Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0413 SKUNKNET ROAD
� � .���� �,� . , . . ,�� �. . r ., � ,.. ,.; .�, ' - � .. R - n 0 :, ,� .:• _ � . TOWN OF BARNSTABLE BUILDING PERMIT APPLICATION Map Parcel Application #o b Health Division Date Issued 9 )S Conservation Division Application If -�" Planning Dept. Permit Feell/br S� Date Definitive Plan Approved by Planning Board Historic - OKH _ Preservation/ Hyannis Project'Street Address 413 Skc Y� /Pd�T7 Village e�� .tl�, �V>L L E- _ f Owner ¢i?Ienq,4AD Address :SdZM Telephone S�"� 775 -O 8'l 4 Permit Request L4:� t y-L L Z / 5,94 zM zM&,eL S TD-T`, / A/a ,QA1 D Square feet: 1 st floor: existing proposed 2nd floor: existing proposed Total;new v= Zoning District Flood Plain Groundwater Overlay Project Valuation 2�40,Q�Construction Type y` Lot Size Grandfathered: ❑Yes ❑ No If yes, attach supporting docurntation. DwellingType: Single Family *2 yp g y Two Family ❑ Multi-Family (# units) „h Age of Existing Structure Historic House: ❑Yes A No On Old King's Highway: ❑Yes XNo Basement Type: ❑ Full ❑ Crawl ❑Walkout ❑ Other Basement Finished Area (sq.ft.) Basement Unfinished Area (sq.ft) Number of Baths: Full: existing new Half: existing new Number of Bedrooms: existing —new Total Room Count (not including baths): existing new First Floor Room Count Heat Type and Fuel: ❑ Gas ❑ Oil ❑ Electric ❑ Other Central Air: ❑Yes 0 No Fireplaces: Existing New Existing wood/coal stove: ❑Yes ❑ No Detached garage: ❑ existing ❑ new size_Pool: ❑ existing ❑ new size _ Barn: ❑ existing ❑ new size_ Attached garage: ❑ existing ❑ new size _Shed: ❑ existing ❑ new size _ Other: Zoning Board of Appeals Authorization ❑ Appeal # Recorded ❑ Commercial ❑Yes ❑ No If yes, site plan review# Current Use Proposed Use APPLICANT INFORMATION (BUILDER OR HOMEOWNER) NamejU� �/�/ D Telephone Number � o� Address 9;2 40q/ C_ AiQ D SDi(/ /la-; License # 42 ,2 7� V Home Improvement Contractor# l V-0/i l Email 42k2A/ ?'-10 6, P A,QPJ,9 Ad126k_.-5,�6MWorker's Compensation # ALL CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT WILL BE TAKEN TO SIGNATURE Z DATE dl /��' C '. r FOR OFFICIAL USE ONLY k APPLICATION# DATE ISSUED MAP/PARCEL NO. i ADDRESS VILLAGE OWNER • ' DATE OF INSPECTION: FOUNDATION FRAME " INSULATION FIREPLACE ° ELECTRICAL: ROUGH FINAL PLUMBING: ROUGH FINAL GAS: ROUGH FINAL FINAL BUILDING b L11 S' DATE CLOSED OUT ASSOCIATION PLAN NO. ^ t III �G!ze�oo•nv�•auueal�z o�G/�aac�u j, '•' Office of Consumer Affairs&Business Regulation j License or registration valid for individul use only OME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: egistration 120111 Type: Office of Consumer Affairs and Business Regulation 10 Park Plaza-Suite 5170 Expiration 10/18/2015 individual , ^� Boston,MA 02116 PAUL F.CAPRIO PAUL CAPRIO - "'_'_.."`: ' 92 Richardson Road � o Centerville,MA 02632 Undersecretary Not valid witho rgnature vYae ipryryu�searyccue�clt/a�C�/l7'eiatae/ureff- Office of Consumer Affairs&Business Regulation *OME IMPROVEMENT CONTRACTOR egistration: <120111 Type: Expiration:�-_10.8%2015 Individual PAUL F:CAPRIO f. t `ry PAUL CAPRIO 92 Richardson Road , — Centerville,MA 02632 Undersecretary s Massachusetts.Department of Public Safety . Board of Building Regulations and Standards License: CS-022375 Construction Supervisor PAUL F CAPRIO = 92 RICH ARDSON.RD ern r r • "a'r CENTERVILLE MA 02632 t .. nnt <••.T84tC S. Expiration: . Commissioner 07/28/2017 77ze CoMmornvealih rsj -Vassadiusetts m . �-� Depar'anivit o,f lridustrial Accidents Of-ce ofImwstigadons . _ ; 600 Washington Street _y -Bostvn,MA 02111 >'mvmmass_gavIdiza V,Grkers' Campensatian Insurance Affidavit:Builders!Contractors/EIectr cians/Plu nbers Applicant Infarmatkn Please Print Leib Name($tyffie g=ern andnmdre P,41 Address:-9,-7_ /1�C � ,�✓'Y`; CifylStatelip' y' :© Phoneme D8�Are you an employer?Checkthe appropriate box: ' Type of project(required): 1.❑ I am a employer with 4. I am a general contractor and I , ❑New ve fired the sub-contractors 6. Ne construction employees(full aritilorpdrt-time)- ` 2.❑ I am a sole proprietor orpartner- listed on the attached sheet 7. ❑Remodeling ship and have no employees. Thy sub-cont<adors hafie $,,❑Demolition wo.ring for me in any capacity. employees and have Workers' INoorlpem, camp.insu=ce camp-insuran�l 9. ❑Building addition sv- required] 5. We are a corporation,and its 10-[1 Electrical repairs or additions officers have exercised their 3.❑ I alas a homeovEmer doing all work 11_❑Plumbingrepairs or additions myself o workmt right of exemption per MGL , fimx nce required_]i c.152,§1(41 and we have no employees.[No workers' 13:;Q OtherSplf),Q /Pi(/ camp.insurance required-] 'Any appficmt that checks box rEl mast also fiU cutthe sectionbebow shuning their wa&ee campevsatioupoyey im5rmafion_ #liameuwners who submit This aT.I v t in:Tk tmZ they are dokg all w,oal and thm hire outside contmaors zmad submit anew affidavit indicating sash IConhactors that check iWs ba x must attar-bed sa additional sheet showing tham2me of the sob-c=tractaa and state whether or not those eatitiesbam employees.If the suk cautmctnrshave emgIosers,the ymvstpruvide their nmrkers'-comp.policy nim ber I am an srttplolYrr fJtatis prot�ding yuorkers"cotrrpertsafiott insrtra>tce for m}*enrp es Ho[mv is fltepoli y and job site itzfarmalian .• { Insurance~Company Nance: Policy#or Self--ins.I.ic- EkpiratomI?ate: Job Site Address: City/StatelZ�p: Attach a copy ofthe workers'compensationpolicy detdaration page(showing the policy number and expiration date). Failure to secure coverage as required-under Section 25A o€MGL c- 152 can,lead to the imposition of crim;nai penalties of a fine up to$1,5QU OQ and�or one-year irprisoun2euf:as well as civil peualties,in the faun of a STOP�JCJR DRDERand a fine, of up to$250-00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of lavest gations office DIA,for insurance coverage verification_ I rfo thereby c rutdcr the prri a andpenaheias afper,wy,thattjlte irtformadwj proi-*ied abm a ig true and r-orrect Sitmature. Date: f Phone g- -' Ofeial use only. Do not swite in this area,to be campWad by city+artown offieiaL City or'Fowu: PermitUcense# Issuing Autlsority(circler one): 1:.Board of Health 2.Building Department 3.Citylrown Clerk 4.Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#: ormation and Instructions . Massachusetts Geheral Laws chapter 152 reqirires all employers'to provide workers'compensation for their employees. FarSaant tD&his statute,an mi 7royee is deed as_"-.every person in the service of another under any conxact of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged m a joint enterprise,and including the legal represenfafives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other Iegak entity,employing employees. However the owner of a dweIIing house having not more than three apartments and who resides therein,or the occupant of the - dwelEng house of another who employs persons to do mafi±Eaace,construction or repair work on such dweIIing house or on the grounds or building app themto shall not because of such cmploymentbe deemed to be an.employer." MGL chapter 152,§25C(t7 also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct burZdmgs in the commonwealth.for any applicant who has not produced acceptable evidence of compliance with the insnrauce.coverage req¢Ired" Addiiiona by MGL chapter 152,§25C(7)states"Neither the commonwealth nor any ofits political subdivisions shall eater mt D any contract for the perfoffiance ofpubho wo3:k until acceptable evidence of compliance with the in sin-anc6.. requicemen s of this chapter have been presented 7n the cow-acting authoz4_" = Applicants Please fiII or the workers' compensation affidavit ccmpkf,- ly,by checking 5 boxes that apply to your situation and,if necessary,supply sub-contractors)n�e(s), addresses)and phone numbers) alongwiththeir cerfifcate(s)of Limited Liability Companies(LLC)or Limited Liability PartnPiships(LLP)with no employees other than the members or partners,are not rbquimd to carry workers' compensation msm-ance. If an LLC or LLP does have employees,a policy is required. Be advised that this athdayh may be submitted to the Department of Industrial Accidents for confirmation of m srn-an ce coverage. Also be sure to sign and date-he of davit The affidavit should be retrimed to$e city or town that the application for the permit or license is being requested�not the Department of lin-diistwl Accidents. Shoukdyou.have any questions regadmg the,law or if you are requ:iied to obtain a workers' compensation policy,please call the,Department at the number listed below Self-insured companies should enter their self-bis rranca license number on the appropriate line. City or Town Officials f Please be sore that the affidavit is complete and prided legibly. The Department has provided a space at the bottom of the affidavit for you to till out:in the event the Office of Investigations has to contactyou regarding the applicant Please be sure to fill in the peamitllicense number which will be used as a reference number. In addition,an.applicant that Must submit multiple permWhcense applications in any given year,need only submit one affidavit indicating current p olicy jji- =ation(if n(-,cessary)and under"Job Site Address"the applicant should Write"all locations in (cry or town)_"A copy of the-affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as prooftbat a valid affidavit is on file for futnre'permits or licenses. A new affidavitmust be filed out each year.Where a home owner or citizen is obtaining a license or permit not.related to any business or commercial ventise (it. a dog license or permit to bum Ieaves etc.)said person is NOT required to complete thn affidavit The Of of Investigations would Irke to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Dt--u h enfs address,telephone and fax number_ 'fie CG-rnanWeattij of Ma&-sachu&-c-tfs Department of I�dustiai AQCZeats �ff7t�r���tve�fig�i�ioAs ��4�ashiz�tan Stc�� , Fax 617'27-7M Revised 4-24-07 w w .mas5-gQvfdia A ® ROK DATE(MM/DD/YYM CERTIFICATE OF LIABILITY INSURANCE R045 4/7/2015 THIS CERTIFICATEIS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. <, IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATIONIS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT NUMBER ONE INSURANCE AGCY INC/PHS (AG,ti,Eat): (866) 467-8730 wc,Ne): (888) 443-6112 088171 P: (866) 467-8730 F: (888) 443-6112 FA-D1`DReSS: 301 WOODS PARK DRIVE INSURER(S)AFFORDING COVERAGE NAICY CLINTON NY 13323 INSURERA: Hartford Fire Ins Co INSURED NSURER B: MATTHEW ABOODY DBA MATTHEW ABOODY INSURERC: ELECTRIC INSURERD: 79 KINGSWEAR CIR INSURERE: SOUTH DENNIS MA 02660 wsuRERF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO.WHICK THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY-THE POLICIES DES_0RI5ED HEREIN IS SUBJECT TQ_ALL,THE "TERfiAS;EXCL"USIONS AND-CONDMO19S OF ZUCF PMC1E3`:'L1UMS SAOWMAYFIAVE BEEN`IMDUCED BY PAID,CLAIMSr , INSR TYPEOFINSURANCE ADOL SUER PaucrNumm P�YEFF POLfCYEXP Lwrrs COMMERCIAL GENERAL UABILITY EACH OCCURRENCE CLAIMS MADE OCCUR . DAMAGE TO RENTED PREMISES occurrence MED EXP(Any one person) PERSONAL BADVINJURY GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE POLICY❑JECT LOC PRODUCTS•COMP/OP AGG OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accidenO ANY AUTO BODILY INJURY(Per person) ALL OWNED SCHEDULED BODILY INJURY(Per accident) AUTOS AUTOS HIREDAUTOS NON-OWNED - PROPERTY DAMAGE AUTOS (Per accident) UMBRELLA UAB OCCUR EACH OCCURRENCE EXCESS UAB CLAIMS•MADE AGGREGATE DED RETENMCN 3 WORKERS COMPENSATION X STATUTE STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE YIN E.L.EACH ACCIDENT 10 0,0 0 0 OFFICER/MEMBER EXCLUDED? A (6landatory In NH) ❑ N/A 08 WEC EG7606 10/27/2014 10/27/2015 E.L.DISEASE-,EA EMPLOYEE 100,000 It yes,describe under NSDelo DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) ' Those usual to the Insured's Operations. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Robert Dean AUTHORIZED REPRESENTATNE 586 STRAWBERRY HILL RD �-� CENTERVILLE, MA 02632 01988-2014 ACORD CORPORATION.All rights reserved: ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD A� CERTIFICATE OF LIABILITY INSURANCE °A 410312015 04I03/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder is an ADDITIONAL INSURED,the pollcy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Marcl S.Hansen Dickey Insurance Agency a/c°NN Et: 508-398-3031 AtC No): 508394-2524 41 Hall St. ADDRESS: email@dickeyinsuranosagencycom PO BOX 39 INSURER(S)AFFORDING COVERAGE NAIC# Dennisport MA 02639 INSURERA: Safety Insurance Company INSURED INSURER B: Matt Electric,Inc. INSURER C: Robert J.&Matthew R.Aboody INSURER D 79 IGngswear Circle -INSURER E South Dennis MA 02660 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR _.- ._rYPE OF INSURANCE POLICY N061HER-- M Wmfoplyyyyl GENERAL LIABILITY EACH OCCURRENCE $ $1,000,000 COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ $100,000 CLAIMSMADE ®OCCUR MEO EXP(Any one person) $ $10,000 BMA0014846 01/04/2015 01/04/2016 PERSONAL&ADV INJURY $ $1,000,000 GENERAL AGGREGATE $ $2,000,000 GEN'LAGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ $2,000,000 POLICY PRO-JECT LOC $ COMBINED SINGLE AUTOMOBILELIMff— LIABILITY Ea accident $ ANYAUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS HIREDAUTOS NON-OWNED AUTOS Per accident) $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS UA13 CLAIMS4MDE AGGREGATE $ DED RETENTION$ S $ WORKERS COMPENSATION C AND EMPLOYERS'LIABILITY YIN TOY L MITS ER ANY PROPRIETORMARTNER/EXECUTIVE❑ NIA E.L.EACH ACCIDENT $ OFFICERIMEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYE9 $ It yes describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Electrical Wiring CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Robert Dean THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN 586 Strawberry Hill Road ACCORDANCE WITH THE POLICY PRIM Centerville,MA 02632 AUTHORIZED REP ACORD 25(2010105) ©1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD a.ITown"of Baf-nstable .� .: R.egu�atory SeY�ces s�xxsxest�. Richard V.Scali,Director a w +'i � ATE �w a Bufldh.g Myn, OzI+ . t rt t Ft; e Ion Perry,Building.Comndissioner. ' ;�a • - 200 Main Street,Hyannis,TYf A.02601 wwYv.town.Uarastab1exna,us. Office: 508-862-4038 . , Fes: 508-79Q-6� 0 {� ProperL Owner�must (;,t plete and Sign. This Section ,w If Using :A.Puxldex Y "" . `,•,,(� - - _ . .,r ,1 S" is a"A�, ,+}x.i. {S�«�Y 'r" i J.. _ w•t. } x ii +,t ,,. � r"�"�t''.#}a `� 4i,�..Lj^3�:('.�r.S. -'�5� 3 a I i n g�' �1��:5 ,as Owz er of the subject p:coperry ,. r J- t, hereby authorize L t< �o.act on.mybhaf, i _ � t�"�, � as a :}'> � ,K ,� t r t� { :•'4ti+a � o��',ii..t�ifi��� l��.� ,ii�.t"tr`"Fs`�`� -A in all matters.relative to work.autho:ri ed by dais building permit application,for, t:4!5 4:e �+ 1413 - l.�N (`�+.C-� 'A'�!. ._...,;,.:r•`_-.'?J,.w. i�ti,r.s (Addxess of Job) ,,. ti .�. , a a �''a+t .rk. . `,i�u� :.'w .,•!�$,,Y,tt�S#. d+7r,t�� ^;"�5,�` °+�,' ' w "Pool fences axad'alar os are the responsibility of the applicant PN4 . are not to be filled orutilizedbefore fence is installed aad all.final inspections are pe:r.[onned and accepted. ., + tpa .t' l< a. a et -�r l .:+r . _ - •: ,��vt,,. ,p.�.t�*,. , it�ii+�.`♦w�i ti"w�f ;"i`Y P Signatur of Owner Sigaatuxe of ,w' . . .. + , `fit E' � �E. � xi,`. -�: ifl. �tr1t,`e•'iy»�jF g�i 'e}. � t .�,4'ag +�2�'wt w"�4Le�L�+�"i`.C.S'. `#i A i>, r?}11n, i�A,Pb"-��`1l ��i st t 9"��#i' fruit Naiae �., Print Name. .* 3�,��:t ae.• >, M1. .' $,..�S z. .4 Ib "n:�,i"1!glpi'��.�1+1{�.��+.§.,��ip; Av"i- `5r-+4:�":I gr"rryi (} � ' °t :.` V ,l'V i •r,. ... �?a a:h'i3"�14,,: +•... �-" . g Yk� a.•s� ���{'��`t �.i - . �e•.f t}► .s 1 sa. 1 x m i 'date -1 ' a, -� s i a ,a�`�" :« A t�,z $�,•. zt s Q:FoRMS.OWN ER2MS1ozPooz.s rZ r � Structure SNP #: rrt� ttcss� ' Z iYjs' i r Rafter___)Rafter supports oc. s , Notch::Y/N Coll �# �; Rafter Size:_ o%L Ceiling joist: _fs�c/10 Ij-• iF)•��. ..Sb••,-.a 3 >�' -� Distance between rafters: 3 i # i ss i.. 3 .1 l l i t Ridge Beam:. Ridge Support oc Hi Rafter:. Hi rafter su ' � Rafter species:. ? . i 1 Ali Ridge Blocking:Y/N Size i Truss Span Eave to Eave:._ / ✓ Roof sheeting.materials a ` + Roof Sl.Ope: . . �. . i F + : l - ' Rafter Upgrade needed`"T .44 Flat Ceiling:Y/N pitc �� ,i lat roof:Y,/N Pitt r Direction of flat r�f�stoq Vaulted ceiling:Y/N I �' Vaulted tailing pitch. Depth een c. , roof and vaulted ceiling: -4 "-` Knee wall:Y/N diskance from eave'r , 1 span.r^i'dge o eave: Z _�. I - ' -1 TT177- Horizontalom_ ri �( OC i i z .i Collar tie size: toad'°Bear�pg Ala 1 - Attic Hatch Size;'"- eight: 16 .d ✓ Y-.h+ e...:x}r3, y f i.,. t j 3 d p 3 r # 1 -� � I_ Wood length fit: e. Room fo 'nstal.lers: i �y Y i y.���� +— l 1 5 x t 3 y 3e+ 2 E I q:. L. Ait+c Potosi , � Photos of the path from the outside access door(front door or other door)to the attic hatch _I Photos of the attie Batch(Designer will use to determine patfiway of installer) Trussing network under MP Tape against rafter lnclinator against rafter Grade.Stamp/rafter species Ail damage(regardless if on the plane or,pat) 360g d agree in attic at middle of MP IMP view from middle of.each mounting plane. " Upon leaving the attic take photos of ceiling under each thouriting plane showing condition after attic work For all flat roofs;:.photos of carpentertrussing:n vault.,.. For all vaulted ceilings,photo of interior room Mounting Plane #: Homeowner. r-l'; So)metric: MP# '; Proposal Terrn`s �riUleasureda 1• (dumber of Modules Pitch Azimuth 4. Sunny(%) .. ; Obstructions. _ 6. AZI: Pitch: Eaves Gable: t B Parapet H. 7' Roof Material 5 . j Lai yers Tile H. Overlap Reveal. .. 8'' Roof Condition: 60o Shading Issues: 1 '� '•�. '.�„�'�" ! t + .. ��m��F-'"�-�(i' �'-•��-�--- -�- { z -�.. •.^. ; ^'"!-4 - t �- e _ r f s 1 ' 1. ! 3 { I I. .a l i - l � 1. _. !- -y,._,7 t x. 3 I t - 3 ...-...:�., Yf E,3 � a t t�- ��-•..L-.t�...�._,,..�aw� 3�-�.,.�--F F ;.._.y.....�_--i•--r"-"t•---!�_,�,,_,��� s x r _- I.,.a.�-aa-_�, " w..�,._.I.,_..:.-,� �`" ___�A...:. a�•-� � _�-..},,,�. �,,,_.-.-j. F t�_1�..e•.�.,::-_'. t_.�..e.>,....F.T � � b j F� t 3 � i � . : � { 3 �E._.� .. ",�t..""'�'�'...�^ #�' g { 1 t i � �:-'--.•rr-.t#�t � :-#^--?- ��� £ "-f---��1, .rY .: # I f .I j- j # ����� � "t ���# t. ,q x a,...�r. # } i .€......,t 3 } f ,, i... 4 I „•,{'�,�.,!,.... i-4�w `�"' _t v •' - -• . t ..-,t'..,.,,,L-.• ?N• 1 Y � _ s } E ; f d f t�..._..t .._.-�=-q---�£ . f 3 t �.; �,.. ..e� s { -�-��:,:.�,.. � �..- .-�-•-$ _� ,fit �.�,._._ � ��� .. i _'�.'"'�""`'"� ? �. - � ; z � i"�.� . . �, :� 1 --s —77 w r-t- ? --; 1 }. �•.r•_y-.a E --r From the middle of the roof-36(r photos starting a true north with a reference to the starting'position Photos of mounting planes from 0-45 degree'angles from two opposite points within the same MP All shading affecting plane Photos of all.obstructions(from a pulled back angle as'well as close ups):relevant to plane Remove a the(if applicable)and photograph.the tleheight,overlap,reveal,and type Ali visible damage Conduit run Obstruction TypeX A. E. B. F, .. D. K Mounting Plane #: , Hotneowners: r � �S SOimetLlC: D t —A X Y Proposal�errrs} 3 Measf�rel 1• Number of Modules 2, ` Pitch 3. 71 Azimuth Sunny(%) wr Obstructions AZI: Pitch:�0 Eave:____ Gable: / irapetH, Roof Material: iayers__L_ Tile H. Overlap Reveal S. Roof Condition: D� Shading issues: r 3 r " IH 4-1 € } 9 r a a } i�'' e �j „.-F..-,e.......,.� .w�. „; �::�,,,,? ._„.,�. �...,�� '� ....,�..� .�.-- � .i,_ � .•.�.... ., `�. mot" i.: 3 P - { # i 3 .i t d _1 Ill IN a:Ay pk� } a Frowthe middle of the roof -360`photos starting a true north:with'a reference to the starting:position Photos of mounting planes from o 45 degree angles from two opposite points within the same. All shading affecting,plane Photos of all obstructions(from pulled back'angle as well as close ups}relevant to plane Renmove:a tile:(if applicable)and photograph,the the height;, ver!api.reve4l,and type. All visible damage Conduit run OhstrutionT,,:� s X� °Y UU/L/H.or t?/H ©bstrocd TYi . ' `. i Electric Information Eiectrt�Panel ' Sub P-anei Meter#:' S 7.?6 •Z Rating.100 0325 0 150112000 Outer Utility Provider: Brand: Brand: 60c,!_Q ' Buss Rating Panel#• Catalog#: -2-b 0 /*-4 _J��o Main Breaker for sub: MSP Mounted: Entering Wire size: Surface fit"Semi-Hush 11 Flush!al Neutral Wire Present:Y/N Exterior Siding Ground Wire Present:Y/.N Stucco 0 Wood 10 Qrick 0 Concrete 0 Location: Distance': Hardy Boardtj Vinyl Siding O Other[J Free tabs:Y/'N How many Main Panel Location: Type of Breakers used BedroomO BasementlF GarageE3 Utility Room 0 (SA)-Cement BlockC: a x Interior Siding. .ip Reference Stucco 13 Wood 17 Brick 0 Concrete tom' inverter location with geometrical viewport Hardy Board O Vinyi Siding E) Dry Walla Photo Verification of Inverter Placement Other L] Main.panel(entire panel in one shot) Reference Utility feed location with geometrical viewport Main CB Type: /Amp R ting OD Gas main location pertaining to BD5 CG Interruption rating: fib Utility meter(close up) Gauge Wire: Material Dead front on(entire panel In shot) Utility Feed Page on panel door Overhead 10 Dead front removed(entire panel in one shot) Utility feed into main(CB)wire size/buss material Underground CI Panel Upgrade Y/N Main breaker amperage and Sticker - DeRate'Y/N Close-up overlapping photos close enough to read amperage of each individual breaker If Upgrade Needed,Conduit size Hand Hole Location Photos overlapping showing left and right side of wiring network;, ground,neutral and live feeding into(CB)(show gauge of wires) Transformer Location Ali GEC(Grounding Electrode conductors) Main Service Noti's �•: Fed-Top"lP Bottom D Center G9 Free Tabs:Y/N How many Abilityto twin or qu�akers?