HomeMy WebLinkAbout0152 LAKESIDE DRIVE EAST f�� �a j�ces`i�e ,s-,-
. .
� U
:. � o � c
N. P
' � ' � �� - _
r � j}�
1
_ e
�.
_ v
- ,. � � .�
R �i
i,
r ,. ..
8 - ..
.. �.
.. s. .,
_ - r q ,. _
,. �
o. e
�� � .: c
o
.. s ., _ ..
- - ,
a ,. ,�
.. - .- ,.
,. ,z
c - d ., _
_.. .. _ � _� .. .o ,.' ..
- e ,
y -., �. -
,,:
i ;. � x
.. .'
.. � e
.. � ..
{ � .. � ,�
'. 1.. � f ..
..
e _ ..
.� .. ...,
0
d <
,. -. _ ,`.
. � c - - ..
,�, .. ,,
,.
. � u - .
0
a a ,. � w v
,�.
�' ,'
., � ,� rr
e � ., - �,
� o
e
' ,. �� � ,
Town of BarnstableBuilding n.... ur .w.- .. .. mn _ .
m the Street-Approved Plans Must be Retained on, and this Card Must be Ke'.Post This Card So That it is Visible Fro pp Kept �.
a `
'Where a Certificate of Occupa ncy is R Posted Until Final Inspection Has Been Made. �� ��
_,. :. ' 4q"^ be Occupied until a-Final Inspection has been made.
ere Required,such Building shall Not
Permit No. B-19-715 Applicant Name: William Callahan . Approvals
Date Issued: 03/13/2019 Current Use: Structure
Permit Type: Building-Insulation- Residential Expiration Date: 09/13/2019 Foundation;
Location: 152 LAKESIDE DRIVE EAST,CENTERVILLE Map/Lot 252-109 Zoning District: RD-1 Sheathing: ,
Contractor Name: WILLIAM CALLAHAN Framing: 1
Owner on Record: MORITZ, BARBARA A �.,. � g�
Address: 152 LAKESIDE DR Contractor License: C5-095581 2,
CENTERVILLE MA 02632 + - e
Est Project Cost: $7,736.00 Chimney:
Description: Insulation/Air Sealing . ;Permit Fee: $89.45
i Insulation:
Project Review Req: — Fee Paid:` $89.45
Date. 3/13/2019 Final:
Plumbing/Gas
Rough Plumbing:
Building Official Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authoized,by this permit is commenced within'six months after`1 1. issuance.
All work authorized by this permit shall conform to the approved application and theapproved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structuresshall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public,inspection for the entire duration of the Final Gas:
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and"Fire Officials are provided on this permit.
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footingt!
2.Sheathing Inspection , _ .. M. Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
Final:
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection
5.Prior to Covering Structural Members(Frame Inspection) Low,Voltage"Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Fire Department
Building plans are to be available on site
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
�-