duration of he
work until the completion of the same. s Service:
The Certificate of Occupancy will not be issued until allapplicable signatures byAke lSdilding and Fire Officials are provided on this permit. Rough:
Minimum of Five Call Inspections Required for All Construction Work:°'"$`-
1.Foundation or Footing Final:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed tow Voltage Rough:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Final:
6.Insulation
7.Final Inspection before Occupancy Health
Final:
Where applicable,separate permits are required"for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Fire Department
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). final:
f
........._._......._........
p m O
O n P
rl P
' b O
O i
Q F• JPBO[�
t
n
m u
0
•. ij
r
I a �
,a Bat:)
m tC
• P
O ro HEJ
q
mr On <-y
"jCC� O ............,.
0
a
r
` j Sink
r• r § i
tl. • tl
b
i
P � I
u _......._..—........... e
_..1 .............
_.......,
m
0
....
M
I
f
f
r
"0-r9Z
P
m L N.
�g Y 5'-0r. � n
W
10'-10" 0
q T-0" n m a
b w rr
p
w 5'-0" o" p
m
ameo
m uv
n �N
0..
o E—,vwop a:tva9 n
r m °
Y �
A
� F
eme
m
P
n
w
Q closet 14'0"
m
m
n
7epotJ
5'10" 24'-6"
Assessor's map and lot number .......�42-2..... s THE
TO
Sewage Permit number ...............................
d�QRBARNS-TABLE,
House number ...............................1�6....................................... NAB&
TOWN OF BARNSTABLE
BUILDING INSPECTOR
1(�()
APPLICATION FOR PERMIT TO .....
TYPE OF CONSTRUCTION ....../1/1" ol.d
.......................... . ...........................................................................
.
................... ........ .............I 93y
TO THE INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a permit according to the following information:
..........4412 0.........
Location ..... .......
ProposedUse .......................... ..........11 te ........................................................................................................................
ZoningDistrict ........................................................................Fire District ..............................................................................
Name of Owner /.m.....��.A"-..Aciclress .... .......................................................
....................... .........................
Name of Builder .........................4-P.....(,e'4,1.W ..........Address
Name of Architect ...(rAn& .........................................Address .....................................................................................
Number of Rooms ....... ........................................Foundation ..i2 .&.&-::�....................................
... .Roofin ......6 �t.t..e...... P..Exlerior ..... g .....
Floors ..... ..................................Interior .... .............................................................
Heating-
...... ..................................................Plumbing ..................................................................................
Fireplace .............��=n.............................................Approximate Cost ........ (A9
............................
Definitive Plan Approved by Planning Board ---------------—--—-----------19 4. Area ....... ..................
Diagram of Lot and Building with Dimensions Fee ............. ...........
SUBJECT TO APPROVAL OF BOARD OF HEALTH
r
0
A
71 �
40L�l
Cr 1-4 ie6 G-IF
o
OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS
I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above
construction.
Nome .............. ........
Construction Supervisor's License
WHITE, BETRAM A=252-127
No .,27088.... Permit for ..`ADD POPCH.............
Single Family Dwelling
...............................................................................
Location
303 Huckins Neck Road
................................................................
Centerville
...............................................................................
Owner .Betram White
. ..............................................
I
Type of Construction ..F. ..ame.............................
................................................................................
Plot ............................ Lot .................................
i
Permit Granted ..,October 12, 19 84
Date of Inspection.....................................19
Date Completed ......................................19
Assessor's map and lot number ...a -��. ..�.� .., ..... Qy %THEt
- . . �. SEPTIC SYSTEM MUST SE o 0
Sewage Permit number ..0 � T!' !.............. ............. WSTALLED Ifs C®i�!!PLt�l��� fO� �♦0
........................
B 2' ��� i� �i�L� BJBHSTOBLE, i
Kouse number .......................... b.G`............................... ENVIRONMENTAL TAL CODE AND '°0 KIM 6&
TLJwN R"GULAT►SJNS �EYAYOr
TOWN. OF BARNSTABLE
BUILDING INSPECTOR
APPLICATION FOR PERMIT TO W.. L..............
TYPE OF CONSTRUCTION ..... ......... ...................................
. .................. .............................
............. � � .............19.w
TO THE INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a permit according to the following information:
Location .. . ..��...........IV y ...r.........
ProposedUse ................ ................ itr'k.........................................................................................................................
ZoningDistrict ........................................................................Fire District ..............................................................................
Nameof Owner ........... ...... . .. . ...!. `.... ...Address .. ... .......... ... ... .....................................................
JName of Builder '...Address ... . .. .............. ..... ...... ..................... � I> :.... .............