-_ Quantity: GECType: /Distance I SOLAR SURVEY SATURDAY AUG.1 BRIGGS 41-3 SKUNKNET RD. CENTERVILLE MA CELL SERVICE`GOOD VERIZW INTERNET DIRECT TV ROOF 17 YEARS OLD NO LEAKS NO DOGS METER ACCE5IBLE SINGLE STORY 12 FOOT LADDER TO ACCESS.ROOF o � -o• c. 000000J�000♦OOJ�♦ ���� 5.88 KW SOLAR ARRAY SITE ADDRESS Az CENTERVILLE MA,02632 PREPARED FOR: �jqW♦/GAMEMO/i1/♦i♦/ A♦/�/ Atlantic Power Partners, 586 Strawberry Hill Road Centerville,MA 02632 ���♦%1i♦/GG// /i♦G1i so FOR REGISTRY USE 'KGB+' Gmcn Soul Gnvkonmrnwl.ma l IJ Sint.NnvQ'Building R M Snry ni rz 13.vclt\T a0]563 xv�:,r/.R4Yfi5. ONSIONS DATE MNENT O RAIL ATTACHMENTS MAX 48"-SPAN MAX 16"CANTILEVER CONDUIT RUN LOCATION TO BE DETERMINED IN FIELD PROPOSED SOLAR SUB PANEL PITICH I-36,- J S ox PROPOSED SOLAR PRODUCTION METER PURPOSE: I I 1 I AZIMUTH-1114°1 1 I 1 1 1 1 I 1 1 1 1 1 ! f 1 1 5.88 KW SOLAR ARRAY 1 1 I TL_ C:INDY&RICHARD BRIGGS I I I I I I I I I I I I 1 I I I I 1 I I 1 1 1 1 PROPOSED UTILITY DISCONNECT SITE ADDRESS 1 f 6 413 SKUNKNET ROAD PROPOSED SERVICE RATED DISCONNECT CENTERVILLE MA,02632 1 I I 11 1 1 1 1 1 1 1 E 1 1 1 I I I I I I I I I I I I I I v \ PREPARED FOR: EXISTING UTILITY METER Atlantic Power Partners,LLC. EXISTING MAIN SERVICE PANEL 586 Strawberry Hill Road Centerville,MA 02632 DRAWING TITLE: • - PV-1.1 ROOF PLAN EXISTING RAFTERS 2x6"-16"O.C. CAD TECH: CHECKED BY: VERIFY LOCATION IN FIELD AC RP ENGINEER: OATS. AC 8/10/15 SCALE: SHEET: 20F 9 SYSTEM DETAILS BRIGGS RESIDENCE System Size: 5.88KW 413 SKUNKNET ROAD 21 LG280 N1C-G3 5.88KW CENTERVILLE, MA 02632 1 STRINGS OF 11 MODULES Panel Manufacturer LnG 1 STRINGS OF 10 MODULES 21 ENPHASE M250W MICRO INVERTERS Panel Model FOR REtlS RT USE _ 280 N1C-G3 NOTE: MAX 16 MODULES PER 20A CIRCUIT rrt eN}w r ro"mnmL Un. I IJ tilm.R.M.IA,ildin6 H IMP: 8.97A ISC:9.56A Panel Count:21 a S.,",11 hh.111U2 G2 VMP: 31.5V VOC:38.9V r �lys 11 1 "UTILITY DISCONNECT" 30A 1PH 240V CUSTOMER OWNED NEMA 311 DISCONNECT CELLULAR UTILITY ELECTRI CAL NOTES:M250 M250 PRODUCTION METER GRID I. All equipment to be listed by LIL or REe s aous E coNNnT NRTL and labeled for its application 2. All conductors shall be coppeq rated for 600v at 90 degrees C and rated for we environment such asTHWN-2 30A 3. Where sizes ofjunction boxes,raceways, and conductors are not specified,the 1 EXISTING contractor shall size per code 10 UTILITY.METER 4. Modules shall be bonded to support tall per MFR's instructions 5. Support rails to be bonded • 3 R continuous copperE.G' o C via weeb lug or Ilscolay in lug 6. Provide inverter with options,voltages, M250 M250 OUTSIDE and accessories as required by project site conditions 7. Combiner boxes,fuses,wire sizes, PURPOSE. quantities,and conduit sizes between solar INSIDE arrays and inverter to be verified by 5.88 KW SOLAR ARRAY contractor with solar panel and Inverter —LINE SIDE TAP Mfg before installation CINDY&RICHARD BRIGGS S. All electrical work shall be In accordance 1-10/3 NMC with all applicable portions of the state ROMEX 100A building code and NEC SITE ADDRESS MAIN .9. Provide conduits,wire,grounding,etc.to 100A TYPICAL T accommodate utility co.voltages Prior to 413 SKUNKNET ROAD MLO - BREAKER installation of metering and connection to grid CENTERVILLE-MA,02632 30A to. Inverters to have Integral DC and fused AC disconnects PREPARED FOR: 11.,Fuses to be CLITD/DE unless recommended otherwise by Mfg. 30A 12. Contractors shall coordinate grid-Inter- Atlantic Power Partners,LLC. face work requirements with utility company 586 Strawberry Hill Road before installation Centerville,MA 02632 13. Disconnect switch required by utility co. 1P-15A shall be pad-lockable In the open position 2P-2DA ENVOY 14. Une21(B Side Tap to follow NEC"Tap Rule" DRAWING TITLE: EXISTING 100A 1PH 240V P-20A HOUSE PANEL C,+'t�rnScaLkmlrpnrncnSrT4�lInG �� 100A 1PH 240V CATS TEc- c C__ar 2-12/3 NMC PV COMBINER PANEL 30A 1PH.240V AC RP ROMEX NEMA1 SERVICE RATED DRAWING: EL-1 DISCONNECT WITH 2-30A FUSES ENGINEER: DATE: 8-13-15 AC 8/10/i6 BY: RP SCALE: SHEET: 3oF9 (9 LG Life's Good O Mechanical Properties O Electrical properties(STC) 280W .... _.. ..LG - .._ MPP Ii 9(V Pp) .. 315. FOR REGISTRY USE C NP M no arrant 1 ppl e0 Circcn Sa I I 4 i k - MPP 89] i•v� "FK1145ra ft A'H II yn ,t OP 9(V c) ° '� - ��- D mansions(L x W H) 1640 1000 35 mm Bh i t II c) 956 � \ 64.57 x 39.37 x 1,38 in Module of icl—(%) 17.1 Static snow loatl 5400 Pa/113 Psf --___ OP ling to P (Cl 40 •90 "�'�.��"^•°"d�''�•'• Static wind load 2400 Pa/50 D .. .°i.,..�,,;,^,..xw�'a••.""<.rC�:ems*.. Ps_._.—_____-._. Maximum sniem volta9eM G00(UL),100011EC) . u."r...�.m.a Wa9nt_ _168 OS F9/3G.9631.116 .. ... _......_ ........... ._...... ... ..._. LG Electronics,Inc.(Korea Exchange:06657.KS)is - I&B. P6- - M f 9(A) zo r,^A "`""•'�""""" one of the globally leading companies and J md' y la 67 rn h 31ryp dl d l I4 a ______ eo Y technologyinnovator for electronics information -'- 0 -" t REN40N5 jf L ghf bla 2x1000 /2 393] inn,.map era i,rc e°.,m•anr lGE«°x• ,+w.wi°trmraasx rn° NO A. COMMENT and Communication products.The LG Electronics GI _ H�9h 1 1 rl yl s_ a ' currently employs more than 91,000 people Frame Anod:�d all mwm 0 Elecir'cafProperties(NOCT•) ' worldwide in companies.In fiscal year 2011, 2BOw achieved. - 48.97 billion USD of revenue was 0 Certifications and Warranty- -- - - -- . -,- - . -" M Imam Po ar(Pmpp) 206 Ili I LG is one of the world's largest manufacturers of C r#f ns IEC 61215 IEC bTT30_1/2 UL 1]03, MPP aye(VmPp) 28.8 9e IS090011EC 61701 MPP t(I PP) 7.15 - mobile phones;flat screen TVs,air conditioners, a a t my to ye - '-- -'---- """ " washin hines and refrigerators.As a future- omp,n panty ofP ,. 359 washing machines 9 iMe�•m� u,arce13xt neer wanany 7.] sn 0 1 0 -- �I oriented company,LG enables others to use is Rix.zi Anw zw3•y o.3x.°m..nrwnlo,..y eP.zx rw zs w•+ EI .. 4.5% technology consisting of renewable energies „f,,l loon w/m•.°zoo wrmo ` LG's high quality solar products are being asC zo c, 0 Temperature Coefficients manufactured in LG'S leading production facility in South Korea. .v 'NOCT ---- 45. 2 C -- _.__. _ °'O''0 PURPOSE: P C "45�2/C O.Dimensions(mm(IO). v b.31%/c ? ? 5.88 KW SOLAR ARRAY 1sc o.o3%/•c CINDY&RICHARD BRIGGS 0 E B U` 08 t o�- 0 Characteristic Curves MnI� sJ oaf + s w v.�..�—� i"°xJei "'°'• SITE ADDRESS 413 SKUNKNET ROAD ._... - CENTERVILLE MA,02632 YYYiii k#e.{s t PREPARED FOR: s LG's High Efficient Cell Technology Convenient Installation Driven by I_G s own N-tyPO tochnologY LG s high- l LG modules are caret Ily dd g ed to benefit s o is zo .s 30 3s °.e°Iv1 ..., °...,Aos Atlantic Power Partners,LLC. ff-rency.modules.111 pmv de customers with Installers by allowing quick d.easy'nstailat'ons [ 586 Strawberry Hill Road o t P•'T^^^"°sr high economic benefits, a.iw, ih nughout the cany,ny giound'ng,and connecting {p 3 f Centerville,MA 02632 stages of modules l.c f i 9 S 16Bkg Light and Robust 100%EL Test Completed H v« DRAWING TITLE: ._... .. W,m. man With a weight of just 16.8 kg,LG modules are All LG modules pass Electroluminescence _ P proven to demonstrate outstanding ng durabTty - inspecnm.This EL inspection detects cracks and <i.uw.yN nnn against external pressure up to 5400 Pa other imperfections unseen M the naked ale. ------ ......._...._. .........__.._._ o CAD TECH: CHECKED BY: Reliable Warranties Positive Power Tolerance ,za.M.a°, r um°" LG stands by its products Mth'the strength of a LG Provides.rigorous quality testing to solar P ROTAme.mmA fq 4 • ro global corporation and sterling warranty policies. modules to assure customers of the stated power <�°w.,"•° LG offers a 10 year product limited warranty and a outputs of all modules,with a positive nominal ENGINEER: DATE: —.11 easm•s. 25 Year limited ltnfar OUlPut warranty. rw� tolerance starting at0%. Non,A—..SP., Team AC B/10/TS �� OOEI«M1a,JES. LG U.S A.kic w•m.e.m�s+R.m'.n,°rmn.d n4,�a C°;n NO Sylvan A,Englewoodad., com P5.rv.5o.e es-r-[rvaosm °"`^n° 3 J O]fil2 All Life's Good C-1,H1 .13 LG E Y9 SCALE: Cenixt:lesolartRlge.oxn gbcimru:s. n9mz�uw„vetl O t 9w m<am o5/oT/2o13 SHEET: 4 OF 9 Enphase°M250 Microinverter//DATA • Enphase®Microinverters INPUT DATA(DC) M250-60-2LL-S22 Recommended input power(STC) 210-310 W Enphase®M 25� Maximum input DC voltage 48 V Peak power tracking voltage - 27 V-39 y _ _ FOR REGIaTRT USE Operating range �.�. 16 V-48 V eN sem IimSronmmml.me. Min/Max startvoltage 22 V/48 V - i 4 sm rs u Midi,u ure L �„T^-_. _ _ 01� Sa&more n h\I\02543 Max DC short circuit current 15 A T` '- OUTPUT DATA(AC) @208 VAC @240 VAC _ Peak output power 250W 250W n a. Rated(continuous)output power 240W 240W Nominal output current 1.15 A(A rms at nominal duration) 1.0 A(A rms at nominal duration) RENSIoeS - Nominal voltage/range 208 V/183-229 V 240 V/211-264 V No.DATE cowNENT Nominal frequency/range 60.0/57-61 Hz 60.0/57-61 Hz ^ Extended frequency range' 67-62.5 Hz 57-62.5 Hz Power factor - 24(three - 16(single Maximum units per 20 A branch circuit 24(three phase) 16(single phase) _ Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency 96.5% _ Peak inverter efficiency 96.5% 4 _ Static MPPT efficiency(weighted,reference EN50530) 99.4% - � """""^"' - ' ."yw,.:...,..