Loading...
HomeMy WebLinkAbout1513 IYANNOUGH ROAD (5) J o�. pay? deh e- wb+t�?e�� o r x o a Y , r t 3 o d 0 0 � a c voFtHEr Town of Barnstable i „U ST„BLE, .: Building Department-200 Main Street I ; Hyannis, MA 02601 IEn,IMA Tel. (508) 862-4038 , _ Certificate Of Occupancy Permit Number: B-19-1163 CO Issue Date: 1/2/2020 Parcel ID: 253-018-001 Zoning Classification: SPLIT Location: 1513 IYANNOUGH ROAD/RTE132, Proposed Use: CENTERVILLE Name of Tenant: Sprinklers Provided: YES Gen Contractor: ROBERT A PARRIS, III Permit Type: Commercial Business Type of Construction: Design Occupant Load: 61 , Comments: SPAULDING OUTPATIENT CENTER. CONDITIONAL UPON.SITE PLAN REVIEW APPROVAL. Building Official Date: A Certificate of Occupancy is Required Prior to Occupying Space Building Code: 780 CMR 9th Edition Town of Barnstable r In s Posf':Th sis Card So That it is Visible From the Street Approved Plans,Must be Reta pt r ■IHNHTAHiE M i r • 6:5 ,� Posted Until Final Inspection Has`Been Made x � , fl 4 a yPermi Where a Certificate of Occupancy�s Required,such Building shall Not be Occupied untd a Final`Inspection has been made , Permit No. B-19-1163 Applicant Name: Robb Parris Approvals Date Issued: 05/22/2019 Current Use: Structure ' Permit Type: Building-Alteration INTERIOR Work Only- Expiration.Date: 11/22/2019 Foundation: Commercial Map/Lot: 253-018-001 Zoning District:- SPLIT Sheathing: Location: 1513 IYANNOUGH ROAD/RTE132,CENTERVILLE ',3 Contractor Name:.:, ROBERT A PARRIS, III Framing: 1 q/9 Owner on Record: 1513 IYANNOUGH LLC Contractor License yCS-097119 2 Address 1436 IYANNOUGH RD Est Project Cost: $432,000.00 Chimney: HYANNIS, MA 02601 P.ermit,Fee: $4,031.20 Description: Renovation of existing former retail space for Outpatient Insulation- Fee Paid- $4,031.20 Rehabilitation Therapy and Medical Clinic. Date 5/22/2019 Final: �- ?�Z?�/9 t- Project Review Req: 3PHv�t-D6 ®�PAr ^'� g Plumbing/Gas 3 1 r Rough Plumbing: Building Official Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six,months,;a_ er issuance. All work authorized by this permit shall conform to the approved application and theapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by laws and codes.This permit shall be displayed in a location clearly visible from access street or.road'and shall be maintained open for public inspection for the entire duration of the Final Gas:, work until the completion of the same. Electrical The Certificate of Occupancy will not be issued until all applicable signatures by the Budding and Fire Officials are provided on ths;permit. Minimum of Five Call Inspections Required for All Construction Work rf `' Service: 1.Foundation or Footing - ` 2.Sheathing Inspection Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Building plans are to be available on site Fire Department Final: All Permit Cards are the property of.the APPLICANT-ISSUED RECIPIENT Transmittal PROJECT: Spaulding Rehab Hyannis DATE: 12/27/2019 10108042 SUBJECT: Final MEPFP Affidavits TRANSMITTAL ID: 00067 PURPOSE: For your use and distribution VIA: Email FROM NAME COMPANY EMAIL PHONE Deborah Rivers HDR Architecture, Deborah.Rivers@hddnc.com 617-603-6362 Inc. TO NAME COMPANY EMAIL PHONE Andrew Parris 333 Richmond Street Parris Construction Andrew Parris (508) 967-7232 Raynham MA 02767 <aparris@parrisinc.com>. United States REMARKS: Andrew and Bob, Attached are the.electronic versions of the MEPFP Final Construction Control Documents for this project. Regards, f Deborah DESCRIPTION OF CONTENTS CITY DATED TITLE NOTES 1 12/23/2019 Elec_Final—Construction Control Document S auldin B-19-1163 Stam df 1 12/23/2019 FA_Final_Construction Control Document Spaulding B-19-1163 Stamp.pdf 1 12/23/2019 FP_Final—Construction Control Document Spaulding B-19-1163 Stamp df 1 12/23/2019 Mech_Final—Construction Control Document Spaulding B-19-1163 Stamp.pdf 1 12/23/2019 Plumb_Final—Construction Control Document Spaulding B-19-1163 Stamp.pdf COPIES: Ron Freeman (Partners Healthcare) Robert Parris (Parris Associates) Jessica Stebbins (HDR, Inc.) Harold Levkowicz (HDR, Boston) Page 1 of 1 �i Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional F s� for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date: December 19, 2019 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I, Mark Rattenbury, MA Registration Number: 42757 Expiration date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: I. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: ate a MARK'F. RATTENSURY w ELECTRICAL No.42757 4 Phone number: 617-737-1111 Email:MRattenbury@akfgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 r , Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional ,r for work per the ninth edition of the re Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date:December 19,2019 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I, Peter Reiliv, MA Registration Number: 47826 Expiration date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,.and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet'or electronic signature and seal: -10f� q ILLLY FIRE PROTECTION Ca No.47826 C Q s� Phone number: 617-737-1111 Email: PReilly@akfgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01012018 i Final Construction Control Document To be submitted at completion of construction by a ttt Registered Design Professional ,e �y for work per the ninth edition of the Massachusetts State Building Code, 780 CMR,Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date:December 19,2019 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I, Peter Reilly, MA Registration Number: 47826 Expiration date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. 1,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if'the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: OF � �y pETERJ. c REILLY w FIRE PRDTECTMN .e 9 N6.47828 Q spa Phone number: 617-737-1111 Email: PReilly@akfgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document To be submitted at completion of construction by a ' Registered Design Professional- for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date: December 19,2019 Permit No.B-19-1163 Property Address: 1513 Ivannough Road,Centerville,MA 02632' Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I,Jeffrey Jansen, MA Registration Number:51971 Expiration date: 06/30/2020,am,a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical . Fire Protection Electrical Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: l. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Pending completion of punch list and an approved testing and balancing report Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or 'i!1 Of Aq'�Ssq electronic signature and seal: cy. i .g EF M. R, J N .1 0.5 Q 90� IcG/$TIE �sSIONAL ENG Phone number: 617-737-1111 Email:JJansen@akfgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document w To be submitted at completion of construction by a Registered Design Professional , for work per the ninth edition of the Massachusetts State Building Code, 780 CMR,Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date: December 19,2019 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I, Peter Reilly, MA Registration Number: 47826 Expiration date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: OFlyo�_ � cy WSJ. c REILLY H FIRE PROTECTION N0.47828 9�GISTEP� Es�0 Phone number: 617-737-11.11 Email: PReilly@akfgroup.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 . q Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional J� for work per the ninth edition of the ve Massachusetts State Building Code, 780 CMR,Section 107 Project Title: Spaulding Outpatient Clinic Renovation Date: December 19,2019 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Buildout of tenant space I, Peter Reillv, MA Registration Number: 47826 Expiration date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural' Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or ' electronic signature and seal: FM,o�_ cy pfiTER J. o REILLY H f18E MECTtON A ,Q No.47826 4 9p FatstEQ' �. Phone number: 617-737-1111 Email: PReilly@akfgroup.com Building Official Use only Building Official Name: Permit No.: Date: Version 01 01 2018 NORTHEAST TEST & BALANCE; INC.i P.O. BOX 1337 SAGAMORE BEACH, MA '02562 {781 ) 8 1-1376 robertmuirTAB@ mail.com HVAC TEST AND BALANCE REPORT PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION LOCATION.:: 1513 IYANNOUGH ROAD HYANNIS, MA 02601 i ARCH ITECT: H DR ARCH ITECTURE CONSTRUCTION MANAGER. PARRIS & ASSOCIATES MECHANICAL CONTRACTOR;: NORTHSTAR MECHANICAL, INC. This is to certify that Northeast Test and Balance, Inc..have tested and balanced the scope of work described herein and have documented the results in the following report. The testing has been performed in accordance with the standard requirements and procedures per specifications. CE;ItTl F I f_0 Robert.J. Muir President : c 12/17/2019 _ £ NORTHEAST TEST & BALANCE- , INC. P.O. BOX 1331 SAGAMORE BEACH, MA. 02562 robertrnuI,rTAB@gmal com SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 ROOFTOP UNIT DATA SHEET SYSTEM: RTU-01 RT1,142 Equipment Location ROOF ROOF Area Served SEE AIR DISTRIBUTION _._ SEE AIR DISTRIBUTION Equipment Manufacturer TRANE T'RANE Model Number YHC102F3RHA0PGEBOA1060 YHC102F3RHA0PGEB0A1,060 Serial Number 194416095E 194416093L Specified Actual Specified Actual Total CFM Fan 2 545 2,588 2,930 2,941 Return/Exhaust Air CFM 2,175 2,:141 2;430' 2,448 outside Air cFM 370. 447 . _ 500 493 TotalStatic.Pressure Inlet Pressure In.w.c, 90Fanl-.80ES.P 88Fan/-.67ESP Discharge Pressure ln.w.c. 1.48,in-.W.c-. 1.40 in.w.e. Fan RPM Variable S d; I Variable S d. S deified Actual Specified Actual Motor Manufacturer Motor HP _ - 2.75 2.75 Voltage t Phase 208'/3, 2074 206 [207 208 / 3 207.1206]207 Amperage __. 7.3 5.4 /:5.5./5.6 7.3 5.0 15.6/5.6 _ Motor RPM Variable Sod. Variable S d Motor Service Factor NL . -- - NL -- - Starter Neater Elernent DISCONNECT DISCONNECT Motor sheave Position DIRECT DRIVEDIRECT DRIVE Motor Sheave&.Shaft Size. DIRECT DRIVE DIRECT DRIVE Fan sheave&Shaft Size DIRECT DRIVE DIRECT.DRIVE Belt Quantity 8 Size DIRECT DRIVE DIRECT DRIVE Unit set for 15' SP 84W Unit set for 1.5" Sp @ 8-r NORTHEAST TEST & BALANCE, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 robertmuirTAB a@gmail.com PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 0261 RTU-01 VAV TERMINAL AIR- DISTRIBUTION DESIGN MIN. DESIGN MAX. ACTUAL MIN ACTUAL MAX. - OUTLET LOCATION SIZE S.P. CFM S.P. CFM S.P. CFM S.P. CFM VAV 1-01 811 1 THERAPIST WORK 121 CD-D/12" 200 665 204 649 _kf= 1.04'VAV 1-02 811' 1 THERAPY GYM 135 LD=A/$" 100 107 2 THERAPY GYM 135 LD-A/8 100 108 3 THERAPY GYM 135 LD-A/8" 100 100 4 THERAPY GYM 135, LD-A/8" 100 1 103 5 THERAPY GYM 135 LD-A/8" 100 97 _6 THERAPY GYM 135 LD-A/8il100 99 7 THERAPY GYM 135 _ LD-Af8" 75 79 kf= 1.30 TOTAL 6,75 676 693 693 VAV 1-03, 12" 1 THERAPY GYM 135 SG-A/81V120 128 2 THERAPY GYM.135 -_---SG-A/8 120 130 3 THERAPY GYM.1.35 SG-A/8 120 130 4 THERAPY GYM 135 SG-A/811 120 122 5 THERAPY GYM_135 SG-A/8 _ 120 125 6 OCC. THERAPY 134 CD-A/101" .245 238 7 THERAPY 133 CD-A/6" 90 97 8 THERAPY 132 CD-A/6 -- 90 96 9 THERAPY 131 CD-A/6" 90 92 10 THERAPY 12.9 CD-A/6 90 88 kf= 1 02 TOTAL, 1 120 1205 -1,160 1,246 NORTHEAST TEST & BALANCE, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 ro b e rt rn u rTA B @g m a i l,.c o m PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 RTU-02 VAV TERMINAL AIR DISTRIBUTION 1 of 2 DESIGN MIN. "DESIGN'MAX. ACTUAL MIN. ACTUAL MAX: OUTLET LOCATION SIZE S.P: CFM S.P. CFM S.P. CFM S.P: CFM VAV 2'-01 - 891 _ 1 - THERAPY 122 CD-B/8" 120 120 2 THERAPY 124 C:D-B/8011 120 120 3 SPEECH THERAPY 123 CD-B/8 120 123 4 THERAPY 126 CD-B/8" 120 125 kf= 1.01 TOTAL _ - 480 480 488 488 VAV 2-02: 12" 1 CORRIDOR 109 CD-A/6" 85 _ 93 2 CORRIDOR 109 CD-A/6' 85 90 3 MULTI PURPOSE 107 GD=C/10" '250 259 4 STAFF WORKROOM 10 CD-B/8" 140 138 5 _ EXAM 111 CD-B/8" 120 _ _ _ 117 6 EXAM 112 CD-B/8 120 122 7 M.D. OFFICE 113 CD-B/8" 135 128 8 E LE'C. ROOM 114; C D-A/6,1 - 50 51 9 CORRIDOR 116 CD-A/6" 45 47 _ 10 CLEAN SUPPLY 115 CD-A/6" 50 49 11 SOILED HOLDING 117 CD-A/6" 50 51 12- DATA ROOM 118 CD-A/6 __ 50: 48 13 CORRIDOR 119 CD-A/6" 45 46 14 MENS RM. CD-B/8" 100 97 kf= 1.07 TOTAL- 9864 1,136 1,326 1,01611,150 1 336 CLG. HTG CLG. HTG NORTHEAST TEST & 'BALANCE, INC. P.O. BOX 13317 SAGAMORE BEACH, MA. 02562 robertmui.rTAB@gmaii.com PROJECT: SPAULDING REHABILITATION NETWORK, OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 ' RTU-02 VAV TERMINAL AIR DISTRIBUTION 2 of 2 DESIGN MIN. DESIGN MAX. ACTUAL MIN. 'ACTUAL MAX. OUTLET LOCATION SIZE S.P. 'CFM S.P. CFM S.P. CFM SR CFM VAV 2-03', 12'1 1 WAITING 102 LD-A/8" 100 106 2 WAITING 102 -LD-A/8" 00- 105 3 WAITING 102 SG-A/80 140 132 4 WAITING 102 SG-A/81' 140, 130 ,5 WAITING 102 SGA/F 140 133 6 RECEPTION 103 CD-B/8" 195 195 7 CORRIDOR 102A CD-A/6!' 45 45 8 SUPPLY CD-N6111 70 76 9 MNGR. OFFICE 105 CD-B/8" 195 192 kf 1.09 TOTAL 340 760 1 19126 363 1756 1.,117 CLG. HTGI 'CLG. HTG. NORTHEAST TEST & BALANCE, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 robertmuirTAB@gmail.com PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 RTU RETURN AIR DISTRIBUTION SUMMARY OUTLET# LOCATION TYPE. SIZE. K'FACTOR/FH DESIGN CFM ACTUAL CFM RTU-01 - -- - RETURN. 1 THERAPIST WORK_121 CR-D 12 FH 465 447 2 CORRIDOR.119 _CR-B 81' FH 340 341 3 CORRIDOR` - CR-D 12" FH`. 685 - 715 4 STAFF WORK 123A CR-D 12" FH 685 638 _ TOTAL_. 2,175 2,141 RTU-02 RETURN 1 M.D. OFFICE 113 CR-R 8" FH 125 121 2 EXAM 112. CR-B 811 FH 110 1,12 3 EXAM 111 _ CR-B 8" FH 110 _. 108 4 STAFF WORKROOM 108 CR-B 8" FH - 125 123 _ 5 MULTI PURPOSE 107 CR-B 8" FH 190 185 ji 6 CORRIDOR 106 CR-C 10". FH 325 .333 7' MNGR. OFFICE"105 CR-B .81' FH 175 169 8` CORRIDOR 102A MD 12" FH .500 :537 9: RECEPTION 103 CR-C 10" FH 330 340 10 THERAPY-126 CR-B 8" FH - 11.0 106 1.1 SPEECH THERAPY 123 CR-B 8" FH 110 102 1-2 THERAPY 124 CR-B 8" FH 110 110 13 THERAPY 122 CR-B 8." FH 110 102 TOTAL_ 2,430 - 2,448 FH FlowHood'TM. i NORTHEAST TEST & BALANCE, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 robertmuirTAB@gmail..com SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 EXHAUST FAN DATA SHEET SYSTEM. EF-01 Equipment Location ROOF Area Served SEE AIR DISTRIBUTION Equipment Manufacturer GREENHECK Model Number G-133-VG-7-X serial.Number 16075449 19J Specified Actual Specified Actual Total CFM Fan 1,305 , 1,278 - Return/Exhaust Air CFM Outside Air CFM Total Static Pressure Inlet Pressure ln,w.c. -.54 in.w.c. Discharge Pressure ln.w.c. Atmosphere Fan RPMI Variable SO. Specified Actual Specified Actual Motor Manufacturer VanGreen Motor HP 3(4 Voltage l Phase 11511, 118 Amperage 8..8 2.2 Motor RPM Variable S d. Motor Service Factor-- NL Starter Heater Element DISCONNECT Motor Sheave .Position DIRECT DRIVE Motor.Sheave AShaft-Size DIRECT DRIVE Fan Sheave..&Shah Size DIRECT DRIVE Belt QuantitykSize .DIRECT DRIVE NORTHEAST TEST & BALANCE, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 robertmuirTAB@gmail.com PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYAN NO UG H ROAD, HYAN.N I S, MA 02601 EF-01 .AIR DISTRIBUTION SUMMARY OUTLET# LOCATION TYPE SIZE W FACTOR/FH DESIGN CFM ACTUAL CFM. EF-01 EXHAUST 1 SOILED HOLDING 117 CE-Bl 8" FH 150 165 2 SUPPLY CE-A 6" FH 70 69 3 PAT. TLT 127 CE-A 6" FH 75 74 4 PUBLIC TLT 128 CE-A :6" FH 75 71 5 THERAPY GYM 135 LR-A 8" FH 1.90 186 6 THERAPY GYM 135 LR=A 8" FH 190 18$ 7 OCC. THERAPY-134 CE-D 12" FH 560 525 TOTAL 1310 1,278 FH F1owHood TM NORTHEAST TEST & BALANCE-, INC. P.O. BOX 1337 SAGAMORE BEACH, MA 02562 robertmuirTAB@gmail.com PROJECT: SPAULDING REHABILITATION NETWORK OUTPATIENT CLINIC RENOVATION 1513 IYANNOUGH ROAD, HYANNIS, MA 02601 INSTRUMENTATION LIST INSTRUMENT MANUF. MODEL SERIAL No. RANGE CAL. DATE AirData Shortrid; e - Multimeter Instruments ADM-860 M05032 0-60 in. w.c. 7/10/2019 25.500.0 FPM . -65I+250"F Digital Dwyer TAC.-L S772- 639 25-99,999 7/10/2019 Tachometer Clamp Meter Klein Tools CL200 0613X-132 0-600 Volts 7/10/2019 Amp Probe 0400 Amps Complefe Calibration Certificates are available upon request. V r bent"'"ed alanc Cum des ignation.awarded to Northeast Test., & Balance Inc. for successfully meeting all requirements for certification as set forth in the NBC Certification Standards in the field of commercial HVAC air and hydronic testing and balancing r Certified.Since. June 19, 2015 as administered and recognized by National o u - k NBC.Certification.# 103667 Expires: 7/19/2021 NAT i O,�l`AL C ?U'NCI V' Rob Falke,President 1 1 Y 1 ! Final Construction Control Document To be submitted at completion of construction by a W Registered Design Professional ewe for work per the ninth edition of the Massachusetts State Building Code, 780 CMR,_Section 107. Project Title: Spaulding Outpatient Center Hyannis Date: December 18,201 Permit No.B-19-1163 Property Address: 1513 Iyannough Road,Centerville,MA 02632 Project: Check(x) one or both as applicable: New construction u Existing Construction Project description:buildout of tenant space I Richard M. Reilly, Jr. MA Registration Number: 20678 Expiration. date: 68/31/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: (X) Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provision R 107. �.�EREQ qq Enter in the space to the right a"wet" or electronic signature and seal: , on No.20678 BOSTON X ti ?yO MA �J 3 y�F9�TH OF NAp`'�'PG Phone number: 617-357-7746 Email: chad.reilly@hdrinc.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document w To be submitted at completion of construction by a Registered Design Professional Y f for'work per the 9th Edition of the Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: SpauldingOutpatient Clinic Renovation Date: December 18, 2019 Permit No.: B-19-1163 Property Address: 1513 I,, a�gh Road, Centerville,MA 02632. Project: Check one or both as applicable: ❑ New Construction ® Existing Construction Project Description: Buildout of tenant space. 1, Benjamin B. Wild, P.E., MA Registration Number: 46107, Expiration Date: 06/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Q Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. 1, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: ®��p �6AAQ 'AV,OF�1��, i3�i4 AgJllN 13 €sril_i3 T, �a C-Do STR 10 m s P'-+ ! y co � 0 A Phone Number: (617)737-0040 Email: BWild@mcsal.com 19015.000-1513 Iyannough Road- Centerville,MA 02632-Description-Spaulding Outpatient Clinic Renovation Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 J Town of Barnstable rpRM Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on 1ob.and this Card Must be Kept BAPNn Posted Until Final Inspection Has Been Made.. j 1634. ♦`� e 1 Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a final Inspection has been made. Permit No. B-19-2222 Applicant Name: SCOTT R HANDRAHAN Approvals DatE- Issued: 07/11/2019 Current Use: Structure Permit Type: Building-Sheet Metal-Commercial Expiration Date: 01/11/2020 Foundation: Location: 1513 IYANNOUGH ROAD/RTE132,CENTERVILLE Map/Lot:253-018-001 Zoning District: SPLIT Sheathing: Owner on Record: 1513 IYANNOUGH LLC Contractor Name' ,SCOTT R HANDRAHAN Framing: 1 Address: 1436 IYANNOUGH RD Contractor.License: 9691 2 HYANNIS, MA 02601 i` `, Est Project Cost: $90,000.00 Chimney: Description: PROVIDE SHEET METAL DISTRIBUTIOIN FOR(2)8.5 TON RTU Permit Fee: $ 160.00 SYSTEMS AND ONE EXHAUST FAN ' ' Insulation: Fee Paid:' $ 160.00 Project Review Req: Date 7/11/2019 Final: Plumbing/Gas Rough Plumbing: .;.�._ , _ This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commencemFd within six months after issuane. icia Final Plumbing: All work authorized by this permit shall conform to the approved application and the`approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. Rough Gas: This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the 1 work until the completion of the same. ( a Final Gas: The Certificate of Occupancy will not be issued until all applicable signatures by the Building-and,Fire Officials are"provided on this permit. Electrical Minimum of Five Call Inspections Required for All Construction Work: f: 1.Foundation or Footing Service: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before,firest flue lining is installed Rough: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation 7.Final Inspection before Occupancy Low Voltage Rough: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Low Voltage Final: Work shall not proceed until the Inspector has approved the various stages of construction. Health "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: i _ i i 'Commonwealth of Massachusetts Sheet Metal.Permit Map �3 Parcel o Q Date: -7 6 d (1cf Permit# Estimated Job Cost: $19 Perm._1t.Fee:.sP 160 Plans Submitted: YES ✓ NO Plans Reviewed: YES NO Business License# — 1 �7 9 Z—b Applicant License# v l 6 Business Information: klo_vckz( j��Name: Property Orw,nerr/Job Loeation Information: Name:_A4.SAY L4e�G_4­ CA street; e4 Q street: l 5- a�V�vt� vCi /Town.:ty P o /� d23CO City/Town: �A vk Telephone: 3 6 Z Telephone: Photo I.D.required/Copy of Photo I.D. attached: YES NO Staff Initial J-1/Vj- unrestricted license J-2/M-2-restricted to.dwellings 3-stories or less and commercial up to 10,00.0 sq. ft./2-stories or less Residential: 1-2 family ---Multi-family Condo/Townhouses Other Commercial: Office i/ Retail Industrial. Educational i Fire Dept..Approval Institutional_ Other Square Footage: under 10,000 sq. ft.Z over 10,000. sq.ft. Number of Stories: Sheet metal work to be completed:' New Work: Renovation: HVAC Z Metal Watershed Roofing Kitchen Exhaust System, i I Metal Chimney/Vents. Air Balancing { Provide detailed description of work to be done: , s eJ i INSURANCE COVERAGE: I . I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch.112 Yes No ❑ i If you have.checked Yr&indicate a type of coverage by checking the appropriate box below: j A liability insurance policy Other type.of indemnity ❑ Bond ❑ ( i OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement, ' Check One Only, Owner ❑ Agent ❑ i i Signature of Owner or Owner's Agent I • By checking this box2,I hereby certify that all of the details and information I have submitted(or entered)regarding,this application are true and i accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be t in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation:YES NO 'j Progress InsRections I Date Comments I Final Inspection Date Comments E Type of License: 3y ,Master, rdle Q Master-Restricted i ityrrown QJoumeyperson' Signature of Licensee zetrrit# / Q OJoumeyperson-Restricted License Number: zee$ r Check at www-mass.dovldnl . i nspector,pignature of Permit Approval i •la,a Town of Barnstable Regulatory Services IIMUMWASIXMASS Thomas F.GeDer,Director +16 Building ZD1VISIOR Tom Perry,Building Commissioner 200 Main Street,Hyannis,MA 02601 www.town.barastable.ma.ns Office: 508-862-4038 Fax; 508-790-6230 Property .Owner Must Complete and Sign This Section If Using A Builder as Owner of the subject property hereby authorize (50b ` fy .e���) __ to act on my behalf; in all matters relative to work authorized by this building permit L 1?J 6 , I (AddsJss of job) **Pool fences and alarms are the responsibility of the applicant. Pools are not to be filled before fence is installed and pools are not to be utilized until all,final inspections are performed and'accepted. L Si at6e of Owner Signature.of Applicant dog.[, Print 14ame Print Name r7 Win Date QFORMS.OWNERPEMSSIONPOOLS ' COMMONWE H OF MASSACHUSETTS - BOARD OF SHEET.-METAL W RKERS ISSUES THE FOLLOWINi LK ENSE MASTER UNRESTRICTED � ...SCOTT R HANDRAHAK" z 71 PONDEROSA DR HANOVER..i A 02339-1170. z Uj J 9691 0.8/28/2020 544797 f •1 p p ` Commonwealth of Massachusetts Dnnsion of Protessional Licensure Refrige 4t!;t ,%ect..jnisian RT-021214 ®' .�,. � I Ejpires: 08/29/2020 SCOTT R HANDRAHAN,r� s �i 71 PONDEROSA DR • �' f HANOVER MA 02339. Commissioner a. j Town of Barnstable Bulln ,l, Post This Card So That it is.Visible From the Street Approved°Plans Must be Retained on Job and this Card Must be,Kept SrABM M&ULPosted Until Final Inspection Has Been Made 1 1 elt � s634 rnl iJlJl .e ,Ma a Where a Certificate•oftQccupancy is Required,such Building shall No#tbe Occupied until a Final•Inspection has been made. Permit No. B-19-2981 Applicant Name: Ed Juralewicz Approvals Date Issued: . 09/26/2019 Current Use: Structure Permit Type: Building-Sign Expiration Date: 03/26/2020 Foundation: Location: 1513 IYANNOUGH ROAD/RTE132,CENTERVILLE Map/Lot: 253-018-001 Zoning District: SPLIT Sheathing: Owner on Record: 1513 IYANNOUGH LLC Contractor Name: EDWIN J JURALEWICZ JR Framing: 1 Contractor CS`058192 Address: 14361YANNOUGH RD 2 HYANNIS, MA 02601 '� Est Project Cost: $9,000.00 Chimney: Description: Install new internally illuminated 3'x 19'(57 sq) wall``sign and Permit Fee: $200.00 reface 14"x 67" (6.51 Sq) panel on freestanding sign. Insulation: Fee Paid: $200.00 Final: Spaulding Outpaient Center i Date: 9/26/2019 Plumbing/Gas Project Review Req: Rough Plumbing: Zon.ing Enforcement Officer Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authoi cl,by this permit is commenced within'sixmonths aft_er,=,issuance. All work authorized by this permit shall conform to the approved application and theiapproved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. 