HomeMy WebLinkAbout0295 LAKE ELIZABETH DRIVE . �. .,z:.
/� �'�
f
. r. s ..
_„
w s<
.. � � ,•, -
y .�
a ..
., � -.
... a .�' �,
.. �.. �.
z ,
x
o � .. � a
.• ,. -
� � � -
�. � - o
r
e .. _ - � � - � � � .0 _ _ - _ `
.. .,
a. ,. u
�. _ .,- _ s
- -_. r z -,. ..
:. �.. � -
., - o - - ,.� _ _ _ o - - - _
� .,
,. .. _
- -
m ..
Lb .. ', � o
_ ..N a
... - - L �+
., .. �
;... .:,.
e ¢ ,. ..
�, _'
tl � ,.
.. � _ _ � .,
o
��. ry .. i'
,.. �� r
�. ..
y ,; �.^ '�
,� � e
,. �.,.
,N.
,. ..
.,
�. a � o
:. .. ��.
n •�
.. �. . ,,
.. ...
.:
.... a
- ..
o.
.: ..
i .�
r o
Y :.
e,. � c ,. n
T ,. Town of� Barnstable
Building
_ Ilg
M nJob and,this CardMust be.Kept
Snxnsrwuc
Permit
MASK
Poste1639,
d Until`Fina! Inspection Has Been Made
'�earu ° Where a Certificate of Occupancy is Required,such Building shall Not be Occupied.until a'Final Inspection has been made
Permit NO. B-19-3894 Applicant.Name: W. Ray Colwell Approvals
Date Issued: 11/19/2019 Current Use: Structure
Permit Type: Building-Insulation—Residential Expiration Date: 05/19/2020 Foundation:
Location: 295 LAKE ELIZABETH DRIVE,CENTERVILLE Map/Lot: 227-004 Zoning District: RC Sheathing:
Owner on Record: FACKRE,GABRIEL J ESTATE OF Contractor Name: 5C Energy Framing: 1
Address: 32 CASTLETO.N STREET Contractor License: 194390 2
JAMAICA PLAIN, MA 02130 Est. Project Cost: $ 1,575.00 Chimney:
Description: Insulation;See Contract =;P"ermit Fee: $85.00
Insulation:
Project Review Req: Fee Paid: $85.00
X Date: 11/19/2019 Final:
Z�dsuCrn Plumbing/Gas
Rough Plumbing:
`. •_ Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized bythis permit is commenced within six months after issuance.
All work authorized by this permit shall conform to the approved application,and theapproved construction documents for which this permit has been granted. Rough Gas
All construction,alterations and changes of use of any building and structuresashall be in compliance with the local zoning by laws and codes.
This permit shall be displayed in a location clearly visible from access street orroad and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by theiBuilding and Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing
2.Sheathing Inspection iw Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final'
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT