Loading...
HomeMy WebLinkAbout0216 PLEASANT PINES AVENUE a c .. .ice Town of Barnstable 1111C11I1 � g s Post This Card So That it is:Visible From the Street-Approved Plans Must be Retained on Job`and this Card Must be Kept ► aAMSTARM Posted Until Final Inspection Has Been Made - e� j .a�v.��� �u re ... lM upancy is Required,such Building shall Not be Occupied until a Final Inspection has been made 4� 1 Where a Certificate of,Occupancy g Permit No. B-19-103 Applicant Name: Donald Webb Approvals Date Issued: 02/11/2019 Current Use: Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: 08/11/2019 foundation: Location: 216 PLEASANT PINES AVE,CENTERVILLE Map/Lot: 234-070 Zoning District: SPLIT Sheathing: Owner on Record: WEBB, DONALD RTR Contractor Name:-- Framing: 1 Address: .216 PLEASANT PINES AVE Contractor License:. '* 2 CENTERVILLE MA 02632 Est Project Cost: $ 25,000.00 l f Chimney: Description: Remove Screened Porch and Replace with aAtion..Move'exisiting Permit Fee: $ 177.50 interior walls,change in floor Ian. $ 177.50 Insulation: g p �. �' Fee Paid:F<' r _ Project Review Req: SMOKE/CO DETECTOR'OUTSIDE MASTER BDRM TO BE R Date 2/11/2019 Final`. INSTALLED WITHIN TEN FEET OF DOOR. i Plumbing/Gas Rough Plumbing: _ . •., Building Official Final Plumbing:. This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after,issuance. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. Rough Gas: All construction,alterations and changes of use of any building and structure's shall be in compliance with the local zo�in -by-laws,and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the Final Gas: work until the completion of the same. f Electrical The Certificate of Occupancy will not be issued until all applicable signatures.-by the Building and Fire Officials are provided on this permit. Minimum of Five Call Inspections Required for All Construction Work:;i Service: 1.Foundation or Footing Rough: 2.Sheathing Inspection ` 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed''" 4.Wiring&Plumbing Inspections to be completed prior to.Frame Inspection Final: 5.Prior to Covering Structural Members(Frame Inspection) 6.Insulation Low Voltage Rough: 7.Final Inspection before Occupancy Low Voltage Final: Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Health Work shall not proceed until the Inspector has approved the various stages of construction. "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in M Final: GL c.142A). Building plans are to be available on site Fire Department All Permit Cards are the property of the APPLICANT-ISSUED RECIPIENT Final: bN�N� Em4cf-- ' ►, Town of Barnstable Building BASUMAMM xPost�£Thi �C 'rihSo.That rt;is Nisible;From-the'•Street A ""roved:Plans;;Nlust beRetained on Job andahis�Card�Must�beKKe`t�,: - M"W eat Where a Certificate of�Occupancy;s Required,such Building shall Not;:be Occupied until a Final Inspection-has been�made �,f Permit No. B-18-3272 Applicant Name: Donald Webb Approvals Date Issued: 10/24/2018 Current Use:. Structure Permit Type: Building-Addition/Alteration-Residential Expiration Date: . 04/24/2019 Foundation: Location: 216 PLEASANT PINES AVE,CENTERVILLE Map/Lot: 234-070 Zoning District: SPLIT Sheathings Owner on Record: Donald R Webb Contractor Name:' • Framing: 1 Address: 178 ANNABLE POINT ROAD Contractor License; 2 CENTERVILLE, MA 02632 Est Project Cost: $4,000.00 Chimney: Description: Exploratory removal of interior wall covering,Insulate,winterize. Permit Fee: $:85.00 Reinstall interior wall covering. Fee Paid,. $85.00 Insulation: Project Review Req: NO STRUCTURAL WORK. NO RECONFIGURATION OF'SPACE. Date 10/24/2018 Final: INTERIOR WORK ONLY. Plumbing/Gas Rough Plumbing: g • ,_, Building Official x0 ca Final Plumbing: Rough Gas: This permit shall be deemed abandoned and invalid unless the work authorm d*'this permit is commenced within six months after issuance. Final Gas: All work authorized by this permit shall conform to the approved application and the approved construction documentvfor which,this permit has been granted. All construction,alterations and changes of use of any building and structures shall be incompliance with the local zoning;by laws•and codes. Electrical f h entire duration This permit shall be displayed in a location clear) visible from access street or road,and hall,be'mamtaned o 'en for ublic ins ection or the e t e du at o o t e PY p, P P work until the completion of the same. Service: The Certificate of Occupancy will not be issued until all applicable signatures bythe Building and fire Officials are providedAon this permit. Rough: Minimum of Five Call Inspections Required for All Construction Work:" 1.Foundation or Footing Final: 2.Sheathing Inspection 3.All Fireplaces must be inspected at the throat level before firest flue lining is installed Low Voltage Rough: . 4.Wiring&Plumbing Inspections to be completed prior to Frame Inspection 5.Prior to Covering Structural Members(Frame Inspection) Low Voltage Final: 6.Insulation 7.Final Inspection before Occupancy aHealth Fiinal: .. Where applicable,separate permits are required for Electrical,Plumbing,and Mechanical Installations. Work shall not proceed until the Inspector has approved the various stages of construction.. Fire Department "Persons contracting with unregistered contractors do not have access to the guaranty fund" (as set forth in MGL c.142A). Final: O N 4Z•N'� FM AXL S iFJ T