1 Electrical, The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work: Service: 1.Foundation or Footing 2.Sheathing Inspection ,. ^' Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Fire Department Building plans are to be available on site All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: a WE A 19-0414 EXTERIOR WALL SIGN' I INTERNALLY ILLUMINATED SINGLE 51DED WALL 516N,UL 1-15TED OPAQUE ALUMINUM COMP051TE BACKGROUND PAINTED PND 033CYELL BLUE WHITEITS AND YELLO W OW PUSH THRU TRANSLUCENT �``—'IJ��� _�� ]J • ACRYLIC LETTERS INTERNALLY ILLUMINATED WITH WHITE LED MODULES L. 19' CLIENT ®SPAULDING., DATE THIS DRAWING CONWNS PROPRIETAKt'NFORMATION AND DESIGN WNCEPTS AND IS ' OUTEATI NT CENTER 9/10/19 PRDMMOF UNITED SIGN COMPANXINC.ITI5 PRESENTED TO YOU FOR YOUR M USNE HYANNIS USE AND MAY NOT BE COPIED OR SHOWN 70 ANYONE OUTSIDE WUR ORGANIZATION WITHOUT 33 Tozer Rd. PO Box3106 LOCATION DE5IGNEDBY OUR WRITTEN PERMISSION.OW40NGOFCOLORS,SIZE.MATERWS,OFILLUMINATIONDOES Beverly,8- 01915 9346 15131YANNOUGHRDHYANN15 EJ NOT ALTER THE BA5ICDRAWING.©2019 UNITED SIGN CO.INC,ALL RIGHTS RESERVED. Fax97Phone -927- 351 Fax 978-927-9351 www.unitedsign.biz Sfax (c( ' qq 0I 0 �A cog 1513 t l.i p, U f • ' EXISTING PYLON SIGN TO BE MODIFIE MANAGEDl�s'lAi�tuu %Er. r 1 - BY: 608-3'75-9300 $ r, 19-0414 EXTERIOR PYLON SIGN PANELS TWO 14"X 67"X 314"PVC PANEL5 FOR EX15TING PYLON 5167147 r ra7sl D BACKGROUND PAINTED PANTONE 633C WITH WHITE LETTERING REPLACEMENT EM5 PANEL5 BY OTHER5 (PUTIPINATH MIT 67" CLIENT SPAULDING., DATE THIS DRAWING CONTAINS PROPRIETARY INFORMATION AND DESIGN CONCEPTS AND LS ' OUTPATIENT CENTER g/10/19 PROPERiYOF UNITED SIGN COMPANY INC.rr15MESENTEDTO YOU FOR YOUR EXCLUSIVE H•1ANNis USE AND MAY NOT BE COPIED OR 5HOWN W ANYONE OUTSIDE YOUR ORGANIZATION MTHOUr 33 Tozer Rd. PO Box 3106 LOCATION DE516NEDBY OUR WRITTENPERMLSSION.CHANGING OF COLORS.SIZE.MATERIAL5,OR ILLUMINATION DOES Beverly,MA 01915 15131YANNOUGH RD HYANNIS 9 76- EJ OCT ALTER THE BASIC DRAMNG.©2M UNITED SIGN CO,INC.ALL RIGHTS RESERVED. Phone 927-939351 Fax 78- www.unitedsign.biz r� + (Los I �a �l Town of Barnstable ��;... �.�..r=�.,:M Buil ding to Post This Card So That"it is Visible from the Street ApprovedrtPlans"Must be Retained on Job and this Card Must'be Kept Posted Until,final Inspection Has Been Made , ?x .� x ;. . Permit " Where a Certificate of Occupancy i Requredsuch Building sFiall`Not==<beOccup�ed until a.Final Inspection has been made rmi Permit No. B-19-3734 Applicant Name: Rene A Lachapelle Jr Approvals Date Issued: 12/19/2019 Current Use: Structure Permit Type: Building-Smoke Detector-Fire Alarm Dection Expiration Date: 06/19/2020 Foundation: System Ma Lot: 253-018-001 Zoning District: SPLIT Sheathing: Location: 1513 IYANNOUGH ROAD/RTE132,CENTERVILLE Contractor,Na me''. RENE A LACHAPELLE Framing: 1 "= Owner on Record: 1513 IYANNOUGH LLC Contractor License: 13502 2 s x Address: 1436 1YANNOUGH RD ^-- `-'" Est Projec t Cost: $5,000.00 Chimney: HYANNIS, MA 02601 ( , Permit Fee: $ 160.00 Description: Furnish&Install new fire alarm devices;(1) new power supply; I Insulation: i �� Fee Paid.''' $160.00 extending existing addressable loop;(1) new fire control panel; new -" Date / 12/19/2019 Final: /z/Z��/y fire control panel to communicate with existing fire,alarm panel I � �- �iy Project Review Req: Related tenent fitout B-19-1163 Plumbing/Gas G�y Rough Plumbing: ,,Building Official. Final Plumbing: This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months aftergissuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for,Which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structures-shall be in compliance with the local zoning by laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for,public inspection for the entire duration of the Final Gas: work until the completion of the same. 4— - Electrical The Certificate of Occupancy will not be issued until all applicable signatures"by the-Building and Fire Officials are provided on thispermit. Minimum of Five Call Inspections Required for All Construction Work: Service: 1.Foundation or Footing ^ 2.Sheathing Inspection `�_ R Rough: 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final: 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough: 6.Insulation 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. Final: "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: -MECHANICAL SYMBOL LIST ABBREVIATIONS DEMOLITION NOTES DUCTWORK (NOT ALL ABBREV.ARE NECESSARILY USED ON THIS PROJECT , 1.. GENERA F)l A AMPERES TAT LEAVING AIR TEMPERATURE A. THIS CONTRACTOR SHALL VISR THE SITE AND A0.101NINC AREAS AND EXAMINE ' (NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT) MAY AUTOMATIC AIR VENT LBS POUNDS THE EXISTING CONDITIONS TO BECOME FAMILIAR WITH THEM AND TO DETERMINE _ THE DIFFICULTIES WHICH WILL AFFECT THE EXECUTION OF THE WORK OF THIS AL AR CONDRIONINC - lD LINEAR DIFFUSER - CONTRACT. THIS CONTRACTOR SHALL PERFORM THIS PRIOR TO THE - SUBMISSION OF HIS PROPOSAL SUBMISSION OF A PROPOSAL WILL BE N SINGLE LINE DUCTWORK OR EQUIPMENT NEW CONST LED AS E AND ACCU AR COOLED CONDENSING UNIT TDB LEAVING DRY SUM TEMPERATURE LATER CLAMS WILL NOT.BE RECOGNIZED FENCE THAT SUCH AN OR(EXTRA LABOR.EQUIPNATION HAS BEEN MENT OR -- --- SINGLE LURE DUCTWORK OR EQUIPMENT-EXISTING AILS AROMATIC CONTROL SYSTEM LF.UN.FT. LINEAR FEET MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EYAMINATION BEEN MADE. AW AR CONDITIONING UNIT LR LINEAR RETURN B. THE OEMOLRION WORK SHALL INCLUDE.PROVIDING ALL MATERIALS,ALL %— DUCTWORK TO BE REMOVED - HDR AIcht we AD ACCESS DOOR URA LOCKED ROTOR AMPS NECESSARY EXTENSIONS.CONNECTIONS.CURING,REPAIRING.ADA'TING AND HD Boston ® ° OTHER MECHANICAL WORK REQUIRED.TOGETHER WITH ANY REQUIRED DUCT UNDER OR FAIR PRESSURE AFT ABOVE FINISHED FLOOR LWB LEAVING WEr BULB TEMPERATURE TEMPORAFF CONNECTORS TO MAINTAN SERVICE PENDING THE COMPLETION OF 99 High Street,SuXe 2300 (SUPPLY AIR OR FAIL DISCHARGE) �• THE PERMANENT WORK. NOTES AND GRAPHIC REPRESENTATION SHALL NOT AHU AIR HANDLING UNIT LOOT LEAVING WATER TEMPERATURE UMT THE EXTENT OF DEMOLITION REQUIRED. EMEND OF DEMOLRION WORK 80610n.MA D2I TO DUCT UNDER NEGATIVE PRESSURE r SHALL BE COORDINATED WITH THE PRCHRECT AND BUILDING MANAGEMENT. (RETURN OR OUTSIDE AIR) AL ALUMINUM MAX MAXIMUM C., REFER TO ARCHITECTS PLANS FOR AREA Of WORK. ® DUCT UNDER NEGATIVE PRESSURE BF BOOSTER FAN MB MIXING BOX2. SLOPE OF WORK BCE BOTTOM EXHAUST GRILLE MEN THOUSAND BTU PER HOUR (EXHAUST) 0. REMOVAL OF MECHANICAL EQUIPMENT DUCTWORK AND PIPING. BCR BOTTOM RETURN GRILLE MHP MOTOR HORSEPOWER 1) REMOVE ALL EXISTING AR COOLED,HEAT R AND FLOOR MOUNTED AR �VD VOLUME DAMPER BNP 'BRAKE HORSEPOWER IN MINIMUM � CONOTIIONING UNITS AND OUTDOOR HEAT REJECTOR DEVICES WITH ALL I � BLOW BACKWARD INCLINE DOUBLE WIDTH MM MILLIMETER ASSOCIATED DUCTWORK,TERMINAL BOXES.DIFFUSERS,GRILLES,HANGERS IN 1�IS lYFIRE DAMPER AND ACCESS DOOR AND ACCESSORIES. BISW BACKWARD INCLINE SINGLE WIDTH MOT MOTOR B. REMOVAL OF DUCTWORK AND ACCESSORIES ssq ales - LLi ' BDD BACK DRAFT DAMPER NcN4NARA 54LVIR BMS BUILDING MANAGEMENT SYSTEM MOV MOTOR OPERPTEO VALVE � 1) REMOVE ALL SUPPLY AIR,RETURN AIR AND EXHAUST AIR DUCTWORK WITH 'rAlisln((IIgO MalMpemrul - ORS BOTTOM SUPPLY REGISTER NC NORMALLY CLOSED ALL ASSOCIATED DIFFUSERS,TERMINAL BOXES,CONTROLS,COLLARS, �J AUTOMATIC DAMPER - DAMPERS.RETURN/EXHAUST GRILLES AND CONTROLS. BT BOTTOM THROAT NIC NOT IN CONTRACT - - - REPLACE/PATCH WADS AND FLOORS TO MATCH EXISTING. _ R RISE IN DUCTYORN(IN DIRECTION OF AIR FLOW) BTUBRRISH THERMAL UNIT - N.O. NORMALLY OPEN - C. CONTRACTOR TO D. WHICH ADDITIONAL SUPPORT FOR ALL EXISTING DUCTS AND PIPING TO REMAIN BNM BTU PER HOAR N0. NUMBER - WHICH ARE AFFECTED BY OEMOUTION OF EXISTING CEILING AND PARTITIONS. - - AK F• O DROP IN DUCTWORK(IN DIRECTION OF MR ROW) - 'C DEGREES CENTIGRADE(CEL9U5) TUTS NOT t0 SCALE E IN A METH REQUIRED TO BE TURNED OVER t0 THE OWNER SHALL BE PLACED ROOM PRESSURIZATION _ R A MUTAS A ACCEPTABLE LOCATION. ALL MBE TAKE AND EQUIPMENT _tpp_ ARROW INDICATES DIRECTION OF AIRFLOW CO COOLING COIL OA OUTSIDE AIR - REMOVED AS A RESULT A DEMOLITION SHALL BE LAWS FROM THE SITE AND NUMBER INDICATES AIRFLOW RATE DISPDBED OF IN ACCORDANCE WITH APPLICABLE TAWS AND ENVIRONMENTAL ' CCW COUNTER CLOCKWISE P PUMP RECUTATIONS. CENTER UNE - LD CEIUNG DIFFUSER PC PRESSURE DROP ♦p Ly p^ B F. CONTRACTOR SHALL.IDENTIFY ALL EXISTING WORK TO REMAIN NT ACCEPTABLE -CAM M PBELL CCABE CFFC CAP FOR FUTURE CONNECTION PHC PREHEAT COIL IDENTIFICATIONFDE. RRON MEANS TO CONFIRM PROPER SCOPE PRIOR TO COMMENCEMENT ,�OR CFM CUBIC FEET PER MINUTE OF DEMOLTtON. - - - CFM CUBIC FEET PER.MINUTE PSI POUNDS PER SQUARE INCH 0 DIAMETER GO CEILING GRILLE PSN PSI ABSOLUTE _ �J Y1 {� L.� �] Y� 0 SQUARE FEET CE CEILING EXHAUST REGISTER PSIG PSI GAUGE Spaulding Rel Ia UIIIiatio l CLG CEILING PVC POLYVINYL CHLORIDE - l ®900A ME COUNG SUPPLDINR ^ CORD CONDENSATE RA NETURNAIR -` GENERAL NOTES Network C. CP CONDENSATE PUMP (RE) RELOCATED EXISTING 1. GENERAL NOTES.SYMBOL UST AND DETAILS ATE APPUCABLE TO ALL Outpatient Clinic Renovation, LZ A TYPE A CEIUNG RETURN GRILLE/CEIUNG [R CEILING RETURN REGISTER RF RETURN FAN NVAC/MECHANICAL DRAWINGS. /� �400 400 EXHAUST GRILLE, K)D CM RETURN/EXHAUST AR - - Hyannis,MA CU IN CUBIC INCHES RH RELATIVE HUMIDITY 2. ALL WORK IS NEW UNLESS OTHERWISE NOTED. _ ® I RECTANGULAR DIFFUSER WITH OPAQUE QUADRANT CUR CABINET UNIT HEATER RHC REHEAT COIL y 3. DRAWINGS ARE OIAGRAMMAPC. DETERMINE LOCATIONS OF SYSTEMS AND • " -° - ° _ ' INDICATING 3-WAY ARROW PATTERN COMPONENTS IN FIELD. RELOCATE EXISFNQ WORK THAT INTERFERES WITH WORK OF 1-WAY,2-WAY,3-WAY,OR 4-WAY PATTERNS AVAIABILE CV CONSTANT VOLUME RHWP REHEAT WATER PUMP THIS CONTRACT. • CW CLOCKWISE RL REFRIGERANT UOUID 4. COORDINATE THIS WORK WITH TNT OF OTHER TRADES. 1513 IyannDU9h Road,Hyannis, CHAP CONDENSER WATER PUMP flM ROOM 5. NETHER ACCURACY NOR COMPLETION OF SERVICES AND UTILITY LOCATIONS SHOWN MA 02601 m +Y- ON DRAWINGS IS CUMPAFIELD. HET. DETERMINE EXACSHOWN LOCATIONS OF EXISTING SERVICE - RADIUS ELBOW BE ORY BULB RPM REVOLUTIONS PER MINUTE AND UTILITIES D TIFY WHETHER OF NOT SHOWN ON DRAWINGS. EXERCISE WCP DIRECT DKiTAL CONTROL PANEL PERFORM AND IDENTIFY LOCATIONS OF UNMARKED IITUi!LINES AS NECESSAA!TO (TIRO) EXISTING TO BE REMOVED AND RETURN TO PERFORM WORK OF THIS SECTION. + OWNER DX DIRECT EXPANSION 5. OFAL-IURER MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLSH STANDARDS FLEXIBLE DIAMETER .SPA L.J LDII V GN BILE DUCT IRS REFRIGERANT D'GERANT SUCTION -OF OUAU FORR ALS PERFORMANCE AND MATER . I - o SA SUPPLY AIR ]. PRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURERS RECOMMENDATIONS. • � REHABILfTAT10tY NEfwORK' - OMPR DAMPER - - .SAL BOUND ATTENUATION CURD B. -PROVIDE ACCESS PANE MR EQUIPMENT THAT REQUIRES PERIODIC SERVICE. - - _____________ SLOTTED LINEAR DIFFUSER WITH PLENUM ON DOWN SAU SOUND ATTENUATION UNIT _ B. PROVIDE MANGERS.INSERTS,ANCHORS,SUPPLEMENTAL STEEL&SUPPORTS AS / \. (E) EXISTNG TO REMAIN REQUIRED M SUPPORT DUCTWORK,PIPING AND EQUIPMENT FROM STRUCTURE - PARTNERS 7�lTrl I- SEE DUCT DETAILS MR TYPE OF BRANCH U EACH SD SMOKE OANPER 11[]]'ll`1 11\VI j!J( I141f CONNECTION SF SUPPLY FAN 10. SCHEDULE WORK OF THIS SECTION TO AVOID INTERFERING WITH EXISTING 1 1 FAT ENTERING MR TEMPERATURE OPERATIONS IN THE FACILIII'. DUCE FLEXIBLE CONNECTION EDB ENTERING DRY BULB TEMPERATURE SP STATIC PRESSURE 11. COORDINATE ROOF PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH H E A L T H C A R E —f T THROAT FLASHING REQUIREMENTS.MECHANICAL CONTRACTOR TO NOTIFY OWNER PRIOR TO - , EF IXHAOST FAN STARTING WORK TO VERIFY COMPLIANCE WITH BOND AND WARRANTY OF EXISTING L� TDH TOTAL DYNAMIC HEAD ROOF' VERTILA DUCT DROP ELEC EIFCTRIC , 12. RUN DUCTS AND PIPING CONCFAlED,UNLESS OTHERWISE SPECIFIED AND CLEAR OF - IN DIRECTION OF AIRFLOW TEMP TEMPERATURE( ) EDH ELECTRIC DUCT HEATER - CEILING INSERTS. _ FyTx of iCE TOP EXHAUST GRILLE VERTICAL DUCT RISE EQ. EQUAL 13. 'BYS THERMOSTATS 4'-fi'ABOVE FINISHED BOOR OR AS DIRECTED OTHERWISE 'C (IN DIRECTION OF ARROW) TGR TOP RETURN REGISTER BY ARCHTIECT. - (ER) EXISTING TO BE REMOVED TRD TRANSFER Ducr AIR SYSTEMS - -------� VARIABLE AR VOLUME 80%W/ELECTRIC HGTNG COIL (EXIT) EXISTING TO BE REMOVED&RELOCATED TRi TRANSFER FAN 4�axexr�NE`'-/ ._ 14. AR SYSTEMS REFER t0 ARCHTFELTURAL REFLECTED CEILING PUJS FOR EXACT m , WIN ELECTRIC UNIT HEATER - LOCATIONS OF AR DEVICES. o , AND CONTROL PANEL CLFiNANCE ED NOANI'. - THG TRANSFER GRILLE g REFER TO SCHEDULES MR AIRFLOW BALANCING AND EWE ENTERING WET BULB 15. INTERNAL ARROW DIMENSIONS ARE SHOWN FOR DUCTS..INCREASE DUCT SIZE AS ELECTRIC HEATING COIL REQUIREMENTS. IRS TOP SUPPLY REGISTER 6 , - NEC6.VU0'TO KWNTAN FREE FLOW AREA INDICATED. s -------� EWT ENTERING WATER TEMPERATURE S. TT TOP THROAT 16. USE FLAT TRANSVERSE SEXV FOR DUCTWORK WHERE SPACE AVRIABLE DICTATES. .. IXH EXHAUST - 1YP TYPICAL THERMOSTAT EXIST EXISTING 17. 'PROVIDE VOLUME DAMPERS OR OTHER APPROVED BALANCING DEVICES AT DUCT - T% TOILET EXHAUST -BRANCHES AND RUN OUTS,AND AT REGISTER GRILLE AND DIFFUSER NECKS IN -F DEGREES FAHRENHEIT 'S SUPPLY,RETURN AND EXHAUST DUCTWORK WHETHER SHOWN OR NOT: QH HUMIDISTAT - UON UNLESS OTHERWISE NOTED 18. PROVIDE 36'CLEARANCE IN FROM OF AL ELECTRIC CONTROL PANELS PER N.EC. SMOKE DETECTOR FC FLEXIBLE CONNECTOR - ® - FA FREE AREA(NNET.)CTION UH UNIT HEATER AND MFG.REQUIREMENTS. ' - V VOLTS 19. PROVIDE WCT TRANSITIONS FROM VAV 80%(NET/OUTSET DUCT WORK AT SIZES _ FCU - FAN COIL UNIT VAV VARIABLE AR VOLUME TERMINAL UNIT INDICATED TO VAV BOX INLET/OUTLET UNIT CONNECTIONS. FD FIRE DAMPER IN WIDTH 20. VAV DUCT INLET SIZE SHALL BE AS SCHEDULED OR AS INDICATED ON THE FLOOR - PANS. PROVIDE TRANSOON FROM DUCT SIZE INDICATED DN THE FLOOR PLANS TO , PIPING FIN R FINISHED FLOOR w/ WITH SCHEDULED SIZE MINIMUM Y-O'MGM VAV BOX INLETS. PM - (NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT) FLA FULL LOAD PIPING SYSTEMS P. FEET PER MINUTE PERES - w/o wITHDur _ WE WET BULB 21. PITCH PIPING 1'IN 20'IN DIRECTION OF ROW. NEW PIPE WITH DIRECT FPS FEET PER SECOND ION OF FLOW WATER GAUGE '22. PROVIDE CLEAN OUTS-IN CONDENSATE DRAIN PIPING AT EACH CHANGE IN DIRECTION. - .. FR FLOOR REGISTER - - - • 9FEET WMS WIRE MESH SCREEN - ---------- EXISTING PIPING , FV FACE VELOCTIY HASP WORKING STEALTH PRESSURE - --%- --%—x----%— EXISTING PIPING TO BE REMOVED Pegrl mvne.r I19loe5nro � V. GALLONS PER MINUTE 04W�M hmA DW N19 PIPE DROP G% GENERAL EXHAUST H HUMIDIFIER 0 PIPE RISE HALX HALON EXHAUST y D — COLD CONDENSATE HC HEATING COIL 4 HD HEAD MECHANICAL DRAWING LIST - REFRIGERANT SUCTION pS DRAWING NO. DRAWING TIRE HR HOUR M-HAD MECHANICAL COVER SHEET -Rl REFRIGERANT LIQUID NT HEIGHT M-LOB MECHANICAL FLOOR PLAN-DEMOUTION MWP HOT WATER PUMP - M-101 MECHANICAL ROOF PLAN-DEMpUT10N IA-200 MECHANICAL FLOOR PLAN - HV HEATING AND VENTILATING ' M-201 MECHANICAL ROOF PLAN seM NvmA GENERAL NX HEAT EXCHANGER M-300 MECHANICAL SCHEDULES MECHANICAL (NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT) IN INCH OR INCHES FM� MECHANICAL DETAILSIRS IRON PIPE SIZE MECHANICAL DETAILS COVER SHEET EQj POINT OF CONNECTION KW KILOWATT jGMECHANICAL SPECIFICATIONS MECHANICAL SPECIFICATIONS L LENGTH ° PECIFICATIONS POINT OF DISCONNECTIONMECHANICAL SPECIFICATIONS man\V; Nene. M-000 a CONSTRUCTION DOCUMENTS Q EXIST NO ROOFTOP UNITS AND ALL ASSOCIATED DUCTWORK,DIFFUSERS,REGISTERS, FD!ZHANGERS AND CONTROL PRE TO BE DEMOLISHED.ELECTRICAL POWER TO BE CUT BACK TO SOURCE AND COORDINATED WITH DN'SION 26.NATURAL CIS PIPING TO BE - U K R LD IT S - O2 EXISTING EXHAUST FM AND ALL ASSOCIATED EXWU,ST REGISTERS SERVING DuSDNG _ $ - - - MEN AND WOMEN'S SHORED TOILET ROOMS,AS WELL AS UISRNG ANITOR'S CLOSET _ ME TO BE TESTED.MEASURED AND PRO)nU D PRIOR TO COMMENCEMENT ANY - - DEMOUTION OR CONSTRUCTION WORK.O-ST FAN EQUIPMENT PROFILE TO INCLUDE - - BRAKE HORSEPOWER.MOTOR HORSEPOWER AND RPM.TOTAL STATIC PRESSURE,TOTAL NRFLOW.AND ALL ELECTRICAL POWER CNMACTERISDCS INCLUDING VOLTAGE PHASE. HDR ATctul:duTe CURRENT.AND VFD FREQUENCY(IF MPUCMLE),CONTRACTOR TO SUBMIT REPORT TO FOR Boston - PROJECT ENGINEERS FOR REVIEW AND SYSTEM ASSESSMENT.THESE BB High Street,Suite 2300 - PRE-CONSTRUCTION MEASUREMENTS WILL BE UTILIZED TO DETERMINE IF THE EXISTING EXHAUST FAN WILL BE ABLE TO PROVIDE ENOUGH EXHAUST TO MEET CURRENT DPH BoStDR,MA 02110 STANDARDS.REFER TO ORAWING M-200 FOR ADDITIONAL INFORMATION RETARDING - ASSOCIATED CONSTRUCTION WORK. - - - / - RwssqdaleJ M NA GR....•L 14 a ---,�'— i `.-----_—_—_— --_----_----------------- —————————————————— ----------i - CBnslmdwo�anag�eol. .. -- — — _Ll ----------------- , it ! A°K F Awe — 00 - (ER)Y«.y '•,+ 'N -�I(ER) (ER)Y«..} i :--r-a.-•-+ Y.._.�✓(ER) 1 -1' ,. _ # I CAMPBELL MCCABE .. {N.LC•) `. '. -(N�I.C.1 1� i i i - -I�f__ --._ ! __.— - :-__-. - - # __ __ I� f : 1 - - r--. # ; Spaulding Rehabilitation .,.,. _ ....._..... III -ram :*. ....... a......::.,. ___.. .. ...-....... ......, __. I; I # ......"... ..-._ ... # ._ ..-,..:_.. -- ... .._ Network [ t Outpatient Clinic Renovation, Hyannis MA F• _ - -. 1 :r"f".. ..........:.. i ---'; .;......... .. .:_._.. _.. .,.......... _..._....._.., 's'-9 -=".. I _ ,�`-.,;......: -- -........... '.,.,_.. --- --.-a^'.-'iw.* $ .-,.,,:1 15131yanhough Road,Hyannis - _ - ..........1 ---I r 1 Y«^.. -' (ER) - " ' { # 02601 (ERUP TO RTU II. (ER) (ER) __ k• _ - __.-n .-. .-• __ _ r J 1 L18,14 34.T4 SPAULDING- L."".�, ."_,.__."_. ".__._,,.__„�,__.�"_.J UP To RN —_.,_","__ -.._„-- _._L_.,-' - ; REHARIUTATION NETWORK PAFE` H E A L'r H-C A R E r X ' j (ER)K« T f - '�I(ER) _ Y«✓=(ER) i, 1 24416 __""`__`-"" 8 I.-.-a-,- .-. .-. .-. - w--� i N. z - • ; _ - _ I - _ I • - I, 5- MARK DATEDESCRIPTION - _ - _.- ...._- _- . 1 .. - _ - (� '- # i � � oa ADDENDUM aT 4-:3 1 (Er+).—`fC;_};:✓_' 1 --- � I i __., - .-._., i - • i 1 - oNyw lm. - IDwrmle .. I __. .._.. .-._ 1 ..-... ........... _ t ' _______________.__-_______ _________ --____--__-______________---___--___ J LSCOPE OF WORK MECHANICAL . MECHANICAL FLOOR PLAN — DEMOLITION FLOOR PLAN- DEMOLITION NORTH PigMsmum n - - CONSTRUCTION DOCUMENTS - - - DEMOLITION NEY NOTES - Q, EILSTING ROOFTOP UNITS AND ALL PSSDCWTED DUCTWORK,DIFFUSERS.REGISTERS, F)l HANGERS ANO CONTROL PRE TO BE DEMOUSHED.EIECTRICAL PDWER TO BE CUT - BACK TO SOURCE AND COORDINATED WITH WSION 25.NATURAL CAS PIPING TO BE -- CUT BACK AND COORDINATED WITH DIVISION 22. QEXISTING RDOFTOP UNIT CURBS ARE TO BE REUSED FOR BASE BID OPTION AND - .. DEMO SHED FOR ADD ALTERNATE OPTION.AS PART OF THE BASE BID WORK,THE r INTERNAL COMPONENTS OF THE COSTING ROOF CURB PRE TO BE REMOVED AND PREPARED TO CONNECT TO THE NEW ROOFTOP UNIT ADARER CURBS. ' - HER Architecture - HDR Boston - ' 99 High Street SuAe 230D Boston,MA 021ID iris ssmates MCNAMANA S LV IA' -------------------------- --- -- --------- --------- ----- — Caslmdlon�anapemeui r------------ ----- ---- -- --- ------ ----- _E,} _..... .......__ .___._.........._,.. ..._....... .. . . ....._L._ .......... _ .....__.. __.......... _._......_. .,.._....... -......._.._. ...._.._.._ ---.�_.... .. .___.. ., .........................._..._.__................_._-.... ..._ ................ ............. 1 .._.__. .. .._..__..._..-..... _. .._...._. - -- -- — ------------ -- ---- AiK F 1 CAMPBELL McCABE I Spaulding Rehabilitation 1 Network r------------- Outpatient Clinic Renovation, Hyannis,MA i I i 15131yannough Road,Hyannis, _ .-w 1 T - _..._ ___...... -.- -- --- - - - -- - -- MA 02601 1 1 - - - SPAULDING- w } r } REHABIL TATiON NETWORK 2 (EF)m PARTNERS 1 ) I I H E A L T H C ARE If 1 v 1 , 1 sL-----------------------------------=----- ------------------------------------------------------------------------------ ------ - SCOPE OF WORK MECHANICAL ROOF PLAN — DEMOLITION MECHANICAL 1 SfAE:vA•_,_D• ROOF PLAN- DEMOLITION ' .M M-101 5 .. NORTH >MmsMw. n - CONSTRUCTION DOCUMENTS - : - - ADD ALTERNAIiVE 2 NOTES' DRAWING NOTES: - - _ - - THE MECHANICAL CONTRACTOR WILL INCLUDE PRICING FOR PROVIDING EXHAUST TO US 1. PROVIDE VOLUME DAMPERS AS REQUIRED TO ACHIEVE TOTAL SISIEM BkUAHCE.REFER - ' ROOM 152 IF EXISTING EXHAUST FAN CANNOT BE RE-BALANCED TO ACHIEVE THE TO SPEcinCAPONS FOR MORE INFORMATION ON WHERE TO LOCATE THEM. ., - _ REQUIRED EXHAUST AIRFLOW.THE MECHANICAL CONTRACTOR WILL INCLUDE THE FOLLOWING - - _ SCOPE: - KEY NOTES _ 1 RSS:RL PIPING UP TO ACCU ON ROOF.REFRIGERANT PIPING TO BE SIZED AND` 1 ,. EXISTING EXHAUST DUCTWORK SERVING EVS ROOM 152 TO BE DISCONNECTED. Q - S DEMOLISHED AND CAPPED AT EXISTING EXHAUST MAIN INCLUDING ALL ASSOCIATED INSTALLED PER THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. •' - - b _ DUCT ACCESSORIES,HANGERS AND SUPPORTS.EXISTING EXHAUST REGISTER WITHIN US ROOM 152 TO BE REMOVED.EXHAUST ARROWS IN MEN AND WOMEN'S TOILET O2 PROVIDE WALL MOUNTED CONDENSATE PUMP AND WALL MOUNTED PIPING ENCLOSURE. :F .° - - .' ROOMS TO BE.RE-BAANCED EQUALLY BETWEEN EACH OTHER. THE INTENT IS ENCLOSE THE CONDENSATE PUMP.THE REFRIGERANT PIPING'AND- - • - - - - 2, PROVIDE 6'0 EXHAUST DUCT TAPPED FROM 8-0 EXHAUST DUCT LOCATED IN SOILED THE CONDENSATE DRAJN PIPING FROM VIEW..ENCLOSURE WILL EXTEND FROM A UNIT HEIR AT'h@ecture HOLDING ROOM 117 AND EMEND TO US ROOM 152. CONNECTION TO BOTTOM DF DROP CEILING.REFER TO EQUIPMENT SCHEDULES FOR HDR BDSt.D 3, PROVIDE CE-B,TPE CEILING REGISTER AND CONNECT TO 6.0 EXIIAUSi DUCT. MORE INFORMATION. - - 4. BAANCE CEILING REGISTER AS REQUIRED VW DUCT MOUNTED VOLUME PER. 1 99 High 02,Su,le 2300 - - .- - }CONDENSATE GRAIN TO DISCHARGE INTO INDIRECT GRAIN CONNECTOR BY PLUMBING Bosto MA n,MA D2110 CONTRACTOR.REFER TO PLUMBING DRAWINGS. o- - - -- DPROVIDE RTU MANUFACTURER'S BUILDING AUTOMATION CONTROL PANEL WITH TOUCH « - - SCREEN DISPLAY.REFER TO PROJECT SPECIFICATIONS FOR MORE INFORMATION. _ _ - COORDINATE POWER REQUIREMENTS WITH ELECTRICAL DRAWINGS - - 11111DI OOR UNDER CO.REFER TO PJiCHDECTURAL DRAWINGS ' PARTOF PRp1ECT BASE BID.CONTR(CTOR TO RE-BALANCE EXISTING EXHAUST FAN _ r- ♦ ^ ' - ")" - SARY TO PROVIDE 65 CFM DF EXHAUST AT US ROOM 152 IN ORDER TO • : - - _ HE REQUIRED IpACH PER DPH STANDARDS.IF THE EXISTING EXHAUST FAN' '" ■Qp� - - - - 1 - NOT BE ABLE TO PRONpE THE(REQUIRED EXHAUST RATE,CONTRACTOR TO '- �+ EW EXHAUST DUCTS TO US ROOM 152.REFER TO ADD'AL THIS SHEET FOR MDRE INFORMATION. �.S OU1.Id IQS • : , - -- ---../--<:------- --7---------- -- --.- - - - -- ---- --- --------.------ t N NA 4RA SALV14 _ __ funslmtltDu Elanage gal 1 _ M... _. 12 ..�....,� ......... ._.*. ,... ..... ....._:._ ............... II +�: ...........�... .r p.16x16 --CD C...,I.:...�t.•. , CDCD=B CD-B UP TO EF - .,i' .- r so 135§ 12e1 - 14D zso€ i - - F § K 1'F. • _ .Y F \ ._I. - , - 5D I m m ,4x12 E%H ,GAMPBELL NsC ; , 0 .- r'a a " , ., .. CR-B I - CR„8.._ OR 10xa - 1 _. 6 1 \ 1 '"' - 4 , , : -1 25fCR B :.. -110 \ ,. _ 125 SDR-8 - r 1 r _ OT ,...:-.J T ---I -�,<, _., .L.I I. _-1 .i , :. - h 1 2x4 Spaulding Rehabilitation 1 - ` , -OCP-01 .6.0 CD-A, CD-Al VAv-2-03 a li- ._ _ _ 50€ 50€ ;. 12xB 10e1p ," 'Network >% u I, ) mI A ?_a _ , 1 .. --- ---- _�_-� _. ,.' Outpatientlini Renovatior C7 2,:, 1 Clinic _I��.,_-.—.-.:._.-,Y?:'� 1 ! _:: .:. . ..... .....:: i VAV-2-02 i � I', i VAY 12-03 i -. 12xe -. .. 1 Y r—'.. _.:::...: L- --.i-J I i 12xe 60 �. _ /: ,i i- _ _ ... _ 1 J I _ F ;GD R I Hyannis,MA - .. ... CO—A 6.0 -' 14x4 R ''� 85€ C C VAV-2-01 325€. I..,M'......I- fl 20.6 - - - 12x6 - , CR B CR'B 6.0 12.8 J ; "•k -., a •., - -. -.: L` - .._' 340§ I10 T - Av-s-m sP R N i....L 1 15131 annou h Road:Hyannis, _.......... —< ._....... Y 9 Y Q, r T:..-... VAV-2-05� 1 .__. q¢_ ...._,�� c � ,. I .. 1 •t)l,.,� _._,_ ::..,' :..a € I) 32x14SAkRA :..:,-:..1 � f2 14 RA :I i ^CE- �_.,. CR-B I 1 o :.. x• - -.: ,: - - 465 _L .—• IOx4 tOx6 1UP i0 RN ® - �':1:- ( 70§ 6.0 ,]5§ , 1 ' e ww«......: .__AxxAv<xxa'___-_ �.1............ ........._ +w,w v ,� � f � 20 6 � I 1 ._o : -:, :_3 ,6xlp- , -Vs SPAULDILVG� " - - _ ... H:32x14 R4 0 32T Sl...-. .;..: ._._. ...._....; CR-D 12.4 1 - a..c,T ® ( L : _ FL..,H ® r ' HABIIJTAIT0+1 N6'1'WORIC SAcRx P"15F _ . y:, - .• .: _ - •: ,; - sAu-sa-m -sdu-RA-D /-� :. sau-sA-oz sau-RA-oz I_Y Y : - .. - .. ".. 1 • CE 12D€ CR-0 • CD :. PI tr cD-e I ,zo§ I {.. 1 -- 6 m . •: 120 :._: 14.1.RA 1 -1 8 1 c.PAR T A R .. : CD- _.. 195 12 6 1R0 Y CE pl 145 ._ .. •. 1` i _ P e - v CD-A - CD-A r CD-A 4 :. 6 0 J JI -.F .. .. , I' of n 9p -9D - •...:. .....I, '.12. T B'o 1 ...:,-- CR-C VAV--06 l .. < i. .......: ..x......., I ) , .._ VAV-2-O6 • '+ -.;. 1. ?TAFF o m- n m 6•m 14.6 CD-B 1 _ ' - .- 195§ 1 '45 RISE Ij F VAV-2-07 1YII\\ I/�I.' - -. - . ., :VAV 2 02 _ ,_:, B m ,..._.. L ...:-12x1 D .,. _ , - I - '.. _ - -_ - � 1 ,_ 6Bs �- s k., _ I r v :.. 2oxa .. - ... I m m. r , 1 1 -... � .. 1 afi MARK DATE^e DESCRIPTION'Od-18-19:.'ADDENDUM k1 ..-. : «., • z - �: ,:.- , .. :. :w, . .. .: :..., ., � Ip - _ .. VAV�3 1 t„ Il roar . I I n m t. % r : m 3) y 16 ' I I c ,n:.z" 1 -. - _ ... -' e, - L VAV-2-D]• _ a m m - 1 _ �Hecnr -:LIT A • 1, - .. 190§ a) ,T 1 c '. .,-----, i � ,. _ - : •. .x.•Yf E � i , : ... o% Nu M ]0950W 1 ......._ ) ; i NAM lau. --.. 6aDarzol9 ,...,. ......