•„- Nighttime power consumption 65 mW max PURPOSE: MECHANICAL DATA 5.88 KW SOLAR ARRAY Ambient temperature range_ -40-C to+65"C CINDY&RICHARD BRIGGS The Enphase®M250 Microinverter delivers increased energy harvest and reduces design and Operating temperature range(internal) -40°C to+85°C installation complexity with its all-AC approach.With the M250,the DC circuit is isolated and insulated Dimensions(Wx D) 171 mm x 173 mm x 30 mm(without mounting bracket)3�`� SITE ADDRESS 0 k 2. g from ground,so no Ground Electrode Conductor(GEC)is required for the microinverter.This Weight 413 sI<uNKNET ROAD further simplifies installation,enhances safety,and saves on labor and materials costs. cooling _ Natural convection-No fans CENTERVILLE MA,02632 Enclosure environmental rating Outdoor-NEMA 6 The Enphase M250 integrates seamlessly with the Engage°Cable,the Envoy®Communications FEATURES PREPARED FOR: Gateway'",and Enlighten',Enphase's monitoring and analysis software: Compatibirry compatible with 60-cell PV modules L---------- — - Atlantic Power Partners,LLC. Communication Power line _ 586 Strawberry Hill Road Integrated ground The DC circuit meets the requirements for ungrounded PV arrays ini Centerville,MA 02632 PRODUCTIVE SIMPLE RELIABLE - NEC 690.35.Equipment ground is provided in the Engage Cable.No- additional GEC or ground is required.Ground fault protection(GFP)is -Optimized for higher-power -No GEC needed for microinverter -4lh-generation product - integrated into the micromverter. ��_ DR—NG TITLE: • modules -No DC design or string calculation -More than 1 million hours of testing Monitoring Free lifetime monitoring via Enlighten software -Maximizes energy production required and millions of units shipped Compliance - UL1741/IEEE1547 FCC Part 15 Class B,CAN/CSA-C22 2 NO.0-M91, -Minimizes impact of shading, -Easy installation with Engage -Industry-leading warranty,up to 25 _ 0.4-04,and 1071 01 dust,and debris Cable years 'Frequency ranges can be extended beyond nominal if required by the utility A cAo TEa: cnc—BY: AC RP ENGINEER: DATE: r l Enphase° �Ae To learn more about Microinverter technology, e Ac 8no/1s eJ ]enphase E N E R G Y C US visit enphase.com E N E R G Y SCALE: 0 2015 Ertohese Energy.All dghts ieser e.AU trader arks or bantls in Ihis document are registered by their re pactive owner. MIT 00070 Rev 1. SHEET: 50F9 i.[1rIC�L1.1 {fit;r. Y'1`° \ \ FOR REGISTRY USE ♦ Gran Scnl l'r+rnn n+nr."Inc. r 1111 11J Sinc Rn I e• .n'1 .ox�, �I � ( \♦ SaSamwc 8.nch,\\IAI.\L2 035G3 0011111110" :1�til r K C905° / 0 WM nt ` So r RoMtler� REMSHONS r m a a. w mw�ierns a,u.em n �• NO OAIE �-COudENT f Solar Sold utility Utility ImMm Meter Dliconnect Meter Sdel Ir Meter Y eter How it Works Smarr iJ,etel t•.ommunication over cellular networks Installation Production data can be stored in the Cloud and Hosting Services A Solar Meter plugs into a number of meter for up to 90 days.The Solar Meter Itron offers a hosted server so that solar As consumers become more environmentally aware of their energy consumption and carbon footprint,the energy industry-standard ANSI plug-in module provides the solar provider with a providers don't have to worry about adding PURPOSE: bases.For most residential installations vast quantity of meter alarms that provide "yet another system"to manage and interest in and use of solar power is on the rise.Itron's revenue-grade Solar Meter is ideal for monitoring of 200 amps or less,a widely available information about the inatallrtion. operate with in-house staff.With ourcloud 5.88 KW SOLAR ARRAY the production of residential and commercial solar photovoltaic(PV)systems and can support bidirectional standard Form 2S is used.In North Network Connectivity and hosting services,production data is CINDY&RICHARD BRIGGS and net metering.The meter collects,stores and uploads the PV system's production data to the solar America,the meter is designed for a 240 collected and provided via web services or solution provider over an existing.cellular network link that IS fast;reliable and secure. Volt,60 Hz system. Itron Solar Meters are truly'Plug and play" XML files to the solar providers in-house p Installing the Solar Meter in-line with the devices that use a cellular connection for systems or web-portal systems. SITE ADDRESS data transfer.Using a Solar Meter,the service panel feed allows the solar provider installer has flexibility to select either AT&T SPECIFICATIONS 413 SKUNKNET ROAD Itron's cellular meter adheres,at minimum, expensive than other available monitoring doesn't require entrance into the house to utilize the meters remote disconnect or Verizon as the commercial network CENTERVILLE MA,02632 to the stringent ANSI C12.20 5.5.2.5 systems.Using our technology,you ran or property capabilities when required. of choice to ensure the highest quality Meter compatibility and specifications accuracy class CA 0.5 standards— benefit from: »Immediate notification of production Every Solar Meter is enabled to accept network connection available.Our meters available upon request. measuring inverter production with up to »Supports bidirectional and net metering issues through alarms over-the-air firmware upgrades,ensuring use 3G connectivity for high-speed,secure PREPARED FOR: 99.5%accuracy,regardless of inverter or »Revenue-grade meter accuracy »Over-the-air upgrades to ensure your the meter always has the latest updates. and reliable communications.As cellular panel type.Simply put,ltron's Solar Meters meters have the latest features and data networks incorporate new technology,- Atlantic Power Partners,LLC. »ANSI certification and the highest level Data Collection • are the most accurate and fellable meters functionalit no visits required the Solar Meter will remain backward 566 Strawberry Hill Road of security available(meets federal R q available—antl are already trusted by All Iron Solar Meters collect interval data tat compatible so your investment remains Centerville,MA 02632 leading electrical utilities around the U.S. security standards) Simple and Reliable intervals typically between 15 minutes and protected for the long term. And because our meters can be installed In »Unparalleled reliability and proven Itron Solar Meters can monitor any type of T hour)as defined by the solar provider. a simple"plug and play"fashion with utility- architecture deployed by leading utilities solar energy system production with 99.8% DRAWING TITLE: standard installation techniques,installation »Low-cost,one-piece installation that accuracy regardless of inverter or panel and activation is streamlined—meters can requires significantly less labor type.Information can be stored for up to report production data to the solar provider »Standard meter connections—no 90 days. ® Itron is a lobar technology we in as little as 45 minutes. 9 analyze energy Water.Our solutions that help utilities CORPORATE HEADQUARTERS Custom pans or Wiring Production data is stored on the meter and measure,manage and,W itter energy thermill water,Our broad product ponfdi0 Ulbe N Moller ROetl »Certified with network carrier for the uploaded automaticallyover the cellular technology; clhnolog;udes Comm.gas vats Systems: ms:Software;aWren, remoralsent rnwl Ubarry Lake.WA 990t9 CAD TECH: CHECKED BY: BENEFITS OF CELLULAR technology:nds ofe lcetlons systems:gnearly and IxdeeslonelseMhes. q • SOLARMONITORING highest possible reliability and Pasty providnetworktotheve lection production Solar too thousands—mployoessupposto resonsibly and Gas in more than g AC RP transfer with immediate accessibility providers retrieve production data Via an 100 Countries.Itron empw+ers utilities to resporrslbty end eRlcienty manage Phone: 1.800.635.5461 ' industry-standard format or secure XML file energy Fax: 1.509.891.3355 In addition to quick and easy Installation, ene and water resources. - ENGINEER: DIM: Itron Solar Meters are Significantly less ^Remote disconnect swtch option g y helps with non-payment issues and transfer from the collection system. Join us In Crowding a more resourceful—do:start hem:www.hron.con, AC 8/10115 .urm•nnlvs:o,nekolnocwnanrwna,W.I.muymmerhrn.tmerYtnxl ncwm.nslrae.�ata..uron nwnrochuW.,Wm+Fnm.n vmrnmw,m,Wl n,n nc�nnny,arrnwnan�.vn Ho uoC ol.mUennrnWJoivlelnw lbWM:Y for wrae ma wNe4one in,euoN mnrnehls.ND wenentY elamk4M.MwIiM,anroneno,or 5tcn:tory,rntlunln,tnllnolnmltpU to ,unleso ovu. ,ru:erlala. SCALE: o W WnNnM1in6 oc_,amfaoAH,dmmaW .o,zSDSP.a SHEET: 60F 9 SOLAR MICROINVERTER :10 000° SMSOLAR o ROOF ATTACHMENT&L-FEET ❑E OOD S M 00 MOUNT INSTALLATION GUIDE;PAGE 00 ; MOUNT INSTALLATION GUIDE,:PAGE ----------------------------------------------------------------------------------------------------------------------- -------------------- ---------- ------------- ---------------------------------.................... --------------------- ------------------ 3' F�; i1•i... © © © FOR REGISTRY USE - (:racn Real Lns irmmtmml.L,e. ROOF PREPARATION: Layout rand DRILL PACT HOLES:rCeme,the,of FLAT FLASHING INSTALLATION:Insert INSTALLIAG BOLTS&L-FOOT: - INSTALL MCROINVERTER MOUNT INSTALL MICROINVERTER: Install INSTALLMICROINVERTER: ALAN POSITION INDICATOR:Verity IIJltnle Rnnd,Building 15 stall Rasning a rafter l,ca[lons tacnment Duel me rafter and tlrill a me Fla[Flashing so the lop Dart is Insert the lag bolt tnmugn the L-Foot T-BOLT:Apply An[i5eize anG install Iter on tp rail.Engage with TORQUE VAWE(See Note on PG.1) that position intlicat,on bpLt is �p+l(, / M1a6 niure Bcicli.\I:\1125GZ detnmined pert Design and pilot hole(,)for the lad bolt(,) nuerthe no.—of sningle,and the I,the order shown in the lUu::11oln. ,re assembled—1'banal ng T-Halts boltoinv 1/4•nut Le l0 ft-mtw/Ad,,Seize pemendiculartorau oTel:i�n)xvx.r�yn Engineering Guide, note lines up with the pilot hole. Verify proper dri cation bdai Into top 14 it slot at micuum,erter x oemm'rx Mstw size ae mmealmv tightening lag bohs.en locations.Rotate bolts into position. e.'elw.wn a rt Q.mnP r*e ddune PlwtnM.n glBm gat - See'Unal at'Flasninq Manual for ,N B ulwnian,a.e-krt on. AdditlPrsal Details. SM EQUIPMENT GROUNDINGTHROUGH ENPHASE MICROINVERTERS �rue,•�„�,a,•m,-„�•.,s„ \ TheEnphaseMZ15 M250 and CZ50 micmmverters nave mgrated ground ngcap tit[es bl It n In this Case,[he DC c-it I,sodtod from the AC 6-It, d RENSIONS n AC equ pment ground ng conduct,,(EGC)s bu It nto the Enphase Engage NO,DATE MMENT grated gededng(IG)CabingIla A nmumofone EnpM1aumcronvene, fthimb,,ndetl ground must be present a single trunk Cabe,The mcminverter b d d n SOIARMOUNT rail the m t ng hardware Complete equ p g d g ach seed through N a mpnal EGC wn i r i d rounds- G. a tlu the En nose En a cool n th [ e g g( ) p g qe g eg a-.�y � ground ng notes are requxed,as all toutscurtentn Carr ed m grpund Nrougn Z PIECE ALUMINUM STANDOFF WITH FLASHING 6 LFOOT TOP MOUNT TILE HOOK 6 L-FOOT I.Engage cable. Ifne<essary-m openng,thdmdfing material raher to ono-date the R Id roof llle piston[ roof nook ii-dIl (rafter y A Y7F"J!$`# I� Rasning,1., 11 a ,k 1 the-de of the undo lying Interlock., 1 ey'Dr II 1111 n U ne,standW.nMudng that both lag bolts am suewe0'mo the aher nm phot Holes tn,augn the underlaymem he Into t com o t<ws er tahers Gtturely Insert the flasn'nq under the sh,ngle above and over the than of Ne stand- sum d.ch I.hook ustlw.