Name.of Architect ... ..........................................Address ...........................................................................
Number of Rooms ......0 .......................................Foundation ..
Exlerior ......T. .f.1..............................................................Roofing ..... ...41v ......V1.4
.......
Floors ... . �. .... .. .. .............................................Interior .... ..... .°.............................................................
Heating ....... ....... ..................................................................Plumbing ........ .....................................................
Fireplace ........... .. ..... ............................................................Approximate Cost ........ ..........
Definitive Plan Approved by Planning Board -----------_______-----------19_______. Area � Q� r.. .... .. .. .. ........................
Diagram of Lot and Building with Dimensions Fee 111
SUBJECT TO APPROVAL OF BOARD OF HEALTH
2 3_ row L L (�1 YY1 rtvs)0 n,
0 . Olt ,Rig 01-L's Oleffl1IVv S
p GLP56D
` r0
�;r/x,6 140 0
t 00o
,000G�� a'
OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS
1 hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above
construction.
Name67...... . . ...............................
Construction Supervisor's License ..0.00..7.".../9, 9
{
WHITE, BETRAM
F
27088 �� , ADD PORCH
No ............. .. Permit for ....................................
f' Single Family Dwelling
.............. ................. ................. ......................
' Location 303 Huckins Neck Road
r
!' Centerville `
...............................................................................
Owner ....Betram White............................................................... _
r _
.. Type of Construction ....Frame.......................... ,.
.......
- - ,
Plot ........................... Lot ................................... -
Pe ran ....rmit Granted October, 12, r 84 ;
............................... ' 19 I • • - �'
Date of Inspection. . 19
.'Date Completed .... ..19 ^
fi Y�
xt
-7,
7�- ; r
2, 7
PyofTHETo�♦ TOWN OF BARNSTABLE
31 L
1639- BUILDING . INSPECTOR
APOLICATION. FOR PERMIT TO ............V�...�y.......... .............................................
TYPE OF CONSTRUCTION ................! �� Xe
.......... ...........4. ° °' ..............................................
. .............%.2XW..J1.................I 9.1j.
TO THE INSPECTOR OF BUILDINGS:
The undersigned hereby applies for a permit according to the following information:
Location .............4.jejo..?................... ......oV-(FCJf........;4A-D.....................................
Proposed Use ..................D. .1#440—
...................................................................................................................................
Zoning District ................&:!kJ.............................................Fire District .......CC%W.)7*2.&.jA.44r........................................
Name of Owner .......... ....Address ....... -'j!!t#jFA.CoA0....
Name of Builder ............A.J.a&Ly...... ........Address ...........+ m'.Q ..., ..`......A AMW 11.................
Nameof Architect .........116u"......4ccw-7................Address ....................................................................................
Numberof Rooms ...............6.................................................Foundation .....COOPAOC-.1..........................................................
Exterior ................. ,....................................................Roofing ........44r001?,44-7 7....................................................
Floors ..................04A.......................................................Interior ..............�A/A v.A&
Heating ...............F!./W. 9.............2...lex0jor S J
.......................Plumbing ....................... .........................................
Fireplace ......................421."e-ot ................................................Approximate Cost ..............
..............................9............
Definitive Plan Approved by Planning Board ---------j k----dt-------------19 r:*- / 7 �,7
Diagram of Lot and Building with Dimensions ce e-
SUBJECT TO APPROVAL OF BOARD OF HEALTH
SEPT16 SYSTEM must �t
INSTALLED IWCOMPLIANCE
IUBTH ARTICLE 11=STATE
SANITARY CODE AND TOWN
REGULATIONS.
44
1 ��_
Ar
7.3 9A—
//a 4 Ae-"IJ-r ec 14C. 0.41 D
I hereby agree to conform to all th6-Rules and Regulations of the Town of Barnstable regarding the above
construction.
Name ........0.001... I ..... ...... ......
. ........ ...
Mar Realty Corp.
No .5 6... Permit for .......one..story........
.........9Pinle,fames aWei3.n
g......................
j Location ,3. ji
19s.Neek Road,,,,,,,,,,,,,,,,, '
........................ a ......:........................ I
Owner ...........Mar Realty Corps.................... ;
Type of Construction .............. rame.,_..............
................................................................................ t
Plot ............................ Lot ...............#�9..........
January 3l 73
' Permit Granted ..19 ( �
Date of Inspection � ...... .... .............�.. ' t
/ 0
Date Completed .... ..Z ... ...3........19
fi I �
f
PERMIT REFUSED E
i
............ ................................................ 19
...............................................................................
i
...............................................................................
............................................................................... j. �1
Approved ................................................ 19
...............................................................................
a I,
.................... .................................................::.....