__. .......:.... , .._........ ...... ..._:.._ :._. LD-A m mL. iR—A - a W A cux of - mo§( -TYP Z�----- �(, 1 1_OGf _(TYP.2) 90§(rm.2) - - ,DDf ) :L. T (TM )Too ........ ........_...... .._.._. _ J _ - ----------------------- ----- --- --- ---------------------------------------------------------------i--� a I SCOPE OF WORK MECHANICAL MECHANICAL FLOOR PLAN €'.. FLOOR PLAN _ M 200 -. E NORTH >rqA srewA. °, • - n ;. CONSTRUCTION DOCUMENTS - - — DRAwINc NDTEs: F)l '. 1. FINAL LOCATIONS OF ROOF MOUNTED EQUIPMENT,EOUIPMENT SUPPORTS AND ROOF _ PENETRATONS TO BE AS INDICATED IN STRUCTURAL DRAWINGS.COORDINATE IN FIELD. KEY NOTES: - i QPROVIDE ADAPTER CURB TO MOUNT UNIT ON EXISTING ROOF CURB.EXISTING ROOF $ CURB MANUFACTURED TO SUPPORT DEMOLISHED RN BY CARRIER MODEL ABHUFO08. - - AS AN ADD ALTERNATE,THE EXISTING CURB IS TO BE REMOVED AND REPLACED WIN - AN ACOUSTICAL CURB BY VIBRO-ACOUSTICS,REFER TO EQUIPMENT SCHEDULES, e DETAILS AND PROJECT SPECIFICATIONS FOR MORE INFORMATION ABOUT PRODUCT ' CONSTRUC110N AND PERFORMANCE. • HDR kchitecNre + QPROVIDE FIELD INSTALLED OUTSIDE AIRFLOW MEASUREMENT STATION BY EBTRON MODEL _ HDR Boston EB-FLOW AND MOUNT TO RTU OUTSIDE AIR OPENING.PROVIDE SLEEVES AND 99 High Sb BK Suite 2300 EXTENSIONS AS REOUIRED TO MEET AIRFLOW STATON MANUFACTURER'S INSTALLATION Boston,MA 02110 REQUIREMENTS. ` QPROVIDE EQUIPMENT STAND TO SUPPORT ACCU.RE FEN TO PROJECT SPECIFICATIONS - FOR MORE INFORMATION.CONTRACTOR 10 PROVIDE RUBBER PADS BELOW EACH LEG TO PROTECT ROOF FROM DAMAGE.COORDINATE LOCATION IN MELO. 4ORS&RL PIPING DOWN TO AC UNIT BELOW.REFRIGERANT PIPING TO BE SIZED AND -A I INSTALIED PEN NE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.PROVIDE PIPE I`3, 14, ...__....._...-. -.. .. �_;F._�_...... _ SUPPORTS AS INDICATED IN PROJECT SPECIFICATIONS - Q LOCATE EXHAUST FAN AT LEAST 25-0•AWAY FROM ANY OUTSIDE AIR INTAKE .I R"Godates rrisPROVIDE WN MANUFACTURER'S EQUIPMENT CURB REFER TO DETAILS EQUIPMENT I SCHEDULES.AND PROJECT SPECIFICATIONS FOR MORE INFORMATION I MCMAMAWP SALVIA' Q PRWIOE MODUTATNC EXHAUST ECONOMIZER KIT BY CANFPB.REFER TO SCHEDULES 25-0-DISTANCE TO RN OUTDOOR AIR INLET I 25'-0'DISTANCE TO RN OUTDOOR AIR INLET , - FOR MORE INFORMAl10N. r — -- — ————— ---------------------------- ---------------------------- —1 rAIISII11dIDit 6fana92meul - - —NC ------------ 1 EF-01 Q I 1 I I 1 • _ 1 I '•.O ( 1 A"D°'Q CAMPBELL MCCABE i Spaulding Rehabilitation Network Outpatient nt Clinic Re novation, r------------ Hyannis,MA 1513 Iyannough Road,Hyannis, RN-01 Q Q - RN-02 Q Q SPAULDING- 1 \(� ! I (� I , � RLtiABB.TTATION NEfVNORK 1 m OUTDOOR AIR © _ RN OUTDOOR AIR i - (NI AND ECONOMIZER INAKE AND ECONONIZEA PARTNERS ^nTT* ER H E A L T H C A\RR EJl 'a • 1 _ I � i ?ss+oRAL LW�� t 8 i i _ - _- i I•. ' I - 1 I rvgm t9roasaoo \• - ... - •-----------------------=--- ------ --------------- --------------------------'--� --------- ---- ------------ ----------- ------ SCOPE OF WORK sn.MN.m. MECHANICAL MECHANICAL ROOF PLAN 6 1 SDAIE:v<•_,•_D• • ROOF PLAN M-201 . NORTH P.4 tswm n - CONSTRUCTION DOCUMENTS , ROOFTOP AIR CONDITIONING UNIT SCHEDULE - AIR COOLED - SUPPLY FAN DATA ---COOLING DATA � �- � -� -. HEATING DATA FILTER DATA s-«-COMPRE UNIT ELECTRICAL DATA UNIT DIMENSIONS : - - "' F " AMBIENT CAS DATA - SP(IN W.C.)` TER- - TEMP. EXT.SP MOTOR DRIVE TOTAL SENSIBLE OA MAX.FACE FAT'F LAT'F INPUT OUTPUT INLET N0. EAT LAT - FILTER STARTER' FULL LENGTH WIDTH HEIGHT OPERATING MWUF. - „ UNIT No. LOCATION F) CFM (IN.W.G.) RPM BHP HP TYPE (MEN) (MBH). CFM : CFM VEL(FPM) DB/WB DB/WB MBH. MBH PRESS.(WC) STAGES ('F) CF) TYPE INITIAL FINAL TYPE OUANTITY SPEED LOAD VOLTS PHASE HZ MCA MOOR (R-IN) (FT-IN) (FT-IN)'.W.(LDS) MODEL I! REMARKS - 2.]5 DIRECT 99.5 85.1 2,900 125 500 80.5/65.2 53.6/53:] 200 162.0 4.5'MIN 2.5:1 50.9 102.8 MERV-B 0.25 0.5 SCROLL-� '"1-- VARIABLE 12.6 208 3 60 42 fi0 ]-5 4-5 3-11 1195 THANE PRECEDENT YZC102 SEE NOTES ' RN-OI ROOF 91 2,900 1.T5 - ' 2.15 DIRECT 99.5 85.1: 2,900 ]25 500 BO.S/65.2 5},8/53] -200. 162.0 4:5•MIN 2.5:1 50.9 102.8 MERV-8 0.25 0.5 SCROLL- '.1 VARL4BLE 12.6 208 } 60 42 60 ]-5 4-1 3-1:1 -1195 TRANE PRECEDENT YZC102 SEE NOTES ' RTV-02 ROOF 91 2,900 1.]5 - - c NOTES: 1. BASE BID CURB OPTION:PROVIDE AN INSULATED ADAPTOR CURB TO ALLOW NEW RTU'S TO BE ATTACHED TO IXISUNC ROOF CURB.WITHIN CURB AREA;.PROVIDE 4-INCHES OF CLASS FIBER BOARD INSUTATION ON THE ROOF DECK AND THEN COVER WITH TWD LAYERS OF _ _ _ HDR Architecture - - - REINFORCED CEMENT BOARD(PROVIDE 2-SPACERS BETWEEN BOARDS)THAT IS SEALED AROUND THE PERIMETER TO THE CURB AND DUCTWORK/SOUND ATTENUATORS TO PREVENT SOUND TRANSMISSION_REFER TO SOUND ATTENUATION SCHEDULE FOR ADDITIONAL COMPoNENTS TO _ HDR Boston - - t BE INCLUDED AS PART OF THE B.4-SE BID OPTION. - - - - 99 High SbW,Suxe 2300 2. ADD ALTERNATE CURB OPTION:PROVIDE ADD ALTERNATE COST TO REMOVE THE IXISTING ROOF CURB AND PROVIDE A'INSULATED SPRING VIBRATION ISOLATION ACOUSTICAL CURB DESIGNED AND.MANUFACTURED BY VIBRO ACOUSTICS TO MEET A NOISE CRITERIA OF NC 35 IN THE - _ _ -�. - Boston,MA 02710 ... _ OCCUPIED SPACES LOCATED BELOW THE ROOFTOP UNIT.SOUND ATTENUATION SHALL NOT BE INCLUDED AS PART OF THIS ADD ALTERNATIVE OPTION. - '3. PROVIDE MODUTAtINC POWER EXNAUST ECONOMIZER KIT BY CANFAB PART NUMBER 6144-MPE,ELECTRICAL POWER CONNECTIONS TO BE COORDINATED WITH DIVISION 26,POWER CONNECTION REQUIREMENTS ARE 208V/3PH;2HP;9.tRA;11.4 MCA;20.5 MOOR 4. REFER TO PROJECT SPECIFICATION FOR MORE INFORMATION RELATED TO UNIT CONSTRUCTION,CONTROLS.AND PARTS WARRANTIES. - SPLIT AIR COOLED SCHEDULE - gN01 VPORATOR COIL CONDITIONS ELECTRICAL 0.4TA UNIT DIMENSIONS y CONDENSING UNIT UNIT DIMENSIONS .TOTAL AND OPER. SENSIBLE CO ND.. „- EOUOIP. LOCATION SERVICE COOLING CFV1.' ENTERING AIR LEAVING'A1R VOLTS "PH HZ FLA WEIGHT LENGTH WIDTH HEIGHT p51CNF CUNRNNmNG COOLIN MBH G -COOLING COMPRESSOR ELECTRICAL-DATA COMPRESSOR MOCP WlBS LENGTH WIDTH HEIGHT DESIGN REMARKS (MEN) ffi - - ( OB WB DB WB (CBS) (IN) (IN) (IN) ( ) (BHT. .MLA ( ) (IN) (IN) (IN) . CF). CF) C� CFI - - QUANTITY TYPE FLA VOLT$ PH HZ z .N- o _ AC-01 DATA ROOM DATA ROOM 24.0 ]05 80 67- 55 54 20B 1 60 0.36 46 51 28 11-3/16 PKA-A24KA] ACCU-01 24.0 1 ROT 0.4+0.4 208 1 60 -19 -26 41. 18 41 PUY-P29NH4] 1.23.456 ri 71 NOTES: - _ - - - 1.INDOOR UNIT ISEVAPORATOR ONLY-OUTDOOR UNIT IS CONDENSING UNIT(COMPRESSOR AND CONDENSER). - •: 2.INDOOR UNIT AC-1-01 SHALL BE PAIRED WITH CORRESPONDING CONDENSING UNIT ACCU-01. - - _ A ,- - 3.PROVIDE WITH WALL MOUNTED REMOTE TEMPERATURE SENSOR.. _ - - 4.INDOOR UNIT IS POWERED BY olmonR UNIT. L- - - :, - 5.CONDENSING UNIT SHALL BE CAPABLE OF LOW AMBIENT OPERATION DOWN TO 0'F. PROVIDE WIND BAFFLE AND OTHER REQUIRED ACCESSORIES. � A �F fi _. I VIDE 1.3 GAL/HR AT 16 FT HD MPX,WITH A SUGUON LIFT OF 6 FT HD.PROVIDE WITH MANUFACTURER'S DUCTING KIT TO DOING UsAND,PIPING. " ` T.PRONOE OUTWOR UNIT EQUIPMENT STAND BY OUICKSLING AND MOUNT 24"AWAY FROM ROOP - - - - - Y • , ONIROLS,AND PARTS WARRANTIES. A r R DIFFUSER SCHEDULE TERMINAL BOX SCHEDULE._ LINEAR � x , GAMPBELL McGABE -- - - PLENUM SIZES AIRFLOW RANGE - - ELECTRIC COIL PERFORMANCE ELECTRICAL'DATA MINIMUM DISCHARGE' -RADIATED - ... -.SLOT ACTIVE - STATIC SOUND LEVEL SOUND LEVEL - L - + No.�OF. SIZE LENGTH LENCTFI WIDTH. HEICHt MANUF. : - BOX BOX SIZE MA%.CLG MIN.OLD HTC EAT TAT PRESSURE pP5' AT MPX.CFM& AT MAX.CFM& TYPE OF -OF.^ - ^• f ) % 4 pE51CNATON SERVICE TYPE CFM SUITS (IN.)' (Fi.) (IN.) (IN.) (IN.) MODEL Q REMARKS-. - DESIGNATIONSYSTEM SERVICE TYPE •(INLET'SIZE) CFM LFM CFM DB('�' DB('F) KW CONTRDlS VOLTS PHASE -H2 MCA- MOCP (IN W.C.) pPS=3 (NC) pP5=3.(NC) CONTROLS MODEL a REMARKS' - - LD-A SUPPLY LAY-IN- 190 '2 1 4 4B 6 15 PRICE SO510D WITH PRICE-SDA PLENUM - VAV-1-01 RTU-Di.. THERAPIST WORK N 8.0' '665. -200' 200 55 ']5 1.5 SCR' 120 1 -60 -15.6 20- 0.04 - ". 29 - - N DDC TRANE VC SEE NOTE Ft 'Pp-Rehabilitation ♦'{ ''^- _ ' ' - • LR-A RETURN/EXH LAY-IN 190 - 2, 1', 4 AB 6 15 PRICE SDS100 WITH PRICE SM PLENUM VAV-1-02 RTU-01 THERAPY GYM SIN - 8.0 6J5. ^_6]5- 6]5. 55 -85 6.5- SCR 208. 3-_ GO ,1-- 25 0.04 29- F 24 * DDC TRANE NO -SEE NOTES - *- Spaulding ReI abilitation +. VAV-1-03 RN-01 THERAPY GYM SIN 8'. 600' -GOO. GOO 55' ]5 4D SCR 208 -3 60 13B 15 0.03- 29 -23 DDC. TRANE VC SEE NOTENetwork Or1 - . Iv K NOTES: - - � ,. '� -. -'. : - VAV 1 04 RTU 01 STAFF WORK 6 0 245 160 160 - 55 75 1.0 SCR -' 120 1 - 60 10.4 1S 0.05 24 - 17 DDC TRANE VC SEE NOTES - - x " VAV-I-OS - RTU-01 -CORRIDOR SIN 6'm A50 - 395 _395 55 ]5 2.5 SCR 208 1 60 15.0- 15 OCR 24' �22 DOC THANE VC SEE NOTED _ ♦ �]{pIt{ F�!�Renovation { - 1. THIS SHALL BE SPECIFIED BY ARCHITECT.'CODROINATE FINAL LOCATION WITH ARCHITECTURAL REFLECTED CEIUNG PLPN. t Outpatient l Clinic Renovation 2. SEE.SPECIFICATIONS MRADDITIONAL INFORMATION. . --- -, - VAV-2-01 - RN-02 THERAPY $Iry B.. 4. -480 '480 55 �75 3.0 -SCR 208 1 60 18.0 20 "0.02 -_..28 20 'DOC TRANE VC SEE NOTES - ° 3:ALL DIFNSERS SHALL BE SUITABLE FOR THE TYPE OF CEILING CONSTRUCTION.IN WHICH THEY ARE BEING INSTALLED. : �_ -- - : SN - , « "E. - 4. PROVIDE LINEAR DIFNSERS WITH PLENUM AND CORD OPERATED OPPOSED BLADE VOLUME DAMPER.SUPPLY PLENUMS TO BE EXTERNALLY INSUITED. VAV.2 02 RN 02 THERAPY ; 6-0 36D -360 360 55 T5 2.5 .SCR 208 1 60 15.0 15 0;11 - 25 23 DOC TRANE VC SEE NOTES "' Hyannis,MA - ' 5. UNEAR DIFFUSER WIDTH IS DETERMINED BY THE a OF SLOTS.REFER TO DRAWING FOR @ OF SLOTS AND - - - ': ARCHITECTURAL DRAWINGS FOR EXACT LENGTH AND MOUNTING LOCATION. - _ _. - '` VAV-2-03 RTU-02 S OM N B A 515 -515 515 T55, :25 3.5 SCR 20B' 3 60 12.1 15 0.02 - 28 20' "DDC �TRANE VC SEE NOTES 6. PROVIDE LINEAR DIFNSER WITH AIRFLOW PATTERN CONTROLLER AND SET PATTERN TO VERTICAL ARROW. SING - ., � - VAV-2-04 � RN-02 6'm 250 "]5 225' S5 85 2.5 -SCR 208. 1 60 15.0 15 0.05 "24 -1]- "- DDC. � TRANE VC SEE NOTES VAV-2-05 RN-02 ry -. 6"0 '.195- -60 150 55: 85 I.5 SCR 120 1 60 15.6 20 0.03 - 22 _ 14 DDC TRPNE VC': SEE NOTES sIN 15131yannough Road,Hyannis, „r VAV-2-Ofi RN-02 RECEPTION 6.0 310'- 95 150' S5- -]5 1.0. SCR 120 1- 60 10.4 15 "O.OB .23 -21 DDC TRPNE VC 'SEE NOTED - - -..j - VAV-2-0T RN-02 WATIING SIN 8'0 610- _185 460 55 85 4.5 SCR 208 3 60 15.6 :20 0.03 -'29 23 DOG TRPNE.VC SEE NOTES ,MA 02601. - - DIFFUSER SCHEDULE ` CFM NECK SIZE(1N.)/SIZE NOMINAL OVERALL. MANUF. - NOTES: DESICNATION SERVICE RANGE MAX NO TYPE &NSI OF SLOTS DIMENSION WxL IN. MODEL REMARKS 1. PROVIDE WITH UNIT MOUNTED LOW VOLTAGE TRANSFORMER TO.POWER LOW VOLTAGE CONTROLS. ( ) - 2.-:REFER TO PROJECT SPECIFICATIONS FOR MORE INFORMATIDN RELATED TO UNIT CONSTRUCTION,CONTROLS AND PAT WARRANTIES. - d - - CD-A SUPPLY 0-100 <15 LAY-IN 9x9(fi•0) 24x24 PRICESMD SEE NOTES .. .. _ T.T,��IT _ .-'«• - r -CD-B SUPPLY 101-225 <15 LAY-IN 9x9(8'm) 24x24 PRICE.SMD SEE NOTES' - - _ - - - - SPAULDv O - - o - - - - .. - - - REHAINUTA'CION N&'(WORK�i' _ w CD-C SUPPLY 226-400 17 LAY-IN 12.12(10.0) 24.24 PRICE SMD SEE NOTES r n _ CD-D SUPPLY 401-6]5 <15 UY-IN 18z1B(12'0) 24x24 PRICE SMD SEE NOTES _ CR/CE-A RETURN/IXH 0-100 19 LAY-IN 9x9(6 m) 24x24 PRICE SMD SEE NOTES .. ^� •' _ GRACE-A1 RETURN/IXH 0-100 19 SURFACE 9x9(fi•0) 24.24 PRICE SMD SEE NOTES- :�' FAN- SCHEDULE " '" ' - - - _ PARTNERS CRACE-B RETURN/IXH ipt-225 -19 LAY-IN 9.9(8•0) 24x24. PRICE SMD 'SEE NOBS - -PERFORMANCE DATA CONSTRUCTION MOTOR DATA' " VIBRATION ISOLATION - - CRACE-B1 RETURN/IXH 101-225 19 SURFACE 9x9(e•0) 24x24 .PRICE SMD SEE NOTES -, ,- - FAIR TOTAL SP MAX.OV - : �'DRNE - SIARIER -ELECTRICAL pATA - SPECIFICATIONS ROOF OPENING 'WEIGM MANUF. - !I E A.L T II C.A R E - E; "' �•- 'CR/CE-C RETURN/IXH 226-400 21 LAY-IN. 12z12(10"m) 24x24 .PRICE SMD SEE NOTES _ UNIT No. LOCATION SERVICE- TYPE CFM (IN.W.G.) RPM - -BHP (FPM) CUSS -ROT DISCHARGE TYPE MHP .TYPE VOLTS .PHASE HZ: -FLA MOUNTING TYPE.BASE TYPE SIZE(IN) (CBS) MODEL REMARKS - '� - - I- CR/GELD RETURN/IXH 401-6]5 19 LAY-IN 1Bx18(12'0)- 24x24. PRICE SMD -SEE NOTES ( EF-Ot' ROOF •-EXHAUST -:CENT., 1,5]5 1.25 1.655'. 0.52 5,28].. -I OOWNBLAST DIRECT. -3/4 ECM 208 1 60 5.4 ROOF INGED B45 14.5z14.5 90 _ _ - • - ._ SG-A SUPPLY 0-150 <15- LAY-IN' 16.4 -. 18xfi PRICE 520 W/.OPPoSED BLADE DAMPER -• ' '. � NOTES: - p1. PROVIDE WITH.MANUFACTURER'S EC.MOTOR.DIAL ON MOTOR SPEED CONTROL,RUBBER ISOLATORS,NEMA 3R RATED DISCONNECT.ALUMINUM BIRDSCREEN,24-INSULATED ROOF CURB,AND HINGE WE. - ._ NOTES: 2. REFER TO PROJECT SPECIFICATION FOR MORE INFO RNATION-RELATED TO UNIT CONSTRUCTION,CONTROLS,AND PARTS WARRANTIES: •• : -1 1. REFER TO ARCHITECTURAL DRAWINGS MR ROD FINISHES. - 2. PROVIDE MANUFACTURER'S SQUARE TO ROUND ADAPTOR.RDUNG CONNECTION SHALL BE AS SCHEDULED UNLESS OTHERWISE INDICATED ON FLOOR PLANS. - - - 'v 3. REFER TO PROJECTSPECIFICATIONS FOR MORE INFORMATION. _ _CABINET UNIT HEATER SCHEDULE _. - MARK DATE -DESCRIPTION - ' y ELECTRICAL DATA ' z - --.." " r- ,: .-.. - _ - NI OF • - W-16-18 _ADDENDUM " 7_ UNIT No. 'LOCATION .SERVICE TYPE (MEN) OB('h DB('h -CFM KW- STAGES FLA VOLTS PHASE HZ �� MODEL/ - REMARKS - J r.,•. .. 0 -*r- -• - • - - CUM-01 :VESTIBULE' VESTIBULE'. 10.2 65 - 96.5 ',300 .3.. 1 FIC4. 2D8 "3 60 SEE NOTED - - - - - •..: --.G CUH 02 VESTIBULE VESTIBULE .102 65 91 .5. - }00 3 1.1 14.4 208 3 6p.: SEE NOTES' .. .. :-. NOTES: ,. •.. ..-. ,t ..-x - - - - - S .: - •. _ - '_ - - ;. - -- 1. PROVIDE T-BAR CEILING MOUNTED UNIT TO FIT IN STANDARD 2'X2'CEILING PIE.PROVIDE WITH MANUFACTURER'S RECESS ENCLOSURE AND T-BAR MOUNTED KIT.. - - - J '-2. THERMOSTAT TO BE MOUNTED ONTO UNIT CHASSIS. - - «• " - - +5 '^ _ CONTROLS. - - . REFER TO PROJECT SPECIFCATON FOR MORE INFORMATION RELATED TO UNIT CONSTRUCTION AND.PARTS WARRANTIES: - < i- 4 INTEGRAL VIBRATION ISOLATION AND NOISE CONTROL CURB SCHEDULE (ADD ALTERNATE) . " DUCT SILENCER.SCHEDULE (BASE BID) - 1 `MINIMUM REQUIRED DYFNMIC INSERTION LOSSES,DB - MPX,'. -- CURB SUPPLY SUPPLY RETURN RETURN MINIMUM SEISMIC WIND -SEISMIC NO LEVEL MAX. -- - - - .. - CENTER F - ... PRESSURE , ' - _ P.q°ct - 19T005000 HEIGHT AIRFLOW PRESS G) ARROW PRESS DROP DEFLECTION REQUIRED RESTRAINT COMPONENT REQUIRED WEIGHT MANLj " DUCT UNIT SIZE LINE FACE RATED . - - _ WEIGHT DROP NANUF - o6mnY bwe '' MMY20t9- UNIT No. SYSTEM (IN) (CM) (IN WC). (CFM) (IN WC) (IN) REQUIRED REQUIRED FACTOR (NC) (LB$) MODEL REMARKS UNIT No. =SYSTEM SERVICE CM SIZE (WxH) LENGTH VELOCITY PERFORMANCE 63 125 250 500 1K 2K 4K BK (LDS.)-. (IN WC MODEL 8 REMARKS SAC-RTU-01 RN-01 36 NOD 0.25 2900 D.25 2 NO NO 1 35 600 ABROACOUSTICS NCC-VCR-23468 SEE NOTES � SAU-SA-01 RTU-01 SUPPLY AIR 29. 32x14 32.14 84 935 NO 35 _ ] '14 20 25' .33 29 25 -22 IN 0.28 VIBROACOUSTCS REAL-NV-NN-23468 SEE NOTES _ SAC-RN-02 RN-02 36 2900 0.25 2900 0.25 2 _NO NO 1 35 600 ABROACOUSTICS NCC-VCR-23468 SEE NOTES 'SAU-RA-Oi M-01. RETURN AIR 2175 32z14 32x14 96 -111 NO 35 9 18 26 : 32: 36 34: 29 22 200 0.26 VIBROACOUSTICS REEL-MRV-NN-23468 SEE NOTES ' SAU-54-02. RN-02 SUPPLY AIR 2900- 32x19 32x14 84 935 ''NC SS ] - 14 20 25 33. 29 25 22 200 0.28 VIBROACOUSTICS REF_-HV-NN-23468 SEE NOTES - ~ SAU-RA-02 RN-02 'RETURN AIR 21T5 32.14 32x14 96 .-]00' NC 35 -9 .11 26 - 52 36 - 34 29 22 200 0.26 VIBROACOUSTCS RER-MHV-TUN-23468 SEE NOTES ' NOTES: NOTES: - " - - - I. ACOUSTICAL CURB INCLUDES SUPPLY AIR AND RETURN AIR SOUND ATTENUATORS PARTmtiLY INSIDE THE CURB AND INTO THE CEILING SPACE ATTENUATOR 1:. PRONG E EELOW SOUND ATTENUATION UNIT WITH FILM LINED FILLER MEDIAL SECTION WTIHIN CDUNC SPACE TO BE SUPPORTED FROM ROOF/CEILING STRUCTURE. _ - 2. UM MAXIMUM PRESSURE DROPS INCLUDE SYSTEM EFFECTS AS PART OF CALCULATION. _ - - T _ 3."SILENCER MUST HAVE HTL Cl51NG EQUIVALENT TO 12CA DUCT WALL TO PREVENT NOISE. 2. ACOUSTICAL CURB O HAVE HIGH TRANSMISSION LOSS ML flSINO EOUNALENT TO 12W DUCT WALL TO PREVENT BREAK-OUT NOISE - ' INFORMATION RELATED TO UNIT N TIN LONTRWARRANTIES - - - 'T SPECIFICATION F INF Cp STRUC 0 OLB AND PARTS -. gy 3. ACOUSTICAL CURB TO HAVE FllM LINED MEDIA 4. RE PROIEC S OR.MORE .y _ 4. ACOUSTICAL CURB TO HA E SIC RATED ACOUSTIC BOOR BPRRI TO PREVENT RAIM D N015 FROM THE BOROM OF THE M.ER EVE TE E , G 5. OCCUPIED SPACE SHALL MEET SCHEDULED NO LEVEL - fi. LISTED TOMNOMUMPROJECT PRESSURE DROPS OR MORE SYSTEM EFFECTS AS PART U CALCULATION. - - _ y,M ]. REFER TO PROJECT SPECIFICATION FOR MORE INFORMATION RELATED 1D UNIT CONSTRUCTION,CONTROLS,AND PARTS WARRANTIES. - � - - - _ ° MECHANICAL SCHEDULES x 6A, M=3W m _ - .,-•'•'... - _ .T.- -' '. - - --. _ - M°CONSTRUCTION DOCUMENTS _ S ROOFTOP RVAC UNIT DMW THRU NOTES BLOW THRU NOTES: OUTSIDE MR INTAKE(MINIMUM 1. A=MINIMUM DROP EQUAL.TO NEGATIVE I. A=I'MINIMUM DROP REQUIRED USE OF 25'-0'FROM LTTIIAUST SYSTEM INTERNN.STATIC PRESSURE AT FAN INLET. STANDARD FITTINGS SHOWN EXCEEDS THIS OUTSET DUCT WITHIN ADAPTER ROOFTOP HVAC UNIT - &PLUMBING VELAR,MINIMUM CURB TO FR INTO EXISTING MINIMUM. 36-AWAY FROM ROOF) .( ROOF OPENING. OUTSIDE MR INTM (MINIMUM 2, B=A/2+1'_(MINIMUM 5-) HDRATchdecture 25'-G'FROM EXHALJST SYSTEM ROOF OPENING,SEAL AND 2. B-Y+1'-LEG FOR BLOW-THRU UNIT HDR Boston PLUG UNUSED DRAIN OPENINGS &PLUMBING VELAR,MINIMUM I'COPPER CONDENSATE INSULATE ANNULAR SPACE PITCH DOWN WHERE Y=DISCHARGE PRESSURE OF FAN 99 High Street,SuHe.2300 DUN UNE PROVIDE DUN TRAP 24•HIGH MIN P 36-AWAY FROM ROOF) .( - AROUND DUCTWORK TOWARD DUN (MIN 7-). Boston,MA 02110 PER DETAILS MID ALLOW TO (MIN)PREFABRICATED ADAPTER CURB _ SPILL ON ROOF. TO MANNY NEW UNII ILL EXISIING HUUF GUKB. I'COPPER CONDENSATE /—PLUG UNUSED DUN OPENINGS F)l VERIFY HEIGHT IN FIELD TO ELEVATOR OUTDOOR DUN UNE.PROVIDE DRAIN TRAP MR INTAKE HOOD AWAY FROM ROOF. PER DETAILS AND ALLOW TO FULL SIZE CONNECTDNS(TYP) ROOF OPENING SEAL AND SPILL ON ROOF 36 HIGH(MIN)PREFABRICATED DRAIN PAN INSULATE ANNULAR SPACE ACOUSTICAL ROOF CURB FASTENED FLEXIBLE CONNECTION(lYP) AROUND DUCTWORK:SEE NOTE 5 DIRECTLY TO ROOF STEEL CLEAN DUN LINE SHALL BE AT LEST ..... FF \ .:� _. ... THE SAME SIZE AS THE NIPPLE I.F: .^: - ..... ..... ,::.'::i :�. ....:::: ON THE DRAIN PAN .. ,:v. ...: ..... . ..... .......I m SUPPLY AND RETURN ELBOW SOUND SUPPLEMENTARY STRUCTURAL - FULL_SIZE CONNECTIONS(TYP) I SUPPLEMENTARY STRUCTURAL ATTENUATORS SUPPORTS(TYP) FLEXIBLE CONNECTION(TYP) SUPPORTS(TYP) SUPPLY DUCT BUIIDINC JOISTS OR BEAMS BUILDING JOISTS DR BEAMS Y SUPPLY DUCT essoctates `� RETURN DUCT RETURN DUCT ^ MCNAM RA SA LV IA' la\J '�OIBIIB(IIOBNanapnu2N - MaTFc. - M RS. `OPEN DRAIN _ 1. CONTRACTOR SHALL FURNISH AND INSTALL All ROOF CURBS.ROOF FLASHING BY X. 1. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOF CURBS.ROOF GUSHING BY GC. - N= 2. CONTRACTOR SWILL FURNISH,INSTALL AND/OR PAY FOR ALL SUPPLEMENTARY 2. CONTRACTOR SHALL PROVIDE AND/OR ENWRCE EXISTING ROOF OPENINGS AS REQUIRED. CONDENSATE DRAM SIZING STRUCTURAL SUPPORTS REQUIRED TO FURNISH AND INSTAL L LED ROOF MOUNTED CONTRACTOR SHA PERFORM ALL WORK REQUIRED TO PROVIDE ROOF OPENINGS. MINIMUM CONDENSATE I. ADD STRUCTURAL STEEL TO RAISE THE BOTTOM OF THE UNIT TO EQUIPMENT CAPACITY ACCOMMODATE DROP AND TRIP HEIGHT. A C EQUIPMENT. - PIPE OMETER 3. CONTRACTOR SHALL FURNISH,INSTALL AND/OR ISH PAY INS ALL ROOF MENTARf UP TO 20 TONS OF REFRIGERATION INCH 2. PITCH GRAIN FOR PROPER RUN-OFF AND DISCHARGE TO APPROVED 3. FASTEN ROOFTOP UNIT TO ROOF CURB TO YITIHSTAND WIND NPDS. STRUCTURAL SUPPORTS REQUIRED TO FURNISH AND INSTALLED ROOF MOUNTED RECEPTACLE. EQUIPMENT. OVER TO TONS TO 40 TONS OF REFRIGERATION I INCH 4. CONTRACTOR SWILL COORDINATE AND RETAIN THE BUILDING APPROVED ROOF OVER 40 TONS TO 90 TONS OF REFRIGERATION I.INCH 3. SUPPORT DRAIN LINES TO PREVENT SAG AND CONDENSATE OVERROW. - - CONTRACTOR i0 sWNTMN INTEGRITY OF ROOF AND WARRANTY. 4. FASTEN ROOFTOP UNIT TO ROOF CURB i0 WBHSTAND WIND LOADS. _ 5. WITHIN CURB AREA PROVIDE 4-INCHES OF CUSS FIBER BOARD INSULATION ON THE 5. CONTRACTOR SHALL COORDINATE AND RETAIN ME BUILDING APPROVED ROOF OVER 90 TONS TO 125 TONS OF REFTRIGEMTON Uf INCH 4. MANUALLY PRIME FILL TRAP BEFORE START-UP TO FORM INITIAL = ROOF DECK AND THEN COVER WITH LAID LAYERS OF REINFORCED CEMENT BOARD CONTRACTOR TO MAINTAIN INTEGRITY OF ROOF AND WARRANTY. � OVER 125TONS TO 250 TONS OF REFRIGERATION 2 INCH DRAIN SEA'- CAMPBELL:MCCABE (PROVIDE 2-SPACERS BETWEEN BOARDS)THAT IS SEALED AROUND THE PERIMETER TO THE CURB AND DUCTWORK/SOUND ATTENUATORS M PREVENT SOUND TRANSMISSION. 6. COORDINATE ELECTRICAL AND CAS CONNECTIONS WITH ELECTRICAL AND PLUMBING -- CONTRACTORS.S. COORDINATE ELECTRICAL AND CAS CONNECTIONS WITH ELECTRICAL AND PLUMBING CONTRACTORS. - ROOFTOP A.C. UNIT INSTALLATION ROOFTOP A.C. UNIT INSTALLATION AIR HANDLING UNIT DRAIN TRAP Spaulding Rehabilitation BASE BID RTU AND CURB DETAIL ALTERNATIVE NO. 1 `RTU AND ACOUSTICAL CURB DETAIL e 9 Network MOTOR OUT OF AIRSTREAM - I —GHT RIGID DUCT(EN— MOUNT CONTROL BOX TD • outpatient Clinic Renovation, .,. 2 OMEIERS AT BOX INLET PROVIDE ADEQUATE C VIBRATION ELIMINATOR MINIMUM LENGTH 3'-Q• SERVICE ACCESS. _ Hyannis,MA • - NON-FERROUS FASTENER TO - MAXIMUM LENGTH 5'-0' REHEAT COIL n PERMIT DOME REMOVAL FOR ALUMINUM HOUSING WITH SHEET METAL H000 ACCESS TO MOTOR� MEDIUM PRESSURE REMDVPBIE MOTOR DOME (IF APPLICABLE) SUPPLY DUCT TRANSITION INSULATE INSIDE OF _ UNNSED DISCONNECT SWITCHCONICAL TEE(BELL MOUTH) METALWORK IN 1S19I annOU h Road,Hyannis, CONNECTION SEE DETAIL COLD CLIMATE Y 9 Y !ELECTRICAL CONDUIT GUIDE - CENTRIFUGAL FAN WHEEL - MA 02601 -• HACKWARGLY INCLINED AIR ROW 4 -_-_- _- IP SHEET METAL OR • ' SECURE FAN TO CURB WITH / ALUMINUM DISCHARGE APRON I F -MBE COLLAR A S/M SCREW$12.00 ALL AROUND RUN POWER SUPPLY FADS SLOPE PIPES AWAY _ IN CORNER INSIDE CURB RUNOUT DUCT-SIZE 5 FROM HOOD ED—CAV BO%IN MOTORQED DAMPER DAM +2- LOW PRESSURE RECTANGULAR FASTENERS M'PROX w NEB TO UNDERSKRE OPEN WHEN FAN STARTS • SUPPLY DUCT �'- ''-�, - 24'OD :. SPAiJLDINGa OF FAN CURB CPP TRANSITION DUCT FROM �v ALUMINUM CURE CAP RUNOUT DUCT SIZE DOWN F L'% j1! BASE BASHING 1t©'IABILTTiU 7O:V NE[YIR71RK Wppp HALER TO BOX INLET DMEIEA TERMINAL BOX E TO BE PROVIDED WITH BOTTOM -� I,Y !i``'• PREFABRICATED ROOF CURB ACCESS DOOR FOR COIL CAULK SEALANT NOTE: CLEANING IF REHEAT COILS !! ARE PROVIDED. \ FASTENERS - COUNTE FI15HINC 1. THE OPERATION OF VAR LE VOLUME TERMINAL UNITS ARE AFFECTED BY ! I APRRO%B'OC FIBER CANT IXCESNE TUgBULFNCE ON THE ENTERING SIDE OF EACH TERMINAL UNIT -• A '•�� / PARTNERS ROOF MEMBRME THEREFORE,TERMINAL UNITS MUST NOT BE INSTALLED TOO CLOSE TO T'MINIMAL (BY GC) \ FINISHED ROOF - MAN DUCTS,ELBOWS AND FIRINGS. - T fi E A L T ff C A R E 2. WHEN MINIMUM UPSTREAM STRAIGHT DUCT CONNECTION TO TERMINALS MING MOVE CANNOT BE INSUUTION \ A VANES OR OTHER DEVICE AS RECOMMENDED RBYI TERMIDE INALEUNIT MMNUGACTIR RING DUCT. {/ AND SUBMIT TO ENGINEER FOR REVIEW PRIOR TO INSTALLATION _ FIBER LPM SET /// ROOF DECK IN BITUMEN • f, r, ROOF OPENING I / / - 3. MMUFACTURER OF TERMINAL UNIT SHALL PROVIDE.CONTROLS ON LEFT DR RIGHT SIDE AS REQUIRED BY FIELD CONDITIONS. NOTE: - MQIES: • 4. ARM GE ACCESS TO PERMIT EASY FIELD BAANCE AND MAINTENANCE OF 1. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS 1. FANS AND CURBS SHALL BE FROM THE SAME MANUFACTURER. TERMINAL UNIT. ..' FOR THE ROOF CONSTRUCTION. 2. INSTALL WITH CURB HEIGHT SUCH THAT A DISTANCE OF 24'BETWEEN THE DISCHARGE 5. DO NOT USE ACOUSTIC LINING FOR HOSPUAL APPLICATION THAT DOES NOT HAVE INSTALLATION.FINISHED ROOF IS MANTMNED.SQUARE CURB AS REQUIRED FOR LEVEL A METAL INSIDE LINER. 8PIPING THROUGH ROOF'DECK ROOF EXHAUST FAN TERMINAL UNIT INSTALLATION -MURK DATE - OESCRPTTON ADDENDUM WI 1 , P,WM Numb, 19TD950W " .• .on(AnM lerv. oMnvml9 SLAM Xeme MECHANICAL DETAILS 9NM XumWr M-400 - a ` CONSTRUCTION DOCUMENTS UILATED FLEX $ 4FTI DEGREE WTIHTDAMPERF - - - 5'SMA%LENGTH CONN - - FLEXIBLE 5 FT LENGTH - REtIBIE DUCT FULLY AND LOCKING OW10Wv1T - - - - < MENDED - _ ROUND DUCT CONNECTOR - ROUNp DUCT CONNECTOR - HDRAN,hit-tore ACOUSTIC LINING ACOUSTIC UNING - HER BOSt00 - c SEE NOTE 2 -----� O 99 High SIT 1,SBife 230D - L i SEE NOTE t - ----- ^— Boston,MA D211Q Y DIFFUSER NECK SIZE I r - DIFFUSER NECK SIZE i EXTERNALLY INSULATED PLENUM - WITH INTEGRAL(NOT FIELD I..___ - FAB ICKDIFFUSER MANU OIFFUSER ACIURER - - - / TYPICAL LOW VELOCITY B DI MANU CDUNG J -/ 6-MIN METAL TRUNK DUCE _�__ ___._ _____ . DIFFUSER CGUNC J 6 MIN SEE NOTE 1 - USE NYLON tt-RAP TICHiEINED- SIDE CONNECTION OIFTUSER -- i �TI L SIDE CONNECTION - AnlusraBLE VANES WRH tt-waAP root OR rdtflS&.+MfSNIVM 5 FT LENGTH (,I,� _ ''REUSABLE 55 DRAW BAND _ _ 1 . FLEXIBLE DUCT FULLY _ ypg,5; 11�1+ "SSO�I�IQS M Na ARA 4ALV IA* - IXTENDEO _--•...__.__I - - - SEE NOTE 1 - 1. FOR LAB OR HEALTHCARE COH$UII[iIA�FIdtIdgPOf�( - _ APPUCAnONS.USE EXTERNAL 1� INSULATION.FOR OTHER I6•MAX TD GLAZING _ _ APPLICATIONS.USE ACOUSTIC OR WALL FACE—� • BEE NOTE 2 SEE NOTE 1 _ UNING - - 45 DEGREE TAKE-OFF _ e R=D FNDL WIN DAMPER /�IK F . D MINIMUM� AND LOCKING QVADRaVT � �R=D - - �� - - _. .. • I - ROUND DUCT ADAPTOR U MIMMUM __— _ I. OFFSETS WITH FLEX DUCT SMALL NOT EXCEED 3C AND SHALL BE- - A \�It THERMAL INSULATION FOR RECTANGUAR 1 ,� I tlQffS: - ROUND DUCT ADAPTOR � THERMAL INSULATION GRADUAL OFFSETS IN EXCESS OF 30 SMALL BE H4R0000IED - DIFFUSER '—r 1 FOR RECTANGULAR - '2. FLEX DUCT SHAH NOT HAVE MORE THAN Y,'SAC/FT. - 2.IN MINIMUM 1. PRWIDE ELBOW SUPPORTS AND - - - �_—'V DUCT OR EQRT STRAPS.MEl( DIFFUSER --FL 2Y IN MINIMUM L— --- ------ ---------------J ROW OR EQUAL - _ 3. FOR PERIMETER DIFFUSERS LOCATE DISTANCEFROM OUTSIpE WALL T SHOWN ON ARCH PI-ANS. M CEILING� ` OIFTUSER 2. FOR LAB OR HEALTHCARE ----- - - � ELL IYMCCABE • " . - - APPUGAnONS,USE EXTERNAL CEILING — �. ¢ CAMPS OIRTJSER 9. CONNECTION TO NVilN DUCT'SHALL BE HARD DUCT 1RPNSInDN AND -TOP CONNECTION APU CKTI FOR OTHER - - VOLUME DAMPER. _ - UNINGnnQNS,USE ACQUrnCAL 'TOP CONNECTION - - - - .. UNING. .