-1 with two 3/Ul 3ts'1ag u down or de d or { (No-(alk",ollardoesnotrequiesealngoftheRlhi, .nds nd ert th offshahl hInsetla Add LFoot to top wth-111.1se—,the EPGM washer tp the top of the nanoafl C r See Standvh tt Fleshings lnstallatlon l4 1907..2 for Addltlonal Counts. -See Tile Hook Law Mount lnstallat o,Manual fnr Addltlortal lefmmallon. PURPOSE5.88: �� SOLAR ATTACH RAIL TO L-FEET © 00000 SOLAR SPLICE&THERMAL BREAK � CINDY RSCOHA D BRGGS 000 GUIDE:M INSTALLATION GU L PAGE 00 _ 5111 MOUNT INSTALLATION GUIDE;PAGE 00 ;SM MOUNT r SPLICE INSTALLATION(IF REQUIRED PER SYSTEM DESIGN) SITE ADDRESS Qnr�; 0,3. ® ,L -3, 5,�5, AI'r Imyour nstallat on uses SOLARMOUNT pl b h.M1 ,ls together before mng to the L fen/f 'g u pL n lv inn mmnstol-mes or 413 SKUNKNET ROAD ' �,` r'-. T- b'k +'k-• n e Ina[use low pmRl i 1,I.A '1 should 1 y be sim,.Nuadl by more A3/tl'T•bolt -'R-r �.- / x e7I / - `� 1' N.♦ - than am,footing an both side,ofn pt Th n mbe qap th—dnrmis CENTERVILLE MA,02632 ronxt i..".t' p to.3/16-at the splitt ons T Wt,should not be ptoced Less man a al tm—f l'from the end of thenil-go,doss of ,fik,wm[he excepton of the high pmfile ►•• .- .�' //%`--g+ � � ` ,4 s,Y^. -; "1+. -� 5� 'l.*'.e �.�' y�'�!`f•ar Hex LEE VALUE s eeN Colon notuc¢¢d m PREPARED FOR: 10 R4ba.Do am useArrtt-Sent. Atlantic Power Partners,LLC. PLACE TBOLT INTO RAILInset 3/8' SECURE TBOLT Apply A Ant-Se ill CONNECT RAIL TO 4FOOT' Rase ALIGN POSITION INDICATOR 'H,ntl +xa ;af,y ya"`c/ Maxiengthofsplicedrallis40ft.Anexpansionlolntls,equi,edx40ft. 666 Strawberry Hill Road Tboltintar I fitalecabons. but.ROlateTta I Into position rail to upright Poston and attain tghten nut until rall algnment is u'R/ m L-feet to look w th'3/B'Senotea nmptete.Verify that position and<a- I'b I Centerville,MA 02632 Flange Nut Use either slot.gb m on tur, , bolts vertical(Uvp-d<uW, desired height and algnment to"it) fs TORQUE Vtio A.ee Note an PG.1) ,Iq� r6W ye. -` DRAWINGITL TE: m 30 R 1/B•nut ins �••'^'� • - ALIGN RAILS: _ EXPANSION JOINT USED AS THERMAL BREAK Align one p i,f N t t nds td the edge of the lnstallat,n ar,,.Tho oppos to pair Ply. ' '� Exports on jo n[s nment buckl ng of m is due to thermal expansion Spice bars of ra I ends w 11 ovemang id'et ation area Do at Tr m them off until the-al- -19 _ may be used for thermal expans on Io eB To create a thermal exports on joint. lotions nebtate If the rails are perpend mlar to[he,often a the,one of the slide the ipit,,bar let,the foot ng slots or both,a 1 lengths Leave app,.I rails can be aligned but the first molfule must be nstalled at the aligned end _ - moiety M-between the ra I segments Shure me spl Ce bar with two screws on CAD T— CNECKED By: e side pnty Fppt ng,(such as L feet or standoffs)sh,utd be secured nprmally ♦♦ If the,,is are parallel to the Nui the aligned end of the ra is must face the - n bothsides of the spl ce No PV m,out,or moon[ng hardware mmp.,e,t AC RP I.—edge of mero,fSecmely tighten all hardware aferalgnmentacompete. should,[radde the expanson font Modules must clearly end onto,,the joint �= With mounting hardware(top mount Endclamps)term nai eg on that ra LT bolts Mount modules to thew N as soon as possible Large temperature changes may should not be placed less inan a dEd—I e of 1'him the end of the Nnt regard. ENGINEER: - DALE: bow the Nits,,to e a few lours f module placement s delayed +tut I s of a split,.The next set of module would men start aRe<the splice with Dunng_ t hardware beglnn ng on the next ra L Allent al break is requiree,Vaq AC MOM 40 fM tvatlRnPously cP-se,andat For additional Codands,on th m,Roreaks your sp a u pmlen,please .an m UcerlsM nmcL,al ed do air Rum of ,..c' Il lessman M/eeu ino,the OMA mare elan two pain splired mBvler,are en SCAB: -vabx �V_ ding paid e'nnallm,R forthe.,ad,dUNTSYate da S _ Bs,,beg(Metal for splice used as a thermal edi Fin-Opt de shown uses two Ilsco tugs(ModN No GBL4DBf PM GB4dDBT-sec produtt debt amen Tor mom avails)and sd0d Cppper Mim. SHEET: 70F 9 �® BURNDY © WEEBLUGASSEMBLY OGG S M SOLAR SYSTEM GROUNDING 00 I MOUNT INSTALLATION GUIDE;PAGE Slide bon to desired "------------------- """'------ Washer,Electrical Equipment Bond WEED loath towards roll position and slip bolt through WEEB 6.7 WEEB INSTALLATION INSTRUCTIONS -WEE86] For Iron Ridge Light&Standard Series Rails Only Please read carefully before installing. { FOR REGISmv USE ` ONE LUG PER OFMOOIBES' WEEBWGCONDUCTOR-UNIRAC PM OOBO025:' Rmll.nvironmcnlal.Inc. Burndy.reeommerids that the sufficient details of the[retaliation be •Ontyone logo of motlufes is Apply Anti Seize and insert a bolt in dre aluminum rail and through dre clearance L,llnl a n,.,Read,l3urldm611 submitted to the AMJ fora Val before any work Is stoned. se Pa ar edtlit 1 W ubetl Pora�-~ - 5nn,orc Beach.MA I2562 pore 9< w M1 chc Ne min less nee,rat Lull rins, bon M19lemtne stainless steer not a L n Iprnts a M1e aluminum miL Place tM1e I .ion on Ne 1a n led o the dim al Nx will concoct t. iet P u9 Do rasa(sm)ssa; _ rr1 ed,tandstanlessst anittwasherinrta,l sm pleesteelnalintrlock washer and TORQUE V the nut itt l the dimples are K.1)telyembetlddd into tM1e mil and tug. _.. TORQUE VALUE 10 tbs.fa(See Note On PG.1) ' B See pmduR data sheet far more details,Modl1 No.1AEE6-LUG-6.7 � •"� GROUNDING LUG MOUNTING DETAILS: De .tails are providad for both the WEE8 and I..pnuhi Ih,WEEB Lug has a B-OMC grounding sy,W1 tocated on th,tug as embly The Ilsco lug has a green colored REIS-�r WEE _ Install WEEBLug-6.]assembly entl set screw for grounding nd cat on purposes Installation must be n accanlanca ®� N0.DAIS rd..ENT�m� \-IOrque last....to III Ib/13.5 N-m with NFPA NEC 10,however the 111110111 designer of r111 should refer to 1h, sing general purpose anti seize last reviswn of NEC for actual grounding conductor cable size. ' compound on threads. R ired if not usin approved integrated grounding m-hrActral ego g Imp.-nt note: 1. WEE&6.T that sits under the WEEBLug.is for.SINGLE USE ONLY? GROUNDINGLW BOLTS¢EADXILLSUE IUCO—N LUG CONDUMR-UNIRAC PM 008009P:Alternate Grounding Lug vinagauge.Y WEEB Bonding Jumper6.7 Ensu Ep Iflon is correct before tightening. GROUND LUG BOLT SIZE DRILL -.,eland D.Itth,.both raft walls per table. 2. The WEEBlugb.7 may be used with a maximum equipment ground wire WEEBLug ]/I6' N/A-m Tap sH Ratt iml TORQUE VALUF 5 N1Ds.r-14br PG.3) of 6 AWG. IISCO Lug 110.32 ]/32' See product data street Wr more detail;Model NO.GS-06T. PreduLNa ere tested to safety yBT,CAN/g ib� ndl No.d1 US/Canadten standards 9 1/� fors.laty grounding entl bontlng equipment 1.1 1(� Torque value depends on conductors WILeLi 028t2 BURNOYa LmLDCmro wll�/y mho�t2ceeua DY L�LG re $eP prod ct data sheet or Trque vane. -PABa 1 ll to Pane ll of to CIN PURPOSE: GROUND CONDUCTOR ASSEMBLY WEEB BONDING JUMPER-6.7 ASSEMBLY 000 t SM SOLAR BONDING CONNECTION GROUND PATHS;M 5.DY&RICHARD BRIGGS KW SOLAR ARRAY 07 ; The Ilesible WEER Bonding Jumper can be mounted on all mil splices including 00 MOUNT INSTALLATION GUIDE PAGE - expansion joints indfferent ways shown below _ e SITE ADDRESS Torque to loll Ib/ WEEBBoadng 13.5Nm using general\ O'°alQ. ,} `�a. 413 SKUNKNET ROAD Jumper "purpose ant se:e "A.aq.. O> !" ea" © © .�'_ - CENTERVILLE MA,02632 co W-d on threads PREPARED FOR: • BONDING M10CUMPASSEMBLY ENDCIAMPASSEMBLY� BONDING RAIL SPLICE BAR RAIL TO LFOOTw/BONDING T-BOLT Atlantic Power Partners,LLC. O r.o,um.,a. " 586 Strawberry Hill Road ©a e1 .b 1 ..10 � ©� Centerville,MA 02632 \\ OananaN sin r.rt torn.m tome.. w.sme.naenmrmemarwm... © kaM µsemi.,rynn a"e� nu DRAWING TITLE: nmrr v h...n _ Torque m Uan Ib/ Equpment� WEEB Bonding 135Nm g9anerel - g-da Jumper /-.coalpa-d-t 2e mDtvgr f/ mppendonmrems. �,q'^%,^°+r""""' slt CAD TECH: CHECKED BY: \`laYn equpment ground conductor - �s"`� ''` c'` "NO AC RP entl torque bolt to]ft to 110 N-m. —' �. �, EFNDTF pp 1pll ENGWEER: DALE: n 'BONDING MICROINWMR MOUNT BACK SYSTEM GROUND AC 8110/15 Om O,."rIZ1111. 1111mma "ranm ©�o uNmiNrcaa�n�i iao rnrt..�b sr. © m SCALE: Route WEEB Bonding Jumper as shown above if the edge 01 solar module lands s �i�erua M^ti��as� er^m'm,emmdmm..mm between has splice tells. e.�dowie° dva.b.....am ab Oavman102n12 BURNDV L m¢D. �I\�� eman103.13 BURHD U-S. \li Pane t2 of to Page 13 1a SHEET: 8OF 9 ,// " ,,• :�%' LABELING REQUIREMENTS FOR ARTICLE 690 NEC 690.13(B)Each photovoltaic system disconnecting means shall be permanently marked to identify it as a photovoltaic system disconnect. a ' NEC 690.15,IFC 605.11.1&IFC 605.11.1.4 If the equipment is energized from more ' / ♦ than one source,the disconnecting means must be grouped and identified. z ' NEC 690.16(8)Non-load break rated disconnect means shall be marked. ,,;�sI p " • • NEC 690.17(E)Where all terminals of the disconnecting means may be energized in O the open position,a warning label shall be mounted on or adjacent to the disconnecting ►1 .•i . means. e ' PHOED IPPH65YSTEM NEC 690.31(B),IFC 605.11.1.2 Identification and Grouping:Photovoltaic system u RAPMS o „ .O N conductors shall be identified and grouped.The means of identification shall be ,.•�° - •• •• permitted by separate color coding,marking tape,tagging or other approved means. �p ' •• NEC 690.31(E)(3),IFC 605.11.1.2 Labels shall appear at every section of the wiring system that is separated by enclosures,walls,partitions,ceilings or floors.Spacing between labels not to exceed 10 feet(3M). C NEC 690.33(E)(2)Interruption current-be a type that requires the use of a tool to open C� ' will be marked"Do Not Disconnect Under Load". NEC 690.35(F)A PV power source shall be labeled at each junction box,combiner box or L9 � WARNING PHOTOVOLTAIC •WAR"�"�� disconnect, n device where 2n un grounded e circuits e se during service. ,c,z HOTOVO i[POWER SOURCE d ct and d h energized,ungro d may expo ing se e. Powell soucee .. -- .. NEC 690 4(F)Where circuits are embedded in build up,laminate or membrane roofing • materials not covered by PV modules and associated equipment,the location of the circuits trrn i��r �l shall be clearly ma rked. NEC 690 4(G)Bipolar photovoltaic systems shall be clearly marked with a permanent, legibresult in overvoltage on the equipment. disconnection of thegrounded conduct O 5.88 KW SOLAR ARRAY •, , -ro ors may NEC 690 5(C)A label shall appear on the utility interactive inverter or be applied by the o� I p installer near the ground fault indicator at a visible location. SITE ADDRESS DC DISCONNECT , Elsr`s NEC 690.52 AC modules shall be marked with identification terminals or leads with the 413 SKUNKNET ROAD • •- ratings as shown on the label. ucuse......1 PHOTOVOLTAIC 1° NEC 690.53 A permanent label for the direct-current PV power source shall be PREPARED FOR: � � MAIN PHOTOVOLTAIC •�•• •„C ,� provided b the installer at the PV disconnecting means. SYSTEM DISCONNECT Y g Atlantic Power Partners, m.._. NEC 690,54All interactive system points of interconnection with other sources 586 Strawberry Hill Road c shall be marked at an accessible location at the disconnecting means as the • E . 