HomeMy WebLinkAbout0143 MAIN STREET (CENT.) Unit #A C
i
'
»
,
s
:
w
i.
c :f
„ r
.. .. - ,. a ...
ss
ra .. ,
s
,
s
n
,
- Y
,
i
,
,
a
,
P
,
,, .
..
��
Y � ,:
�, , , , . ,
.. t ,
�. ..
..
,,
„ a
,: � <.
. . . .
_ A ::
,.
.'
.. ,�.
�: _ r
,,
_..
i. i
. ... '� !'
�:
.. � .'
.. -
n
., .. ....
.. ,;
..�
,.
.. - ,'. 4
' 4: - .,, .
��. .. r ,.
,. :. > � - -
- ..
F
�. t
.,. Town of BarnstableBuildipg
r " Post , �? MA-S, ThC e po n t
ceLln it.,Final nspectio�n w
�
HasjBeen Made z z Permit
FarNct° Where a Certificate of Occupancyis Required,such Building shall Not be Occupied until a Finallnspect�on,;has been made#
Permit NO. B-19-3840 Applicant Name: Richard Tupper Approvals
Date Issued: 11/14/2019
Current Use: Structure .
Permit Type: Building-Insulation-Residential Expiration Date: 05/14/2020 foundation:
Location: 143 A MAIN STREET(CENT.),CENTERVILLE Map/Lot: 208-154 Zoning District: RD-1 Sheathing:
Owner on Record: Marc Philip Contractor Name:' ..Richard S Tupper Framing: 1
Contractor License. CS.069058
r _ 2
Address: 143A Main Street
Centerbille, MA 02632 Est Project Cost: $5,432.00 Chimney:
„ y:
Description: Air seal home to restrict air leakage, install 10 mil poly and 2" R-10 Permit Fee: $85.00
board in crawlspace,install R738 FG and R 14 tellulose in attic, Insulation:
r "Fee Paid $85.00
install densely packed cellulose in exterior walls,install ventilation
Final:
chutes. Date,.,' 11/14/2019
�. .
i L[ s�.scrn�y Plumbing/Gas Review Req: y Rough Plumbing:
�� _ Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authored by this permit is commenced within siz aonths after`;.issuance.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be incompliance with the local zonmg0by law's'a id codes.
_ � Final Gas:
This permit shall be displayed in a location clearly visible from access street orjroad�and shall be maintained open for public nspect�on for the entire duration of the
work until the completion of the same.
Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Bu�ldmg andwFire Officials a're prowded�on this permit.
Minimum of Five Call Inspections Required for All Construction Work r � k Service:
1.Foundation or Footing _
ROu h:
2.Sheathing Inspection w g
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
Feb 20 2020 03:53PM Tupper Construction Co. 5087785010 page 1
'N } TU PPE R
' CONSTRUCTION CO-LILC
546A Higgins Crowell Rd,WEST YARMOUTH,MA 02673
PHONE: 508-778-0111 FAX: 508-778-5010
EMAIL:admin®tupperco.com
FFB Fpr
Date: �-) � � TOWN 2®2020
OFe'qRNSTq
e4F
Town of Barnstable
Building Inspector -- - -�-�- _----
200 Main Street 3-lam/-Yl. j=►�-S' - C.�►�=
Hyannis, MA 02601
(508) 790-6230 fax
Re: Insulation Permit at
Permit#
Issued On I (y
This affidavit is to certify that all work completed for the above permit
application has been inspected by a certified Building Performance Institute
(BPI) inspector. All work performed meets or exceeds Federal and State
requirements.
Sincerely,
i
Richard Tupper
License # CS-69058
Town of Barnstable Building
¢ Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept f
MAOM Posted Until Final Inspection Has Been Made. �'
i6fQ.a4Vi IL 1
Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made.
Permit No. B-19-2394 Applicant Name: Mark Phillip Approvals
Date Issued: 08/05/2019 Current Use: Structure
Permit Type: Building-Siding/Windows/Roof/Doors Expiration Date: 02/05/2020 Foundation:
Location: 143 A MAIN STREET(CENT.),CENTERVILLE Map/Lot: 208-154� Zoning District: RD-1 Sheathing:
Owner on Record: Mark Phillip Contractor'Name',_,,., Framing: 1
Address:' PO BOX 2920 Contractor License: 2
NANTUCKET, MA 02584 Est. Project Cost: $6,000.00 Chimney:
Description: Reshingling the sidewalls and roof Permit Fee: $35.00
l i
i Insulation:
# Fee Paid:r $35.00
Project Review Req:
$ Date. 8/5/2019 Final:
Plumbing
/Gas
r✓7G�'�.
Rough Plumbing:
Building Official
Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after-,issuance.
All work authorized by this permit shall conform to the approved application and the'approved construction documents for which th s permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same. w
i' Electrical
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this=permit.
Minimum of Five Call Inspections Required for All Construction Work.I. >'` Service:
1.Foundation or Footing
Rough:
2.Sheathing Inspection
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed-
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection)
Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations.
Work shall not proceed until the Inspector has approved the various stages of construction. Health
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site Fire Department
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final:
.,, Town of BarnstableBuilding
Post This Card So That it is Visible From the Street-Approved Plans Must be Retained on Job and this Card Must be Kept
XAJ% Q Posted Until Final Inspection Has Been Made. �� ��
s6Yq.A��B'
Where a Certificate of Occupancy is Required,such Building shall Not be Occupied until a Final Inspection has been made.
Permit No. B-19-2360 Applicant Name: Mark Phillip Approvals
Date Issued: 07/24/2019 Current Use: Structure
Permit Type: Building-Shed-Residential-200 sf and under Expiration Date: 01/24/2020 Foundation:
Location: 143 A MAIN STREET(CENT.),CENTERVILLE Map/Lot:208-154 Zoning District: RD-1 Sheathing:
Owner on Record: Mark Phillip Contractor Name, Framing: 1
Address: PO BOX 2920 Contractor License: 4 2
g
NANTUCKET, MA 02584 Est. Project Cost: $3,600.00 Chimney:
Description: Home Depot will put a 10x12 wood shed down Permit Fee: $35.00
) Insulation:
Fee Paid:,,' $35.00
Project Review Req: 10'x12'shed located as shown on submitted plot plan
Date / 7/24/2019 Final:
/ - Plumbing/Gas
( Rough Plumbing:
,Building Official
' ry Final Plumbing:
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after_issuance.
E
All work authorized by this permit shall conform to the approved application and the"approved construction documents for which this permit has been granted. Rough Gas:
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas:
work until the completion of the same. �y
p Electrical
h Building and Fire Officials are rovidedonthis' ermit.
The Certificate of Occupancy will not be issued until all.applicable signatures byte d g, p p
Minimum of Five Call Inspections Required for All Construction Work: Service:
1.Foundation or Footing
2.Sheathing Inspection Rough:
3.All Fireplaces must be inspected at the throat level before firest flue lining is installed
4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection Final:
5.Prior to Covering Structural Members(Frame Inspection)
Low Voltage Rough:
6.Insulation
7.Final Inspection before Occupancy
Low Voltage Final:
Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health
Work shall not proceed until the Inspector has approved the various stages of construction.
Final:
"Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A).
Building plans are to be available on site /�� Fire Department
Final:
All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT 0�
S�j