- DIFFUSER CONNECTION DETAIL DIFFUSER CONNECTION DETAIL — RIGID DUCT LINEAR DIFFUSER CONNECTION DETAIL Spaulding Rehabilitation Clinic Renovation, Network Outpatient Clin• R vati n OD .'o SO SCREW - - - -. • - - - - SPOT WELD 1-a"•-GALV STRIPS • .. 1 - - S Hyannis M �W2-` .., + _ - u - • F . *VONME DAMPER WITH 16 GA E.NQTE: - '.LOCKING TYPE INDICATOR •• Y LESS 11WN DU 3 IyannoUgh Road,Hyannis, _ cTB -- cuv filaD _ Y' --, QUADRANT AND SADDLE TO n AECnnN a-A 1.'PROVIDE 2'WENSION FOR 151 ad is MA 02601 _ s —__. �CLE4RINSULATION HANDLE IN INSULATED DUCT r n = D BRANCH DUCT - - SO ROD— SYSTEMS.. ' R 45 IDuCT _ _0 TROFFER - CLINCH COLLAR VENILOCK NO809R DIFFUSER G25zW2 4-MIN END BEARING-!_ GASKET " MANUAL VOLUME DAMPER - MAIN DUCT .. S WITH LDCKING TYPE '. AIR NOW SPA lJ LADll V G - ' INDICATOR OUADRAM� - - - a - SHELT METAL AS - SUP PLr _ N6HAHIWTAT(ON NG[N'ORKW �REOUIREO , a^ MAIN DUCT I + RENRN4EXHAUS! - i - - PARTNERS �Tl7�'7�-�1 R�`'l - - - II— aRTLaw - --g it RT �I RS .. - - - - H.E A.L-T HC A R E - - - I. NOT TO BE USED AS'A SUBSTITUTE FOR AN E1.B01Y.-•'�� � - - - - - -VENROCK NO 635 REGULATOR�� GASKET--INDICATING HANOL£ CIRCULAR BRANCH CONNECTION �LGCKNU TO SINGLE OUTLET RECTANGULAR DUCT TAP WITH VOLUME DAMPER ROUND VOLUME DAMPER — LOW PRESSURE t2R - • - _ MARK DATE DESCRIPTION 2! ADD UNWI FLEX GABLE COUPLING 3/8-CRS DAMPER - - - - - ROD P�fl65 FIT OPPOS BLADE DALIPER� PVSID2 f.,_. '_ :PIASTER IMF I- RN-1 RN-2 .. ^ I. DUCT _ SINGLE DUCT VAV - - - TYPICAL FOR 12,- - PVSTER - - UNE .:. CDLING� FLEX GABLE CONCEALED m 'OWL-12O .. \ - .. •. 04BYAI9 • __ _ ....._ ._— .—. REGULATOR ---3 UC210-1 •'` c. �. .. . - P,NM NimMi 19T0&5000 - ON91AM hw — _ _ 120 VAC I CEIUNG RING) RECESSED - ADIUSIMENT SCR EwJ RECESSED ADJUSTMENT SCREW - "-�—,0•TABLET DISPLAY o - " TRACER CONCIERGE - 1. USE REMOTELY—ABLE VOLUME DAMPERS WHERE REQUIRED$ " - u ' - TO ELIMINATE ACCESS PANELS IN GYPSUM CEILING. - -r .. L 2, LOCATE ADJIISMEM SCREW IN AIR OUTIO UNLESS INDICATED ,- - - g OTHERWISE ON PLANS. ' -_, SNM Nmn• MECHANICAL REMOTELY ADJUSTABLE BALANCING DAMPER DETAIL RTU MANUFACTURERS COMMUNICATION RISER DETAILS h. F)l N.— M-401 n - - - CONSTRUCTION DOCUMENTS - - - SUBMRFAL OF TIE SUBSIIITJIION. ANY SUBSTRU.pN MUST BE DAMFiR MISAIJCNMEM. ' 1. MECHANICAL SPECIFlGTONS RELATED ACCESSORIES. "SUBATTED WITH AN EXPMNATON WHY A SVB"TURON IS BEING A T E-GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION; 3) 'FURNISH-OR"SUPPLY': TO PURCHASE,PROCURE.ACQUIRE AND UTILIZED. IF THE SUBSTITUTED REM DEVIATES FROM THE SPECIFIED - 3) PROVIDE ACCESS DOOR IN DUCT AQACEM TO EACH IRE DAMPER. ' AA DOCUMENT A201,LATEST EDITION,SPAULDING RENAMIJTATION DEI-I COMPLETE WITH REIATED ACCESSORIES. ITEM,THOSE DEVIATIONS ARE TO BE ID7 EO ON q LINE BY UNE ' BASIS. IF THE SUBSTITUTE IS BEING UTILIZED FOR FINANCIAL 4) .PROVIDE FlRE/SMOKE DAMPERS AS NOTED ON THE PIAN5 AND IN F)l STANDARDS.AND THESE SPELIFICTIONS PS APPLICABLE ARE PART OF DUCTS AND OPENINGS IN SHAFTS.FLOORS.FIRE OVALS,FlRE-RESISTANCE THIS CONTRACT. 4) -WORK': LABOR,MATERIALS.EOUIPMENT,APPARATUS.CONTROLS. REASONS,THE ASSOCIATED CREDIT MUST BE SIMULTANEOUSLY SUBMITTED. . - ACCESSORIES AND OMER ITEMS REQUIRED FOR PROPER AND COMPLETE. - F PARTIDONS.FIRE RATED CEILINGS AND SMOKE BARRIERS. ' B. ALL APPUCABLE LODES,LAWS AND REGULATIONS GOVERNING OR INSTALLATION. B. ALL SUBSTITUTED EQUIPMENT SHALL CONFORM TO SPACE RELATING TEL ANY MUCH OF MIS WORK ARE HEREBY INCORPORATED INTO REQUIREMENTS AND PERFORMANCE REQUIRE SHOWN ON COMRACF 5) THE HVAC CONTRACTOR SHALL PROVIDE ALL DEVICES,REIAYS,FAD AND MADE A PART OF THEE SPECIFIGTONS,AND THEIR PROVISIONS 5) 'CONCEALED': EMBEDDED IN MASONRY OR OTHER CONSTRUCTION, DOCUMENTS. COMPACTOR SWAL RE%ACE ANY EpUIPNEM THAT DOES NOT - SWITCHES,E/P SWITCHES,CONTROL COMPONENTS.AIR PIPING,POWER SHALL BE CARRIED OUT BY THE CONTRACTOR WHO SHALL INFORM TIE INSTALLED IN FURRED SPACES,WITHIN DOUBLE PORTIOONS OR HUNG - MEET THESE REQUIREMENTS AT HIS OWN EXPENSE: qM MODIFIGTDNS TO WIRING.CONMOL WIRING AND INTERLOCK WIRING AS REQUIRED TO OWNER,PRIOR TO SUBMITTING A PROPOSAL,OF AM WORK OR MATERIALS CEIUNCS,IN TRENCHES.IN CRAWL SPACE.OR IN ENCLOSURE. - ASSOCIATED SYSTEMS OR ADDITIONAL COSTS ATTRIBUTED TO THIWHICS ACCOMPLISH ME SEQUENCE OF OPERATION FOR THEE DAMPERS. S DO EX VOIUATE ANY OF BY ME CONTRACTOR ABOVE CAUSING SUCH VIOLATION AND REGULATIONS. SHAL BE CORRECTED 6) 'EXPOSED': NOT INSTALLED UNDERGROUND OR'CONCEALED'AN WORK SUBSTITUTION$HALL BE AT THIS CONTRACTOR$EXPENSE 6) DAMPERS SHALL BE MANUFACTURED BY RUSKIN MODEL FSD-60, NT'ME CONTRACTOR. DEFINED ABOVE. C. CONTRACTOR SHALL SUBMIT BID EASED ON SPECIFIED EMS AND POTOROFF OR APPROVED EQUAL SHALL SUPPLY AS AN ALTERNATE PRICE ANY SUBSTITUTIONS = C. INVESTIGATE W EACH SPACE THROUGH WHICH EQUIPMENT MUST BE ]) 'SIMILAR'OR'EQUAL': EQUAL IN MATERIALS,WEICM,SIZE. )) WITH MODULATING COMBINATION ND TESTES DAMPERS TO BE PROVIDED MOVED. WHERE NECESSARY,EQUIPMENT SMALL BE SHIPPED FROM DESIGN ANp EFFICIENCY OF SPECIFIED PRODUCT. 6. ACCESS DOORS IN GENERAL CONSTRUCTION WITH ACTUATORS RATED AND TESTED FOR MIS APPLICATION. FOR ArchiteCture _ MANUFACTURER IN SECTIONS S. SIZE SUITABLE M MOVING THROUGH A THIS CONTRACTOR SMALL SUBMIT TO THE ARCHITECT FOR APPROVAL A 8) HD R Boston AVAILABLE REOF DA EVE SPACES. MAY BE M FROM BUILDING OWNER AT 2. SCOPE OF WORK , SEE INSTALLATION ON DRAWING WHAT TIMES OF DAY EOUIPMEM MAY BE MOVED THROUGH ALL AREAS. PLAN L INDICATING DOORS SIZE(MINIMUM 18 INCH%18 INCH)ANp LOCATION 99 High MA 02 Suite 2300 A ME WORK UNDER CONTRACT INCLUDES ALL TABOR,FULLING AN AND - OF ALL ACCESS DOORS REQUIRED FOR OPERATION AND MAINTENANCE OF ALL K. ALL DUCT DIMENSIONS INDICTED ON PLANS ARE INSIDE CLEAR Boston,MA 02770 D. DUCTWORK AND PIPING IS SHOWN ANDUSESORUNS.DIAGRAMMATICALLY AND DOE NOT GO RU CE D EADY FOR THE FURNISHING. ME SYSTEMS. AND RSRNC, CONCEALED EQUIPMENT,DEVICE,VALVE,DAMPERS AND CATION O DIMENSIONS. SHOW ALL IS PRICE DROPS AND RISE U RUNS. THE CONTRACTOR SHALL COMPLETE AND READY FOR SALE OPERATION Of ME SYSTEMS. WORK SWll1 CONTRACTOR SHAG ARRANGE FOR FURNISHING A AND DUDE COLON OF ALL ALLOW IN HIS PRICE FOR RATIONS M DUCTWORK O APPROVAL PIPING TO Av01D BE INSTALLED IN A HAT.WORKMANLIKE MANNER. ACCES DOORS IN FlNSHFO CONSTRUCTION AND INClUOE COSTS IN THE L AUTOMATIC 0.4OPPOS: COMPIiTE WITH ORKAGEGAL AND ELECTRIC AND RUCTONS. EXACT LOCATIONS ARE SUBJECT RV ES.INC OF BID. OPERATOR. OPPOSED BODE DAMPER OR GALVANIZED PRE MIN.4 INCH, THOSEOF. ER TRADES RE THE IXI511NC SERVICE.INCLUDING B. THE CONTRACTOR SHALL CANE NECESSARY NOTICE,FILE DRAWINGS ' MAX.8 INCH MBE WITH COMPRESSIBLE EDGE SERE TO PREVENT IFAKAGE. HOSE OF OTHER TRADE IS REOVISO. AND SPECIFICATIONS WITH TIE DEPARTMENT HAVING JUUT MIION. ). SHEET METAL WORK FACTORY-ASSEMBLE STEEL INKACE AND SWAT WITH NYLON OR OIL- - OBTAIN PERMITS ER LICENSE NECESSARY TO CARRY OUT MIS WORN AND IMPREGNATED BRONZE BEARINGS. MOTOR WITH SUFFICIENT POWER TO E SUPPORT ALL DUCTWORK AND PIPING FROM BUILDING OVERHEAD PAY ALL FEES THEREFORE. ME R AIJ.PART SHALL ARRANGE FOR A DUCT CONSTRUCTION.TION.REINFORCEMENTS, SHEET META.THICKNESS,SEAM LIMB LEAKAGE TO IC CMA PER SQUARE NG F. UNRAGE TO WITHSTAND AND/OR FRAMING IN AN APPROVED MANNER, WHERE ORES MR INSPECTION AND TESTS OF ANY PA ALL PARTS OF ME WORK IF E ANDSHALL JOINT CONSTRUCTION.REINFORCEMENTS.AND RANGERS S SUPPORTS. LOAD EQUAL TO D IN MAXIMUM OPERATING FORCE WITHOUT DEFLECTION. - FU NIS ADI O0E NOT PERMIT FASTENING OR SUPPORTS FOR EQUIPMENT, REQUIRED R MALL PAYS AND PAY ALL CHAIR FURNISH MR SAME. ME SHALL COMPLY WITH SLAEST 'HVAC DUCT PERFORMANCE STANDARDS- DAMPER MOUNTED IN WELDED STEEL CHANNEL FRAME. FURNISH ADDITIONAL FRAMING, INSERTS SILALL BE STEEL SLOTH TYPE CONTRACTOR SMALL PAY ALL COSTS FOR,AND FURNISH TO THE OWNER METAL AND FLEXIBLE.INDICA EDITION'AND PERFORMANCE REQUIREMENTS 5XISSiolcilat AND FACTORY PANTED. SINCIE ROO SHALL BE SIMILAR TO CRINNELL BEFORE FINAL BILLING.ALL CERTIFICATE NECESSARY AS EVIDENCE THAT AND DEIGN CRITERIA INDICTED. M. ROUND OR FLAT OVAL DUCTWORK rFIG.281. MULTI-ROD SNALL BE SIMILAR TO FEE k MASON SERIES 9000 THE WORK INSTALLED CONFORMS WITH ALL REGULATIONS WHERE THEY APPLY WITH END CPS AND CLOSURE STRIPS. MAXIMUM LOADING INCLUDING TO THIS WORK. B. EXCEPT AN OTHERWISE SHOWN OR NOTED,ALL DUCTWORK AND OTHER 1) ROUND DUCTWORK: FOR DUCTWORK,PROVIDE SPIRAL SEAMPIPES.GUM RK CONTENTS AND COVERING SHALL NOT EXCED T5X OF SHEET METAL WORK SHALL BE GALVANIZED SHEET STEa CONSTRUION.GALVANIZED STEEL OF DUGS AS RECOMMENDED BY SMACNAeS RATED INSERT CAPABILTY. WHEN SUPPORTING FROM BUILDING USE BEAN C. PRIOR TO ME INSTALLATION OF AM WORK AND PROCUREMENT OF NVAC DUCT LONSTRUCTON SFANONDS.PROVIDE SPIRAL SEAMS MR ALL -NAMARA SALVIA-- CLAMPS IN APPROVED MANNER. EQUIPMENT PROVIDE COMPLETE SET OF COORDINATED SHOP DRAWINGS OF C. DESCRIPTION OF DUCTWORK PRESSURE CUSS AND EQUIPMENT DUCTS AND FITTINGS. - ALL NEW AND EXISTING EQUIPMENT,DUCTWORK,PIPING AND CONTROL F. INSTALL WORD(SO AS TO BE READILY ACCESSIBLE FOR OPERATION. SYSTEMS INDICTING CAPACITY DIMENSIONS AND SEQUENCE OF OPERATION 1) 4 INCH AND GREATER DUCT CUSS: ALL SUPPLY DUCIIYORK FROM 2) FLIT-OVAL DUCTS: INDICATED DIMENSIONS ME ME DUCT WIDTH - MVJNTENANLE AND REPAIR. MINOR DEVIATIONS FROM DRAWINGS MAY E FOR WRITTEN APPROVAL BY THE ARCHITECT AND ENGINEER. DISCHARGE OF FANS.MR HAWUNG UNITS OR AC UNITS TO INLETS OF ("OR DIMENSION)AND DIAMETER(DIAMETER Of THE ROUND SIDE ' MADE TO ACCOMPUSH THIS,BUN CHANCE WHICH INVOLVE O MA COST TERMINAL BOXES ON FLOOR,ALL OUTDOOR DUCTWORK AND AL DUCTWORK GI NNECRNG ME FLAT PORTIONS OF THE DUCT)OF THE INNER DUCT. SHALL NOT BE MADE WITHOUT APPROVAL D. WITHIN 15 DAYS AFTER AWARD OF CONTRACT,SUBMIT FOR REVIEW,A RUNNING THROUGH UNCONDRIONED SPACE. SEAL CLASS•A',LEAKAGE UST OF ALL MATERIAL AND EQUIPMENT MANUFACTURER'S PRODUCTS THAT CLASS 5(RECTANGULN METAL)OR CUSS 3(ROUND). 3) LONGITUDINAL SEAMS: SELECT SEAM TYPE AND FABRIGR - - G. THIS CONTRACTOR SHALL SUBMIT TO TIE MOO CT FOR APPROVAL A ME PROPOSED,AS WELL AS NAMES OF ALL SUBCONTRACTORS WHOM MIS +, ACCORDING TO SMACNA'S'HUNG DUCT CONSTRUCTION STANDARDS-METAL- A V - " PION INDICATING THE SIZE(MINIMUM 18 INCH%18 INCH)AND LOCATION TRADE PROPOSES TO UTILIZE ON THIS PROJECT. 2) 3 INCH DUCT CLASS: ALL SUCTION AND DISCHARGE OF KITCHEN AND FLEXIBLE,•SEAMS-ROUND DUCT AND FITTINGS:FOR STATIC- - u;^ F , OF ALL ACC ES DOORS REQUIRED MR OPERATON AND MAINTENANCE OF ALL EXHAUST AND OMER EXHAUST DUCWORK.SEAL CLASS'B'.LEAKAGE CLASS PRESSURE CUSS,APPUCABLE SEALING REQUIREMENTS,MATERIALS ' `, CONCEALED EQUIPMENT,DEVICES,VALVE,DAMPERS AND CONTROLS. 3. SHOP DRAWINGS 12'RECTANGULAR MEIN OR CUSS 5(ROUND). INVOLVED.DUCT-SUPPORT INTERVALS,AND OMER PROVISIONS IN CONTRACTOR SMALL ARRANGE FOR FURNISHING AND INMAUALDN OF ALL SMACHA'S'HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE' _ ACC ES Won IN FINISHED CONSTRUCTION AND INCLUDE COSTS IN THE A INDICATE ON EACH SUBMISSION:PROJECT WE AND LOCATION, 3) 2 INCH DUCT CLASS AND LESS: ALL OTHER LOW PRESSURE BID. ARCHITECT AND ENGINEER,REM IDENnnCTION AND APPROVAL STAMP OF - DUCTOWOR.SEAL CUSS'C'.LEAKAGE CLASS 24(RECTANGULAR)OR A FABRICATE ROUND DUCTS LARGER TAW 90 INCHES IN DIAMETER WITH PRIME CONTRACTOR,SUBCONIPACIOR NAME AND PHONE NUMBERS. CUSS 12(ROUND). BUT-WELDED LONGITUDINAL SEAMS. - H. REMOVAL AN O RELOCATION Of CERTAIN EXISTING WORK WILL BE REFERENCE TO THE APPLICABLE DESIGN DRAWING OR SPECIFICATION - .CAMPBELL:MCCA8E NECSSARY FOR THE PERFORMANCE OF ME GENERAL WORK. ALL EtSTING �ARTICLE.DATE AND SCALE. D. GENERAL FABRICATION REQUIREMENTS: COMPLY WITH SMADS B. FABRICAT E FLAT-OVAL DUCTS LARGER THAN 72 INCHES IN WIDTH CONDRIONS CANNOT BE COMPLETELY DETAILED ON THE DRAWINGS. ME 'HUNG DUCT CONSTRUCTION STANDARDS-METH AND FLEXIBLE',LATEST (MAJOR DIMENSION)WITH BUTT-WELDED LONGRUDIMM.SEAN. - - CONTACTOR SHALL SURVEY TIE SITE AND INCLUDE ALL CHANCES IN B. THE WORK DESCRIBED IN ALL SHOP DRAWING SUBMISSION SHALL BE - EDITION,BASED ON INDICTED STATIC-PRESSURE CUSS UNLESS ' MAKING UP ME WORK PROPOSAL , CAREFULLY CHECKED FOR ALL CLEARANCE G THOSE REQUIRED OTHERWISE INDICATED. 4) TEES (INCLUDING AN LATE RALS:ERALS: SELECT TYPES AND FABRICATE ACCORDING TO • ` FOR MAINTENANCE AND SERVICING),FIELD CONDITIONS,MA4INTENANCE OF SMACRA'S'HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE I. 'PLAN INSTALLATION OF NEW WORK AND CONNECTIONS TO EXISTING ARCHITECTURAL CONDITIONS AND PROPER COORDINATION WITH ALL TRADES - 1) THE FOLLOWING FITTING CONNECTIONS AND DUCT CONSTRUCTION 90 DEGREE TEES AND LATERALS:AND'CONICAL TEES,'FOR STATIC- WO K TO ENSURE MINIMUM INTERFERENCE WITH REGULAR OPERATION OF ON THE JOB. GAUGE ARE NOT ACCEPTABLE PRESSURE CUSS,APPUCBLE SEALING REQUIREMENTS.MATEPWS - EXISTIN FACILME. ALL SYSTEM SHUTDOWNS AFFECTING OTHER AREAS INVOLVED,DUCT-SUPPORT INTERVAS,AND OTHER PROVISIONS IN �] ,J�1 SHALL BE COORDINATED WITH WORDING OWNER. INSTALL ISOLATION C. EACH SUB RED SHOP DRAWING IS TO INCLUDE A CERTIFICATION - A DRIVE SLIP[T-.1,T-2]FITTING CONNECTIONS SAACHA'S ITVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE.' - Spaulding Rehabilitation VALVE AT POINT OF CONNECTION TO THE U19ING PIPING. PROVIDE THAT ALL RENTED JOB CONDITIONS HAVE BEEN CHECKED AND VERIFIED - - - - TEMPORARY DUCT CAPS AND/OR CONNECTIONS TO MINIMIZE SHUTDOWN TIME. AND THAT THERE ATE ND CONFLICTS. B. 26 GAUGE DUCTWORK N. LEAKAGE TESTING: }L�� �[ J. CONNECT NEW WORK TO EXISTING LL NRTN G WORK IN NEAT AND APPROVED O. A SHOP DRAWINGS ARE TO BE SUB M ALLOW AMPLE TIME 2) TRANSVERSE JOINTS: SELECT JOINT TYPES AND FAR CATS 1) AL DUCTWORK GREATER TAW US 2 INCH CS AS DEFINED WITHIN IS - Network MANNER. RESTORE EXISTING WORK DISTURBED WHILE INSPLUNG NEW FOR CHECKING IN ADVANCE OF FIELD REQUIREMENTS. ALL SUBAREAS TO - ACCORDING TO SMA NA'S TNAC DUCT CONSTRUCTION STANDARDS-METAL TO BE TESTED. ALL TESTING SHAl1 BE DONE IN THE PRESENCE OF THE -WORK TO ACCEPTABLE CONDITION AS DETERMINED BY ARCHITECT. BE COMPLETE AND COWAN ALL REQUIRED AND DETAILED INFORMATION. AND FLEXIBLE.TRANSVERSE(GIRTH)JOINTS,FOR STATIC-PRESSURE ENGINEER OR OWNER'S REPREENFATVz TIE CONTRACTOR IS - Outpatient Clinic Renovation, SHOP DRAWINGS WITH MULTIPLE PARTS SHALL BE SUBMITTED AS A CLASS.APPUCABLE SEATING REQUIREMENTS.MATERIALS INVOLVED.DUCT- RESPONSIBLE FOR PROVIDING ALL COLLARS,CAPS,ELECTRIC POWER,ETC. K. DISCONNECT,REMOVE AND/OR RELOCATE EXISTING MATERIAL PACKAGE. SUPPORT INTERVALS,AND OTHER PROVISIONS IN SMACNA'S',VAC DUCT NECESSARY TO PERFORM ME TESTS. THE CONTRACTOR IS ALSO LJ w EQUIPMENT AND OTHER WORK AS NOTED OR REQUIRED FOR PROPER - CONSTRUCTION STANDARDS-METAL AND FLEXIBLE'FRIENDS AND/OR RESPONSIBLE FOR SCHEDULING THE TEST NO LESS THAN THREE(3) � � Hyannis,MA - - NSTALLATION OF NEW SYSTEM. E. IF SUBMITTALS DIFFER FROM THE CONTRACT DOCUMENT JDINTS OF TWO DIFFERENT CADGE,CONNECTED JOINT RATING SIWL MEET BUSINESS DAYS PRIOR TO TTS'INFENDED OCCURRENCE. LOW PRESSURE REQUIREMENTS,MAKE SPECIFIC MENTION OF SUCH DIFFERENCES IN A ' MORE STRINGENT CONDITIONS DUCWORK(2 INCH CLASS)SHALL BE TESTED ON AN AS NEEDED BASIS AT - -- - L ME CONTRACTOR SHALL KEEP ALL EQUIPMENTAND MATERIALS,AMIDSUBSTITUTION,LETTER OF WANENRTAL,WITH REQUEST FOR SUBSTITUTION,TOGETHER THE ENGINEER'S DIRECTION. LEAKAGE TEST PROCEDURE SHAl FOLLOW ALL PARTS OF TIE BUILDING,EXTERIOR SPACE AND ADJACENT MELTS. WITH REASONS FOR SURE. 3)FR , USE ME ALLOWING SMACNA TRANSVERSE(GIRTH)JOINTS THE WTUNE AND CLASSIFICATIONS IN THE SMACNA WAD DUCT LEAKAGE ' SIDEWALKS AND PAVEMENTS,FREE AM MATERIAL AND DEBRIS RESULTING TEST MANUAL. IF SPECIMEN FAILS TO MEET ALLOTTED LEAKAGE LEVEL - FROM ME EXECUTION OF THIS WORK. EXCESS MATERIALS WILL NOT E F. SUBMISSIONS: A DUCT CONSTRUCTION AS FOLLOWS FOR 2 INCH W.C.CIASS: ME CONTACTOR SHALL MODIFY TO BRING IT INTO COMPLIANCE AND NAIL _ 1513 IyannOU9h Road,Hyannis, PERMITTED TO ACOUMUUR EITHER ON ME INTERIOR OR ME EXTERIOR. RETEPTABLE LEAKAGE IS DEMONSTRATED. TESTS AMID 1) PROVIDE All COORDINATION DRAWINGS.DUCTWORK AND PIPING SHOP (1) UP TO 12 INCH WIDE USE T-6 OR T-T NE ESSARY IT TI RSREPAIRSMALL E COMPLETED PRIOR TO CONCEALMENT OF MA 02601 - M. SEAL OPENINGS AROUND DUCTS AND PIPING THROUGH PARRTIONS. DRAWINGS IN AUTDCD FORMAT,VERSION COMPATIBLE WITH OWNER. ALL DOLTS. WALLS AND BOORS fNOT IN SWJTS WITH H MINERAL WOOL OR OMER CATALOG GUTS AND SUBMITTALS 10 BE PROVIDED IN ELECTRONIC'PDT' (2) 13 INCH 28 INCH WIDE USE T-11 OR T12 NONCOMBUSTIBLE MATERIAL - - FORMAT THE ARCHITECT WILL FORWARD ALL SUBMISSIONS TO ME S. MR OUTLETS ' ENGINEER (3) 29 INCH WIDE AND UP USE MC OR TOF - m N. PROVIDE Al NECESSARY FISHING AND COF THUS U BUILDING i0 - A CENERAI: - ° �+ MAMAIN ME WATERPROOFING REMOVAL OF OF THIS BUILDING R REQUIRED G. SUBMIT SHOP DRAWINGS FOR THE FOLLOWING: B. DUCT CONSTRUCTION AS FOLLOWS FOR 3 INCH W.G.CLASS: c BY THE EQUIPMENT OR REMOVAL W PIPE,DUCTS,LOUVERS CONDOR, I) MARGIN TYPE.COLORS,FINISH AND METHODS OF COORDINATED FOR SPAULDING: x AND EOUIPMEM. PROVIDE EQUIPMENT CURBS AND DUNNAGE STEEL AS 1) DUCTWORK AND SHEET FOETAL DESIGNS. (1) UP TD 20 INCH WIDE USE T-6 OR T-T ALL DIFFUSERS,GRILLE AND REGISTERS SHALL BE COORDINATED WITH REQUIRED. ARCHRECNRAL CEILING AND WALL DETAILS AND SPECIFlGTONS.FINISH A SHEEMETAL SHOP STANDARDS SHALL BE COMPILED DIRECTLY FROM (2) 21 INCH TO 24 INCH WIDE USE T-11 OR T12 SHALL NOTCH COLOR SAMPLE AS APPROVED: REHABILrwiorO,NETIVORK 0. ALL PRESENT MATERIAL EQUIPMENT AND CONSTRUCTION DEBRIS TO ME"SMAEG DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE' - ERE REMOVED UNDER THIS WNTRACT SHALL BECOME ME PROPERTY OF ME MANUAL MODIFICATIONS MR A SPECIFIC PROJECT,IF ANY,SHALL BE (3) 25 INCH WIDE AND UP USE ADC OR TDF 2) FRAME ME SUITABLE MR MOUNTING IN COUNG OR WALL CONTRACTOR WITH ME EXCEPTION OF SPECIFIC EDUIPMEM AND APPARATUS INDICTED OIRECRY ON ME S RNIA,TEMPUTES. MODIFIED SHOP CONSTRUCTION AS INDICATED ON ARCHITECTURAL PLANS. REWESIED BY ME BUILDING REPRESENTATIVE ARCHITECT OR AS NOTED STANDARDS NOT TAKEN DIRECTLY FROM ME SMALN4 TEMPLATE WILL NOT C. DUCT CONSTRUCTION AS FOLLOWS FOR 4'W.G.CLASS: / 1 TO BE RELOCATED ON ME DRAWINGS SMALL BE PROPERLY DISPOSED OF BY BE ACCEPTED. ANY DEVIATIONS FROM SMACHA SHALL E NOTED. 3) EXACT LOCATOR OF A-AR OUTLETS AS PER ARCHITECTURAL PARTNERS MIS CONTRACTOR. 2) REGISTERS CRILIE AND DIFFUSERS (1) UP TO 12 I WIDE USE T-6 OR T-T PLANS. PAR NS. - P. MAlERWS AND WORKMANSHIP.UNLESS OTHERWISE NOTED,SHALL BE (2) 13 INCH TO 18 INCH WIDE USE T-11 OR T12 4) PROVIDE MOUNTING AND BLOCKING IN ACCORDANCE WITH BUIIDINC.STANDARDS. 3) DUCMORN,PIPING AND EOVIPMEM LABELS. (3) 19 INCH WIDE AND UP USE MC TOR TDF +' - 5) SUITABLE FOR OPERATION AT 20%EXCESS AND 20%LESS THAN NOTED - H E. A )'T H.C A R e - 0. ME WORK IN ME BUILDING SHALL BE DONE WHEN AND AS DIRECTED. 4) DUCTWORK,PIPING AND EQUIPMENT INSUUTON - - CAPACITY FOR CONSTANT VOLUME SYSTEMS AND AT 20%EXCESS AND 60% EC AND IN A MANNER SATSFACTORY TO ME OWNER. THE WORK SHALL BE - - E: VOLUME DAMPERS: GALVANIZED STEEL PER SMACN4-LOW VELOCITY LESS THAN NOTED CAPACITY FOR VARABLE VOLUME SYSTEMS. - PERFORMED SO AS TO CAUSE ME LEAST POSSIBLE INCONVENIENCE AND_ 5) AIR AND WATER BALANCE REPORT MANUAL'EXCEPT PROVIDE BEARING AT ONE END OF DAMPER ROD MIND _ DISTURBANCE TO ME PRESENT OCCUPANTS. QUADRANT,WI1H LEVER AND IUNI RLW AT OMER END. FOR INSULATED 6) MANUFACTURER RESPONSIBLE FOR EXAMINING APPUCTON OF EACH - 6) AD UNITS,FANS AND R. DUCTS,QUADRANTS MOUNTED ON MILM TO CLEAR INSUTATON. INSTAL OLTTIE GUARANTEE GUATEE THAT EACH WILL PROVIDE REWIRED NO LEVEE R. ME CONTRACTOR'S PROPOSAL MR ALL WORK SMALL BE PREDICTED WITH LEVERS ACCESSIBLE AND COMFORT SPACE CONDITIONS WITHOUT DRAFTS THROUGHOUT OPERATING ON ME PERFORMANCE OF ME WORK DURING REGULAR WORKING HOURS. T) ROOT TOP UNITS AND CURBS RANGE „F WHEN SO DIRECTED.HOWEVER,ME CONTRACTOR SHALL INSTALL WORK IN 1) PROVIDE MANUAL VOLUME DAMPERS TO PROPERLY PROVIDE MANUAL OVERTIME AND ME ADDITIONAL COST TO BE CHARGED THEREFORE SHALL BE B) VN DRIVES BALANCING VOLUME DAMPERS AS REQUIRED TO PROPERLY BALANCE ME AR 9) PROVIDE SHEETMETAL BANK OFF AS REQUIRED FOR I WAY,2 WAY OR ONLY ME`PREMIUM'PORTION OF ME WAGE PAD. DISTRIBUTION SYSTEM. IF ME LOGTON OF BALANCING DAMPERS PRE 3 WAY DIFFUSERS,OR DIFFUSERS WITH PATTERNS IDENTIFIED ON M - 9) TERMI RAWI NAL BOXES(VAY) NOT DEFINED ON ME DRAWINGS,ME FOLLOWING MINIMUM STANDARDS DNGS. N S. UNLESS OTHERWISE SPECIFIED.INCLUDE ALL CUTTING CUNG AND PATCHING _ - S—L GOVERN: �AQ SY p4o OF EXISTING FLOORS, ,PARNTONE AND OTHER NATMAS IN ME 10) PIPING SHOP STANDARDS ,. B) PRONGE BI,XWING FOR PROPER COVERAGE AND BLOW WITHOUT EXISTING BUILDING, ME CONTRACTOR SHALL RESTORE RESTORE THESE AREAS TO A LOW PRESSURE: ALL SUPPLY AR MWN�BRANCHES FROM TRUNK,EACH PRODUCING OBJECTIONABLE NOISE OR MR MOTION AT OCCUPIED LEVEL ' ORIGINAL CONDITION. - 11) VALVE SPLIT,AND ALL SUB-BRANCHES FROM MAINS SWAG BE PROVIDED WITH BALANCING DAMPERS 9) MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, - - T. REMOVABIE ACCESS TRUE AND/OR ACCESS DOOR ARE REQUIRED IN 12) PIPING U(OUT:DETAIL AT 3/8 INCH SCALE PIPING LAYOUT WITH PROVIDE PRODUCTS BY ONE OF ME FOLLOWING: E HUNG MU CS.SHAFTS AND WALLS MR AL VOLUME AND FIRE DAMPERS. RINGS,VALVE AND EQUIPMENT,USE SINGLE LINE FOR PIPE SIZE 3 B. LOW PRESSURE A RA FR L EXHAUST AND RETURN BRAND OM TRUNK, FOMAT AUC DUMPERS AND ALL OMER MECHANICAL EQUIPMENT AND DEVICE AN. INCHES D=MR.AND DOUBLE LINE MR PIPE SIZES 4 INCHES AND EACH SPLIT AND ALL SUB-BRANCHS FROM NNNS SMALL BE PROVIDED WITH A ANEMDSTAT PRODUCTS:A MSTEK COMPANY. - HVAC CONTRACTOR TO FURNISH ACCESS LOGTON REOUIRNENE TO GREATER FABRIGTON OF PIPE ANCHORS,HANGERS,SUPPORTS MR BALANCING DAMPERS. GENERAL CONTRACTOR. ACCESS TILE IDENTIFICATION' PROVIDE MULTPLE PIPE,ALGNMENT GUIDES,EXPANSION JOINTS AND LOOPS,AND B. TEES. - BUTTONS.TABS,AND ANWERS TO IDENTIFY LOCATION OF CONCEALED ATACHMENTS OF ME SAME TO ME BUILDING STRUCTURE PETAL C. AS NOTED ON PUN$ - VALVE,DAMPERS AND EQUIPMENT LOCATION OF ANCHORS,ALIGNMENT GUIDES AND EXPANSION JOINTS AID C. TITTLE AND BA-I LOOPS SUBMIT ALL WELDING CERTIFICATES. F. FLEXIBLE DUCTS ' U. ALL MATERIAL AND ACCORDANCE TO BE NEW UNLESS OTHERWISE NOTED - A D. PRICE - -AND SNAIL BE IN ACCORDANCE WITH BUILDING STANDARDS. 13) VIBRATION AND SEISMIC ISOUTON. 1) FLEXIBLE ETS DUCT SHALL BE USED ONLY FOR FINAL CONNECTIONS TO - - ELBOWS,FIVE FOOT LENGTH D BY WITH GRADUAL BENDS OR OFFSETS. E. MEFALURE V. SUBMISSION Of A PROPOSAL SHALL RT CONSTRUED AS EVIDENCE THAT 14) SOUND ATTENUATION DEVICE ELBOWS SHALL BE SUPPORTED Bf A MANUFACTURERS PACKAGED ELBOW - A CAREFUL EXAMINATIONHIGH OF ME PORTIONS OF D EXISTING BUILDING, SUPPORT(FLE%FLOW). B. LINEAR DIFFUSERS:REMOVABLE G ALUMINUM CONSTRUCTION.FINISH AS B MACES,H,ETC.,WHICH AFFECT AL WORK,AND ME ACCESS TO SUCH 15) AUTOMATIC LDNRtOL SYSTEMS AND DEVICE. PER ARCHITECT,REMOVABLE PRE,AR DETECTION VANE AND CABLE - - SPACE,HAS BEEN MADE AND TEAT ME AT MILL AFFECT IS FAMILIAR WITH - 2) TEAR RERE ERG,RUGGED FLEXIBLE DUCT DEIGNED S I HIGH 0.4M1PfR W EACH BRANCH TAP WITH 3 FELT CABLE i0 DIFFUSER FACE - .. EXISTING WNpIME AND DIFFlWLTIS THAT WILL AFTEBE ME - 16) SEQUENCE OF OPERATIONS PRESSURE ENGINEERED XVAC SYSTEMS.UL181 CUSS I INSULATED AND NON- EXECUTION OF ME WOW(. LATER CAMS SHALL NOT BE MADE FOR TABOR INSRLATED AR OUCT FABRICATED WITH A UNIQUE AND EXTREMELY TOUGH 1) LLNER MEANS T TRAMS 1 BUM SHALL MATE WITH CEILINGS EQUIPMENT D MATERIALS RWUIRW BECAUSE Or DIFFICULTIESRINGSX. COORDINATION DRAWINGS: PLANS.DRAWN TO SCALE GM INSTALLERS HEAVY COATED FlRERI TAN FABRIC.SOLD MECHANICAL UNION E FABRIC PROMS MEANS TO NARY BUR AND A. N UNITS TO LANE CONTINUOUS ENCOUNTERED ME COULD-SEE HAVE BEEN FORESEEN DURING SUCH AN COORDINATION BETWEEN ME TRADE USING INPUT iPOM INSTALLER$OF AND CORROSION RESISTANT GALVANIZED O AN GRATE AN EXTRAORDINARY6.0 CORNER VISIBLE HALE ON DURING FIANCE. S SCREW HOLE TE WELDED - OUCTWATION. ME ON-SS INSPECTION SHALL VERIFY EXISTING THE RAMS INVOLVED: DURABLE SEAM.THERMALLY INSULATED TO AN R VALUE OF 6.0 AND WITHERS VISIBLE ON DIFFUSERS OR fGAMAI WILL BE FACE WEED. T DUCTWORK,PIPING(SIZES,CLEARANCE.ETC.)AND CONDITIONS OFFERED E DH T CHOICE FIRE RETARDANTVORB RIERS YLENE OR VOLUME SHALL DE ADJUSTABLE THROUGH AIR SUPPLY DACE WRNS F - 1) DUCT AND PIPING INSTALLATION INDICTING ENT..COORDINATION WITH - 10 INCHES OR SIZES PROTECTIVE 12 CH D BARRIERS SUITABLE FOR UP TO REQUIRING REMOVAL OF FACE PANEL PROVIDE BLAMED SECTIONS FOR - -W. INSURANCE IN ACCORDANCE WITH BUILDING REQUIREMENTS N AND GENERAL CONSTRUCTION,BUILDING D SIZES OF AND OTHER BUILDING 10 INCHES FOR SIZE UP TO 12 INCH OWMETER,6 INCHES FOR SIZE 14 s INACTIVE LANCES. PROLATE PLASTER TRAMS MO OPPOSED BUDS SHALL INCLUDE A HOLD HARMLESS CLAUSE FOR OWNER AND ENGINEER. SERVICES. INDICATE LOCATIONS AND SIZES OF ALL OPENINGS IN BOOR, TO 16 INCH DIAMETER,AND 4 INCHES FOR 10 TO 20 INCH DIAMETERS. VOLUME DAMPERS WITH REMOTE CABLE OPERATORS WHERE NOTED.REFER TO WALLS AND ROOF THAT MAY BE REQUIRED. - PRCHRECTURAL DRAWINGS FOR.MOUNTING DETAILS AND OVERALL LENCMS. - %. ME FINAL ACCEPTANCE WILL BE MADE MILER IO CONTRACTOR HAS 3). FLEXIBLE DUCT CONNECTORS:COMPS SCREW T BE BRAINLESS STEEL - ADJUSTED HE WUIT IT R BALANCED ME VARIOUS SYSTEM. 