32 �H �s� G _.; r... K o - power Source and with the rated AC output current and the nominal operating -mil .� MAIN PHOTOVOLTAIC_ AC voltage. SYSTEM DISCONNECT NEC 690.55 PV power systems employing energy storage shall also be marked x° it E.1 + f +a'•'s with the maximum operating voltage, including any equalization voltage and polarity of the grounded circuit conductor. NEC 690.56(B)Each Rapid Shutdown Switch shall be permanently marked to ®® dentify it as a Photovoltaic Rapid Shutdown.The sign or placard shall be marked .' •. I' - ., as "PHOTONOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN" using whit e hers t at are 3/8"tall on a red background and shall be reflective. 64 Points of con le h • •• ••• "� ' •• nection shall be in accordance with NEC 705.12. From: Andrew Casey a.casey@gseenv.com Subject: Unirac Structural Letter Date: September 8,2015 at 11:04 AM To: Bob Dean dean025639yahoo.com Cc: Paul Caprio pcaprio@capriobuilders.com Hi Bob, _ Attached is the UniRac Stamp for MA. It describes that the system itself, when designed based on the "On-Line U-131 ilder" with 11 al snow/wind loads, will be structurally sound. ' http://desian.unirac.com/tool/promect info/solarmount 2/7b85eee4/ is the specific design itself from Unirac for Briggs in Barnstable, using the 120 mph wind loading and 35psf snow loading (From Mass 780 CMR 161. The unirac design tool allows for a max span between mounting feet of 52 & max cantilever of 16". In the plans I call out for 48" max span and 16" cantilever (even though actual cantilever will most likely be under 10" ), well within acceptable limits. I have also placed additional mounts on the furthest outside rafters where the wind load will be the highest (this is on top of the minimum requirements) Andrew Casey Green Seal Environmental, Inc. Project Engineer 114 State Road Sagamore Beach, MA 02562 Office: 508.888.6034 Mobile: 978.265.1340 a.casey@gseenv.com US SBA 8(M)- Certified WOSB-EDWOSB MA SDO Certified M/W/DBE 6ior �o '1,ets"L�n�r tuv'AtrL�'�'a/t9�� s _ I 33_SM_CERT_MASSACH USETTS.PDF Engineering Report.pdf i i i 't , f i James A. Marx,Jr.P.E. i 10 High Mountain Road Ringwood,NJ 07456 I. E-mail:jamEght@verizon.net !� i October 31,2014 j Unirac,Inc. j 1411 Broadway Blvd.NE Albuquerque,NM 87102 To: Building Department or Others: RE: Engineer's Notice of Evaluation for UniRac SolarMountTM Solar Module Mounting System i Dear Sir: (. I I have reviewed Unirac SM SolarMountTM"Design&Engineering Guide—Solarmount Enhancements:Flush-To-Roof Design"and the"Installation Guide",and certify that the information and results are accurate.To determine the design level forces,the appropriate wind speed shall be determined as prescribed by local jurisdiction requirements and applied in accordance to the 780 CMR Massachusetts Code. The code requires that wind and snow loading is determined based upon 780 CMR Building Code 8th Ed. or 780 i. CMR Residential Code 8th Ed. and ASCE 7-05.Unirac's"Design&Engineering Guide" ff utilizes ASCE 7-05 -Method 2 for which Unirac's On-Line U-Builder or Appendix B— f Pressure Lookup Tables are based upon,and that is dependent upon conditions of Low- i Rise Buildings with spatial form,height and other structure parameters that are specified in the code provisions for determining the applied wind and snow loading pressures imposed onto the Unirac SolarMountTM rails supporting solar panels.For snow j conditions having unbalanced or drift snow,the Analytical procedures should be followed. The SolarMountTM railing and anchorage requirements for the installation are properly represented in the"Installation Guide". For other conditions,the determination of wind and snow pressures should be determined i by Unirac's Analytical procedures: For the other conditions,use Massachusetts wind or snow loading criteria and use ASCE 7-05 requirements that are dependent upon conditions of spatial form,height and other structure parameters that are specified in the code provisions for determining the applied wind and snow loading pressures imposed onto the Unirac SolarMountTM rails supporting solar panels. r James A.Marx,Jr.R.E. Page 2of2 i The design verification is based on: i I. ASCE7-05—ASCE Standard II. "Steel Construction Manual," 13th Ed.,American Institute of Steel Construction,Chicago, IL, 2005. III. "Aluminum Design Manual",The Aluminum Association,Washington D.C., 2005. IV. Allowable Load Test,Unirac UTR-248 SM2 Enancements.doc Use: I Three methods have been provided by Unirac "Design&Engineering Guide"to aide in I the solar railing requirements. A) On-Line U-Builder that will provide Bill of Materials&Calculations from project specific input. B) Prescriptive Design Method when project specific requirements are known,the project load pressures can be looked up in Tables located in Appendix B. C) Do it Yourself—Analytical method design approach that follows ASD calculations per ASCE 7. t By this letter,I certify that the Unirac SolarMountTM assembly,when designed in accordance with one of the 3 methods outlined in the"Design&Engineering Guide"and installed in accordance with the"Installation Guide"will meet the solar railing requirements of the building codes adopted by Massachusetts. Others should evaluate the �. building structure to which the Unirac SolarMountTM system is to be connected on a case- by-case basis to ensure its adequacy to accept attachments and to support all applied loadings per the building code. Please call me if you have any questions or concerns. Sincerely, .? `4=A �,• .{� tip, s James A. ,r S' Marx,Jr. ,• Professional Engineer `', MA License Number 36365 . fy cc:James Madrid,Unirac I t 0BB-U N i R AC U-Builder Project Report 0 A li;ltn-C4 UP+rJ'iMAikW Project Title: None September 08, 2015, 02:41 PM Project ID:7b85eee4 Name: Briggs Designed by None Address: Centerville,MA SOLARMOUNT City,State: Centerville,MA,02632 21-280 Watt Panels Module: LG LG280NIC 371 Sq Ft. 280 Watts 5.9 kWs Plan review Inspection Roof Po1nt Load Up. -225 IbS. .M mum Rail Span(Zone 1) 2�' Roof Point Load Down ?85#bs 1 Selected Rail Span. 4 �� ` Total Number of Modules: 21 TProduct: SOLARMOUNT Total KW: 5.9 KW Module Manufacturer: LG Rows/Columns: 2/11 (with gaps) Model: LG280NlC NS Dimension: —10.8 ft Module Watts: 280 watts EW Dimension: .-36.5 ft Module Length: 64.57" Module Width: 39.37" T Loads Used for Design Module Thickness: 1.38" -Building Code: ASCE 7-05 -Wind Speed: 120 mph Maximum Rail Cantilever: 16.00" -Ground Snow Load: 35 psi Expansion Joints: Every 40' -Seismic(Ss): 0.20 Rails Direction: EW -Wind Exposure: B Building Height: 15 ft. Loads Determined by Zip Roof Pitch: 12:12 -City,State: Centerville,MA Roof Type: Shingle -Wind Speed: 115 mph -Ground Snow Load: 25 psi 1 1 THE Tod, Town of Barnstable *Permit# Expires 6 months from issue date h� rya r Regulatory Services OI�G Fee S + BAmsrABLE, • v toss ��' Thomas F.Geller,Director34o 2 rFD MA't Building DiVIS10II Tom Perry, Building Commissioner F treet, Hyannis,annis,MA 02601 �e 200 Main S Office: 508-862-4038 bwN®P Fax: 508-790-6230 _ EXPRESS PERNM APPLICATION RESIDENTIAL ONLY Not Valid without Red X Press Imprint Map/parcel Number ,p Property Address Residential Value of Work Owner's Name&Address 1 Contractor's N Telephone Numberf ��y�r ame , Home Improvement Contractor License#(if applicable) Construction Supervisor''s License#(if applicable) Worlanan's Compensation Insurance Check one: ❑ I am a sole proprietor ❑ I am the Homeowner I have Worker's Compensation Insurance f Insurance Company Name Workman's Comp.Policy# yX 4-1 Permit Request(check box) EkRe-roof(stripping old shinglesfAll construction debris will be taken to ❑Re-roof(not stripping. Going over existing layers of roofl ❑ Re-side ❑ Replacement Windows. U-Value (maximum.44) ❑ -Other(specify) •Where required Issuance of this permit does not exempt compliance with other town department regulations,i.e.Historic,Conservation,etc. 1 Signature Q:Forms:expmtrg Revised121901 rr'`t P Fraser Construction Roofing Siding Specialists rotted or otherwise deteriorated trim boards, plywood Possible Extra-Any re lacement will be done sheathing, lead flashing, or other carpentry needing p plus materials, plus and charged for as an extra at the rate of$40.00 per hour, p 20% overhead mark-up on total extras. FRASER CONSTRUCTION Warranties the shingles and labor for 10 years. FRASER CONSTRUCTION Warranties the shingles against Blow-Offs for 10 years. CERTA-MTK�.:-Warranties the ethjng1_e�;and lab-o 1,00% for the iarst S.:yCal and then on a pro rated basis for 30 years total if the shingles become defective. CERTAINTEED Warranties the shingles to be ALGAE resistant for a full 10 years. Any deviation or alteration from above specificationover and e ex above e ti ed on All written orders and will become an extra charge agreements contingent upon strikes, accidents or delays are beyond our control. Owner should carry fire, tornado and other necessary insurance upon the above work. We, if not accepted within thirty days may withdraw this proposal. , FRASER CONSTRUCTION Carries Woriznan's CoMpOnsation and Public Liability Insurance on the above work. DATE OF ACCEPTANCE: wr meowaer :Fru�tio�a z a TOWN OF BARNSTABLE Permit No. Building Inspector • Cash ---- --- OCCUPANCY PERMIT Bond Issued to Address Wiring Inspector Inspection date Plumbing Inspector Inspection date Gas Inspector Inspection date Engineering Department Inspection date Board of Health Inspection date THIS PERMIT WILL NOT BE VALID, AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL SIGNED BY THE BUILDING INSPECTOR UPON SATISFACTORY COMPLIANCE WITH TOWN REQUIREMENTS AND IN ACCORDANCE WITH SECTION 119.0 OF THE MASSACHUSETTS STATE BUILDING CODE. .................................................... I).........._ :.... ....:........:........................................................... ......... ._ Building Inspector / ssess3r's map and lot number�.�.................../. '; '. Sewage Permit number SEPTIC SYSTEM US NA"STADLE,ONSTA L:® IN COMPLd i Y House number .... . .... ...........................:.......:.... 1� TLC 5 9'Oq�M6 'F 6 WITH TITLE 9• e �,., a` rr p N iVTAL CODE - DNO TOWN AR �. BUILDING INSPECTOR APPLICATION FOR PERMIT TO .......0 ... :......... ......... .............. CA 'TYPE OF CONSTRUCTION ........ .f,?Q. pp r' TO THE INSPECTOR OF BUILDI'NGS:' '' The undersigned hereby applies for a permit according to the�fol.l g inforraicrtion Location -`. .:.......�Z'` :.:... Ue-r ..... :. 0.U.. (� .� v�.............................\� ..... ' Proposed Use ...... ..... �!� � � ..... I...:........... i Zoning District l' �Si.