2) COORDINATION WHICH SUSPENDED BETTING COMPONENTS.A D LOCATION BAND$WITH CADMIUM PULED HEX SCREW N TIGHTEN BAND WITH A WORM C. SQUARED BITE SUITABLE DIFFUSERS SHALL BE STEEL CONSTRUCTION DEMONSTRATED THAT R FULFILLS ME TIDAL.ME E THE DRAWINGS MEMBERS TO WXICX DUCT WILL BE STTACHED,SIZE AND LOCATION OF CAR ACTION 10 SUIT DUCT SIZE. PANTED WHITE SUITABLE Nfl ME ME Of CBUNG AND SPECIFI OF IN AND HAS FURNISHED ALL THE REWIRED INRRL ACCESS MODULES MR ACOUSTICAL TILE,PENETRATIONS OF SMOKE - CERTIFICAIE OF INSPECTION AND PPPROVPl_ BARRIERS AND FlRE-RAID CONSMUCTEON UGXi1NG FIXTURES,AR 4) MANUFACTURED BY FiFXMASRR TYPE 4,MERMAilEX MODEL M-KC. p. REGISTERS AND CRIlLES: peyNn xumSA, - 1T66560D N OURFTS AND LETS..SPFAKERS.,SPRINKLERS.AWEA Y. GUARANTEE: PANE1S.PfleNE1ER MOLDINGS$HAIL BE PERFORMED. ACCESS DOORS; INSULATED OR UNINSULAIED AS DUCT. 1 RETURN AND EL CONSTRUCTION. 04 IBa,A OVDYb119 G. A E .SAME EXHAUST REGISTERS' STEEL ' 1) ALL MATERIALS AND WORKMANSHIP SMALL.BE GUARANTEED FOR A 4. AS-BUILTS AND EQUIPMENT OPERATION INSTRUCTIONS 1) PITS BE MINIMUM N INCH X 14 INCH ON MAIN DUCTS,AND 12 INCH 2) SUPPLY REGISTERS: SEEELCONSMUCTION ADJUSTABLE DOUBLE PEFROD OF ONE YEAR FROM DAIS OF FINAL ACCEPTANCE OF MIS WORK. X 6 INCH ON BRANCH DUCTS.UNLESS OTHERWISE APPROVED.AT FIRE DEFLECTION STEEL AIRFOIL LOUVERS.WITH VOLUME DAMPER. PROVIDE FINAL ACCEPTANCE SMALL BE DEFINED AS ME THE AT WHICH ME A PROVIDE ALL COORDINATION DRAWINGS,DUCTWORK AND PIPING SHOP - DAMPERS.AND AT ALL DUCT ACCSWRIE SUCH AS HUMIDIRRS,DUCT AR EQUALIZING DEFLECTOR WHERE REGISTER COLLAR DUCT IS LESS THAN MECIANIGL WORK IS TAKEN OVER AND ACCEPTED BY ME OWNER,AND IS DRAWINGS IN AUTOCAQ FORMAT.VERSION COMPATIBLE WITH OWNER.ALL SMOKE DETECTORS.AUTO DAMPENS,AND LOUVERS. 2 FEET LONG. - UNDER GATE.CUSTODY,AND CONTROL OF ME OWNER. ENGAGE ME CATALOG CUTS AND SUB MAILS M BE PROVIDED IN ELECTRONIC'PDT' SERVICE OF VARIOUS MANUFACTURERS SUPPLYING ME EQUIPMENT MR ME FORMAT ME ARCXRER WILL FORWARD ALL SUBMISSIONS TO ME 2).. ALL ACCES DOORS TO BE HINGED.WITH LATCH SIMILAR TO }) TRANSFER GRILLES: STEEL CONSTRUCTION WITHOUT VOLUME PAMPER. CC PROPER STARTUP AND OPERATION OF ALL SYSTEMS INSTALLED.INSTRUCT ENGINEER. VENILOCK NO.100. - R5 ME OWNERS PERSONNEL IN ME PROPER OPERATION AND SERVICING OF ME 9. NOISE CONTROL - ¢¢ SYSTEM. B. ON WMPLERON AND ACCEPTANCE OF WORK,THIS CONTRACTOR SHALL H: FEXIBLE CONNECTIONS: NEOPRENE-CCTED GUAM FABRIC,30 OZ 0{ 2) ME CONTRACTOR SMALL FURNSH A WRITTEN GUARANTEE TO REPLACE TONIS OWNERW�EIHIE PROPER NOPERATION AND MAINTENANCE OF ALL S.EQUIPMENT MANUALS MIND RATS FABPoCS PROVIDE HARM M PER SQUARE YD WM4 mM CO AND CUARS. P110EMENTED W MIN I.ILAR O VIE OF A AL ROOM NO LEVELS SHALL BE 35 OR LESS. OR REPAIR PROMPTLY AND ASSUME RESPONSIBIUT'FOR ALL EXPENSES EQUIPMENT AND APPARATUS FURNISHED UNDER THIS CONTRACT. 1 INCH. B. PROVIDE SOUNDUNING FOR ME FOLLOWING DUCTWORK: - INCURRED FOR ANY WORKMANSHIP AND EOUIPMEM IN WHICH DEFECTS DEVELOP WITHIN ME GWJtMITEE PIERCE.MIS WORK SHALL BE DONE/S C. THESE INSMUCTpNS SMALL BE TYPED ON 8-1/2 INCH X 11 IN I. FIRE DAMPERS: DYNAMIC:RATED AND LABELED ACCORDING TO 1) ALL AIR TRANSFER AND JUMPER DUCTS. OIRECEED BY ME OWNER.THIS GUARANTEE SHALL INCLUDE FORMAT. ME CONTRACTOR SHALL GE ONE COPY OF ME INSTRUCTIONS UL 555 BY AN NUR GALVANIZED STEEL CONSTRUCTION,CURTAIN TIME o RESPONSIBIUT FOR AL EXPENSE INCURRED IN SPARING AND TO ME OWNER AND ONE COPY TO ME ENGINEER. - WITH BIADS OUT OF ME AIRSTREAM(TYPE 8).SPRING LOADED, C. SOUNDUNINC IN DUCTWORK: NON-FIBROUS CLASS.1 INCH - - REPUCINC WORK OF OMER TRADE AFFECTED BY DEFECTS,REPAIRS OR .. EQUIPPED WITH FUSIBLE UNIX,CONFORMING TO NFPA STANDARD 9G PAD, THICKNESS WRH ACRYLIC COATED FINISH FACTORY APPUED EDGE COATING - R REPIACNEWS IN EQUIPMENT SUPPLIED BY THIS CONTACTOR. D. ME INSTRUCTIONS SHALL BE ORGANIZED IN SECTIONS,WITH ONE SIMILAR TO POTOROFF OR RUSKIN.RATED AS REQUIRED. PROVIDE FIRE AND STENCIL FTAE ED IN ACCORDANCE WITH NMA 90. MPRA UM D SHALL BE A SRAM N fi SECTION PER SYSTEM. THE COVER OF ME INSTRUCTION BOOKLET SHALL DAMLPERS AS NOTED ON ME PLANS AND IN DUCTS AND OPENINGS IN WKIMUM OF 25. UNINC SHALL NOT SUPPORT MICROBIAL GROWN AND MECHANICAL 3 3) MIS CONTRACTOR I$RESPONSIBLE FOR ME MAINTENANCE AND BEAR ME NAME,ADDRESS AND PHONE NUMBER OF ME PROJECT, `SHAFTS FLOORS,FIRE OVALS,FlRE-REISENNCE PARIIIlONS,TIRE SHALL BE TESTED IN ACCORDANCE WITH AM C 1071 AND AM G21/G22. OPERATION OF ALL SYSTEMS UNTIL ME FINAL ACCEPTANCE OF THE WORK. ARCXELT,ENGINEER,MECTWNICAL GO AND SUBCOMRACTDRE. RATED CEIUNGS IXR CORRIDOR WALLS. PROVIDE ACCESS BOOR IN DUCT D. ALL SOUNDUNING,ADXENES,FACE AND ACCESSORIES TO BE ° ADJACENT IO ACTS FlRE DAMPER.SEE INSTALLATION ON DRAWING.E FINAL. APPLIED IN ACCORDANCE WTH MANUFACTURER'S RECOMMENDATIONS.EXCEPT SPECIFICATIONS s 4) ALL MR WMOTIONING UNIT COMPRESSORS AND REFRIGERATION NAL RAWINGS'AS-BUILY D INDICATING AS INSTALLED CONDITIONS AS OWERW6E NOTED. COMPONENTS SMALL HAVE A 5-YEAR WARRANT. SHALL BE PROVIDED TO ME ARCHECT AND ENGINEER AFTER COMPLETION J. COMBINATION FIRE/SMOKE DAMPERS: - 6 OF ME INSTALLATION. A E. DUCT SILENCERS Z. SPIM ICATIONS ARE OF SIMPUFlED FORM AND INCLUDE INCOMPLETE 1) DOMB[MOM FIRE/SMOKE DAMPERS SHALL BE INSTALLED AS - y SENTENCE. WORDS OR PHASE SUCH AS:ME CONTRACTOR SW,LL.' i SUBSMUTIONS INDICTED ON DRAWING AND AS REQUIRED BY BIIILDINC CODE QAMSRS 1) BASIS-0E-DESIGN PRODUCT: SILENCERS SMALL BE MEERCI v�$y 'SHALL BE''FURNISH;'PROVIDE•'A'THE'AND'ALL'HAVE BEEN TO BE UL 555S LATEST ORION LISTED AND UB6 AND IN .AWUSRCS. OMITTED MR BREVRY. A ND SUBSITI MATERIAL OR MANUFACTURER OF EOUIPMEM SWll1 BE CDNNRNANCE WITH NFPA PERMITTED WITHOUT A FORMAL WRITTEN SUBMITTAL TO ME ENGINEER E 2) GENERAL REQUIREMENTS: AA DEFINITIONS: WHICH INCLUDE ALL DIMENSIONAL PERFORMANCE ANO MATERIAL 2) COMBINATION FlRE/SMOKE CARESS SHALL BE CLASS 1(ONE),DIAL SMeM IAmSn - - $PECIFICTONS. ANY CHANGES IN LAYOUT.ELECTRICAL OVERRIDE REMOR REELABLE,OPPOSED MULTIBUDE TYPE WITH A SILENCERS SHALL BE DF ME SIZE;CONFIGURATION.CAPACITY AND 5 1) 'PROVIDE•: TD SUPPLY,INSTAL AND CONNECT UP COMPLETE AND CHARACTERISTICS,STRUCTURAL REQUIREMENTS OR DEIGN DUE TO ME USE 9RESTAT OR EOUNAEM HAT RESPONSIVE DEVICE 120-VOLT ACTUATOR - ACOUSTIC PERFORMANCE AS SCHEDULED ON ME DRAWINGS. Al SILENCERS )$ TO UN NR SAFE AND REGULAR OPERATION ME PARTICULAR WORK REFERRED OF A SUBSTINTON SHALL BE SUBMITIED TO ME ENGINEER AS PART OF AS REQUIRED MOUNTED OUT OF ME AR STREAM WIM TORP_M OPERATOR SHALL BE FACTORY FABRICATED AND SUPPLIED BY ME SOME M-5U 0 8 TO UNLESS SPECIFICALLY OWERWISE NOTED. THIS PROM ME CONTRACTOR TAKES FULL REPONSIBILM MR ME AND BLADE POSTION INDICATOR SWRCHE..PROVIDE MOTOR MOUNT MANUFACTURER. ALL ROM N AND ALL CHANGE RESULTING FROM ME SUBSTITUTION. BRACKET STHENGMENER MR DAMPERS OVER 10 INCH IN HEICM. PROVIDE E 2) INSTAL': TO EREIi,MOUNT AND CONNECT COMPLETE WITH ALL EMS SHALL BE SUBRRIED MR REVIEW IN WWUNCRON WITH THE. .. A 10 CAUSE WELDED VERTICAL STIFFENER AT EACH CORNER 10 PflEVENT B. SILENCER INLET AND OUTSET:CONNECTION DIMENSIONS MUST BE � IhA1MR5Ny. . u CONSTRUCTION DOCUMENTS EQUAL TO THE DUCT SIZES SHOWN ON THE DRAWINGS. DUCT TRANSITIONS 1) TYPE D-1: RDERCUSS BIPNKET HAVING AN INSTALLED(25% OUJJFICATIONS'. ( _• • AT SILENCERS PRE NOT PERMITTED UNLESS SHOWN ON THE CONTRACT COMPRESSED)R-VALUE OF 6.0 MINIMUM WITH FACTORY-APPLIED FOIL- A GENERAL: - - DRAWINGS. - SKRIM-KRAFT FACING SIMILAR TO MANVILLE MICROLITE: _ -3) BRAZIERS SHALL.BE OUAVFIED FOR PEL REQUIRED RUDE SIZES. - • MATERIAL WALL THICKNESS,AND METION IN ACCORDANCE WITH THE - - 1) ELECTRICAL POWER WIRING SWILL BE PROVIDED BY THE ELECTRICAL C. SILENCERS SNAIL BE CONSTRUCTED IN ACCORDANCE WITH ASHRAE AND C. INSTALLATION: AMERICAN SOCIETY OF MECHANICAL ENGINEERING(AEME),SECTION-I%, - - CONTRACT. CONTROL WIRING SHALL BE PROVIDED BY THE WAG CONTRACT. -. SMAoM STANDARDS FOR THE PRESSURE AND VELOCITY CIASSIRCATION " - BOILER MO PRESSURE VESSEL CODE. CONTROL WIRING SHALL BE DEFINED AS ANY WIRING 120V AND BELOW - SPECIFIED FOR THE AIR DISTRIBUTION SYSTEM IN WHICH IT IS 1) FIBNCLASS BLANKET: 2 INCH LAP STRIPS AT ALL SEAMS. SECURE ~'- - INSTALLED FOR PURPOSES OTHER THAN PROVIDING PRIMARY ELECTRICAL INSTALLED.MATERIAL GAUGES NOTED IN OTHER SECTIDNS PRE MINIMUMS. BOTTOM OF ALL DUCTS OVER 24 INCH WIDE WITH MIN.2 ROWS OF WELD - '0. COPIES OF THE CERTIFlED BOWER ODAUECATION REPORTS SHALL - POWER TO EQUIPMENT. " MATERIAL GAUGES SHALL BE INCREASED AS REOUIRED FOR THE SYSTEM PINS 12 INCH ON CENTER. SECURE ALLEA SEAMS WITH FOIL VAPOR BARRIER - � .BE M✓JMPINED BY THE RESPONSIBLE BRAZING AGENCY AND THE.COMPANY - - PRESSURE AND VELOCITY CIASSIRCATION. THE SILENCERS SHALL NOT TAPE AND VAPORSEAL ADHESIVE. PERFORMING THE BRAZING,AND SHALL BE SUBMITTED TO THE OWNER - .2).:MOTOR STARTERS AND VARIABLE FREQUENCY DRIVES(VED)SHALL BE ENL STRUCTURALLY WHEN SUBJECTED TO A DIFFERENTIAL AR PRESSURE AND/OR ENGINEER UPON'REQUEST..I -,FURNISHED BY THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL _ OF 8 INCHES WATER GAUGE. 13. PIPING INSULATION CONTRACTOR, REFER TO EQUIPMENT SECTION FOR VARIABLE FREQUENCY - B: ALL DEFECTIVE BRAZEMENTS SHALL BE CHIPPED OUT AND REPAIRED DRIVE SPECIFICATIONS. 5 D. ALL CASING SEAMS AND JOINTS SHALL BE LOCK-FORMED AND SEALED. A INSULATE ALL PIPING IN ACCORDANCE WITH INSULATION SCHEDULE AT ND COST TO ME.OWNER,BASED ON PROCEDURE TO BE SPECIFIED AT ` OR STITCH WELDED AND SEALED TO PROVIDE LEAKAGE-RESISTANT EXCEPT AS OTHERWISE NOTED. ME TIME. - 3) DUCT MOUNTEDSMOKE DETECTORS,WHERE REQUIRED,SHALLBE - CONSTRUCTION. AIRTICIrt CONSTRUCTION SHALL BE ACHIEVED BY USE OF PROVIDED D. ALL PRE55OR12m PIPING TO BE TESTED HYDROSTATICALLY TO I50 BY THE WAG AND CONTRACTOR. ME ELECTRICAL CONTRACTOR,AND MOUNTED - o A DUCT-SEAJNG COMPOUND SUPPUED AND INSTALLED BY THE CONTRACTOR INSULATION SCHEDULE-PIPING - AT THE JOSSTIE. PSI OR 1507 OF-OPERATING PRESSURE.WHICHEVER IS GREATER,BUT - HER ATchitecNTe SERVICE SIZE MICKNESS MATERIAL FINISH NEVER EXCEED TEST PRESSURE ANSI BI6.1 BASIS TEST DURATION M BE A THIS CONTRACTOR SHALL INSTALL ME SMOKE DETECTOR SAMPLING NOR Boston E ALL PERFORATED STEEL SHALL BE ADEOIMTFIY STIFFENED TO INSURE - 2 HOURS WITH NO PRESSURE CHANGE CORRECTED FOR TEMPERATURE CHANGE TUBES IN ME DUCT AS COORDINATED IN ME FIELD. 99 High SOee4 SMile 2300 ' FLATNESS AND FORM. ALL SPOT WELDS SHALL BE PANTED. REFRIGERANT ALL 1' P-5 VAPORSFAL REPAIR OR REPLACE LEAKS OR DEFECTS WTMOUTIADDITONAL COST. LIQUID 6:SUCTION - F-4(OUTDOOR ONLY) S. MIS CONTRACTOR SHALL ASSIST THE ELECTRICAL CONTRACTOR IN Boston,MA 02110 - F. FlRE-PERFORMANCE CHARACTERISTICS: SILENCER ASSEMBUES, 1) REFRIGERANT PIPING - - TESTING THE DUCT-MOUNTED SMOKE DETECTION SYSTEM. - -• - _ _ . INCLUDING ACOUSTIC MEDIA FILL AND SEALANTS,SHALL HAVE FLAME- COLD WATER ALL 1" P-I VAPORSEAL 'I SPREAD INDEX NOT EXCEEDING 25 AND SMOKE-DEVELOPED INDEX NOT MAKEUP,COLD F-I - A TEST REFRIGERANT PIPING FOR TIGHMESS AND LFN(S UNDER 4) ALL ELECTRICAL CONTROL WIRING SHALL COMPLY WITH LOCAL _ EXCEEDING SO WHEN TESTED ACCORDING TO ASTM E 84,OR UL 723. CONDENSATE. - PRESSURE OR VACUUM.:THE DURATION OF EACH TEST SHALL BE TWENTY- ELECTRICAL CODE,ALL MUM FIRMS HAVING JURISDICTION AND THE - - EQUIPMNT DRAINS FOUR(24)HOURS PROJECT ELECTRICAL SPECIFICATIONS, C. AIRSTREAM SURFACES: SURFACES IN CONTACT WITH ME AIRSTREAM BELOW WE -SHALL COMPLY COMPLY WITH REQUIREMENTS IN ASHRAE 62.1-2016. B. TEST JOINTS IN ACCORDANCE WITH ASHRAE 15-ITEST EDITION. 5) MECHANICAL CONTRACTOR TO OBTAIN OUANTITY OF CONTROLLERS B. PIPING.VALVES AND FITTINGS TO BE INSULATED: - < THERE SHALL BE NO NSOWABLE LEAKS OR CHANGES IN PRESSURE IF REQUIRED AND COORDINATE WITH ELECTRICAL CONTRACTOR FOR ALL 3) RECT/AANI REM SILENCERS OUTER CASING SHALL RV SEAL LEAKS.ASTM A EITHER IS OBSERVED.S LEAKS.AND REPEAT LEST PROCEDURES. OPERATING REQUIREMENTS,INTERLOCKS AND CONNECTIONS FOR STARTERS SPEITTN53SHALL BEEIINIERNEALLY HRADNSED AND AERODYNAMICALLYm� SYSTEMSSYSTEMSU 1) LOW TEMPERATURE PIPING SYSTEMS-40 TO Ip0 DEG F INCLUDING: E PIPE SUPPORTS:- - - 6) ME MECHANICAL CONTRACTOR SMALL PREPARE AND SUBMIT FOR DESIGNED FOR EFFICIENT TURNING OF THE AIR. HALF AND NLL A REFRIGERANT LOUIS h SUCTION. - APPROVAL POINT TO POINT,COMPLETELY COORDINATED WIRING DIAGRAMS AR - t__]�f 11•P_ 1�J'rl SPATTERS E REQUIRED AS NECESSARY M ACHIEVE THE SCHEDULED 1) .PROVIDE ADEQUATE SUPPORT FOR PIPE AND CONTENTS TO PREVENT - AND INDICATE ALL SOURCE POWER REQUIREMENTS AND ALL FIELD WIRING lI U lIJ lY �-'T1yf,FL ha - INSERTION LOSS. ALL ELBOW SILENCERS WITH A TURNING CROSS-SECTION B. CONDENSATE DRAIN PIPING. - SAGGING,VIBRATION,OR SWAYING AND ALLOW FOR EXPANSION AND TO BE PERFORMED BY THE ELECTRICAL CONTRACTOR. DIMENSION GREATER MAN 46'STALL HAVE AT(FAST LAND HALF SPUTTERS - CONRIACTION. PROVIDE SUPPLEMENTAL STEEL AS REQUIRED WHERE - - �SSOIIdIeS _ AND ONE FULL,SPLITTER. C. MATERGM, - STRUCTURE CANNOT SUPPORT POINT LOADS. ]) WHERE EXISTING STARTERS PRE M BE REUSED,THIS CONTRACTOR - IH,MAMARA SALVIA SHALL MAINTAIN ALL EXISTING CONTROL CONNECTIONS. WHERE NEW N@15[ImBmamopm , - 4) INNER PERFORATED HEET STEEL LINER:ASIM q 653/A 653M,C9O 1) 0.23 K-FACTOR AT]5 G DENSITY F MEAN MOWED TEM ERATUREGWIH FACTTORYMAPPUED' 2) HORIZONTAL CIiVIS TYPEPIPIN To WOM BE ­MUM SPACING AS FORGED FOLLOWS: ADUSTABLE. �SURVEY.ME EXISTIS ME To HE NG CONDES TROLREPLACE CONNECTIONS AND MIS PREPAR CONTRACTOR - - - FIRE-RETARGOT FOIL-SKRIM-KRAFT FACING. ALL SERVICE JACKET. - - EXISTING CONTROL WIRING DIAGRAM PRIOR TO DEMOLITION FOR SUBMITTAL - - M A RECTANGULAR ELBOW SILENCERS: 22 GAUGE. SIMILAR TO OWENS-CORNING 650 ASV. A .COPPER I INCH AND SMALLER: 5 FEET. - - TO THE ENGINEER. THE NEW STARTERS SHALL B PROVIDED WITH THE - - NECESSARY CONTACTS AND RELAYS REQUIRED TO RECONNECT THE EXISTING 5) PRINCIPAL SOUND-ABSORBING MECHANISM: 2) TYPE P-5: MINIMUM 6 LB MOLDED FOAMED PLASTIC. MAXIMUM 0.27 S. COPPER 1-1/2 IN N 2-1/2 INCH: B FEET. CONTROLS. PROVIDE ALL REQUIRED CONTACTS FOR START/STOP AND FIRE ' K-FACTOR AT 75 DEG F MEAN TEMPERATURE. MAXIMUM 0.17 PERMOINCF - - ALARM. ���' A FILM LINED SILENCERS: SIMILAR N ARMSTRONG ARMALIX H. - C. PROVIDE ADDITIONAL SUPPORTS AT CHALICES IN DIRECTION,BRANCH PIPING AND RUNOUIS OVER 5 FELT AND CONCENTRATE LOADS DUE TU 19. MOTORS: (1).MEDIA SHAL BE OF ACOUSTIC DUALITY,SHOT-FREE GLASS FIBER D. FINISH: - VALVES.STRAINERS PAID OTHER SIMILAR ITEMS - - - • - INSULARON WITH LONG,RESIUENT FIBERS BONDED WITH A - A MOTORS SHALL HAVE THE ELECTRICAL CHARACTERISTICS AS LISTED N ETI - - MMOSING RESIN. CLASS FIBER DENSITY AND COMPRESSION SHAD. I) TYPE F-1: FITTING COVER,MOLDED WHITE PVC JACKET.UL CAMS -3) ROD SIZE ON THE DRAWINGS. MOROINAB ALL REOUIREMN WITH ELECTRICAL - - - BE AS REWIRED TO INSURE CONFORMANCE WITH LABORATORY TEST DATA 1,MAXIMUM PERMEANCE 0.05 SIMILAR TO MNHNIUE ZESRNN. _ CONTRACTOR. ALL MOTORS SHALL COMPLY WTIR NFJM MG-1 STANDARD AND DVSS FIBER SHAL BE PACKED WITH A MINIMUM OF 15%COMPRESSION - A PIPE 2 IN AND SMALLER 3/9 IN SHALL BE OF ME HIGH EFFICIENCY TYPE AND MEET THE CURRENT ENERGY DURING SILENCER ASSEMBLY. MEDIA SWYL BE RESILIENT SUCH THAT IT 2) TYPE F-4: ALUMINUM JACKETING WITH MINIMUM 0.016 INCH WALL _ - CODE FOR ME.STATE WHERE ME WORK IS PERFORMED. /`FM Ap F>fl f 1 1 A A C!`A of WILL NOT CRUMBLE N BREAK AND CONFORM TO IRREWWM SURFACES. THICKNESS AND LONGITUDINAL JOINTS WITH LOCK SEAMS. 4) VERTICAL PIPING: - - 1.A MPBELL FVI CABS - MEDIA SHALL NOT CAUSE OR ACCELERATE CORR09DN OF ALUMINUM OR - - - B. MOTORS MR VARIABLE FREQUENCY DRIVES(VFD)SHALL BE SUITABLE -- STEEL MINERAL WOOL WILL NOT BE PERMITTED AS A SUBSUME FOR E. OUTDOOR PIPING: A BASE ELBOW SUPPORT WITH BEARING PLATE ON STRUCTURAL SUPPORT. FOR USE WITH VARIABLE FREQUENCY DRIVES AND COMPLY WITH HEM MC-I CLASS FIRER. - - PART 31.40.4.Z THE MECHANICAL CONTACTOR SWILL BE RESPONSIBLE I) FOR ALL PIPING,FITTINGS AND VALVES LOCATED OUTDOORS. B. GUIDES AT EVERY SECOND FLOOR(SPACING NOT TO EXCEED 25 FOR COORDINATING ALL REQUIREMENTS OF ME MOTOR AND VFD - - - B. MEDIA PROTECTION: INCREASE SCHEWLED INSULATION THICKNESS BY A MINIMUM OF 1 INCH FEET). - MANUFACTURER. - - - AND PROVIDE F-4 FINISH. PROVIDE VAPORSFAL ON ALL OUTDOOR PIPES, (1) FILM UNED SILENCERS:ME ACOUSTIC MEDIA SHALL BE COMPLETELY VALVES AND FRANCS SUBJECT TO CONDENSATION. - - C.. TOP SUPPORT HANGER OR SADDLE IN HORIZONTAL CONNECTION WITH C. IF CONTACTOR ELECTS TO SUBSRTIITE OR INCREASE MOTOR ,.F M, ` { ' - WRAPPED N HELP PREVENT SHEDDING,EROSION AND IMPREGNATION. - PROVISIONS.FOR EXPANSION. HORSEPOWER OVER THAT SPECIFIED,ME COST OF MOTOR AND ELECTRICAL - - Spaulding Rehabilitation SILENCER MANUFACMRN SHALL PRUDE A WRITTEN TEST REPORT BY A -F. INSIALIAT10N: CHANGED SHALL BE BORNE BY MIS CONTRACTOR. J R - - THIRD-PARTY ORGANIZATION SHOWING SILENCER ASSFMBUES HAVE FAME- F. VALVES-GENERAL REQUIREMENTS - - - SPREAD INDEX NOT EXCEEDING 25 AND SMOKE-DEVELOPED INDEX NOT 1) BEFORE APPLYING INSULATION ALL PRESSURE AND LEAK TESTS SNAL D. MOTORS(UNDER WAG WORK): IN ACCORDANCE WITH NEMA IEEE AND - Ne1...Orl. EXCEEDING SO WHEN TESTED ACCORDING TO ASM E 84,OR UL 723. BE COMPLETED AND APPROVED. - 1) VALVE PRESSURE AND TEMPERATURE RATINGS: NOT LESS MAN ANSI CEO STANDARDS: ll`w {Network ♦ INDICATED AND AS REWIRED FOR SYSTEM PRESSURES AND TEMPERATURES.. Outpatient Clinic Renovation, 6) HR CASINGS:WHERE INDICATED ON ME SILENCER INTL)SCHEDULE.WALL 2) ALL INSULATION SHALL BE BUTTED FIRMLY D WITH A. PROVIDE 2 I) PREMIUM EFFIGNCY UNLESS OMERNOE NOTED. . - - - EXTERBERS SHALL HAVE CO TRANSMISSION LOSS(AIR)WALLS INCH LAMP STRIPS AT ALL SEAMS SECURED WRAP REQUIRED. USE VAPOR - - - 2) VALVE SIZE:-BUMF AS UPSTRFPM-PIPINC UNLESS OTHERWISE - - EXTERNALLY APPLIED PAID COMER TO SCALED TO ME SILENCER CASING BARRIER TAPE AND VAPORSZALPIP,G INSNE WHERE REQUIRED. STAPLES NOT INDICATED. - - - 2) ILLS SEKVILE FACTOR INCLUDING MOTORS SERVED FROM A VFD Hyannis,MA BY ME SILENCER MANUFACTURER CC ASSURE DUALITY CONTROLLED BE PERMITTED. REFRIGERANT PIPING INSULATION SHALL.HAVE MITERED - - - - -- ACCIMMISSION LOSS. STANDARD ACOUSTICAL.PANELS WILL NOT AK FITTINGS. }) VALVE-ENO WNNENONS: 3) SQUIRREL CAGE INDUCTION,OPEN NIPPRWF RYE,1750 RPM,D. _ ACCEPTED AS NR WALLS.E REQUESTED U A ENGINEER BREAKOUT iYE B INSULATION CLASS.WNI1NUOt15 DULY,EXCEPT AS NOTED. - - - NOISE CALCULATIONS FOR EACH B HANDLING AND FAN SYSTEM SHALL BE 3) ALL INSULATION AND VAPOR BARRIERS SHALL BE CONTINUOUS A SpEDN JOINT: WITH SOCKETS ACCORDING i0 ASME 816.18. - - ME PROVIDES NOISE ME CRITERIA. SUBMITTAL TO ENSURE COMPLIANCE WITH PROVING SADDLES SLEEVES,HANGERS ETC..OR OTHER OPENINGS. - - 4) PERMANENT SPLIT CAPPGIOR(PVC)MOTORS ARE NOT ALLOWED. - - THE ROOM NONE NITERA BREAKOUT'NOISE CALCULATIONS SHALL BE PROVIDE SADDLES OR SHIELDS FOR PROTECTION. 4) CNEPAL-DUtt VALVE APPLICATIONS: UNLESS OMpMSE - BASED ON ME SOUND POWER LEVELS OF ME SPECIFIED EQUIPMENT. 4) INSULATION FOR FITTINGS OR ACCESSORIES REQUIRING SERVICING INDICATED.USE ME MILLDAM VAUNT TYPES: _ 20. EWIPMENT,DUCT,AND PIPING TAGS AND MISS 1513 IyannOUgh Road,Hyannis, -, - ID. TESTING AND BALANCING OR INMOTION SHALL HAVE INSULATION REMOVABLE AND REPIACEPBEE .A .SHUTOFF SERVICE EXCEPT STEAM: BMLL BUTTERFLY OR DATE, A METAL LABELS MR ED IPMNT: MA 02601 WITHOUT DAMAGE VALVE. A ALL AIR BAANGN SMALL BE S BE BY OR AN INDEPENDENT CONTRACTOR NOT - 1) INSTALL M S ON EACH MAJ ITEM OF MECWANICA EQUIPMENT. - v AFFILIATED WITH THE MECHANICAL CONTRACTOR AND IN ACCORDANCE WITH 14, VIBRATION ISOLATION - - 5) INSTALL SHLRMF DUTY VALVES AT EACH BRANCH CONNECTION TO - - - - - - LOLAL STANDARDS. CONTRACTOR SHALL URUZE WE BUIMINC SUPPLY MAINS,AT SUPPLY CONNECTION M EACH PIECE OF EQUIPMENT. 2) MATERIAL AND THICKNESS: REPASS.0.032-INCH MINIMUM - BALANCING CONTRACTOR OR APPROVED EQUAL CONTACT BUILDING - A ED NISH AND INSTALL ALL NECESSARY VIBRATION GOIATORS. - - - THICKNESS.AND HAVING PREDRILLED OR STAMPED HOLES FOR AMANNENT - - MANACEMENT. VIBRATION HANGERS,MOUNTING PADS,RAILS,ETC.,M ISOLATE 6) INSTALL SPRING LORDED CHECK VALVES AT EACH PUMP DSCHARGE HARDWARE VIBRATION77 AND SOUND FROM BEING TRANSMITTED TO THE BUILDING AND ELSEWHERE AS REQUIRED M CONTROL FLOW DIRECTION. SPA IJ LDINGd B. CONTRACTOR TO BALANCE ENTIRE SYSTEM TO AIR QUANTITIES AS MU RE.ALL VIBRATION PRODUCTS SHALL BE SPECIFICALLY DESIGNED 3) MINIMUM'LABEL SIZE: LENGTH AND WIDTH VARY FOR REQUIRED - - SHOWN ON ALL RELATED DRAWINGS FOR THIS JOB,AND AS DESCRIBED FOR THEIR INTENDED USE.PROVIDE GOMON CDR EQUIPMENT,PIPING 16. LOW TEMPERATURE WATER SYSTEMS,BELOW 1M PSK,-M TO 200 _ LABEL CONVENT,BUT NOT LESS TAW 2-1/2 BY 3/4 INCH. - HERON.BAWICING MUST BE DONE IN ME PRESENCE OF A BUILDING RAND DUCTWORK.ETC. DEG F OPERATING MMPERANRES. REHABILITATION NETWORK - ON MOM. - 4) MINIMUM LETTER SIZE 1/4 INCH FOR NAME OF UNITS IF VIEWING - B. NANUfACNRER OF ME VIBRATION ISOATION EQUIPMENT SHALL HAVE A. MATERIAL VIAL BE STEEL IN ACCORDANCE WITH PSIN A 53, DISTANCE 5 LESS RAN 24 INCHES(6W MM),1/2 INCH FOR VIEWING SALAMISALAMI. AIR SA SOUL.BE ACCOMPLISHED BY ADJUSYMENT OF FANS ME FOLLOWING RESPONSIBILITIES SEAMIEVS,GRADES A OR B.OR TYPE L COPPER FOR PIPING 4 INCH AND DISTANCES UP TO 72 INCHES,AND PROPORTIONATELY LARGER LETTERING AND BRANCH DAMPERS FOR WJOR ADJUSTMENTS. AIR SUPPLY OUTSETS TO -BELOW. - FOR OVER VIEWING DISTANCES. INCLUDE SECONDARY LETTERING HMO- BE BALANCED A A UNIFORM SUPPLY ACROSS ENTIRE FACE MINORMEM 1) SUBMIT TYPE.SIZE.CHTDEFLECTION.O LOCATION PAID OETALS THIRDS TD THREE-FOURTHS ME SIZE OF PRINCIPAL LETTERING. - T/.�TE�-T� 7'�l'�/'Y. OF TERMINAL T DAMPERS AND DEVICES SHALL B FOR TRIM LE MINOR INCLUDING FREE ID ON FOR EACH ISOLATOR PROPOSED FOR REINS IN'ME 1) WALL THICKNESS VIAL BE - P R�l`V'l~T2 Q ADJUSTMENT ONLY. ER SHALL BE DONE TO PERMIT ME FAN NOISE SPECIFICATION PAID ON ME DRAWINGS - T 5) FASTENERS: STAINLESS-STEEL RIVETS OR SETS-TAPPING SCREWS. - - ' CNERATON IN ME TERMINAL AREAS AND UitU2E MINIMUM FAN ENERGY. A 9 INCH AND SMALLER TYPE L DRAWNR TAPER COPPER NBNC. - _2) GLUMLY CLEARLY ATORS THE PROCEDURES FOR INSTALLING AIJO ADJUSTING WRWGHi-COPPER FITTINGS,AND BRAZED JOINTS 6) ADHESIVE: CONTACT-TYRE PERMANENT ADHESIVE LOMPATIBEE WRAP - H E A L T H C A R E - - 0. FANS,AIR HANDLING UNITS DESIGN COILS SHALL B&MERGED TO THE ISOLATORS OR HANGERS. - LABEL AND WITH SUBSTRATE. _ WITHIN E5%B OF MDR DESIGN CAPACITIES.+10%OFALL OTHN AR QUANTITIES .. B. BALJ.VALVES - - - - SITYL BE BALANCED TO WITHIN+LOLL OF THEIR OFBiN OIIAQiTIES. 3) CHARPA MI ME SPECIFIED ISOLATION SYSTEMS DEFLECTION AND - - D ]) MR CONTENT: TINCLUDENUMB E.DRRWNYS DRAWING HME EQUIPMENT OR _ - THAT AMINIMUM OF 90X EFFICIENCY WILL BE OBTAINED. -.1) 3 INCHES0PAID SMALLER-THREADED IN SOLDERED.3 PIECE CLASS UNIQUE EQUIPMENT NUMBER,AND SC G NUMBERS WHERE EQUPME A IS O - - 3` E IF DLSCREPANLIES DUST IN ME REPORT THAT REQUIRE FIELD 150 PSI STEAM.600 P51 COLD WAKING PRESSURE(COUP),NLL PORT. - - INDICATED(RAND.DETAILS.AND SCHEDULES).PLUS ME SPEGFlGATON VERIFICATION,ME TESTING AND BALANCING COMPANY IN ME PRESENCE C. PROVIDE INSTALLATION INSTRUCTIONS.DRAWINGS AND FIELD ASTM B584 CAST BRONZE BODY,CHROME PLATED BRASS ROLL WITH BRASS SECTION NUMBER AND TIRE WHERE EQUIPMENT IS SPECIFIED. - OF ME NGINEER SHALL VISIT ME JOBSTTE FOR REM VERIFICATION OF SUPERVISION TO ASSURE PROPER INSTALLATION AND PERFORMANCE STEM.BLOW OUT PROOF STEM DESIGN,FIFE SEATS.POE STEM PACKING. / AWmAI� ME REPORT. ZINC HATED STEEL LEVER WITH VINYL COVERED GRIP,THREADED ENDS OR _ B. PIPE AND DUCT M S _ D. ISOLATION SYMMS SHALL BE MANUFACTURED BY MASON INDUSTRIES, SOLDER ENDS AS REQUIRED BY PIPING TSTD1t - - 0 F. ME CONTRACTOR SHALL PRUDE ALL LABOR,PRESSURE DAWES VIBRATION ELIMINATOR COMPANY,AMBER BOOM.VIBRATION MOUNTINGS - I) PIPE AND DUCT LABELS SHALL BE INSTALLED AT MAXIMUM INTERVALS - -- - ROW METERS,SHEAVES,AND BELTS REQUIRED TO BALANCE SYSTEMS AND CONTROLS. -A MANUFACTURERS- BRONZE ROLL VALVES,CONBRACO INDUSTRIES OF 50 FEET ON STRAGIHT RUNS AND 25 FEET IN AREAS OF CONGESTED - INC..APOLLO DIVISION,CRANE CO.;CRANE VALVE GROUP,JENKINS .PIPING AND EQUIPMENT. - G. BALANCING REPORT SHALL BE PRONBD ON NEBB OR AABC-TYPE E. INSTALL IN ACCORDANCE WRAP ME MANUGACNRER'S INSTRUCTIONS - - VALVES,SROCKHAM OMON,JAMESBURY INC..MILWAUKEE VALVE - •5�e - A FORMS. INCLUDING AND SPRING STATIC DEFLECTION FOR EACH FLOOR OR - COMPANY - - 2) GENERAL ROD ED.COLOR-CODED,IROMENTS FR M�UF�NIED PIK LLAIING SERVICE.AND ?JS,`AL�WM••Ntd• - M. BPNNCING PAID VESTING SWll1 BE PERFORMED AND SUPERVISED BY A - C. VYING CHECK VALVES - - SHOWING ROW DIRECTION. $ CERTIFIED NESS OR MBC TECHNICA4. F. PROVIDE LEVELING DEVICES AND APPROVED RESUENT DEVICES AS - - gREQUIRED TO UMRT EQUIPMENT AND PIPING MOTION IN EXCESS OF 1\4 1) 2 INCHES MD SMALLER, BRONZE SWING CHECK VALVES,MSS SP-M. 3) SELF-ADHESNE PIPE AND DUCT LABELS: PRINTED PLASTIC WITH - 6 I. BM,NCING AND TESTING SHALL BE PERFORMED AND SUPERVISED BY INCH ISOLATORS SHALL HAVE GAPASILTTY OF SUPPORTING EQUIPMENT AND _ CLASS.ISO PSI SIFAM,3W PSI COLD WORKING PRESSURE(CMP).ASAP B CONTACT-TYPE.PNMANEM-ADHESIVE BALKING. - ONE OF ME FOLLOWING INDEPENDENT FIRMS SPECIALIZING IN TESTING PIPING AT A FIXED ELEVATION DURING INSTALLATION AND AT A - 52 C0. -BRONZE BODY AND CAP.Y PATTERN;STAINLESS STEEL FREE - - MD BALANCING: SPECIFIED HEIGHT AFTER ADJUSTMENT. FLOATING HINGE PIN,THREADED CAP.REGRINDING SEAT,BRONZE DISC, 4) PIPE AND DUCT LABEL CONTENTS: INCLUDE IDENTIFICATION OF MR ED(STEEL PIPING)ND CONNECTION OR SOLDERED(COPPER PIPING SERVICE USING SAME DESIGNATIONS OR ABBKVXTIONS AS USED - 1) J.i.LOFFEY C. AL SPRINGS VIAL HAVE AT lFAST 50%ADDITIONAL LOAD CAPACITY - PIPING)ND CONNECTION AS REQUIRED BY PIPING SYSTEM. ON DRAWINGS.PIE SIZE.AND AN ARROW INDICATING ROW DIRECTION. - 3 ABOVE DESIGN LOAD. - - 2) LEONHWBDT - - - A MANUFACTURERS-BRONZE CHECK VALVES,VALVE GROUP, AND A iSERVC RECTION PAROWA INTEGRAL WITH PIPING OR DUCT SYSTEM - - H. PROVOT SUPPLEMENTAL STEEL AS REQUIRED WHERE EQUIPMENT V&VES. AHE VALVES. CRANE NAM CRANE VALVE GROUP,JENKINS _ UNIT ON LETTERINP TO DUCT BOTH DIRECTIONS.OR CTI SEPARATE M - - 3) AMNIGW TEST AND AR BALANCE CANNOT SUPPORT POINT LOADS. - - VALVES CWWE VALVES SIO INC, :DIVISION,INCIGRINNELL VAVE COTIDAL. UNIT ON EACH PIPE OR DOLT LABEL TO INDICATE ROW DIRECTION. WMWORTH COMPANY,NIBCO INC.VERIIGY.CINCINHAT VALVE -' 9) DESIGN ROW ASSOCIATES.LLC - I. PROVIDE CORROSION PROTECTION FOR EQUIPMENT MOUNTED OUTDOORS.- _ - B. LETTERING SIZE AT LEAST 1-1/2 INCHES HIGH.. D. CONDNSATE.DRAM PIPING - 5) MILNARMER J. SPRING CORROSION RESISTANCE SHALL BE POWDER COATING.OF ME - - - 21. EQUIPMENT - WITH MESIEEL MOUSING HOT GIPPED GALVANIZED.ALL HARDWARE NO.- 1) PIPE ASTM LARD DRAWN COPPER TUBING TYPE'L'. - - - - - - 6) E.L.84RRER TO BE- TO BE CADMIUM PLATED. - - - - - A PROVIDE ALL SCHE EQUIPMENTAND ACCESSORIES OF ME SIZES AND FITTINGS, - 2) FITTINGS: SOLDERED JOINT NGS,95/5 VOIDER. _ - CAPPCIIIES AV SCHEDULED LED AND AS INDICATED ON ME DRAWINGS. - - ]) MKKEVIN COX ASSOCIATES _ - N. ROOF MOUNTING OF PACKAGED AIR CONDITIONING UNIT WITH - - - - - -SUPER W ISOLATION FOR COMPRESSORS-NEOPRENE IN SHEAR-TYPE 3) ARCH,EXCEPT AS NOTED: - B.: INSTAL EQUIP REES I IN INSTRUCTIONS AND WITH ODES N SHOP DRAWINGS, - 6) TEKON-TECHNICAL CONSULTANTS INC. � SUPER W-BRIDGE BEARING. � - NAI4UFACNRERS INSTRUCTIONS PAID ALL CODES AND REGULATIONS WHICH - _ A. i INCH IN 4 FEET PREFERRED.' gPPLY. - - J. E PERFORMANCE AND CAPACITY OF SYSTEMS AND EQUIPMENT TO 1) PROVIDE ISOLATION BETWEEN INTERFACE OF UNIT AND B • - - BE DEMONSTRATED THE CONTRACTOR, CURB/SUPPORT. B. i-INCH IN O FEET MINIMUM.: - C. PROVIDE EQUIPMENT SUPPORTS AND/DR MOUNTINGS PS INDICATED ON ME DRAWING,AND IN.VIBRATION SPECIFICATION - - - -'- 11. INSULATION-CNERAL REQUIREMENTS 2) 50 PSI MAXIMUM LOADING. PROVIDE STEEL BNRINC PLATE TO 17. REFRICERANT SYSTEMS - - •- DISTRIBUTE LOAD WHERE REQUIRED. - D. RIGGING - A ALL ESNE ON MGS.AND,INCLUDING S ME T FPDINC, A PROVIDE ALL REFRIGERANT'H AL REQUIRED FORA AND SPE - - AND LIST COY UNDERWRITERS PAID ACCESSORIES ARE.INC. FlRE ISTEINE RATED L SUPPORT OF PIPING IN EQUIPMENT RWMS AND WHERE EXPOSED ON NRE ECESSARY SYSTEM,CTO ALL VALVES FITTINGS AND E WITH S - .1)- THIS CONTRACTOR SHALL PROVIDE ALL REQUIRED RIGGING,HOISTING AND LISTED BY UNDERWRITERS LABORATORIES,IC.LIVING BREWER ROOF - - - NECESSARY FOR SATISFACTORY OPERATION IN ACCORDANCE WITH ASHRAE - PAID BRACING TO INSTALL THE EQUIPMENT AS INDICATED ON ME PLANS TE - _ TUNNEL MST METHOD TOR FIRE HAZARD CEASSIFIGTION OF MIMING STPNOPRO 15-LATEST EDITION,INTERNATIONAL MECMECHANICAL CODE,PAID THIS WORK SHALL BE PERFORMED BY AN INSURED CERTIFlED UCNSED - - ?- MATERIALS.STANDARD UL]23(ABM E-B4 fAYA A2.5-I963). 1) AL WATER PIPING OUTSIDE OF SHAFTS WITHIN 50 FEET OF ALL AUTHORniES HAVING JURISDICTION. REFRIGERATION SYSTEM SHALL , RIGGING COMPANY TWAT IS EXPERIENCED IN RIGGING EQUIPMENT OF ME PACK;Nd��� RANESPREAD: MAXIMUM 25. FUEL CO IRE ED AND SMOKE DEVELOPED: CONNECTED ROTATING EQUIPMENT TO BE SUPPLIED WITH ISOLATORS. - 'INCLUDE ALL REQUIRED ITEMS FOR CHARGING,DRAINING AND PURGING ME TYPE INDICATED MR THE AREAS SHOWN ON ME CONSTRUCTION DOCUMENTS. MAXIMUM S0. FIAMEPROOFlNG TREATMENTS SUBJECT TO DETERIORATION SYSTEM. THIS CONTRACTOR SHALL SUBMIT RIGGING PLANS FOR APPROVAL PRIOR TO - - • FROM MOISTURE OR HUMIDITY PRE NOT ACCEPTABLE. 2) HANGER ROD ISOLATORS(TYPE SON S)MOUNTINGS. - . - BE B: 'REFRIGERANT PIPING O BE HARD COPPER,TYPE L TOR ACTS,ASTM PROCEEDING WITH ME WORK. - - - B. PRODUCTS SHALL NOT CONTAIN ASBESTOS,LEAD,MERCURY,OR 3) INDOOR SUPPORTED PIPING ISOLATORS(TINE SLR). -- 886 OR ASAP-B 200.BRIBED. - 2) ALL PERMITS REQUIRED FROM ME AUTHORITIES PAID AGENCIES - MERCURY COMPOUNDS. - - CONTRACTOR. TO PERFORM ME RIGGING PRE ME RESPONSIBILITIES OF THIS - - 4) VERTICAL RISER PIPING ANCHOR AND GUIDES(TYPE A0.4).; C. JOINTS IN REFRIGERATION PIPING VWYL BE BRAZED: , - CONTRACTOR. - C. DEFINITIONS: ' c M. PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL FANS AND DUCTWORK D. REFRIGERANT PIPING SHALL BE OF ME SIZE AND NUMBER OF PIPE 3) ALL STRUCTURAL SUPPORTS,MODIFICATIONS OR AMMONS PRE TO y, 1) EXPOSED: INDOOR DUCTS.PIPING OR EQUIPMENT LOCATED IN (REFER TO DUCTWORK SECTION FOR SPECIFICATIONS). - RECOMMENDED BY ME MANUFACTURER AND AS APPROVED BY ME ENGINEER. BE SUBMITTED TO ME STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO FJS - _ FT W S MECHNRICPL EQUIPMENT ROOMS AND IN AR WHICH WILL BE VISIBLE - - - PROCEEDING WITH ME WORK. ALL SUPPLEMENTAL STRUMRM.SUPPORTS,WITHOUT REMOVING CEILINGS OR OPENING ACCESS PANELS. 15. PIPING-GENERAL REQUIREMENTS E HORIZONTAL PIPING OF ME COMPRESSOR SUCTION AND DISCHARGE - - ELEVATOR CHARGES/MODIFICATIONS,BRACING AND PROTECTION REQUIRED - LINES ANO THE CONDNSER DISCHARGE LINES SXAL BE ARCHED A FOR THE RIC IS ME RESPONSIBILTTY OF THIS CONTRACTOR, 2) CONCEALED: INDOOR DUCTS,PIPING OR EQUIPMENT WHICH IV NOT A. COMPLETE WAN: PIPE,FITTINGS.VALVES,STRAINERS.MOTORIZEDMINIMUM OF)5 INCH IN 10 FEET,IN ME DIRECTION DE REFRIGERANT_ - q EXPOSED. VALVE OPENATORS,STRAINERS,HANGERS,SUPPORTS,GUIDE,SLEEVES FLOW.EACH SUCTION GAS VERTICAL RISER SHALL BE TRAPPED AT ITS 4) ME RIGGING CONTRACTOR SHALL HIRE MIND PAY FOR ALL CHARGES - AND ACCESSORIES. -,z r EVAPORATOR WITH A TRAP.AS RECOMMENDED BY THE COMPRESSOR - AND SERVICES OF THE BUILDING ELEVATOR CONTACTOR FOR ME RIGGING 3) OURp00R: DUCTS,PIPING OR EQUIPMENT WHICH IS EXPOSED TO THE MANUFACTURER. OF ME EQUIPMENT. WEATHER. B. ALL DENTS SHALL BE FURNISHED AND INSTALLED IN ACCDR MCE + ' WITH ME LATEST EDITIONS OF ME FOLLOWING CODES AND STANDARDS - F. INSTALL REFRICERPNT PIPING TO PREVENT EXCESSIVE OIL FROM E. VPRASLE AR VOLUME(VAV)TERMINAL UNITS:. 12. DUCTWORK INSULATION BEING TRAPPED IN ME SYSTEM., 6T•M wm '`Y 1) PMORIGAN SOCIETY OF MECHANICAL ENGINEERS(ASME). 1) VAV BOXES SHALL BE SINGLE DUCT,PRESSURE INDEPENDENT, - A INSULATE AL DUCTWORK IN ACCORDANCE WITH INSULATON SCHEDULEREFRIGERANT -SHLRORE ELECTRON, PROVIDED WITH ALL SENSORS - G. VALVES SMALL BE DESIGNED FOR U SERVICE C DEG BOXES BOXES SHALL BE EXCEPT AS OTHERWISE NOTED. 2) NANICAN SCCIETY FOR TESTING AND MATERIALS(ABM). 'VALVES SHALL BE BRASS PACK DED LESS TYPE UNIONS,FlANCED VALVES OR - CBNTROLS AS REQUIRED. HOT WATER REHEAT COILS.DAMPERS AND MECHANICAL _ INSULATION SCHEDULE-DUCTWORK 3) AMERICAN NATIONAL STANDARDS INSTIME(ANSI). EM.NMRS MAKING EREPNRS.ALL EXTIM ORAL ACCESS P`MNECTING MINN"PING�ES� ACTUATORS a5 REOUIREO. SPECIFICATIONS - - SMALL HAVE LOCKING TYPE-TAMPER RESISTANT CAPS PER ME _ 2) SUBMIT DISCHARGE AND RADIATED SOUND POWER LEVELS.LEVELS NOT SERVICE LOCATION INTERN. FINISH 9) MWUFPCNREflS STANDARDIZATION SOCIETY OF ME VALVE AND INTERNATIONAL MECHANICAL CODE..PIPING SHALL BE RUN IN A SINGLE TO EXCEED SPECIFIED SPACE NC LEVELS. - - FITTING INDUSTRY(MSS). .LAYER.WITH EACH UNE ISOLATED FROM AJOTHER LTD PREVENT RUBBING. SUPPLY/RETURN CONCEALED D-1 VAPoRSEA - PROVISION SHALL BE MADE FOR EXPANSION AND CONTRACTION OF PIPING. 3) UNITS ARE TO HAVE NORMALLY OPEN DAMPERS(ON A NO-ROW - C. COPPER TUBE BRACING ALL PIPING PASSING THROUGH WALLS,'PARTITIONS,ETC:.SHALL BE CONDITION)WITH A MINIMUM AIR QUANTITY SETTING OF 209 OF ME - EXHAUST. CONCEALED D-1 VAPORSEAL FURNISHED WITH SLEEVES AS REQUIRED. DESIGN AIR QUANTITY..MINIMUM/MMnMVM SETTING SNALL BE USER BETWEN 1) P11 SWING SHALL.BE DONE IN ACCORDANCE WITH DLL CODES - ADJUSTABLE. BUILDING APPLICABLE TO ME PARTICULAR SERVICE BRAZING FILER METPiH: H. RETRICERANT.PIPING PASSING THROUGH-RAIID RAORS N DNISING suM MMmUM ENVELOPE AND MY A5.8,BCUP SHIES,COPPER-PXOSPHDRUS ALLOYS FOR.JORNG WA115 SMALL BE ENCLOSED IN A RIGID AND GAS_TGNT MINT DOGS FIRE- t) CONTROLLER.ACTUATOR SHALL BE SHIPPED TO TERMINAL UNIT - $5 BACI(DRAR COPPER WITH COPPER;OR BAG-I,SILVER ALLOY FOR JOINING COPPER RESISTING PIPE DUCT OR SHAFT VENTED M ME OUTSIDE,IN ACCORDANCE - MANUFACTURER MR MOUNTING.ALL CONTROLS SHALL BE MOUNTED IN A kf 0.AAPN WITH BRONZE OR STEEL - "WITH ASHRAE STADDARD 15-LATEST EDITION. PIPE CONDUIT SHALL BE SINGLE ENCLOSURE.DDC CONTROLS SHALL-BE FIELD CALIBRATED BY AM M-501. 8 COPPER TUBE TYPE L WITH SOLDERED FITTINGS. CONTRACTOR.SIMILAR M ANEMOSTAT MODEL EZTS. _ S. MATERIAL 2) QUALIFY PROCESS SSE OPERATORS IN ACCORDANCE WITH ASME BOILER - 5) CASING SHALL BE:MINIMVM 22-GAUGE GALVANIZED STEEL INTERNAL PAID PRESSURE VESSEL CODE,OPERATORS IN IX,.RDANCIE AND BRAZING.- 18. ELECTRICAL WORK - - - PIM...A n - CONSTRUCTION DOCUMENTS LINING SWML BE UL IBt PND NFPA 9DA COMPLIANT. BOXES SHALL BE (2) MOUNTING YETI SHALL BE PROVIDED PND SWll1 BE WEANED TO THE Y WALL BE SHALL HOVE ABUILT-IN TEMPERATURE SENSOR. TEMPERATURE LUBRICATING OIL 1 1. AUTOMATIC CONTROLS: GENERAL REQUIREMENTS UNIN WITH 1 INCH FIBER FREE INSULATION WITH 1-1/2 LB SHALL.. BASE OF ME CARNET AND BE OF SUFFICIENT SIZE TO AFFORD RELIABLE - SHALL BE DISPLAYED IN FAHRENHER(•i). TEMPERATURE CHAlITES SWILL „ EXPOSED FIBERCL SS IS NOT ACCEPTABLE. INSU—ON SHALL BE EOVIPMEN MOUNT AND STABILITY. BE BY INCREMENTS OF IT WITH A RANGE OF 6TF TO 8TF. 6) .MODULATING GAS FIRED HEATING SECTION A WORK INCLUDED F. VARIABLE FREQUENCY DRIVES (3) EASY ACCESS SHALL BE AFFORDED TO ALL SERVICEABLE PARTS BY E. WIRED CONTROLLER SINLL DISPLAY OPERATING CONDITIONS SUCH 0.5 A COMPLETELY ASSEMBLED AND FACTORY INSTALLED HEATING SYSTEM 1) FURNISH A COMPLETE DISTRIBUTED DIRECT DIGITAL CONTROL MEANS OF REMOVABLE DRIVEL SECTIONS. SR TEMPERATURE,ROOM TEMPEFATURE,PIPE TEMPERATURES(IRE SHALL BE INTEGRAL TO UNrt,UL OR LSA APPROVED SPECIFICALLY FOR SYSTEM IN ACCORDANCE WITH THIS SPECIFICATION SECTION. 1) DESCRIPTION: NEMA IDS 2,ICU.PALM,WC;UUTED AND tABELfD - LIQUID,DISCHARGE.INDOOR AND OlITOWR),COMPRESSOR OPERATING OUTDOOR APPLICATIONS FOR USE DOWNS APP FROM REFRIGERANT COOLING THIS INCLUDES ALL SUPERVISORY CONTROLLERS.LOGIC AS A COMPLETE UNIT AND ARRANGED i0 PROVIDE VARIABLE SPEED OF AN (4) THE FAN GRILL SHALL BE Of ABS PUASTIC. CONDITIONSW "(INCLUDING RUNNING CURRENT,FREQUENCY.INPUT VOLTAGE. COILS.THREADED CONNECTION WITH PLUG OR CAP PROVIDED.PROVIDE CONTROLLERS,AND ALL INPUT/OUTPUT DEVICES. RENTS OF NEAR MC 1,DESIGN B,3-PRASE INDUCTION MOTOR BY ADJUSTING OUTPUT ' CMUN STATUS AND OPERATING TIME),LEV OPENING PULSES,SUB CAPABILITY FOR GAS PIPING. WORK INCLUDED ARE AS FOLLOWS: VOLTAGE AND FREQUENCY. (5) CABINET MOUNTING MID CONSTRUCTION SHALL BE SUFFICIENT TO COOLING AND AND SUPER HEAT c WITHSTAND 155 MPH WIND SPEED CONDITIONS FOR USE IN HURRICANE -) _ B. HEATING SECTION SHALL BE FACTORY RUN TESTED PRIOR TO REQUIRE E SUBMITTAL THAT MEETS THE 2) VFD SHALL BE MANUFACTURED BY ABB MODEL ACH550 ECLIPSE BYPASS CONDITION AREAS.MOUNTING,BASE SUPPORT,AND OTHER INSTALLATION - F. CONTROL VOLTAGE FROM.THE WIRED CONTROLLER TO THE INDOOR UNIT SHIPMENT. REQUIREMENTS BELOW FOR APPROVAL OR APPROVED EQUAL TO MEET HURRICANE CODE CONDITIONS SMALL BE BY OTHERS - SHALL BE 12 VOLTS.W. CONTROL SIGNAL BETWEEN THE INDOOR AND D. PROVIDE POWER FOR PANELS AND CONTROL DEVICES - - S F)l OlfTD00fl UNIT SHALL BE PULSE SIGNAL 29 VOLTS OC. - C. CAPS BURNER SAFETY CONTROLS:PROVIDE SAFETY CONTROLS FOR ME FROM A SOURCE DESIGNATED BY THE ELECTRICAL 3) PROVDE UNIT SUITABLE MR OPERATION OF PREMIUM-EFFICIENCY C. TAN � PROVNC OF COMBUSTION AIR PRIOR TD IGNITION,AND CONTINUOUS FLAME CONTRACTOR. - MOTOR AS DEFINED M NEMA MG 1 SURABLE MR INVERTER USE G.+ CONTROL SYSTEM SHALL CONTROL THE CONTINUED OPERATION OF THE SUPERVISION. PROVIDE FLAME ROLLOUT SWITCHES. • o INSULATION RATED I600A (1) THE OUTDOOR UNIT STALL BE FURNISHED WITH A SINGLE DC FAN MR SWEEP LOWERS,AS WELL AS PROVIDE ON/OFF INC MODE SWITCHING. c. PROVIDE MISCELLANEOUS CONTROL WIRING FOR HVAC MOTOR CONTROLLER SHALL HAVE ME CAPABILITY i0 PROVIDE SEOVENML - D. 'INDUCED DRAFT BLOWER SNg1 HAVE COMBUSTION Nft PROVING AND RELATED SYSTEMS REGARDLESS OF VOLTAGE. HOP Architecture ° 4) DESIGN AND RATING: MATCH LORD TYPE SUCH AS FINIS,BLOWERS, STARITNC WITH UP i0 FIFTY SECONDS DELAY. SWITCHES AND BUILT-IN THERMAL OVERLOAD PROTECTION ON FAN MOTOR. tl. COORDINATE INSTALLATION SCHEDULE WITH THE HDR Bo6IDTI AND PUMPS;AND TYPE OF CONNECTION USED BETWEEN MOTOR AND LOAD (2) ME FAN BLADES)SHAD.BE OF AERODYNAMIC DESIGN FOR QUIET MECHANICAL CONTRACTOR AND GENERAL CONTRACTOR. + SUCH q5 DIRECT OR THROUGH APOWER-TRANSMISSION CONNECTION. OPERATION.AND THE FAN MOTOR BEARINGS SHALL BE PERMANENTLY I.�~CEIUNC MOUNTED ELECTRIC UNIT HEATER l E. BURNERS: BURNERS SHALL BE OF THE IN-SHOT TYPE CONSTRUCTED Bp High BURei,Suite 2300 LUBRICATED, 1) 409 STAINLESS STEEL FURNISH,MOUNT.AND WIRE ALL ASSOCIATED PANELS Boston,MA 02110 - - 5) TWELVE(12)PULSE INPUT CONFlGUPATOPI,25HP i0 200Xp: 1) M4NUFACNRERS: SUBJECT TO COMPLIANCE WITH REOUIRENENTS: � e AND DEVICES FOR THE SYSTEM TO BE COMPLETELY F THE VFD SWILL BE CONFIGURED WITH A 12-PULSE (S) THE OUTDOOR UNIT SHALL HAVE HORIZONTAL DISCHARGE AIRFLOW. PROVIDE PRODUCTS BY ONE OF ME FOLLOWING: F. HEATING CAPACITY SHALL BE MODULATING. OPERATIONAL REGARDLESS OF FUNCTION OR VOLTAGE. CQNVERIER SECTION COMPRISED OF TWO FULL WAVE THE FAN SHALL BE MOUNTED IN FRONT OF ME COIL PUWNG AIR ACROSS UNLESS OTHERWISE STATED. BRIOGE RECTIFIERS.AND AN INTEGRAL THREE-PHASE- T FROM THE REAR AND DISPEWNG IT THROUGH ME FROM. THE.FAN A OMARK,BY MARLEY �I C. UMT CONTROLS:HIGH TEMPERATURE UMR CONTROLS WILL SHUT SHIFTING TRANSFORMERS TO REDUCE THE HARMONIC SHALL BE PROVIDED WITH A BUSED GUARD TO PREVENT EXTERNAL CONTACT. OFF CAS ROW IN THE EVEN OF EXCESSIVE TEMPERATURES RESULTING Y. PROVIDE ENGINEERING AND TECHNICIAN LABORTO CURRENT DISTORTION.THE PEASE-SHIFTING WITH MOVING PARTS. B. STERLING FROM_ FROM RESTRICTED INDOOR ARROW OR LOBS OF INDOOR MRROW. PROGRAM AND COMMISSION SOFTWARE FOR EACH TRANSFORMER AND BR COASS COMACH 1 STALL BE SYSTEM AND OPERATOR INTERFACE. SUBMIT - - PROVIDm IN ONE ENCLOSURE. EACH 12-PULSE VIM D. COIL C. INDEEDO ]) EVAPORATOR COIL b:SECTION COMMISSIONING REPORTS FOR APPROVAL - - SHALL BE NRN6NED WITH A};LINE REACTOR AND 2.5X . D.C.CHOKE TO AVOID LINE INTERFERENCE AND ACT AS (1) THE L SHAPED CONDENSER CALL SHALL BE OF COPPER FUSING WITH D. APPROVED EQUAL A MICROCHANNEL EVAPORATORS PROVIDE STREPMUNED TUBES WIRI 9. ALL CDC CONTROLLERS 5114L1 COMMUNICATE USING , D.C.CHC FILTERS. MT MUMINUM FINS S REDUCE HALL B BUILD UP AND PLOW MAXIMUM SMALL PORTS.AND METALLURGICAL ERE-TO-FIN BOND.ME MICRDOHMINEL THE PROTOCOLS AND NETWORK STANDARDS PP�� AIRFLOW. THE COIL SH4ll1 BE PROTECTED WITH AN INTEGRAL MRM 2) CENUW: COIL HAS BETTOR HEAT TRANSFER PERFORMANCE COMPACT PLC-ALUMINUM DEFINED BY THE LATEST VERSION OF THE -LLi'[IS W E '6) CONFIRM VN PAIFD AMPERAGE WITH MOTOR AMPERAGE TO CONFIRM GUARD. NICRCCHgNNEi DOIW M50 HELP TD REDUCE ME UNIT WE1CM.THERE ALL MI51/ASHRAE STANDARD 135-BACNET.USE OF A -T . COMPATIBILIGY. A THE HEATING EOUIPMEN SHAG INCLUDE AN ELECTRIC,CEIUNC- ALUMINUM COILS ARE RECYCLABLE,GALVANIC CORROSION IS ALSO PROPRIETARY PROTOCOL ON ANY PART OF THE o r RA SA (2) REFRIGEPAM ROW FROM THE CONDENSED SHALL BE COMPOLSED BY MOUNTED TYPE FAN-FORCED AIR HEATER.HEATER SHALL BE UL LISTED. MINIMIZED DUE TO ALL ALUMINUM CONSTRUCTION.STRONG ALUMINUM NE1N•ORK IS PROHIBREO. �S3Uf Id I.L.S ]) DEINER VFCS IN SHIPPING SPLITS OF LENGTH$THAT LAN BE MOVED MEANS OF AN ELECTRONIC LINFPA IXPMISION VALVE(LEV)METERING BRAZED STRUCTURE PROVIDES BETTER FIN PROTECTION.IN PDOTIION, PICNA A A SALVIA' PAST OBSTRUCTIONS IN DELIVERY PATH AS INDICTED GENICCONTROLLEDTH E. ME LEV SHALL BE CONTROL BY p MICROPROCESSOR CONTROLLED B. E HEATER SHALL NI ll BE DESIGNED MR T-BAR MANNING. FIAT STREpMUNED E EL TUB ALSO MAKE MICROCHNNN COILS MORE DUST B. DEFINITIONS: .CBIjSI11IlIIOO Na�agwueul '` - 8) SETUP OR DE•: SET POINTS E LOCK Grt OPERATION AT FREQUENCIES C. THE HEATERS SHALL BE FACTORY WIRED FOR SINGLE-PH45E STEP MOTOR. RESISTANT AND EASIER TO CLEAN. 1) 'PROVI TO SUPPLY,INSTALL AND CONNECT UP NE - THAT MAY PROVIDE MECHANICAM RESONANCE UP TO 1 INDEPENDENT BANDS (3) ALL REFRIGERANT LINES BETWEEN OUTDOOR AND INDOOR UNITS SHALL OPERATION AND FIELD CONVERTIBLE TO THREE-PHASE OPERATION BY B. PROVIDE AN INDEPENDENT EXPANSION DEVICE FOR EACH COMPLETE AND READY FOR SAFE MID REGULAR OPERATION � OF INDEPENDENT RANGE. BE OF ANNEALED,REFRIGEFAHON GRADE COPPER TUBING,ACTT TYPE, REMOVING DIVE JUMPER WIRE.ME HEATERS SHOULD BE FACTORY WIRED FOfl REFRIGERATION CIRCUIT. FACTORY PRESSURE TESTED AT 600 PRIG AND THE PARTICULAR WORK REFERRED TO UNLESS SPECIFICALLY MEETING ASTM 8280 REQUIREMENTS,INDMDUALLY INSULATED IN TWIN- _ FULL WATTAGE AND FIELD CONVERTIBLE i0]5f.OR SOx WATTAGE BY THE LEAK TESTED AT 465 PSIG. OTHERWISE NOTED. ' 9) PROVIDE VARIABLE FREQUENCY DRIVES FOR CONTROL OF FANS AND TUBE,FLE%ISLE,CLOSED-CELL,CM-TREE(OZONE DEPLETION POTENTIAL -- REMOVAL OF ONE OR TWO WIRES RESPECTIVELY. 2) "INSTALL': TO ERECT,MOUNT AND CONNECT COMPLETE _ v ' PUMPS AS SHOWN ON POURS.MANUFACTURER TO PROVIDE HARMONIC OF ZERO),EUASTOMERIC MATERIAL FOR 111E INSULATION OF REFRIGERANT C. PROVIDE A REMOVABLE,REVERSIBLE CLEANABLE DOUBLE SLOPED WITH RELATED ACCESSORIES. +��cs ANALYSIS FOR PARTICULAR JOBSITE INCLUDING TOTAL HARMONIC VOLTAGE PIPER AND TUBES WITH THERMAL CONpUCTNIY EQUAL TO OR BETTER THAN 3) HEATER SECTION � •DPNN PAN FOR BASE OF EVAPORATOR COIL CONSTRUCTED OF PVC. _ I.. ' ' pISNRTION AND CURRENT DISTORTION,TO ENSURE COMPLIANCE WITH IEEE 0.27 BTU-INCH/HOUR PER 50 R/'F,q WATER VAPOR TRANSMISSION _ - •3) -FURNISH-OR-SUPPLY': TO PURCHASE,PROCURE. "STANDARD 519. TUB. L IB BETTER MAN 0.00 PERM-INCH AND SUPERIOR FIRE RATINGS A THE HEATER SECTION SHALL CONSIST OF q 20 GAUGE STEEL CHt5515 D. PROVIOE CLOGGED FILTER REVERSIBLE, ENE INDICATION WILL BE ACQUIRE AND DELIVER COMPLETE WITH RELATED A ° ' SUCH THAT IN WILL NOT CONTRIBUTE SIGNIFICANTLY TO FIRE ON WHICH ARE MOUNTED THE HEATING ELEMENTS,FAN MOTOR AND BLADE REGISTERED WITH EITHER A ZONE SENSOR WITH!STATOR INDICATION ACCESSORIES. 10) NO VFD SHALL BE REVIEWED UNLESS ALL REQUIRED CALCULATIONS AND UP TO 14 THICK INSULATION SHALL HAVE A-FWAE-SPRFPD INDEX FAN CONTROL THERMAL CUTOUT,AND 3-POLE LOMACTOR.HEATER BECKON LIGHTS OR AN INTEGRATED COMFORT SYSTEM.THIS OPTION IS AVAILABLE AR ' E SUBMITTED AND REVIEWED AS PART OF E SHOP DRAWING OF LESS THAN 25 AND ASMOKE-DEVELOPMENT INDEX LESS TWIN 50 AS SHALL BE COMPLETELY PREWIRED. FOR MICROPROCESSOR CONTROLLED UNITS. a) *WORK' LABOR,MATERIALS,EQUIPMENT.APPARATUS. SUBMISSION. TESTED BY PSRA E 64 AND CAN ER/ULC 5-102. - CONTROLS,ACCESSORIES AND OTHER ITEMS REQUIRED FOR 4) HEAT ELEMENT$ E. PROVIDE FAN FAILURE SWITCH.ME INDICATION WILL BE � PROPER AND COMPLETE INSTALLATION. � CHMPBELL �McCABE 11) THE VFO'S SHALL BE PROVIDED WITH THE FOLLOWING OPTIONS E. COMPRESSOR REGISTERED WITH EITHER A ZONE SENSOR WITH STATUS INDICATION _ A ME HEATING ELEMENTS SHALL BE GUARANTEED FOR FIVE YEARS AND LIGHTS OR AN INTEGRATED COMFORT SYSTEM.THIS OPTION IS AVAILABLE 5) "CONCEALED EMBEDDED IN MASONRY OR OTHER A INPUT LINE CONDITIONING:INTEGRAL MINIMUM INPUT SAL IMPEDANCE (1) ME COMPRESSOR SHALL BE A DC TWIN-ROTOR ROTARY COMPRESSOR SHALL BE OF NON-GLOWING DESIGN CONSISTING OF 80/20 NICX FOR MICROPROCESSOR CONTROLLED UNITS. CONSTRUCTION,INSTALLED IN FURRED SPACES,WITHIN I LINE REACTORS TO LET AND INSTALLED WITHIN VN PROJECT SITE WITH VARIABLE SPEED INVERTER DRIVE TECHNOLOGY. FINS ARE B WIRE ENCLOSED IN A STEEL BREAM,10 WHICH STEEL PLATE DOVBIE PARTITIONS IN HUNGNCLO CEILINGS,IN TRENCHES,IN MANUFACTURER TO UST VALUE TO BE PROVIDED IN PROTECT SUBMNAL FINS ARE BRAZED.ME ELEMENTS SHALL COVER ME ENTIRE MR INTAKE F. PROVIDE DISCHARGE MR SENSING TUBE CRAWL SPACES,OR IN ENCLOSURES.ME - B. Ul/NEMA 1 ENCLOSURE OR PROVIDE ENCLOSURE FOR VN'S SUITABLE (2) CONTROL COMPRESSOR SPEEL BE D EN BCOMPR650fl CIRCUIT MWLLL DYNAMICALLY AREA TO ENSURE UNIFORM HEATING OF ALL DISCHARGED AIR. G. PROVIDE NOVAE RETURN MR SENSOR 6) 'EXPOSED': NOT INSTALLED UNDERGROUND OR - _ MR OPERATING ENVIRONMENT. VARY TO MATCH ME ROOM LOAD. 5) MOTOR AND CONTROLS H 'CONCEALED'PS DEFINED ABOVE. ' UNMATI C. MANUAL/AC SELECTABLE BYPASS CONTACTORS (3) TO PREVENT IJOUIO FROM ACCUMUTAIMPEDANCENC IN THE COMPRESSOR DURING ME FAN MOTOR SHALL BE IMPEDANCE PROTECTED,PERMANENTLYH. PROVIDE NGIAR ZONE TEMP SENSOR ]) 'SIMILAR'OR"EQUAL-: EQUAL IN MAMRA WEIGH, Spaulding Rehabilitation LS, SIZE, ' ' ME OFF CYCLE,A MINIMAL AMOUNT OF CURRENT SNp11 BE LUBRICATED,AND WITH TOTALLY-ENCLOSED ROTOR.FAN CONTROL SHALL BE I. UNIT SHALL.INCLUDE A CONDENSATE OVERFLOW SWITCH TO SHUT ME DESIGN AND EFFICIENCY OF SPECIFIED PRODUCT. 0. DRIVE INPUT SERVICE SWITCH AND FAST ACTING SEMI-CONDUCTER ANOMATICALY,INTERMITTENTLY APPLIED TO ME COMPRESSOR MOTOR BI-METALUC,SNAP-ACTION LYRE AND SHALL ACTIVATE ME FAN UNIT DOWN IN ME EVEN MAT A CLOGGED CONDENSATE OWN UNE C. SUBMITTALS Network FUSES SPECIFIC TO DRIVE WINDINGS C MNMAIN W TO BE HEAT TO VAPORIZE AM REFRIGERANT. IS SATISFIED NY AND CONTINUE E OPERATE ME FAN DISC ME THERMOSTAT PREVENTS PROPER CONDENSATE REMOVAL FROM THE UMR. NO CRANKCASE HEATER S TO BE USED. IS SATISFIED AND UNTIL ALL HEATED MR HAS BEEN DISCHARGED. 1) ONE(1)SUBMITTAL PACKAGE SHALL BE PROVIDED FOR ME E. CIRCUR BREWER DISCONNECT WHIN DOOR INTERLOCKED SWITCH. THERMM CUTOUT SHALL BE BI-MRALJC SNA➢-MORON LYRE DESIGNED TO 8) CONDENSER SECTION PROJECT THAT INCLUDES INFORMATION FOR CONTROLS FOR Outpatient Clinic Renovation, ' (4) ME OUTDOOR UNIT SHALL HAVE AN ACCUMULATOR AND HIGH PRESSURE AUTOMATICALLY SHUT OFF ME HEATER IN ME EVENT OF OVERHEATING AND ALL SYSTEMS BEING PROVIDED AR PART OF THE PROJECT. F. UL RATER AND LPBEIEO LOOK PLC RATED DONE AND BYPASS SAFETY SWITCH. ME COMPRESSOR SHALL BE MOUNTED TO AVOID THE REACTIVATE ME HEATER WHEN TEMPERATURE RETURNS TO NORMAL A PflOWOE VERTICAL OISCHARCE,DIRECT DRIVE TANS WITH ALUMINUM PARTIAL SUBMITTALS ARE NOT ACCEPTABLE AND SHALL NOT Hyannis,MA ASSEMBLY. TRANSMISSION OF VIBRATION BLADES. —5 SHALL BE STATICALLY BALANCED.MOTORS SHALL BE BE REVIEWED Bf THE ENGINEER. FOR EXAMPLE,R IS NOT • 6) OPERATIONAL CONTROLS _ PERMANENTLY LUBRICATED,WITH INTEGRAL THERMAL OVERLOAD PROTECTION ACCEPTABLE TO SUBMIT A CONTROL VALVE SCHEDULE PS _ i C. DRIVE SERVICE SWITCH F. ELECTRICAL , IN A WEARER TIGHT CASING. PART OF ONE PACKAGE AND CONTROL DIAGRAMS AS PART T A THERMOSTAT,DISCONNECT SWITCH.AND ALL INTERLOCK RELAYS OF A HATER PACKAGE • H. CUSS 10/20/3D ADJUSTABLE OVERLOAD RELAY. (1) ME ELECTRICAL POWER OF THE UNIT SMALL BE 208VOLTS OR 230 SNAIL BE INSTALLED WITHIN ME HEATER ENCLOSURE B. MICRO CHANNEL COIL HAS FIAT SIHFpMLLNED TUBES WITH SMALL ' VOLTS,SINGLE PHASE.60 HERB. ME UNIT SHALL BE CAPABLE OF BETTER AND METALLURGICAL FO M TO FIN BOND.NNELMICROCHANNEL COIL HAS 2) PRODUCT DATA INCLUDE CONTROL DEVICE IN CATER, • I. PROVIDE BARS BADNG GATEWAY INTERFACE WHICH SMALL ALLOW ALL SATISFACTORY OPERATION WITHIN VOLTAGE LLMI1S OF 198 VOLTS TO 253 ]) RECESS ENCLOSURE REDUCE HEAT TRANSFER PERFORMANCE MICUP TO NX CONDENSER COIL WITHLITERNWRETI FOR EACH CONTROL DEVICE INDICATED.LAIDELED 1513 Iyannough Road,Hyannis, PROVIDE TR SETTING OF VFO TO BE PROGRAMMED N EMS CONTROL VOLTS. REDUCE SYSTEM REFRIGERANT CINACE BY UP E SOfG BECAUSE OF SMV1E WITH STORING OR ADJUSTABLE RANGE OF CONTROL PROVIDE CAPABILITY FOR VFO 10 RETAN THESE SETTINGS WITHIN ME A ME BACK BOX SHALL BE DESIGNED FOR DUTY AS A RECESSED ROUGH- INTERNAL VOLUME.WHICH REDUCES ME UNIT WEIGHT.THESE PLL INDICATE DIMENSIONS.CAPACITIES,PERFORMANCE MA 02601 - ° NONVOUTILE MEMORY.ME YN AND BYPASS MUST COMMUNICATE OVER ME (2) POWER FOR ME INDOOR UNIT SHALL BE SUPPLIED FROM ME OUTDOOR IN BO%IN MASONRY,T-BAR,OR FRAME CEILING WNSTRUCTON.ME BACK MUMINUM COILS ARE RECYCLABLE.GALVANIC CORROSION IS PJ50 CHARACTERISTICS,ELECTRICAL CHARACTERISTICS,FINISHES BMS BACNR GATEWAY FOR SEAMLESS COMMUNICATIONS IN ME EVENT OF UN R VA CONTROL CABLE USING MREE(3)FOURTEEN(14/16)GAUGE AWC BO%SHALL BE 2D GAUGE GALVANIZED STEEL AND BALL CONTAIN MINIMIZED DUE TO ALL ALUMINUM CONSTRUCTION.STRONG ALUMINUM FOR MATERIALS,AND INSTALLATION AND STARTUP VFD FAILURE OR LOSS OF US COMMUNICATION.BYPASS SELECTION AND CONWCTORS PLUS GROUND WIRE CONNE NG ME UNITS. CONTROL CABLE KNOCKOUTS THROUGH WHICH HELD WIRING LEADS ARE BROWNT. BRAZED STRUCTURE PROVIDES BETTER FIN PROTECTION AND OUMTT'.IN INSTRUCTIONS FOR EACH TYPE OF PRODUCT INDICATED. BYPASS MONITORING OF UP TO 45 POINTS SHALL BE AVMABLE OVER ME SMALL BE FURNISHED BY MANUFADFURER AND INSTALLED BY ME ENCIDSURES E RECESS INTD A MAXIMUM]INCN B OF CBUNG SPACE ADDITION.FLAT STREAMLINED TUBES ALSO MAKE MICROCHAN ILS NEL CO BACNR WNMUNICAl10N NETWORK.SACHETMICM SERIAL COMMUNICATION BYPASS - ELFC CONTRACTOR ME LOWERED RECESS FACEPLATE SHALL BE OF 20 GAUGE COLD ROLLED MORE DUST RESISTANT AND EASIER TO CLEAN. 