�::d.''C,.n :.........................Fire District ..... ." ... ........................................ t' �M�me of Owner .... qm 3........................ ..............Address 3.Co'(�s T J� .................. .. ............................................................ . Name of Builder' ...S .o).e4....y)......��k!�......... .Address ................................................................................ Name of Architect ....:..................Address ............................. i L _ Number of Rooms ............ .�......................,: .... : .: ..:.:..Foundation .... .�LLI�ed:..... f1.Cd,Q. ..................... Exterior .....GN4.. 99A.A......�r.....A.W.... Roofing .. ..:.......'� �.�`... :..... q .10 Floors . - .... W. `-'.....,.. Interior' }... Heating ..... ...... . ...... :....... Plumbing .............. �'*�`.... ... ,. Fireplace ..........nQ ...... ...................................:......:.........Approximate Cost ...........:.?.5�. .... Definitive Plan Approved by Planning Board ____________________________19________, Area :.C9� ... Diagram of Lot and Building with Dimensions `Fee ...... �1�................... SUBJECT .TO APPROVAL OF BOARD 'OF .HEALTH OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules 'and Regulations of the Town of Barnstable regarding the above construction. Name .... .............. — - 1 , SMITH, JAMES K. w: R ; 24162 1 z Story ................. Permit for .................................... j ...51ag.7,P'...Fmiil '....Dwelli g............. � Location .Lot .#2:19..4:13...Skunknet..Rd1 Centerville 1 .......................................... ........... - r James K. Smith ► Owner .................................................................. ;- Type of Construction ...........................................Frame — ?. f ......................................... ................................... Plot ............................ Lot ................................ June 24 82 a -_ Permit Granted . ..............19 Date of Inspection z .......19 Date Completed .. 2. 9 ,. . { t T3 •i .c Assessor's map and lot number)�j''�........... Q�O*THE Sewage Permit number Z I STABLE, i Housenumber ... .......................................................... roo 163 9 e� 1 MPY A TOWN OF BARNSTABLE BUILDING INSPECTOR APPLICATION FOR PERMIT TO ...... �: L!? f�r lh) ' k 1 `1 . ...........:,...........................................,................................................ TYPE OF CONSTRUCTION ................ ............... : . .v.hr'. '.....................t................................................ ..............................................19........ TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit according to the following information: Location ........ . ............. I................. ...`..f 1... ... .................. ........................ .............................................................. ProposedUse ......: vN .0........;4.a. .n- .A�-. .....................................................................................I......................... Zoning District .... .. .........................Fire District l �1 — �:� .................................... .......... .......................................... P Name of Owner �A-1 — J� (.l.f C, iJI-,11 ....................................................~:..............Address ..................:.................................... t Nameof Builder' ..... ............Address .................................................................................... Nameof Architect ..................................................................Address .................................................................................... Foundation 'Number of Rooms ....... .�.; . '+. ........... ............................. 1 Exterior � '� tZlr :ii c; t . . ...Roofing ............fy..� ?�':t:: ! .......5 h;1 t1;;'j:.,�/1...... ......... . ................................... .. ... n } Floors ......................................................................Interior ............ .. .::?.L...`;....;:............................................ 1 Heating ....L-.'::. ....................................Plumbing , ......`... .............. .................'............................................. Fireplace ....................Approximate Cost .. ...................................................... Definitive Plan Approved by Planning Board -------------------_----- +I�k\� - 19 - -. Area ............................... Diagram of Lot and Building with Dimensions Fee SUBJECT TO APPROVAL OF BOARD OF HEALTH r OCCUPANCY PERMITS REQUIRED FOR NEW DWELLINGS I hereby agree to conform to all the Rules and Regulations of the Town of Barnstable regarding the above construction. Name ........... t l-rr\............................................................. SMITH, JAMES K. A=170-119 Na 24162 Permit for .....12 Story Single Family Dwelling ............................................................................... Location ,., Lot #219 413 Skunknet Rd. .......................................... Centerville ............................................................................... Owner James K. Smith .................................................................. Type of Construction Frame ................................................................................ Plot ............................ Lot ................................ June 24, 82 Permit Granted .......................................19 Date of Inspection ....................................19 Date Completed � I / pv% 6p �� pE.slvt� y�i n 5tN6Lc_ FAMtL-Y - :5 BEDROOM No GAQ5A-Gc- (,w�tDccz DAIt_�( FLOW = I10 X 2; 3306.PP SEPTIC TANK = 33oxl5c,-"% =,495&.P. use t000 GAL. PRINCE NINCKLE.Y 'RoAC> � 015P405AL P►T v5E• I000 GAL. 11 91.3 99.3 i� S%DEWAI-L AeEA = t>aS.F 50TTOA AZ; A= SO S,F, o G.P o - CITA1- t�ES1GN = �25 G.P_� U) Pm _ d -TOTAL. pA 1 L%{ FLOtr( = 33o G P� M9Zo n�o� yK�o a PEQGOLL1.TtOPI RAT1= r.l''tt`t 2MIN o2trE55 :. -". .. . •.� T�_ . a .. - m yFN - © l.` VN (FNe 14g•55' - f f,I eAXT ' NO.2-1104841 . i ! IV NAL QNAL 'TU-_sr : . ; FG= 9`� ToP FNoz%00.0 1DAtA 1000 INV. DIST I,,V, GAL'. Q>c g L i 9u6 So��. B X PT C. 11 i 3 t o00 )MV GA.1.. 95 '/2, I` ! WASNIaD Cacz-rIF11=o PLo'T Pl-AW I �I - LoG4•TIoN CENT�R�I �...l..l=. I� 135 No 5CA.LE SGALI� Itfl.•.SO-FT �ATt� �01�4/$Z wZ � 4 ! /e z P L.P.N-1 lZ E F E 2.E G E �f 1 C E RT 1 F Y -CHAT T 1-t C-- 5No ww ! NEQ7--OW GOMFL\(6 WITH THI -: SIo�LINtr LOT ZI q AwO 5S,-r15AGK 2.EQutTL MENTS oF �TµE— ^(vW►�t p� �3Atza<iTd�L3 �i,NU ►S IJ� - SUCiD1 V 1 `,a'l�o�l p1_��J F01Z• ff 1_OGP.T�D -WtTNIN THE 1=1.•OCO PLAtN . .. AL..A.N E.,.:;SMALL. o c., `tlzt- Cn-Id-82 S3y_ cH A s N. SA�c �.2Y I i<.1C If DAT1= Cp . BAxTEtZe WYF-- INC. REG I VT�SZED't.A►•►0 5 u ev EYoeS � ! 15 NET aN OSTrc2VILLE w1A55• ' ;� -Tu15 PLnN C3AS�ta o� t 1J'ST12.V M 6 NT S v 2V tT Y 'S-NF- 4 FF j>F-76 'SPOuL:�> ►�oT 6� V5E DT6 �jE_1'1=1Z MItiSE 1. o-�' �.It.1G�j APPLIGAt�T / I�AM c s SM.in+ 11 • . • ,� ��� FOR REGISTRY USE 2 ee Green Seal Environmental,Inc. 114 State Road,Building B omore Beach,MA 02562 .♦eee♦ee♦e♦ee♦e;� 040 . . .. .. . . ... . . ... . . . ... .... .. • ♦♦eeee♦eee♦♦,� . .. . . . ...... . . . . 31: �.eOe�♦�e► Vie♦��,0���,� '�� 741 5.88 KW SOLAR ARRAY SITE ADDRESS �♦♦♦,� 10PREPARED FOR: MW - �' . �t �ee♦ee♦� ♦4,WA ilk -p MINAtlantic Power Partners, LLC. -._. Centerville, MA 02632 MAWING TITLE: CHECKED BY ji RP 8/10/15 • . s - •• • • ' - - FOR REGISTRY USE Green Seal Environmental,Inc. ' - ® 114 State Id Building B m Be \A Sagaore Belch. A 02 0?562 I'�I:(509)S"-6034 fm(509)"S-I506 tt tt tt�.EKc'nt'.C�int ° .. a'Ponr•�'rm.�•twiw�n Fn�nm.rM 0 _ ut u srorgm m.•.Ha•td..n�a.reM i v tw.. _ � � � omvm,lna w•M t�um«q�nce et term•ma cmallan•ut kM u , • r tn•.m to cm"m e�•vyuan.iu tn•Enq�nm •• REVISIONS NO. DATE COMMENT RAIL ATTACHMENTS MAX 48"SPAN MAX 16"CANTILEVER • � CONDUIT RUN CO U U LOCATION TO BE DETERMINED IN FIELD I I PROPOSED SOLAR SUB PANEL f I I 1 i 1 l I I I I .I I I I I I I I I i I . I i I I I I f l ' i • I 1 I PITIC H i- 3 1 1 I BOX I I PROPOSED SOLAR PRODUCTION METER PURPOSE: I AZIMUTH - 111401 1 5.88 Kw SOLAR ARRAY I i i i i I I I I I J I I I I II I I I T I I I I I I I I IL _L I CINDY&RICHARD BRIGGS I f I I 1 I I I I I I I I I I I I I PROPOSED UTILITY DISCONNECT SITE ADDRESS 413 SKUNKNET ROAD 1 I I I° I `l 1 I I. 1 1 I I 1 I I I 1 I I ! I I I I ) I I' I I• 1 1 PROPOSED SERVICE RATED DISCONNECT CENTERVILLE MA,02632 PREPARED FOR- T I \I I 1 I l l I I I I I I I I I I I I I I l I EXISTING UTILITY METER Atlantic Power Partners, LLC. EXISTING MAIN SERVICE PANEL 586 Strawberry Hill Road Centerville, MA 02632 DRAWING TITLE: PV-1.1 EXISTING RAFTERS ROOF PLAN [r. 2X6"-16"O.C. CAD TECH: CHECKED BY: VERIFY LOCATION IN FIELD AC RP e • - ENGINEER: DATE: AC 8/10/15 SCALE: SHEET: 2OF 9 SYSTEM DETAILS BRIGGS RESIDENCE System Size: 5.88KW 413 SKUNKNET ROAD 21 LG280 N1C-G3 5.88KW CENTERVILLE, MA 02632 1 STRINGS OF 11 MODULES Panel MLfacturer 1 STRINGS OF 10 MODULES 21' ENPHASE M250W MICRO INVERTERS Panel Model ZOO N1C-G3 FOR REGISTRY USE NOTE: MAX 16 MODULES PER 20A CIRCUIT reed Green Seal Environmental,Inc. IMP: 8.97A ISC:9.56A Panel Count: 21 m M 6114State Road,Building � Sagaore Beach, A 0252 11 1 VMP: 31.5V VOC:38.9V """'"""'°` "UTILITY DISCONNECT".. 30A 1PH 240V ® ® CUSTOMER OWNED NEMA 3R DISCONNECT CELLULAR UTILITY ELECTRI CAL NOTES: GRID 1. All equipment to be listed by UL or REVISIONS M250 M250 PRODUCTION METER NRTL and labeled for its application No DATE COMMENT 2. All conductors shall be copper,rated for 600v at 90 degrees C and rated for wet environment such asTHWN-2 30A. b 3. Where sizes of junction boxes,raceways, and conductors are not specified,the 10 1 EXISTING contractor Modules shall be bonded to support UTILITY METER r' rail per MFR's instructions ® ® ® 3R 5. Modules support rails to be bonded to continuous copperE.G.0 via weeb lug or Ilsco lay in lug M250 [M250 6. Provide inverter with options,voltages, OUTSIDE and accessories as required by project site conditions 7. Combiner boxes,fuses,wire sizes, PURPOSE:. quantities, and conduit sizes between solar - INSIDE arrays and inverter to be verified by 5.88 KW SOLAR ARRAY contractor with solar panel and inverter LINE SIDE TAP Mfg before installation CINDY& RICHARD BRIGGS 8. All electrical work shall be in accordance 1-10/3 NMC with all applicable portions of the state ROMEX 100A - building code and NEC SITE ADDRESS 100A TYPICAL MAIN 9. Provide conduits,wire,grounding,etc.to BREAKER accommodate utility Co. voltages prior to 413 SKUNKNET ROAD = _ M LO installation of metering and connection to CENTERVILLE MA,02632 30A j grid . 