3) SHOP DRAWINGS: DETAIL EQUIPMENT ASSEMBLIES AND CAPABIEJIIES SHALL INCLUDE BUT NOT BE LINKED T0:BYPASS RUN- STEEL PHOSPHATIZED.MEN ELECTROSTATICALLY PAINIEO NAVPJO WHITE INDICATE DIMENSIONS,WEIGHTS,LOp05.REOUIREp j SHOP CONTROL ME ABILITY TO FORCE ME UNIT M BYPASS;AND ME (3) ME OUTDO HALL OR UNIT S BE CONTROLLED BY ME MICROPROCESSOR BY A BARED ENAMEL PROCESS. C. PROVIDE TOOL-LESS FACTORY INSTALLED CORROSION RESISTPW CLEARANCES.METHOD OF FIELD ASSEMBLY,COMPONENTS. SPAULDING- w ABILITY TO LOCK AMIDUNLOCK ME KEYPAD. ME BYPASS SNAIL.HAVE HAVE LOCATED IN ME INDOOR UMR.ME CONTROL SIGNAL BETWEEN ME INDOOR LOW WJ LOUVERED L/VANDPLSM WARDS i0 PROTECT CONDENSER COILS FROM AND LOCATION TURD SIZE OF EACH FIELD CONNECTION. a CAPABILITY RH ALLOWING ME BUC E MONITOR FEEDBACK SUCH AR. LINT AMID ME OUTDOOR UNIT STALL BE PULSE SIGN4 24 VOL15 M. J. PACKAGED ARC OOEEO,CAS FIRED ROOF MP LINT AWL OR PHYSICALDMAAGE. - . BYPASS CURRENT(IN AMPS),BYPASS KILOWATT HOURS(RESRTABLE). P. SCHEMATIC FLOW DIAGRAMS SNOWING FANS,COILS. HEFWBILR'ATION NETWORK BYPASS OPOWING HOURS(RESETTABLE).AND BYPASS LOGO BOARD (4) ME UNR SHALL HAVE PULSE AMPl1NDE MODULATION GRCUR E i) APPROVED MAVUFACERERS 9) REFRIGERATION SYSTEM DAMPERS.THERMOSTATS AND CONTROL DEVICES. TEMPERATURE ME DDC SHALL ALSO BE CAPABLE OF MONITORING ME UTILIZE 98%OF INPUT POWER SUPPLY. b. WIRING DIAGRAMS: POWER,SIGNAL.AND CONTROL BYPASS RELAYS TIC WA START,AND FA ALL DIGITALFORMA INPUT STATUS. ALL A TWWE A ALL UNITS SHALL HAVE DIRECT DRIVE HERMETIC,SCROLL TYPE BYPASS DIAGNOSTIC WARNING AND FAULT INFORMATION SHALL BE (5) UNIT SHALL BE ABLE TO PROVIDE 100[COOLING CAPACITY WHEN - COMPRESSORS WITH CENTRIFUGAL TYPE OIL PUMPS.MOTOR SHALL BE WIRING. TRANSMITTED DYER ME SERIAL COMMUNICATIONS BUS, REMOTE BYPASS OPERATING AT-27F OUTDOOR PLR TEMPERATURE WHEN A WIND BAFFLE IS B. CARRIER - SUCTION CAS COOLED AND SHALL HAVE A VOLTAGE UTIUZATION RANGE OF ARCHITECTURE DRAWING INCLUDING ALL TA TF°°rT� E16 FAULT RESET SHALL BE POSSIBLE USED. PLUS OR MINUS 10 PERCENT OF UNIT NAMEPLATE c COMMUNICATION WIRING,NETWORK DEVICES.ETC. 11/"�S,L•�`1 l�iFyJ C. JOHNSON CONTROLS INC INDICATE TYPE OF CABLING AND NUMBER OF J. ME BYPASS CONTROL SHALL MONITOR ME STATUS OF ME VFD AND C. OM DOOR UNIT STAND '- B. EFLFX VARIABLE SPEED COMPRESSOR SHALL BE CAPABLE OF SPEED CONDUCTORS. BYPASS CONTACTORS AND INDICATE WHEN THERE IS A WELDED CONTACTOR (1) PROVIDE SEPERATELT PURCHASED OUTDOOR UNIT STAND BY OUICKUNC - D. DNKIN APPLIED MODULATION FROM 15HZ TO A MAXIMUM OF 60HZ.ME MINIMUM UNITH E A LT H C A R E _CONTACT OR OPEN CONTACTOR COIL THIS FPIIED CONTACTOR OPERATION OR APPROVED EQUAL - CAPACITY SHALL BE 25%OF FULL LOAD.ME COMPRESSOR MOTOR SHALL B tl. ARCHITECTURAL FLOOR PLANS INDICATING PROPOSER SHALL BE INDICATED ON ME BYPASS LCD DISPLAY AS WELL AS OVER ME - 2) GENERAL UNIT DESCRIPTION - A PERMANENT MAGNET TYPE.EACH VARIABLE SPEED COMPRESSOR SHALL BE LOCATIONS OF ALL WALL-MOUNTED DEVICES I E SERIAL COMMUNICATIONS PROTOCOL (2) OUTDOOR UNITEEL STAND SHALL BE FINISH TALL,CONSTRUCTED OUT OF 11 MATCHED WITH A SPECIALLY DESIGNED REFRIGERANT COOLED C, PRMASUESSOR (' GAUGE STEEL WITH A PAINTED FINISH FOR TTOOR U USE. STAND ED ' •-- 0. UNIT($)FURNISHED AND INSTALLED SSiHiCHEDULED BE ONTRE PRECEDENT FREQUENCY DRIVE SINEW COMPRESSOR PR SPEED OF THE COMPRESSOR MOT ME UNITS,CONTROL PANELS,SENSORS, K. PROVIDE THREE ADJUSTABLE SET POINTS TO LOCK OUT OPERATION AT - BE ADJUSTABLE TO FR DIMENSIONS OF OUTDOOR UNIT AND PROVIDED WITH PACKAGED ROOFTOP U AS SCHEDULED ON CONTACT DOCUMENTS AND MESS AND PROVIDES SEVERAL COMPRESSOR PROTECTION FUNCTIONS. THERMOSTATS,ETC.)AND MECHANICAL OF DRAWINGS FREQUENCIES THAT NAY PROVIDE MECHANICAL RESONANCE. ANTI-VIBFATION ISOLATION WASHERS AND NEOPRENE PADS UNDER EACH SPECIFICATIONS. COOLING CAPACITY RATINGS SHALL BE BASED ON AHRI INDICATING PROPOSED LOCATIONS OF ALL FOOT. STANDARDS. UNT(S)SHALL CONSIST OF INSULATED WEATHER-TIGHT C. PROVIDE WITH THERMOSTATIC TEMPERATURE MOTOR WINDING CONTROL TEMPERATURE,ROW AND PRESSURE TRANSMITTERS. o L PROVIDE A SEPARATE IFRAIIAAL STRIP FOR CONNECTION OF FREEZE ClSINC WITH COMM-SOR(S),NR-CM E0 CONDENSER GOAL CONDENSER FOR PROTECTION AGNNST EXCESSIVE TEMPERATURES CAUSED BY SYMBOL AND ABBREVIATION UST FOR CONTROL FIRE,SMOKE AND ALL CAMPERS COMACTS AND EXTERNAL START COMMAND. 3) WALL MOUNTED TYPE INDOOR UNIT SELECTION AND SPECIFICATION FANS.EVAPORATOR COIL RETURN-AIR FILTERS,SUPPLY MOTORS AND UNIT OVER/UNDER VOLTAGE OPERATION OR LOSS OF CHARGE ALSO PROVIDE HIGH WHETHEFRRNAL SAFETY THE SYSTEM HIS INLOCKS SHALL FWID,AUTO,REMAIN FULLY NOp6CTME REMOTE A GENERAL CONTROLS' AND LOW PRESSURE SWITCHES. 8 DIAGRAMS. (. POINTS UST INCLUDING HARDWIRED AND SOFTWARE START/STOP CONTACT SWML OPEMTE IN AUTO AND BYPASS MODES,THE B. UNIT(')SHALL BE 10OX FACTORY RUN TESTED AND ALLY CHARGED D. THERMAL EXPANSION VALVES ME STANDARD FOR ALL MODELS. POINTS. TERMIN4L STRIP SHALL ALLOW FOR INDEPENDENT CONNECTION OF UP TO (1) ME WALL-MOUNTED INDOOR UNIT SHALL BE FACTORY ASSEMBLED. WRH R-410A FOUR(4)UNIOUE SAFETY INPUTS. WIRED AMID RUN TESTED. CONTAINED WITHIN ME UNIT SHALL BE PLL E UNITS SHALL HAVE OWUNG CAPABIURES DOWN TO 0 DEGREE FAR g. DETMUS OF CONTROL PANEL INTERIOR,INCLUDING FACTORY WIRING.PIPING,CONTROL CIRCUIT BOND AND FAN MOTOR. ME C. UNIT(S)SHALL HAVE T ANDI DECALS,AND/OR TAGS TO MD IN THE STANDARD WITH MICROPROCESSOR CONTROLS CONTROLLERS,RELAYS.TERMINAL BLOCKS,AND • B 12) ME MANUFACTURER SWllI.PROVIDE UNIT SHALL HAVE A SELF-DIAGNOSTIC FUNCTION,}-MINUTE TIME DELAY � SERVICE OF ME UNIT AND INDICATE CAUTION AREAS. - LABELING OF DEVICES,ETC. MECHANISM,AN AUTO RESTART FUNCTION,MID A TEST RUN SWITCH, F. PROVIDE EACH UNIT W.1 REFRIGERANT CIRCUIT(S)FACTORY- N. A COMPLETE BILL OF MATERIALS OF EOUIPMEW TO -A FACTORY STARTUP SERVICE INCLUDING IONS. COMPONENT TESTING,FIELD DEHYDRATED TED AND REFRIGERANT PIPES OM M BE CHARGED WIRI D. UNITS SHALL BE CONVERTIBLE AIRFLOW DESIGN AS MANUFACTURED. SUPPUQ COMPLETELY PIPED WITH LIQUID UNE FILTER-DRIER SUCTION BE USED INDICATING QUANTITY,MANUFACTURER, CHECK OF CONTROL CONNECTIONS,ODOUMEMATION STATING THAT ALL WORK DEHTDPAlEO AIR BEFORE SHIPMENT FROM THE FACTORY. AND LLOUIO UNE PRESSURE PORTS. AND DRIVE FUNCTIONS ME OPERATING PROPERLY E. WIRING INTERNAL TO ME UNIT SHALL BE COLORED AND NUMBERED MODEL NUMBER AND TAG NUMBER. B. CABINET: FOR IDENTIFICATION. C. PROVIDE ULTRA-HIGH EFFICIENCY WITH EFLIX VARIABLE SPEED MANUFACTURER'S TECHNIC CUT AN WHICH MARK DATE DESCRIPTION - B. PROGRAMMING OF ALL DRIVE PARAMETERS SPECIFIC TO THIS PROJECT TECHNOLOGY INCLUARDEDE A A AL TABLE OF CONTENTS AND ND AN ASSOCIATED(1) CASINGS SHALL HAVE A WHITE FINISH. 3) UNIT CASING - '- I 04-1618 ADDENDUM NI C. TWO YEAR ON SITE WARRANTY MR PARTS AND LABOR AFTER STARTUP. ((2)) MULTI DIRECTIONAL OWN AND REFRIGERANT PIPING OFFERING FOUR 10)'EXHAUST/RETURN SECTION SHEET NUMBERING SYSTEM FOR ALL PAGES. MODEL ' (4)-DIRECTIONS FOR REFRICEPAM PIPING PND TWO(2)DIRECTIONS FOR - A CABINET:GALVANIZED STEEL PNOSPHATIZED.AND FINISHED WITH A NUMBER SHALL BE CIRCLED OR POINTED WITH AN G. NEW IN-LINE FANS-DIRECT DRIVE pRAININC ARE REQUIRED. + PRE-APPLIED BN(EO POLYURETHANE ENAMEL STRUCTURAL MEMBERS WITH •.q �PROVIDE BAROMETRIC RELIEF GRAVITY TYPE DAMPERS TO OPERATE IN - ARROW. - • 1) PROVIDE CABINET FANS OF SIZE AND ARRANGEMENT AS INDICATED .(3) MERE SWMl BE A SEPARATE BACK PLATE WHICH SECURE ME UNIT r ACCESS DOORS AND REMOVABLE PANELS SWll1 BE A MINIMUM 22 GAUGER CONJUNCTION WITH ECONOMIZER TO PROVIDE EXHAUST 4) FIELD OUALTIY-CONTROL TEST REPORTS. M ' AND OF CAPACITIES AS SHOWN ON ORAWINCS. FIRMLY TO ME WALL PROVIDE NEOPRENE PADS BETWEEN WML AND B. UNITTS CABINET SURFACE SHALL BE TESTED 672 HOURS IN SALT B. PROVIDE A FACTORY SUPPLIED FIELD INSTALLED POWER EXHAUST S) OPERATION AND MAINTENANCE DATA. ' 2) FANS 10 BE DIRECT DRIVE BEE SCHEDULE FOR SPECIFIC SPRAY FOR VIBRATION ISOLATION. SPRAY TEST IN COMPLWICE WITH ASTM BIt]. ASSEMBLY TH4T SHALL ASSIST ME BAROMETRIC RELIEF DAMPER IN ME APPUCATONS. C. FAN C. CABNR CONSTRUCTION SHALL ALLOW FOR ALL SETMCE/ ECONOMIZER IN RWEVINC BUILDING PRESSURIZATION. 6) SUBMIT ON ON WIRING DIAGRA AND CONTROL DIAGRAMS FOR � WHETHER REGARDLESS OF MANTENANCE FROM ONE SIDE OF ME UNIT. 11) OUTDOOR AIR SECTION - THE CONTROLS ARE PAC ALL EQUIPMENT LISTED HEREIN EREINKAG PROVIDED BY OF MOTHER ETC. }) FANS SHALL HAVE ACOUSTICALLY INSULATED HOUSINGS,INTEGRAL - (I) ME INDOOR FAN SHALL BE STATICALLY AMID DYNAMICALLY BALANCED ME IS ME INTER OF MIS SPECIFICATION MAT MIS BACKDRMT DAMPER SHALL BE CERTIFIED BY AMG.0 UL TO RUN ON A SINGLE MOTOR WITH PERMANENTLY LUBRICATED BEARINGS. D. CABINET WM TOP LOVER SWILL BE ONE PIECE NSUCTION OR WHERE 0. PROVIDE ECONOMIZER WITH COMPARATIVE ENTIRALP!ECONOMIZER CONTRACTOR SMALL PROVIDE THE OWNER WRN COMPLETE 4) PROVIDE VARIABLE SPEED SWITCH ADJACENT M EACH FAN MR (2) A MANUAL ADJUSTABLE WIDE VANE SHALL BE PROVIDED WITH ME SEAMS EXITS,IT SHALL BE DOUBLE-HEMMED AND CVSKR-SEALED. CONTROL AND FINAL O @ M MANUALS THAT INCLUDE CONTROLS FOR BAUWGNG PURPOSES. ABILITY E CHANGE ME MRROW FROM SIDE TO SIDE(LEFT TO RIGHT). E. ACCESS PANELS:WATER-AND AIR-TIGM PANELS WITH HANDLES B. PROVIDE NOIVSTABLE MINIMUM POSITION CONTROL LOCATED IN ME - ALL EOUIPMEW REGARDLESS OF WHO PROVIDED R. .. 5) FANS SHALL BE MANUFACTURED BY CREENHECK OR APPROVED EWAL SMALL PANELS ACCESS 10 FILTERS,HEATING SECTION,RETURN MR FAN ECONOMIZER ADJ SECTION OF ME UMR. 0. QUALJIA ASSURANCE (3) A MOTORIZED AIR SWEEP LOWER SHALL PROVIDE AN AVTOAWTIC SECTION.SUPPLY MR FAN SECTION.EVAPORATOR COIL SECIKIN,AND CHANCE IN MRROw BY DIRECTING THE MR UP AND GOWN E PROVIDE UNIT CONTROL SEC110N. C. PROVDE SPRING RETURN MOTOR FOR OUTSIDE MR DAMPER CLOSURE 1) INSTALLER QUALIFICATIONS: A QUALIFIED INSTALLER WHO IS H. WALL MOUNTED AIR CONDITIONING UNIT WITH WIRED WALL MWNIED UNIFORM AIR DISTRIBUTION. I DURING LINT SHUT DOWN OR POWER INTERRUPTION. AN AUTHORIZED REPRESENTATIVE OF THE AUTOMATIC _ CONTROl1ER: F. UNTR$BASE PAN SHALL HAVE p RAISED 1 1/8 INCH HIGH UP CONTROL SYSTEM MANUFACTURER FOR BOTH INSTALLATION D. FILTER: AROUND ME SUPPLY AND RETURN OPENINGS FOR WATER INTEGRITY. D. PROVIDE ME UNIT WITH A FlEID-INSTALLABLE OUTDOOR MR AND MAINTENANCE OF UNITS REQUIRED FOR THIS PROJECT. 1) MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, MEASURING STATION-MODEL EBTPON R-%2DO0-U. PROVIDE ME FE PRODUCTS BY ONE OF THE FOLLOWING: (I) RETURN AIR SWILL BE FILTERED BY MEANS OF AN EASILY C. PROVIDE 1/2 INCH FOIL FACED,FIRE RETARDANT PERMANENT. 2) COMPLY WITHALL CURRENT GOVERNING CODER. - REMOVABLE,WASHABLE FILTER. ODORIE55 CLASS FIBER MATERIAL ALL EDGE MUST BE CAPTURED 50 12) OPERATING CONTROLS ORDINANCES.AND REGULATIONS INCLUDING UL NFPq THE pM MAnbx t6]OBSDDD - •A MTISUBISHI ELECTRIC TWIT MERE 5 NO INSULATION EXPOSED IN THE MR STREAM. �� LOCAL BUILDING CODE.NEC,ETC. Q�IgIAM hwe I WDY1019 .E. COIL A GENERAL MICROPROCESSOR CONTROLS SHALL BE PROVIDED FOR PLL ' 8. DAIKIN X. ME BASE PAN SHALL.HAVE ER L- AL ATIDGE WITHIN BE PERIMETER 24 VOLT CONTROL FUNCTIONS.ME RESIDENT CONTROL MWRRHMS SHALL 3) MATERIALS AND EQUIPMENT SMALL BE THE CATALOGUED - A (1) ME INDOOR COIL SWlll BE OF NONFERROUS CONSTRUCTION WITH - OF THE CURB OTHER THAT THE RASED 1 1/8 INCH RICH DOWN FLOW MARE P11 HEATING,COOLING AND VENTILATION DECISIONS IN RESPONSE PRODUCTS OF MANUFACTURERS REGULARLY ENGAGED IN C. YORK SMOOTH PLATE FINS ON COPPER TUBING. ME TUBING SHALL HAVE INNER � SUPPLY/RETURN OPENINGS TO PROVIDE AND ADDED WATER INTEGRITY TO ELECTRONIC SIGNALS FROM SENSORS MEASURING INDOOR AND OUTDOOR PRODUCTION AND INSTALLATION OF gUTOMATI GROOVES FOR HIGH EFFICIENCY MEAT EXCHANGE. ALL TUBE JOINT SWN1 PRECAUTION. TEMPERATURES.ME CONTROL ALGORITHM MAINTAINS ACCURATE TEMPERATURE CONTROL SYSTEMS AND SHALL BE 2) OUTDOOR UMR: BE BRAZED WITH PROS-COPPED OR SILVER ALLOT, TEMPERATURE CONTROL MINIMIZES DRIB FROM SETPOIM AND PROVIDES � MANUFALNRER'S LATEST STANDARD DESIGN THAT COMPLIES .. A GENERAL (2) BE COILS SHALL BE PRESSURE TESTED AT ME FACTORY. 1. FRONT E AND GASFRC ON ONNESCIIONSF UNIT MR POWER,CONTROL FR�BUILDING COMFORT.¶ZCENTRALIZED ES DRIFT TIME DELAY MICROPROCESSOR ANDEEN SHALL MWITHAN ME SPECIFICATION REQUIREMENTS. " (I) ME OUTDOOR UNIT SIl4LL BE EOUIPPEO WITH AN ELECTRONIC 4) CONTROL SYSTEM: J. ME WE OF ME UNIT SHALL HAVE 3 SIDES FOR FORKLIR COMPRESSORS TO PROVIDE A HIGHER LEVEL OF MACHINE PROTECTION. 4) THE BMS CONTRACTOR SHALL HAVE A MINIMUM OF TEN (10)YEARS OF EXPERIENCE IN THE INSTALLATION AND CONTROL BOARD i144T INTERFACES WITH ME INDOOR UNIT TO PERFORM ALL - PROVISIONS. ME NIT HA_H VE3 SHALL HAVE RIGGING/LIFTING B. MZ VAV,PROVIDE ALL NECESSARY CONTROLS TD OPERATE A VAV MMNMNARS OF BARB EXPERIENCE SYSTEMSIN SIMILAR A SIZE MID - ' d NECESSARY OPERATION FUNCTIONS A CONTROL BITTEN SWll1 BE SUPPLIED BY EQUIPMENT MPNUFACNRER. NOTES FOR CRANE MANEUVERING - ROOFTOP FROM SUPPLY MR TEMPEWINRE INCLUDING MICROPROCESSOR LOMPLEXIIY TO THIS PROTECT,BE CERTIFlED_TO_INSTALL SYSTEM SHALL CONSIST OF TWO(2)MICROPROCESSORS ONE ON EACH CONTROLLER pND SUPPLY MR SENSOR.AN MICROPROCESSOR COMING AND BE A DIRECT REPRESENTATIVE OF AN APPROVED - (2) THE OUTDOOR UNIT SHALL BE CAPABLE OF CDOUNG OPERATION DOWN INDOOR AND OUTDOOR UMR,INTERCONNECTED BY A SINGLE NON-BELAR TWO- 4) MR FILTERS CDORDINATE THE ECONOMIZER CONTROL AND STAGES OF COOLLNC WITH CONTROL SYSTEM MANUFACTURER, ' $ E AMBIENT TEMPERATURE TH UT FOR NEAT PUMP SYSTEMS AND-2BF FOR WIRE CABLE. FIELD WIRING SHALL RUN DIRECTLY FROM ME INDOOR UNIT SUPPLY AIR TEMPERATURE RESET CAPABILITY WED UPON TEMPERATURE A x COOLING ONLY SSR?IS WITHOUT ADDITIONAL LOW AMBIENT CONTROLS TO ME WALL NOVNIED COMROUIIt WTIH NO SPLLC6. A THREE(3) A MR FILTERS:FACTORY INSTALLED FILTERS SHALL MOUNT INTEGRAL SEE CONTROLS SPEGFlCADON NR$EOVENCE OF OPERATION. 2. AUTOMATIC CONTROLS PRODUCTS � (OPTIONFL WIND BAfTlE SHALL BE REQUIRED). CONDUCTOR 14 GA AWC WIRE WITH GROUND SWJ1 PROVIDE POWER FEED WRHIN ME UNIT AND SHALL BE ACCESSIBW THROUGH ACCESS PANELS. q MANUFACTURERS AND BI-DIRECTIONAL CONTROL TRANSMISSION BETWEEN ME OUTDOOR AND TWO INCH MERV 8 MEDIA FILTERS SHALL BE PRODDED. C. PROVIDE A HUMAN INTERFACE THAT SHALL HAVE A 5 INCH COLOR f (}) ME OUTDOOR UNIT SWy1 BE ABLE TO OPERATE WITH A M.U. INDOOR UNITS, iOUCHSCREEN DISPLAY TINT CONFORMS TO FCC PART 15 GLASS B WITH AN 1) MANUFACTURERS: SUBJECT TO COMPLIANCE WITH . (HEIGHTOPFO _WIND OF 1DO FEET BETWEEN INDOOR PND OUTDOOR UNITS. 5) FANS ANp MOTORS INGRESS PROTECTION RATING OF R SE ME DISPLAY EIXT SHALL BE snM Nme REQUIREMENTS.PROVIDE PRODUCTS BY ONE OF ME _ • B. SYSTEM SHALL 0E CAPABLE OF AUIOAWTIC RESTART WHEN POWER IS READABLE BY A PERSON WITH 20/20 VISION AT A DISTANCE OF 3 R M'D FOLLOWING: (4) SYSTEM SHALL OPERATE AT UP TO A MAXIMUM REFRIGERANT EBING RESTORED AFTER POWER WTERRUPTIpN. SYSTEM SHALL HAVE SELF- A PROVIDE EVAPORATOR FAN SECTION WITH FORWARD WRVED.DOUBLE 6D DEGREE ANGLE AT UCMINC LEVELS RANGING FROM 100 LUX-2500p MECHANICAL LENGTH OF 225 R BETWEEN INDOOR AND OUTDOOR UNITS wI1N0UT ME DIAGNOSTICS ABILLT',INCLUDING TOTAL HOURS OF COMPRESSOR RUN WIDTH,DOUBLE INLET.CENTRIFUGAL ME,FAN. LUX.ALSO.THE DISPLAY SHALL OPERATE AT THE TEMPERATURES Of-40 a. JCI—BRANCH OFFICE . NEED FOR UNE SIZE CHANGES,TRAPS OR ADDITIONAL OIL BALE EDLNN ME CODES FOR INDOOR AND OUTDOOR UNITS SNARL BE CENTIGRADE E]0 DEC CENTIGRADE SPECIFICATIONS DISPLAYED ON THE WIRED CONTROLLER PANEL B. PROVIDE SEC'-ALIGNING,CREASE LUBRCATED,BALL OR SLEEVE b. TRANE—BRANCH OFFICE (5) OUTDOOR UNIT SMALL BE PRE-CWNCED FOR A MAXIMUM OF 70 LEFT BEIRINCS WITH PERMANENT LUBRICATION FITTINGS. D. PROVIDE DUCT MOUNTED HUMIDITY SENSOR. URRIER CONTROLS—BRANCH DEFILE - OF REFRIGERANT TUBING C. MICROPROCESSOR LOGATFD IN ME INDOOR UNIT SHALL HAVE ME ') - c' • _ CAPABILITY OF MONITORING RETURN MR TEMPERATURE AND INDOOR COIL C. PROVIDE WITH A DIRECT DRIVE PLENUM FAN DESIGN.PLENUM FAN E DISCHARGE MR TEMPERATURE SENSING PRpVI0E5 TRUE DISCHARGE B. EMS NETWORK/ARCHITECTURE ' (8) THE OUTDOOR UNIT SHALL BE COMPLETELY FACTORY ASSEMBlEO, TEMPERATURE RECEIVING AND PROCESSING COMMANDS FROM ME WIRED DESIGN SHALL INCLUDE A BACKWARD-CURVED FAN WHEEL THONG WITH AN MR TEMPERATURE SENSING IN HEATING MODELS.THIS SENSOR IS A PIPED,AND WIRED. EACH UNIT MUST BE TEST RUN AT ME FACTORY. CONTROLLER,PROVIDING EMERGENCY OPERATION.0 CONIRDWNG ME EXTERNM ROTOR DIRECT DRIVE VARABLL,SP®INDOOR MOTOR.ALL STATUS INDICATOR READABLE THROUGH TRACER OR TRACKER.MR 1) THE EMS SYSTEM SHALL USE A CLIENT/SERVER OUTDOOR UMR. 'PLENUM FAN DESIGNS WILL HAVE A VARIABLE SPEED AOIUSMEN MICROPROCESSOR CONTROLLED UNITS ONLY. ARCHITECTURE BASED ON A MODULAR PC NETWORK (]) OUTDOOR UNIT SOUND LEVEL SHALL NOT EXCEED 40DB(A) POlEMIOMETER LOCATED IN THE CONTROL BOX UTILIZING INDUSTRY STANDARD OPERATING SYSTEMS,D. INDDOR UNIT SHALL BE CONNE CTED TO A WALL MOUNTED WIRED _ F. PROVIDE FACTORY-INSTALLED INDOOR EVAPORATOR DEFROST WNMOL NETWORKS AND PROTOCOLS. f:nM Number B. CABINET CONTROLLER E PERFORM INPUT FUNCTIONS NECESSARY TO OPERATE THE .D. ONDOOR FANS SHALL BE DIRECT DRIVE STATICALLY AND TO PREVENT COMPRESSOR SLUGGING BY INTERRUPTING COMPRESSOR SYSTEM. WIRED CONTROLLER SHALL NAVE LIQUID CRYSTAL DISPLAY DYNAMICALLY BALANCED,DRAW THROUGH IN ME VERTICAL DISCHARGE - OPERATION. - 2) THE SYSTEM SHALL ALLOW THE DISTRIBUTION OF SYSTEM /e� A - (I) ME CASING SHALL BE WNSMTICAL FROM GALVANIZED STEEL PLATE. (LCD). CONMOLEER SWLL CONSIM OF, DN/pR BUTTON. POSITION. FUNCTIONS SUCH AS MONITORING AND CONTROL AND M-w0 m IT WITH AN ELECTROSTATICALLY APPLIED.THERMALLY ABED INCRFASE/DECRE45E SET TEMPERATURE BUTTONS,A COOI/OR1/FAN MODE GRAPHICAL USER INTERFACE ETC.ACROSS THE NETWORK TO V !� ACRNIC OR POLYESTER POWDER CMTNG FOR CORROSION PROTECTION. $ELECTOR,FPN SPEED SELECTOR.VANE POSNON SELECTOR,LOUVER _ - E. PROVIDE SWJTS CONSTRUCTED OF SOLID MOT ROLLED STEEL GROUND -- ACHIEVE MAXIMUM FLEXIBILITY AND PERFORMANCE. ° F SWING BORON,LEST RUN BORON,AND A CHECK MODE BUTTON. � AND POLISHED.WITH KEY-WAY,AND PR0IECTNELY CANTED WI1H � ' £ - PmIM SIeWe - j A CONSTRUCTION DOCUMENTS . x - [ - - , _ . 3) THE DESIGN OF THE BMS SMALL NETWORK A GRAPHICAL (3) OCCUPANCY OVERRIDE WITH AN ADJUSTABLE DUCT OR'PLENUM AREA(SO.MI TOTAL.A _ b. CABLE SHALL BE SHIELDED. _ .. THE SUPPLY FAN VARIABLE FREQUENCY DRIVE SMALL 4) THE VAV BOX SHALL NOT OPEN BEYOND THE MAXIMUM GEM _ UW):R INTERFACE AND ASSOCIATED CDC CONTROLLERS.THE TIME PERIOD FROM 1/2 TO 3 HOURS. S• SENSORS/LOCATION - � 9 - - START UNLOADED AND SLOWLY RAMP UP TO SPEED SETTING.PROVIDE ONE(1)DEC CONTROLLER AND ONE 1 NETWORK ARCHITECTURE SMALL CONSIST OF MULTIPLE I )f CABLES FOR 12DVAC WIRING AND LOW LEVEL SIGNAL AS REQUIRED.IN THE OCCUPIED MODE.THE SUPPLY TEMPERATURE'SENSOR () OG SMALL W R N E SOTS FOR EACH VAV BOX. < 4 WIRIN I 4 SOMA ANALOG) ANAL ALWAYS BE V IN .. 2 - _ C .ER F( FAN SHALL RUN CONTINUOUSLY.THE SUPPLY AN NETWORK LEVELS.PROVIDE A NER_TO_PEER PRIMARY (4) SPACE SENSORS PROVIDED IN EXISTING SEPARATE RACEWAYS. NETWORK TO CONNECT THE PC OPERATOR WORKSTATION FACILITIES SHALL MATCH EXISTING SITE 4 >2 AND<4 6 TO MAI E fRETH E SU ORNE SMALL BE CONTROLLED 5) PROVIDE THE FOLLOWING POINTS HARDWIRED TO THE BMS - AND ALL PRIMARY CONTROL PANELS IN THE BUILDING FOR STANDARD. C. FIELD QUALITY CONTROL - - TO MAINTAIN THE SUPPLY STATIC PRESSURE (INTERFACE DISPLAY PANEL): - NETW SYSTEM OPERATION.PROVIDE SECONDARY - � >4 AND.<B., B', 'fir 1 5ETPOINT,AS SENSED AT A POINT 2/3 DOWNSTREAM NETWORKS TO CONNECT FROM EACH PRIMARY CONTROL (5) PROVIDE A COMMUNICATION PORT FOR - - _ 1)�; OPERATIONAL TEST: AFTER ELECTRICAL ICIRCUITRYPROP R - OF THE SUPPLY FAN. AD:DAMPER CONTROL 0 10M - � PA ELASSOC TO THE SECONDARY DORY CONTROL PANELS OF - CONNECTION Of A LAPTOP OR OTHER PORTABLE _ .>1 AND<16 12 BEEN ENERGIZED.START UNITS TO CONFIRM PROPER UNIT _ - L' ( )(0 ^ ASSOCIATED TERMINAL EQUIPMENT. INTERFACE DEVICE. >i6- _ 16 OPERATION. REMOVE MALNNCTIONINC UNITS,REPLACE I. THE COMPRESSORS STAGED THE CSSARED HEATING L. q0:ELECTRIC REHEAT CONTROL 0 IODR _ }) STATIC-PRESSURE TRANSMITTER: NONDIRECTIONAL SENSOR WITH NEW UNITS,AND RETEST. COIL SHILL BE STEMP AS NECESSARY TO MAINTAIN (- )' 4) THE BMS COMPACTOR SMALL PROVIDE NEW CORRECT T OAL B) .TRANSMITTERS - - THE SUPPLY AIR TEMPERATURE SETPOIS. ql:SPACE TEMPERATURE. - S WITH SUITABLE RANGE FOR EXPECTED INPUT.AND - - �2). TEST AND ADJUST CONTROLS AND CONTROLS REPLACE c _ - - CONTROLLERS/ROUTERS AS STALLEDRECUR TO CONNECT IS ALL TEMPERATURE COMPENSATED. - c. THE TY CAPABLE SMALL HAVE AN INTEGRAL LCD : DAMAGED AND MALFUNCTIONING CONTROlS AND EQUIPMENT, 5) ECONOMIZER MODE d. AI:SUPPLY AIR GEM.NEW CONTROLLERS BEING INSTALLED AS PART ITT THIS DISPLAY CAPABLE OF SIMULTANEOUSLY DISPUTING ARCHECT,AS WHILE STILL KEEPING I RM ALL REQUIREMENTS o ACCURACY: IK OF FULL SCALE WITH REPEATABILITY AND RETLRT, P. ECONOMIZER MODE SMALL BE AVAILABLE WHENEVER E. ELECTRIC CABINET UNIT HEATERS _ < SUCH AS SPARE CAPACITY REQUIREMENTS.ETC. OF O.IK. AIRFLOW AND TEMPERATURE.THE LCD DISPLAY SMALL' _ - BE CAPABLE OF DISPLAYING INDIVIDUAL PNDENT AND 3) ADJUST,E TO ACH AND FINE TUNE CIRCUITS AND THE OUTSIDE AIR ENTN MR IS LESS THAN THE 1) THE ELECTRIC UNIT HEATER SHALL BE PROVIDES WITH HER A,chhBoston tine _ < 5) THE NETWORK SMALL NOT L URIHM TO SEND DATA b. OUTPUT: 4-SOMA - TEMPERATURE ASSEMBLY, READINGS OF.EACH INDEPENDENT EOVIPMENT TO ACHIEVE SEQUENCE OF OPERATION ROOFTOP UNIT RETURN AIR MID HAPLY.THERE IF MANUFACTURER PROVIDED CONTROLS. THE BMS HER Boston - REOVIRED BY A CONTROL ALGORITHM FROM ONE SENSOR ASSEMBLY. - SPECIFIED. ECONOMIZER IS AVAILABLE AND THERE DI A RISE IN CONTRACTOR SHALL PROVIDE FIELD WIRING FOR ALL - - CONTROLLER TO ANOTHER. THE DATA SHALL BE A DIRECT c. BUILDING STATIC-PRESSURE PALACE: 0-0.25'WC - TA SUPPLY AIR TEMPERATURE ABOVE UILATE S,THE CONTROL DEVICES SHIPPED LOOSE. THE BMS CONTRACTOR BB High Street Suite 2300- - b. THE TRANSMITTER SHALL BE CAPABLE OF FIELD D. .TRNNING OUTSIDE AIR DAMPERS SHgll MODULATE OPEN FROM SHALL COORDINATE WITH THE MANUFACTURER FOR ALL INPUT TO THE CONTROLLER CONTAINING THE CONTROL (0-62 PA). CH AND DIAGNOSTICS USING AN MINIMUM POSITION TO 100%OPEN AS NECESSARY TO Boston,MA D2110 - ALGORITHM. A MULTIPLE CONTROLLERS REQUIRE THE SAME - a ?) THE. UCT F.RNTRAF,IDR SHAHI PRTIVITI C.TO DESIGNATED FIELD INSTALLATION RCOUIRCIXRJTS. _ SMAL uF AN TUN A CEAIHOC ALGORITHM,THE DATA d. DUCT STATIC-PRCSSURC RMJGC: 0-9 WC(0-124} OM-BOM1RD PUWHBUTTON INTERFACE AJlD LCD INSTRUCTORS T GIVE NLL INSTRUCTION TO DESICNATEp ,TH Riry THE R CAM AN SMALL..ODU SL PCLOS - PA). �DISPUY. - ^c THE RETURN AIR DAMPERS SHALL MODULATE CLOSED 2) THE BMS CONTRACTOR SHALL FURNISH,INSTALL AND WIRE � 1. .4 SHALL BE AN INPUT TO EACH CONTROLLER. PERSONNEL IN THE ADJUSTMENT,OPERATION,AND ,THE AS THE OUTSIDE AIR DAMPER ANY DEVICES NOT PROVIDED BY THE MANUFACTURER TO e. PROVIDE A SETRA M264 OR PRE-APPROVED EQUAL. OPERATE ON 24 VAC(ISOLATION NOT REQUIRED). , I NERA TRAINING OF THE SYSTEM INSTALLED RATHER THAN A 'THE TRANSMITTER SMALL H4VE.A POWER SWITCH AND MODULATES OPEN. IF THE OUTSIDE AIR DAMPER IS ' C. CONTROL PANELS c' GENERAL TRNNING COURSE. ENSURE A COMPLETELY OPERATIONS SYSTEM, THIS SHALL _ ` S PP OPEN AND THERE E A ABOVE SENT RISE IN INCLUDE BE NOT BE LIMITED TO A SPACE THERMOSTAT. 1) FULLY ENCLOSED,STEEL-RACK-TYPE EMOV CABINET WITH T. THESE SENSORS SHALL BE USED FOR CONTROL OF - 2)}i PROVIDE FOUR(4)HOURS OF TRAINING FOR OWNER'S SUPPLY AIR TEMPERATURE ABOVE SETPOINT.THE - LOCKING DOORS OR LOCKING REMOVABLE BACKS,MATCH FAN VFDS.MONITORING OF FILTER DP,ETC. (1) THE TRANSMITTERSLIMLY F SHALL USE q SWITCHING �'. OPERATING AND MAINTENANCE PERSONNEL OUTSIDE AIR DAMPER SMALL REMAIN 1007 OPEN AND 3) ON A FALL IN SPACE TEMPERATURE BELOW SETPOINT,THE . . - WIRIN OF PANEL. AND PROVIDE LAMINATED ATE BUILT POWER SUPPLY FUSED AND,PROTECTED FROM - THE COMPRESSORS SHALL STAGE AS NECESSARY TO THERMOSTAT SHALL ENERGIZE THE UNIT FAN AND ELECTRIC - I _ - WIRINC DIAGRAMS.ROW DIAGRAMS,ETC.RELATED TO THE I. DAMPER ENDSWITCHES TRANSIENTS AND POWER SURGES.-_. E RECORD DOCUMESATON MAINTAIN THE SPACE TEMPERATURE SETPOINT. HEATING COIL TO MAINTAIN THE SPACE TEMPERATURE - - SYSMM BEING CONTROLLED INSIDE THE ASSOCIATED 1) PROVIDE A COMPACT.SPOT SNITCH FOR SENSING OF . (2) THE TRANSMITTER SMALL USE-WATCH-DOG SEMOINT(MN.). ON A RISE IN SPACE TEMPERATURE,THE 1- 4 CABINET. EACH CONTROL PANEL SHALL BE CLEARLY AND 1). OPERATION AMID MAINTENANCE MANUALS fi) POWER EXHAUST - 'l - QAM'F P15TT10N. SHALL BE RATED TO OPERATE FROM CIRCUITRY, ASSURE RESET AFTER POWER ELECTRIC HEATING COIL AND THE FAN SHALL BE I--Ta�[IS lY c t' PERMANENTLY LABELED WITH THE CONTROLLER DESIGNATION _13F-1WER SHALL HAVE A SIDE ROTARY SWITCH FOR DISRUPTION,TRANSIENTS AND BROWN-OUTS, o THREE(3)COPIES L THE OPERATION AND a. THE POWER EXHAUST FAN SHALL START WHEN THE AL E TAUS F -T. ) � - AND INDICATION OF ME MECHANICAL EQUIPMENT SERVED. USE WITH INTERCHANGEABLE LEVERS.SHALL BE - ]11 2) UNITIZED CABINET WITH SUITABLE BRACKETS FOR WALL OR TELEMECHANIOUE%CKL SERIES OR PRE-APPROVED EQUAL d. ALL INTERCONNECTING PINS.HEADERS AND MAINTENANCE MANUALS SHALL BE COMPLETION TO THE OUTDOOR AIR DAMPER MODULATES TO RETURN (ADJ.) F. GENERAL EXHAUST FAN A'SSOf ILLIQS - CONNECTIONS ON THE MAIN CIRCUIT BOARD,OPTION OWNER'S THE ENTIRE OE UPON COMPLETION OF THE ABOVE ITS MINIMUM U ATE C THE RETURN MR - :,. R 54Lv14. FLOOR MOUSING,LOCATED ADJACENT TO EACH SYSTEM J. EQUIPMENT OPERATION SENSORS AS FOLLOWS: CARDS AND CABLE RECEPTACLES SMALL BE GOLD PROJECT.THE ENTIRE OPERATION AND MAINTENANCE DAMPERS SHALL MODULATE CLOSED PROPORTIONATELY 1) OF DAY SMALL BE STARTEDTIME CLOCK MI EO UPON A TIME �BB$I(II(IIBB�d���BI. ., _ UNDER AUTOMATIC CONTROL PROVIDE COMMON KEYING FOR PUTUp MANUAL SHALL BE FURNISHED ON COMPACT DISC - AS THE OUTSIDE AIR DAMPER MODULATES OPEN.THE - , OF DAY SCHEDULE vA THE TIME CLOCK AND RUN All PANELS. 1) STATUS INPUTS FOR ELECTRIC MOTORS: SPAR LORE - - MEDIA AND INCLUDE THE FOLLOWING FOR.THE BMS POWER EXHAUST O VFD SHALL EDDUUTE FROM ,.CONTINUOUSLY. ♦ 3)' FABRICATE PANELS OF FURNITURE-QUALTY STEEL OR CURRENT-SENSING RELAY WITH CURRENT TRANSFORMERS.• 4. THE OPERATING TEMPERATURE RANGE FOR THE - SYSTEM PROVIDED: -MINIMUM SPEED TO MAXIMUM SPEED(SET BY THE 2) 'UPON A COMMAND TO START THE FAN,THE FAN DISCHARGE - - , EXTRUDED-ALUMINUM ALLOY,TOTALLY ENCLOSED,WITH ADJUSTABLE UP TO 1T5f.OF RATED MOTOR CURRENT. TRANSMITTER SHALL BE-20'F TO 12D F. THE _ I - AIR BALANCER)AS THE CA DAMPER OPEN FROM SOK DAMPER SHALL OPEN.WHEN THE DAMPER IS OPEN.AS TRANSMITTER SHALL BE INSTALLED AT A LOCATIDN (1) TABLE OF CONTENTS. TO TOOK. HINGED DOORS AND KEYED LOCK AND WITH K. CURRENT SENSING RELAY:PROVIDE AND INSTALL CURRENT THAT IS PROTECTED FROM WEATHER AND WATER. _ SENSED BY A DAMPER END SWITCH,THE FAN SHALL _ I'II MANUFACTURER'S STANDPS2D SHOP-PAINTED FINISH. ALL SENSING RELAYS FOR ALL MOTOR STATUS POINTS. SENSOR - (2) AS-BUILT SYSTEM RECORD DRAWINGS.RECORD.,, ]) SUPPLY AIR TEMPERATURE RESET - ENERGIZE. UPON A COMMAND TO DE-ENERGIZE THE FAN PANELS SMALL HAVE COMMON KEYING SMALL BE SPLIT CORE.TWO-WIRE.LOOP POWERED,AND SIZED .. ]) THE TRANSMITTER SHALL BE CAPABLE OF COMMUNICATING'- DRAWINGS SHALL REPRESENT THE AS-BUILT � -- s;-- THE DISCHARGE DAMPER SHALL HAVE AN ADJUSTABLE TIME - A,K CFO FOR EXPECTED AMPERAGE. UNIT SMALL BE UL LISTED. PROVIDE -WITH OTHER DEVICES USING ONE HE FOLLOWING INTERFACE CONDITION OF THE SYSTEM AND INCORPORATE c. THE SUPPLY MR TEMPERATURE SETPOINT SHALL BE DELAY RELAY TO KEEP THE DAMPER OPEN UP TO 30 - 4) PROVIDE MINIMUM REM 1 MATING FOR INDOOR STATUS LEGS FOR CURRENT SENSED BELOW SETPOINT,CURRENT OPTION: . ALL INFORMATION SUPPUED WITH THE RESET FROM 50-F(AOJ.)TO 60-F(AN.)UNEARLY 'SECONDS AFTER THE FAN IS DE-ENERGIZED. a . APPLICATION. SENSED ABOVE SETPoINT.AND LOOP POWER FAILURE. a. LINEAR ANALOG OUTPUT SIGNALS FOR gIRROW AND APPROVED SUBMITTAL AS THE RETURN MR TEMPERATURE-DECREASES FROM ' - D. $ECOHOARY CONTROL PANEL HARDWARE L CONTROL RELAYS:MECHANICAL RELAY:THE CONTROL RELAY TEMPERATURE:FIELD SELECTABLE,FUSE PROTECTED (3) MANUFACTURERS PRODUCT DATA SHEETS OR ]5'F(AN.)TO 65'F(AOJJ. _ - SMALL BE PAT FOR 24 VAC OR 24VOC;MAXIMUM CONTACT - AND ISOLATED,0-IOVDC/4-20MA(4-WIRE) CATALOG PAGES FOR ALL PRODUCTS INCLUDING B) DEHUMIDIFICATION MODE _ I -. . " -• - '" 1) ASHRAE 135 COMPLIANCE: SECONDARY CONTROL PANELS RATING OF 10 AMP AT 30 VDC OR 250 VAC. OUTPUTS SHALL SOFTWARE. - - .�/L PET'B L,. [�p ' , SHALL USE THE LATEST VERSION OF BACNET/ASHRAE 135 BE TRUE FORM C TYPE CONTACTS:SOLID STATE RELAYS ARE NOT b., -RS-465:FIELD SELECTABLE BACNET-ARCNET, - a. IF THE RETURN AIR RELATIVE HUMIDITY RISES ABOVE - "`I-B{w�L MCC^BE PROTOCOL OVER MS/TP. ACCEPTABLE. BACNET-MS/TP,MODBUS-RTU OR JOHNSON - (4) SYSTEM OPERATOR'S MANUALS. _ THE DEHUMIDIFICATION SETPOINT OF 60K RH(A0.1.),. -I I - " M. CONTROL TRANSFORMER: CONTROL TRANSFORMERS SMALL BE UL -CONTROLS N2-BUS - - - . _ L-� a_ (5) ARCHIVE COPY OF ALL SITE-SPECIFIC ? THE COMPRESSORS SMALL ENERGIZE IN LOOTING - L� I 2) EACH SECONDARY CONTROL PANEL SHALL OPERATE AS A LISTED.FURNISH CLASS 2GURRENT-LAMBING TYPE DR FURNISH (1) UACNEi DEVICES SHALL PROVIDE.ANALOG. -T DATABASES AND SEQUENCES. • . - MODE AND THE HOT GAS REHEAT SMALL'MODUUTE - _ STANDALONE CONTROLLER CAPABLE OF PERFORMING I15 . OVER-CURRENT PROTECTION IN PRIMARY AND SECONDARY. VARIABLES FOR AIRFLOW AND TEMPERATURE S _ AS NECESSARY(VIA THE UNITS PACKAGED CONTROLS) 4 _ _ _ _ USER SELECTABLE CONTROL ROUTINES INDEPENDENTLY OF I CIRCUITS FAR CUSS 2 SERVICE IN ACCORDANCE WITH NEC CONTAINING INDMDUAL SENSOR ARFLOW RATE 2)1;THE OPERATION AND MAINTENANCE MANUAL CD SHALL BE TO MAINTAIN THE SUPPLY-MR TEMPERATURE - I - - - - - - ANY OTHER CONTROLLER IN THE SYSTEM. REQUIREMENTS.UMR CONNECTED LOADS TO 60f.OF RATED AMID TEMPERATURE DATA #SELF-CONTAINED AND INCLUDE ALL NECESSARY SOFTWARE -. - SETPOINT. _ 1. CAPACITY. PROVIDE STEP-DOWN TRANSFORMER FOR EACH REQUIRED TO ACCESS THE PRODUCT DATA SHEETS.A - ,�JT p {, {� 3) EACH SECDNDPIi(CONTROL PANEL SMALL,AT A MINIMUM, c. 10 BASE-T ETHERNET:FIELD SELECTABLE BACNET �.LOGICALLY ORGANIZED TABLE OF CONTENTS SHALL PROVIDE 9) UNOCCUPIED MODE SpaUIU In9 Tel Ia UIIIIa IIO�i _ BE A MICROPROCESSOR-BASED,MU CONTROL KING. CONTROL PANEL STEP-DOWN TRANSFORMER TH SHALL CA 2]]/24 ETHERNET,BACNET-IP.MODBUS-TCP AND TCP/IP ' DYNAMIC LINKS TO VIEW AND PRINT ALL PRODUCT DATA - Y - • _ STAND-ALONE, MODULE. DIGITAL CONTROL VAC OR 120/24 VAC.COORDINATE WITH THE ELECTRICAL SHEETS.VIEWER SOFTWARE SMALL PROVIDE THE ABILITY TO - D� THE SUPPLY AND EXHAUST FANS SHALL HALL B OFF �.•I MICROPROCESSOR MODULE,LOCAL DIGITAL INPIfi/OUTPUT CONTRACTOR FOR AVAILABLE CIRCUIT. (1)_ PROVIDE DYNAMIC UNK UBRARIES AND VISA DISPLAY,ZOOM AND SEARCH ALL DOCUMENTS. - AND THE VMABIE FREQUENCY DRIVES SHALL BE SET NP.IYYOrk - STATUS;AND A PORTABLE COMPUTER CONNECTION PORT. 1 FUNCTIONS TO INTERFACE ETHERNET DEVICES TO OK.THE COMPRESSORS AND THE GAS FIRED - - � _ - N. MRROW/TEMPEWJRE MEASUREMENT DEVICES - - TO MICROSOFT EXCEL FOR REMOTE MONITORING F. ON-SITE ASSISTANCE - HEATING.SMALL DISABLE. - - ` ` { Renovation, 4) INPUTS AND OUTPUTS INECESSARY TO PERFORM NCLUDE ALL MEMORY DTHE E 1) .PROVIDE AIRFLOW/TEMPERATURE MEASUREMENT DEVICES OF AIRFLOW AND TEMPERATURE USING A 1) OCCUPANCY ADJUSTMENTS: WITHIN ONE YEAR OF DATE OF b. IF THE RETURN AIR TEMPERATURE OR ANY SPACE - i OUtPBtI@flt CIIfiICI�P.fiOVBlIOf11 SPECIFIED CONTROL SEQUENCES. AS A MINIMUM.50Y..OF I _(ATMD)WHERE SPECIFIED. - WINDOWS BASED PC. SUBSTANTIAL COMPLETION.PROVIDE UP TO THREE TEMPERATURE FALLS BELOW 6OF(AO.),THE UNIT -- THE POINT OUTPUTS SMALL BE OF THE UNIVERSAL TYPE: - B) THE TRANSMITTER SHALL BE CAPABLE OF ACCEPTING AN - PROJECT-SITE VISITS,WHEN REQUESTED BY OWNER,TO SMALL RUN AS PER WARM-UP MODE UNTIL THE - Hyannis,annlsl MA - . THAT IS,THE OUTPUTS MAY BE UTILIZED EITHER AS 2) .FAN INLET MEASUREMENT DEVICES SHALL NOT BE INFRA-RED INTERFACE CARD FOR DOWNLOADING AIRFLOW - ADJUST AND CALIBRATE COMPONENTS AND TO ASSIST - RETURN PAR TEMPERATURE OR SPACE TEMPERATURE , '..a _ MODULATING OR 1WD_STATE,ALLOWING FOR ADDITIONAL SUBSTITUTED.FOR DUCT OR PLENUM MEASUREMENT DEVICES -AND TEMPERATURE DATA OR UPLOADING TRANSMETER a •,OWNER'S PERSONNEL IN MAKING PROGRAM CHANGES AND I EXCEEDS 64'F(AN.).THE UNIT SMALL RUN A _ - M ' - �% .' .'- SYSTEM RE%IBIUTY.IN LIEU OF UNIVERSAL OUTPUTS, � - - UNLESS AN AUTHORIZED EBTRON REPRESENTATIVE DEEMS � CONFIGURATION DATA USING A HANDHELD POA(PALM OR- - 1 IN ADJUSTING SENSORS PND CONTROLS TO SEAR ACTUAL MINIMUM pF 1/2 HOUR(AN.)AFTER START UP. . '- - _ - ; . PROVIDE A MINIMUM OF 50%SPARE OUTPUTS OF EACH DUCT WORK TO BE TOO RESTRICTIVE FOR PROBES. I MICROSOFT WINDOWS MOBILE OPERATING SYSTEMS). - `I CONDITIONS. - c. IF THE RETURN MR TEMPERATURE OR PLAY SPACE TYPE VA ADDITIONAL POINT TERMINATION BOARDS OR WRITTEN.AUTHORIZATION IS REQUIRED BY EBTRON AND THE SEQUENCES OF OPERATIONS - T, - .1613 I annOU h Road,Hyannis,- - CONTROLLERS. ANALOG OUTPUTS SHALL BE INDUSTRY - SPECIFYING ENGINEER. - 9) THE ATMD SMALL BE UL USTED AS AN ENTIRE ASSEMBLY. -TEMPERATURE RISES ABOVE WE(AN.).THE UNIT % Y 9 Y - - _ STANDARD SIGNALS SUCH AS 24 VAC FLOATING CONTROL }) EACH ATMD SMALL CONSIST OF ONE OR MORE SENSOR - A GENERAL SHALL RUN AS PER COOL-DOWN MODE UNTIL THE : MA.02601 ALLOWING FOR INTERFACE TO A VARIETY OF MODULATING 10) THE MANUFACTURER'S AUTIIORIZED REPRESENTATIVE SHMI.' RETURN AIR TEMPERATURE OR SPACE TEMPERATURE - ACTUATORS. TERMINAL EQUIPMENT CONTROLLERS UTILIZING PROBES AND A SINGLE.REMOTELY MOUNTED. REVIEW AND APPROVE PIACEMENT AND OPERATING AIRFLOW � 1) ALL SAFETY DEVICES SMALL BE HARDWIRED TO THE FALLS BELOW]6'F(ADJ.).THE UNIT SMALL RUN A PROPRIETARY CONTROL SIGNALS AND ACTUATORS SHALL MICROPROCESSOR-BASED TRANSMITTER CAPABLE OF RATES FOR EACH MEASUREMENT LOCATION INDICATED ON - STARTER MINIMUM OF 1/2 HOUR(AN.)AFTER START UP. - - - NOT BE ACCEPTABLE. - - INDEPENDENTLY PROCESSING UP TO 16 INDEPENDENTLY THE PLANS. - - - _ WIRED SENSOR ASSEMSUES. _ 2) ALL SETPOISS INCLUDING SETPOIAN INTERNAL TO 10)-PROVIDE THE FOLLOWING POINTS HARDWIRED TO THE OMS H -ON _ 95) ALL DATABASES AMID PROGRAMS SMALL BE STORED IN -' 11) A WRITTEN REPORT SHALL BE SUBMITTED TO THE CONTROL ALGORITHMS SHALL BE ADJUSTABLE FROM THE - - 2 NON-VOLATILE EMROM,EPROM AND PROM:CONTROLLER a. EACH SENSOR ASSEMBLY SMALL CONTAIN TWO CONSULTING MECHANICAL ENGINEER IF ANY MEASUREMENT � SPACE THERMOSTAT OR PACKAGED CONTROLLER. - (INTERFACE DISPLAY PANEL): _ T7�T - SHALL HAVE A MINIMUM OF ISK EPROM OR EEPROM. INDNIDUALLY WIRED,HERMETICALLY SEALED LOCATIONS DO NOT MEET THE MANUFACTURER'S PLACEMENT 3) ALARMING DEVICES S.NL BE WIRED SO THE CONTACTS o. ALL POINTS AVAILABLE VIA INTEGRATION(BACNET)TO —� SPAULDI V G- r BUD-IN-GI155 THERMISTORS. REQUIREMENTS. OPEN IN THE ALARM CONDITION. ALL ALARM POINTS SMALL THE RTU PACKAGED CONTROLLER. - _ '- ' a 6) PROVIDE ALL NECESSARY SOFTWARE FORA COMPLETE - a ESIDEIOPERATING SYSTEM AS SECONDARY CON ALL SOFTWARE SHALL D. ATHE SSEMBLY SHALL A MOUNTED IN THE SENSOR 12) PROVIDE EBTRON MODEL GTX116-P,Ci%116-F,OR VI ANNUNCIATED AT q REMOTE ANNUNCIATOR,AUDIBLY AND C. AIR COOLED SPLIT AC UNIT - REHABILITATION NETWORK RESIDE IN EACH SECONDARY CONTROL PANEL SECONDARY ASSEMBLY USING A MARINE-GRADE.WATERPROOF PRE-APPROVED EQUAL VISUALLY. _ CONTROL PANELS SHALL NOT BE DEPENDENT UPON ANY. AND NOT TEXER POSEDT LEADS SHALL BE PROTECTED - 1) GENERAL - —` HIGHER LEVEL COMPUTER OR ANOTHER CONTROLLER FOR - AND NOT EXPOSED TO THE ENVIRONMENT. D P A 4) ALL CONTROL POINTS SHALL K ADJUSTABLE OR _ �\ OPERATION. - THERRIDEABMOSTAL.E FROM THE PACKAGED CONTROLS OR - D, PTHE ROVIDED WITH OR AND CONDENSER LINTS SHALL I- _ T �-{� /`�THE AIRFLOW RATE W EACH SENSOR ASSEMBLY 1) ALL DAMPER ACTUATION SHALL DE ELECTRIC.PNEUMATIC ' THERMOSTAT. - - PROVIDED WITH MANUFACTURER PROVIDED CONTROlS. - ,J�n�`'i(.s n`- ]) AS THE NUMBER OF SECONDARY CONTROLS TO 60 OR - TRANS IT EQUALLY WOOFED AND AVERAGED BY THE - ACTUATION I$NOT ACCEPTABLE. - 5) ALL DAMPERS,'CONTROLLERS,CONTROL DEVICES,ETC. -- COORDINATE WITH THE AC UNIT MANUFACTURER FOR 1L1--,�Ei`111 \JrJ,IRIS TRANSMITTER PRIOR TO OUTPUT. 2) ALL DAMPER ACTWTORS SHALL MEET THE FOLLOWING - . EXPOSED TO OUTSIDE MR SHALL BE AS REQUIRED BY THE MANUFACTURER. ALL FIELD INSTALLATION REQUIREMENTS. - - - d. THE TEMPERATURE OF EACH SENSOR ASSEMBLY REQUIREMENTS: ,SPECIFICALLY DESIGNED FOR OUTSIDE AIR CONDITIONS - r 6) PROVIDE ONE(1)SECONDARYCONTROL PANEL FOR EACH SMALL BE VELOCITY WEIGHTED AND AVERAGED BY THE -- b. THE UNIT SMALL OPERATE AS PER THE - H E A L T H C A R E TRANSMITTER PRIOR TO OUTPUT. ALL DAMPER ACTUATORS SHALL HAVE SUFFICIENT INCLUDING,BUT NOT LMITED TO,NE-4 ENCLOSURES, Of THE FOLLOWING: - jj - MANUFACTURER PROVIDED SEQUENCE OF OPERATION. - - POWER TO OVERCOME REACTION OF DAMPER LINKAGE i WEATHERPROOF ENCLOSURES AND E OTHER WEATHER c. VAV BD% - EACH TRANSMITTER SHAY HAVE A OF CHARACTER - - 1 PRECAUTIONS RECOMMENDED BY THE MNJUFACNRQi. _ 2) THE BANS CONTRACTOR SHgU_ - - - - - OND PITS PRESSURE ACTING ON LOWERS AND TO _ E. WEB BASED OPERATOR INTERFACE ALPHA-NUMERIC DISPLAY SYSTEM SAT DISPLAYING OPERATE THE DAMPER SMOOTHLY THROUGHOUT THE 6) ALL L BE I ASSOCIATED WITH'EQUIPMENT TEAT I$DIS4BIETI .. MOUNT AND WIRE ALL CONTROL COMPONENTS THAT - - - `3 - AIRFLOW,TEMPERATURE.SYSTEM STATUS. ENTIRE DAMPER RANGE. - ' SMALL BE INHIBITED. ARE SHIPPED WITH THE AC UNIT THAT ARE NOT - I Li 1) OPERATOR INTERFACE SHALL BE PROVIDED FOR COMMAND CONFIGURATION SETTINGS AND DIAGNOSTICS. - - FACTORY INSTALLED.THIS SHALL INCLUDE,BUT NOT - ENTRY,INFORMATION MANAGEMENT,NETWORK ALARM - b. ACTUATORS Sall BE SIZED WITH A TORQUE GREATER _ T). THE POINT LIST$ARE PROVIDED FOR CONVENIENCE ANC FA LIMBED TG WIRING BETWEEN CONDENSER UNR, - . ' - _ - - MANAGEMENT,AND DATABASE MANAGEMENT FUNCTIONS ALL I. DEVICES USING CHIP-IN-GAS$OR DIODE-CASE CHIP - THAN 1509.OF THE DESIGN DAMPER TORQUE. 'ARE NOT INTENDED TO BE ALL-INCLUSIVE.ALL POINTS ' k REAL-TIME CONTROL FUNCTIONS SHALL BE RESIDES IN THERMISTORS ARE NOT ACCEPTABLE. - - ' REQUIRED TO PROVIDE THE SEQUENCE OF OPERATION EVAPORATOR UNIT AMID MANUFACTURER PROVIDED . - - c. ACTUATORS SHALL HAVE MOUNTING ARRANGEMENT FOR WALL MOUNTED THERMOSTAT. - TNEDDC CONTROLLERS TO FACILITATE GREATER FAULT - DEVICES USING LESS THAN TWO(2)THERMISTORS IN LOCATION OUTSIDE OF THE AIR STREAM THE GAMPER }SHALL BE INCLUDED AS IF LISTED. TOLERANCE AND RELABILTTY. . 9' p.. FURNISH;MOUNT AND WIRE ANY ADDITIONAL - - a EACH SENSOR ASSEMBLY ARE NOT ACCEPTABLE. ACTUATORS SMALL BE MOUNTED ON THE DAMPER B. AIR COOLED PACKAGED ROOFTOP UNITS(TYPICAL RIU-1 AND COMPONEMS NOT PROVIDED BY THE PC UNIT - - 2) EACH WORKSTATION OR WEB SERVER SHALL CONSIST U b DEVICES USING PIATINUM WIRE RIDS ARE NOT EXTENSION SO THAT R IS NOT BURNED IN THE WALL RTII - - MANDFACTURER TO ACHIEVE A COMPLETELY- - MEE FOLLOWING: DOC SYSTEM HARDWARE$TALL - - ACCEPTABLE. - CONSTRUCTION. - - OPERATIONAL SYSTEM. - MEET OR EXCEED DDC SYSTEM MANUFACTURER'S }) DAMPER ACTUATORS SMALL FAIL-SAFE IN EITHER.THE 1) GENERAL - - - - D' RECOMMENDED SPECIFICATIONS AN SMALL MEET I. .DEVICES HAVING ELECTRONIC CIRCUITRY MOUNTED IN: NORMALLY OPEN OR NORMALLY CLOSED POSTIION IN THE Ie 3) ENABLE/DISABLE MODE I - ' - REOUIREMENTS INCLUDED HEREIN.HARD DISK SMALL HAVE DR AT THE SENSOR PROBE ARE NOT ACCEPTABLE. .E c. EACH ROOFTOP UNIT CONSISTS OF ONE(1)SUPPLY _ - $ SUFFICIENT MEMORY TO STORE SYSTEM SOFTWARE,ONE 1) COMPVENT ES POWER FAILURE.SIGNS.FAILURE OR - FAN.ONE 1 THE AIR-COOLED CONDENSING OUTDOOR UNIT SMALL, - , - - I 1( j. PITDT TUBES AND ARRAYS ARE NOT ACCEPTABLE. COMPRESSED MR FAILURE.FPJI SAFE POSITIONS ARE AS - R, POWER EXHAUST FAN,PIRSIDA - BE HARDWIRED INTERLOCKED WITH THE INDOOR AL - ' i - YEAR OF DATA FOR MENDEDPOINTS AND A SYSTEM - FOLLOWS; - ECONOMIZER,COMPRESSORS,HOT GAS BYPASS AND - A - a DATAB.45E AT LEAST TWICE TIE SIZE OF THE EXISTING _ K. VORTEX SHEDDING DEVICES ARE NOT ACCEPTABLE. GAS FIRED HEATING COIL UNIT WHEN THE INDOOR AC UNIT IS ENERGIZED. _ c- ' _ DATABASE AT SYSTEM ACCEPTANCE.CONFIGURE COMPUTERS a VAV BOX DAMPERS FAIL IN PLACE THE AIR-COOLED CONDENSING OUTDOOR UNIT SMALL AM0.K DATE - DESCRIPTION - AND NETWORK CONNECTIONS IF MULTIPLE COMPUTERS ARE 4) ALL SENSOR PROBES •D. THIS ROOFTOP UNIT SMALL COME WITH PACKAGED ,. _- BE ENABLED. _ ' - IM-16-19 ADDENDUM n1 - -- , 6 REQUIRED TO MEET SPECIFIED MEMORY AND PERFORMANCE. - - _4) .INCREMENTAL ELECTRONIC ACTUATOR FOR TERMINAL - --D CONTROLS BY THE UNIT MANUFACTURER. b. THE INDOOR AIR CONDITIONING UNIT SHALL BE _ _ l a. EACH SENSOR ASSEMBLY SHALL INDEPENDENTLY `EQUIPMENT DAMPER ACTUATION t THIS CONTRACTOR SMALL COORDINATE WITH THE. . ' CONTROLLED BY ITS OWN MANUFACTURER PROVIDED 3). OPERATING SYSTEM.WEB SERVER SMALL HAVE AN - -' DETERMINE THE AIRFLOW ANTE AND TEMPERATURE.AT - Trc. ) -I` ROOFTOP UNIT MANUFACTURER FOR ALL FIELD - THERMOSTAT. THE SUPPLY.FAN SH4LLRUN _' - ✓" U : - INDUSTRY-STANDARD PROFESSIONAL-GRADE OPERATING EACH MEASUREMENT POINT. � o. ACTUATORS SHALL BE PROPORTIONAL,ELECTRONIC, � _ -* - SYSTEM..ACCEPTABLE SYSTEMS INCLUDE MICROSOFT - - DIRECT-COUPLED ACTUATORS USED FOR MODVUTINC INSTAL REQUIREMENTS. THIS CONTRACTOR CONTINUOUSLY WHEN THE UNIT IS ENABLED.- - _ b. EACH SENSOR ASSEMBLY SHALL BE CALIBRATED AT A SERVICE.ACTUATORS SMALL BE EQUIPPED WITH METAL SWILL INSTALL ALL CONTROL DEVICES SHIPPED LOOSE - " WINDOWS%P PRO.RED HAT UNU%OR SUN SOURIS. - - c THE MANUFACTURER PROVIDED CONTROIS'SHgLL - _- - - MINIMUM OF 16 AIRFLOW RATES AND 3 HOUSINGS AND VISUAL STROKE INDICATORS. -i WITH THE ROOFTOP UNIT. _ - CYCLE THE COMPRESSORS AS NECESSARY T0. - - 4) SYSTEM GRAPHICS.OPERATOR INTERFACE SMALL BE TEMPERATURES TO STANDARDS THAT ARE S AMID b. ACTUATORS SHALL BE EQUIPPED WITH A PERMANENT _ ' TO THE NATIONAL INSTITUTE OF STANDARDS AND 2) SAFETIES MAINTAIN THE SPACE TEMPERATURE WETPOINT. - CRAPHICALLY BASED AND SHALL INCLUDE AT LEAST ONE(1) MANUAL ADJUSTMENT. STRIAE RETURN WITCH. - GRAPHIC PER PIECE C EQUIPMENT OR OCCUPIED ZONE, TECHNOLOGY(NISI). SHOULD BE FIELD ADJUSTABLE WITH A SWITCH. D, THE SUPPLY AND RETURN SMOKE DETECTORS(WHERE d. UPON q COMMAND TO STOP.THE COMPRESSOR - SYSTE CS FOR EACH CHILLED WATER AND HOT WATER UNIT U = SHALL R CYCLED OFF:THE SUPPLY FAN SHALL BE- ARROW ACCURACY SHALL BE+/-2K OF READING LE)SHALL STOP THE ASSOCIATED ROOFTOP - - - EACHEM AND GRAPHICS THAT SUMMARIZE CONDITIONS ON c c. MINIMUM'TORQUE:SS'PTI OPERATING VOLTAGE: - - OE-ENERGIZED. - EACH FLOOR R EACH BUILDING INCLUDED IN THIS OVER THE ENTIRE OPERATING AIRFLOW RANGE SPRANG POWER CONSUMPTION: MAXI MAXIMUM; - UNIT UPON THE PRESENCE OF SMOKE - CONTRACT. PROVIDE LINKS ON EACH GRAPHIC TO PDF d. DEVICES WHOSE ACCURACY IS THE COMBINED SPRING RETURN TIME:20 SEC MAXIMUM. - - _ }) WARM-UP/COOLDQWN - D. VARIA9LE.AIR VOLUME(VAV)BOXES WTIH ELECTRIC REHEAT _ - FILES OF THE ASSOCIATED SEQUENCE OF OPERATION.ROW ACCURACY OF THE TRANSMITTER AND SENSOR 2, -AUTOMATIC CONTROLS EXECUTION - 1) COORDINATE FACTORY.MOUSING AND WIRING OF � _ DIAGRAM,AND WIRING DIAGRAM. - PROBES MUST DEMONSDATE THAT THE TOTAL - - DURING THE HEATING SEASON.gWARM-UP PROGRAM SECONGARY CONTROL PANEL.ACTUATOR,ETC.WITH THE - - _ ACCURACY MEETS THE PERFORMANCE REQUIREMENTS A INSTALLATION _ c SMALL BE INVOKED IF THE RETURN AIR TEMPERATURE '- VAV BOX MANUFACTURER.THE BMS CONTRACTOR SMALL BE ' F. TOUCH SCREEN PANEL/COMPUTER(INTERFACE DISPLAY PANEL) OF THIS SPECIFICATION THROUGHOUT THE - `' IS BELOW 69F(ADJ.)UPON UNIT START UP.THE - RESPONSIBLE FOR FURNISHING,INSTALLING AND WIRING OF MEASUREMENT RANGE. I �-'1) CONNECT AND CONFIGURE EQUIPMENT AND SOFTWARE TO' I') WARM-UP PROGRAM SHALL RESET THE SUPPLY AIR. -. CONTROLS NOT FURNISHED.INSTALLED IN WIRED BY -' - - x 1) TOUCH SCREEN OPERATOR WORKSTATION SHALL BE I ACHIEVE SEQUENCE OF OPERATION SPECIFIED. '�. TEMPERATURE TO BUT(AN.)AND SMALL OPEN ALL. OTHERS THAT ARE REQUIRED FOR LE OPERATIONAL SYSTEM.• L - - PRCVIDED'FDR NE1W'ORK ALARM ANNUNCIATION/ e. TEMPERATURE ACCURACY SHALL BE+/-0.15'F OVER 2) VERIFY LOCATION QF THERMOSTATS,HUMIDGTATS,AND DOWNSTREAM VAV BOXES TO THE MAXIMUM GEM - - _ - - MANAGEMENT.ALL REAL-TIME CONTROL FUNCTIONS SMALL THE ENTIRE OPERATING TEMPERATURE RANGE OF-20' OTHER EXPOSED CONTROL SENSORS WITH PLANS AND POSITION.THE SUPPLY AIR TEMPERATURE SMALL BE 2) OCCUPIED MODE ' T I - ./ BE RESIDES IN THE DDC CONTROLLERS TO FACILITATE F TO 160 F. ROOM DETPOS BEFORE INSTALLATION. LOCATE ALL ID RESET LINEARLY AND INVERSELY FROM fiRF(ADJ.)TO' - - GREATER FAULT TOLERANCE AND RELIABILITY. L THE OPERATING HUMIDITY RANCE FOR EACH SENSOR INCHES ABOVE THE FLOOR OR AS OTHERWISE REQUIRED BY - t ]DF(ADJ.)AS THE RETURN AIR TEMPERATURE - A. THE BOX SMALL BE ENABLED WHENEVER THE _ ".I.,... 19)0 60 - - - 2) THE BMS CONTRACTOR SHALL PROVIDE ONE(1) PROBE SHALL BE 0-99X RH(NON-CONDENSING)._ ApA _ INCREASES FROM WE(ADJ.)TO]RF(AN).DURING AIR-HANDLING UNIT SUPPLYING THE BOX IS ENABLED. - .u.— Ipy R, - AU-IN-ONE TOUCHSCREEN COMPUTERS IN ADDITION TO - THE WARM-UP MODE.THE AIR HANDLING UNR SHALL b. UPON A FALL IN SPACE TEMPERATURE BELOW - . '- A THE OPERATION WORKSTATION. THE TOUCHSCREEN 9. EACH SENSOR PROBE SHALL HAVE AN INTEGRAL U.L _ 3) INSTALL AVERAGING ELEMENTS IN DUCTS AND PLENUMS IN OPERATE ON TOOK RETURN MR.AFTER WARM-UP SEHPoINT,THE BOX CAMPER SHN1 MODULATE - - _ - COMPUTERS SHALL HAVE STANDARD VESA MOUSING HOLES UNTIED,PLENUM RATED CABLE AND TERMINAL PLUG CROSSING OR ZIGZAG PATTERN. I I (RETURN AIR ABOVE TO-F(W),THE UNIT SMALL CLOSED TO THE MINIMUM GEM SETPOINT.UPON A I - - . FOR WALL MOUNTING APPLICATION. THE ALL-IN-ONE FOR CONNECTION TO THE REMOTELY MOUNTED - BE CONTROLLED AS DESCRIBED IN OCCUPIED MODE. FURTHER FALL IN SPACE TEMPERATURE.THE BOX - - 4) INSTALL DAMPER MOTORS ON OUTSIDE OF DUCT IN WARM TOUCHSCREEN COMPUTER$HALL HAVE BUILT-IN CPU, TRANSMITTER.ALL TERMINAL PLUG INTERCONNECTING - DAMPER SHALL MODULATE TO THE HEATING GEM - -AREAS.NOT NOT IN LOCATIONS EXPOSED TO OUTDOOR - - D. DURING THE COOLING SEASON,A HE RETURN WN . E MEMORY,NETWORK CARD,TARO ERNE,ETC. A PINS SMALL ENS RE GOLD LY SIHA , MODULATE AND THE ELECTRIC REHEAT SCR SHALL . - - TEMPERATURES. PROGRAM SHALL BE INVOKED IF THE RETURN AIR STANDALONE PC WITH TOUCHSCREEN MONITOR WILL NOT BE MODULATE OR THE ELECTRIC REHEAT STALL BE I. EACH SENSOR ASSEMBLY SHALL NOT REQUIRE TEMPERATURE IS ABOVE BOF(ADJ.)UPON UNIT ACCEPTED. B. ELECTRICAL WIRING AND CONNECTION INSTALLATION ( STAGED'ON AS NECESSARY TO MAINTAIN THE SPACE - MATCHING TO THE TRANSMITTER IN THE E BOTH - START UP.THE TEMPERATURE PROGRAM SHALL RESET TEMPERATURE SETPOINT.UPON A RISE IN SPACE G. TIME CLOCKS I. q SINGLE MANUFACTURER SHALL PROVIDE BOTH THE 1), INSTALL,CONNECT LAND WIRE THE ITEMS INCLUDED UNDER { -THE SUPPLY AIR TEMPERATURE TO 55'F(ADJ.)AND TEMPERATURE,THE ELECTRIC REHEAT'SHALL 1) SEVEN-DAY.PROGRAMMING-SWITCH TIMER WITH NRFLOW/TEMPERATURE MEASURING PROBE(S)AND - THIS SECTION. THIS WORK INCLUDES PROVIDING REQUIRED -4{ SMALL OPEN ALL VAV BOXES TO THE MAXIMUM CFM . DE-ENERGIZE.UPON A FURTHER RISE IN SPACE _ 3 SYNCHRONOUS-TIMING MOTOR AND SEVEN-DAY DAL: TRANSMITTER FOR EACH MEASUREMENT LOCATION, CONDUIT,WIRE.FITTINGS AND RELATED WIRING-: POSITION.DURING THE COOL-DOWN MODE,THE AIR . TEMPERATURE.THE BOX DAMPER SHALL MODULATE CONTINUOUSLY CHARGED. - ACCESSORIES... - HANDLING UNIT SMALL OPERATE ON IUOK RETURN FROM THE MINIMUM TO THE MAXIMUM GEM SETTING ` NICKEL-CADMIUM-BATTERY-DRIVEN.EIGS-HOUR, 5) DUCT AND PLENUM PROBES 2) AL1 E%POSED WIRING AND WIRING IN MECHANICAL _; AIR.AFTER COOL_DOWN(RETURN AIR BELOW ME AN NECESSARY TO MAINTAIN THE GEM SETPOINT AS - POWER FAILURE CARRYOVER:MULTIPLE-SWITCH TRIPPERS: PROBES SHALL BE CONSTRUCTED OF EXTRUDED. EOVIPMENT ROOMS SMALL BE INSTALLED IN CONDUIT (ADI7p� )),THE UNIT$HALL BE CONTROLLED AS RESET BY THE SPACE TEMPERATURE.THE MINIMUM MINIMUM OF TWO AND MAXIMUM OF EIGHT SIGNALS PER AND MAXIMUM GEM SETTINGS SHALL BE THOSE GOLD ANODIZED,6063 ALUMINUM TUBE ALL WIRES. t COY WITH TWO NORMALLY OPEN AND TWO NORMALLY 3) PLENUM RATED CABLE.SHALL BE ACCEPTABLE IN HUNG SCHEDULED ON THE MECHANICAL DRAWINGS. - . CLOSED OUTPUT CONTACTS. CWITHINOATE THE ALUMINUM TUBE SHAH.RE KYNAR CEWNGS,WALLS,AND RAISED ROOKS. D MOOS SMM Nun ,-m COATED. }) DNOCCUPIED MODE Ys2 H. SENSORS b. PROBE ASSEMBLY MOUNTING BRACKETS SHALL BE 4) ALL WIRING LOCATED OUTSIDE SEW1 BE INSTALLED IN RIGIDE ROOFTOP UNIT SHALL BE STARRED B45ED UPON1) ALL ELECTRONIC SENSORS SHALL BE VIBRATION AND CONST'RUCIED OF 304 STAINLESS STEEL PROBE CONDUT,SEAL TIE.OR EMT WITH.COMPRESSION FITTINGS. START TIME OPTIMIZATION PROGRAM,THE OF DAY THE BOX DAMPER SMALL CLOSE AND THE ELECTRIC MECHANICAL _CHEDULE OR MANUAL COMMAND ANO RUN REHEAT SMALL REMAIN DE-ENERGIZED.CORROSION RESISTANT FDR WALL.IMMERSION,OR DUCT ASSEMBUES SMALL BE MOUNTED USING ONE OF THE ONTINUOUSLY. SPECIFICATIONSF MOUNTING AS REQUIRED. FOLLOWING OPTIONS: 5) FASTEN FLEXIBLE CONDUCTORS,BRIDGING CABINETSAND b. IF'THE SPACE TEMPERATURE FALLS BELOW THEDOORS,MONO HINGE SIDE;PROTECT AGAINST ABRASION. - E AIR HANDLING UNR DX COOLING,HOT GAS UNOCCUPIED SETBACK TEMPERATURE SETPOINT OF - - 2) TEMPERATURE SENSORS USED IN DUCT OR SPACE SENSING (1) INSERTION MOUNTED THROUGH THE SIDE OR TIE AND SUPPORT CONDUCTORS. EATING.AIRSIDE ECONOMIZER AND POWER EXHAUST 60-F(ADJ.)OR RISES ABOVE THE UNOCCUPIEDAPPUCATIONS SMAL BE THERMISTORS,TEMPERATURE TOP OF THE DUCT 6) NUMBER-CODE OR COLOR-CODE CONDUCTORS FOR FUTUREHALL OPERATE PER THE UNR$MANUFACTURER SENSORS SHALL HAVE IEEE FOLLOWING CHARACTERISTICS. OVIDED SEQUENCE OF OPERATIONS. FAN SYSTEM ESERV NC THE OIgV BO%BSHAL BE THE _ _ 'P (2) INTERNALLY MOUNTED INSIDE THE DUCT OR IDENTIFICATION ANp SERVICE OF CONTROL SYSTEM.EXCEPT .ACCURACY: PLUS OR MINUS 0.5 DECF. PLENUM LOCAL INOMDUPL ROOM.CONTROL CABLES.: L ASSOCIATED VAV BOXES SHALL BE ENABLED ENABLED AND THE VAV ROX SHALL BE INDEXED TOIOR TO THE SUPPLY FAN STARING. THE MAXIMUM GEM SETTING.THE FAN SYSTEM SHALLb. WIRE: TWISTED.SHIELDED-PAIR CABLE - (3) STANDOFF MOUNTED INSIDE THE PLENUM ]) WIRES AND CABLES SHALL BE AS FOLLOWS RUN FOR A MINIMUM CF 1/2 HOUR(ACJ.). >�— - - c. SPACE SENSORS: c. THE OPERATING PIRROWRANGE$HALLBE0TOR PON A SMALL.COMMG.MM M U TTART.TIRETIN MINIOOR AIR cSINGLE CONDUCTOR(120VAC):'TYPE TMWN 12AWG MPFA$HALL MODUUTETO MAINTALN MINIMUM THE VAV DDC CONTROLLER SHALL BE PROGRAMMEDS000FPMUNLESS OTHERNISEINDICATEDONTHE5TRAN W INSUUTON UTDOOR AIR SETPOIE TN FOR.00CUPANCY OVERRIDE BY DEPRESSING THE -NT UTM NTANDED COPPER ITH 600VAS SENSED BY E OUTDOOR}5$ 1 SET-PO Apt 5 E D INDICATION:Yn EXPOSED PAS' _ R FLOW MONITORING STATION. THE RETURN NR OCCUPANCY OVERRIDEBUTTON LOCATED ON THEM-5O3 - tl. THE NUMBER OF SENSOR HOUSINGS PROVIDED FOR B) CQMMUNICATDNS NETWORK CABLING- MPER SHALL MODULATE CLOSED PROPORTIONATELY SPACE TEMPERATURE SENSOR,iNE VAV BOX SHML S THE OUTSIDE AIR P N. -BE RESTORED TOTHE OCCUPIED TEMPERATURE_ D TE 0 E TH _g (2) LCD DISPLAY FOR TEMPERATURE READING EACH LOCATION SHALLBEASFOLLOWS AMPER MODULI E .G CABLE$MALL AC OF TYPE RECOMMEND BY IRE BM5UPPLY FAN SMALL START AND RUN CONTNUOUSLY. - SETPOINTAND THE FAN SYSTEM SERVING THE VAVSYSTEM MANUFACTURER AND 2OAWC AT A MINIMUM. _ - c � o:nI SHALL BE ENERGIZED. 1'ryx16Hw1 _ A - -CONSTRUCTION DOCUMENTS - - ' - -