10. Inverters to have integral DC and fused AC disconnects PREPARED FOR: 11. Fuses to be CL/TD/DE unless recommended otherwise by Mfg. 30A 12. Contractors shall coordinate grid-inter- Atlantic Power Partners, LLC. face work requirements with utility company 586 Strawberry Hill Road before installation Centerville, MA 02632 1P-15A 13. Disconnect switch required by utility co. shall be pad-lockable in the open position 2P-20A ENVOY 14. Line Side Tap to follow NEC"Tap Rule" DRAWING TITLE: EXISTING 100A 1PH 240V 240.21(B) P-20A HOUSE PANEL • G�►�^t>I SCSI�m�fr�t►.me�t�l,lrx, ..ems'; 100A 1PH 240V CATS CAD TECH: CHECKED BY: 2-12/3 NMC PV COMBINER PANEL 30A 1PH 240V AC RP ROMEX NEMA1 SERVICE RATED . DRAWING: EL-1 DISCONNECT WITH 2-30A FUSES ENGINEER: DATE: DATE: 8-1 3-1 5 -. AC 8I10/15 BY: RP SCALE: .. SHEET: 3 OF 9 (SUM C►�DG� ° - o Life's Good ;o ®Mechanical Properties ®Electrical Properties(STC') il [ o o . 6 x 10 28.0.w. rx g„ y,,x ,t, Cell vendor LG voltage(Vmpp) 315 FOR REGISTRY USE Cell T Monocrystallrne MPP current(Impp) 897 reed Green Seal Environmental,Inc. .,, Cell dimensions 156 x 156 mm/6 x 6 in - - " ""` -- - - -' ""' - /�� to Road,Buildin`B ------- .___.._._. _. ____._.--.--_.___..._.-.... ��\ _ Open c rcuit voltage(Voc) 389 �/ Sagamore Beach,MA 0 562 • c` N'� t',.vR ,'r, #of busbar 3 . _..... .. .. ...._ __...... .. .. Ea �% r ut .__... ___._.-__....--_.__.-__.. ._ _..____.... .____. ._ cl(508)$88-601J •`- '` Dimensions L x W x H 1640 x 1000 x 35 mm Short circuit current(Isc) 956 _ 64.57 x 39.37 x 1.38 in Module efficiency(%) 171 .. _ ... __._.-.._. - .. _.. ......._..................... ... Static snow load 5400 Pa/113 psf _ _ Operating temperature(C) -40-+90 - Static w nd load 2400 Pa/50 psf - ......... ..............._. .. . ...... ........... .. ..... ...... ...,.. - M..m•..a..,«...ww.,>.��a dl,k °..n.,a. • � � - - �� Weight 16 8 0 5 kg/36 96+1.1 Ib Maximum system voltage -10 �•m LG Electronics,Inc.(Korea Exchange:06657.KS)Is - -- -- - ----- -- Maximum series fuse ratingv(A) L)20 O ""r ;.K1".m..e.r 600(U OQEC) Con ector type MC4 un eclo'IP 67 1h•...r,.r.. ee ° ,,,.,n m. y one of the globally leading companies and Power tolerance(%) 0-3 Junction box IP 67 with.,bypass diodes m en a , technology innovator for electronics,information c(standard Test conatpn)brad o0o N/m module temperature 25°C AM 1.5 REVISIONS M,- - 1, - - gY Len th of cables 2 x 1000 mm In 9-_...__ ._._._.__... ........_.._ ....____._.___ _ ................ 'The nameplate powoi output is,neas°reU end determ tied by LG Electi°n cs It its sole and absolu'e drscrction NO. DATE COMMENT • { and communication products.The LG Electronics - Glass .High transmission tempered glass currently employs more than 91,000 people Frame Anodized aluminum IS Electrical Properties(NOCTe) worldwide in 117 companies.-in fiscal year 2011, ,, 48.97 billion USD of revenue was achieved. ®Certifications and Warranty w... __. .... _., _ _... .28ow ' - - - Maximum power(Pmpp) 206 I a - Certifications IEC 61215,IEC 6173 0-1/-2 UL 1703, f - .-,- MPP voltage(Vmpp) 288 IJ� ' LG is one of the world's largest manufacturers of )So 9001 IEC 6170i '' ..""' "` ""' . ....... ...-......... .- .-_.. _....... .. .. _...._.�._ MPP current(Impp) 715 mobile phones,flat screen TVs,air conditioners, Product warranty 10 years - - ' " ' '" '-' -' re. .. ..m... ..... Open circuit voltage(Voc) ... .__. 33:9............. ._...__-... washing machines and refrigerators.As a future- outputwarnty of Pax Linear warranty.* oriented company,LG enables others to use oaauron ant ioleran<e:3%) Short circuit current(Isc) 770 _.. 'n)st year 97%2)Ane,2nd year;0.716annual degradation,3)80.2%for 25 roar: Efficiency reduction technology consisting of renewable energies. (from 1000 W/ma t4 200 W/m<) <4.5 LG's high quality solar products are being NocT(NIn nal On...fing Cell Temps--):Inadian<e 800 W/ma,amblent tempe,ature 20•C, ®Temperature Coefficients wind manufactured in LG's'leading production facility peed 1 m/s in South Korea - NOCT 45 2 C PURPOSE: - Pmpp -0.42 /o/`C ISDimensions(mm/In) v°c 031 r/c 5.88 KW SOLAR ARRAY APPROVED PRODUCT -" " CINDY& RICHARD BRIGGS o�E C �� US C E �� � ®Characteristic Curves •.t 10=39 L long silo framo soon side frame HMF`h—1 BS EN 61215 SITE ADDRESS 10 � ..o,.a .�. eao/3,.eo I a 1 w t BOOM/ � aoM<dulas V a B000w °a.e 9 C413 SKUNKNET ROAD FLma, ae/e ENTERVILLE MA,02632 ..••r'+y��.r,7 �r 'y (� ". '! b 600W u n1•o) ` it t 5 i aoow - PREPARED FOR: LG's High Efficient Cell Technology O��O Convenient Installation 3 200N --�— <� 1 a 2 \ p99,Neo n Driven by LG's own N-type technology,LG's high- fj LG modules are carefully designed to benefit 5 10 15 20 25 30 35 40/oltage(V) Atlantic Power Partners, LLC. m.s/ooa efficiency modules will provide customers with installers by allowing quick and easy installations 140 r r 1 586 Strawberry Hill Road eon.oment _ -e c.nio<n�amgy high economic benefits. tnstailaeon throughout the carrying,grounding,and connecting le, M r a° 2 Centerville, A 02632 _ x 1 0 4s r g% stages of modules. i M E - lee o - Voc °oo e DRAWING TITLE: 16.8kg Light and Robust 100/o Ell- Completed - Be j e With a weight of just 16.8 kg,LG modules are �� All LG modules pass Electroluminescence 60 proven to demonstrate outstanding durability inspection.This EL inspection detects cracks and -'" ",•"" " - """' 1 Lightweight ELTest against external pressure up to 5400 Pa. other impeffections unseen by the naked eye. 40 .-.-._._._...:-..............._.__...... __,.,.�:.,.,...,. °4: 20 R _ _ CAD TECH: CHECKED BY: Reliable Warranties Positive Power Tolerance ° LG stands by its products with the strength of a LG provides rigorous quality testing to solar -40 -25 o 25 e0 ire 90Tempeyat--(°C) The disian<e between the center of the—htng/gro°nding holes AC RP ^ global corporation and sterling warranty policies. modules to assure customers of the stated power U—r war.anty - - ENGINEER: DATE: LG offers a 10 year product limited warranty and a Positive Powar outputs of all modules,with a positive nominal Tolaran<o o ^ North America Solar Business Team Product spocincailona are subject to change without n°rire. AC 8/1 D/t FJ 25 year limited linear output warranty. tolerance starting at 0/. "LG Life's Good"is a re LG Electronics U.S.A.Inc gsva ed vatlemark of LG Corp. 1000 Sylvan Ave,Englewood Cliffs, An other trademarks are Inc pmpedy of then msPeclve owners. yr •� NJ 07632 DS-N-60-C-US-F-EN-30520 Copyright©2013 LG Electronics..All rights reserved. ■ SCALE: Life's Good Contac:Ig.solar@Ige.com 05/01/2013 le www.lgsolarusa.com ' . SHEET: 4CF9 r I ° J Enphase®M250 Microinverter//DATA Enphase®Microinverters INPUT DATA(DC) M250-60-2LL-S22 Recommended input power(STC) 210-310 W Maximum input DC voltage 48 V Enphase@M250 __ _� �. _ _ � Peak power tracking voltage 27 V-39 V _._ _ _ __. _. ......_ .� �... ,�, .- ____',,. .._. � FOR REGISTRY USE Operating range 16 V-48 V _---'. �... �.._..._.-...._- .u_ - . -- __ ..-_. - reeo rl I'State ee l Road,'Build'in IBC. Min/Max start voltage 22 V/48 V _ _ ®I Sagamore Beach,MA 02562 Max DC short circuit current 15 A cl(508)89960: rug(508)998-1506 OUTPUT DATA(AC) @208 VAC @240 VAC Peak output power 250 W 250 W �p Rated(continuous)output power - 240 W _ _ F _ _ _ 240 Wis Nominal output current 1.15 A(A rms at nominal duration) 1.0 A(A rms at nominal duration) REVISIONS Nominal voltage/range 208 V/183-229 V 240 V/211-264 V NO. DATE COMMENT 1 Nominal frequency/range Y _ 60.00/57 61 Hz�- 60.0/57-61 Hz ^- a Extended frequency range` 57-62.5 Hz 57-62.5 Hz ' ��+ 0 IF Power factor >0.95 >0.95 -_ - Maximum units per 20 A branch circuit 24(three phase) 16(single phase) Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles R EFFICIENCY CEC weighted efficiency 96.5% Peak inverter efficiency 96.5% Static MPPT efficiency(weighted,reference EN50530) 99.4% PURPOSE: Night time power consumption 65 mW max MECHANICAL DATA 5.88 KW SOLAR ARRAY Ambient temperature range -40°C to+65'C CINDY& RICHARD BRIGGS The Enphase®M250 Microinverter delivers increased energy harvest and reduces design and Operating temperature range(internal) -40°C to+85°C mm mm installation complexity with its all-AC approach. With the M250,the DC circuit is isolated and insulated Dimensions(wxHxD) 17t x 173 x 3o mrn(without mounting bracket) SITE ADDRESS _ _ m . _ w _ _ from ground, so no Ground Electrode Conductor(GEC) is required for the microinverter.This Weight 2.0 kg _ �. _ _ 413 SKUNKNET ROAD further simplifies installation, enhances safety, and saves on labor and materials costs. Cooling - _ _�` y Natural convection No fans -- _} _ CENTERVILLE MA,02632 _ _. . Enclosure environmental rating Outdoor-NEMA 6 The Enphase M250 integrates seamlessly with the Engage®Cable, the Envoye Communications FEATURES PREPARED FOR: GatewayTM, and Enlighten®, Enphase's monitoring and analysis software. Compatibility Compatible with 60-cell PV modules Atlantic Power Partners, LLC. Communication Power line 586 Strawberry Hill Road Integrated ground 4 _ The DC circuit meets the requirements for ungrounded PV arrays in Centerville, MA 02632 PRODUCTIVE SIMPLE RELIABLE NEC 690.35.Equipment ground is provided in the Engage Cable.No + additional GEC or ground is required.Ground fault protection(GFP)is -Optimized for higher-power No GEC needed for microinverter 4th-generation product integrated into the microinverter. DRAWING TITLE: modules No DC design or string calculation More than 1 million hours of testingMonitoring Free lifetime monitoring via Enlighten software - Maximizes energy production required and millions of units shipped ' Compliancey Y UL1741/IEEE1547,FCC Part 15 Class B,CAN/CSA-C22.2 NO.0-M91,Y - Minimizes impact of shading; -Easy installation with Engage Industry-leading warranty, up to 25 _ 0.4-04,and 107.1-01 dust,and debris F. Cable years Frequency ranges can be extended beyond nominal if required by the utility Y CAD TECH: CHECKED BY: AC RP ENGINEER: DATE: AC 8/10/15 L�J enphase® To learn more about Enphase Microinverter technology, [e] enphase, J E N E R G Y C US visit enphase.com E N E R G Y SCALE: ©2015 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. MKT-00070 Rev 1. SHEET: 5OF9 { - � FOR REGISTRY USE 1 Green Seal Environmental,Inc. - t1 1 U M ao 1r, i` /\��//���/\� 1 14 State Road Building B t cts �„ j^►r J Sagamore Beach MA 02562 "pad�'tve®$BfilS@0� l ,��•O� 1 I � � rd.i>as>8894,0 a cox :Q® O rr,�(inst kvk I or ®Q®\BA r+��66 � _ aid ` ����tl„ ,,,,,,•E g3di rdo�� ° y 1 { — • [� 0 07 REVISIONS Web Presentment Solar Provider COMMENT JL Rg , � DATE Solar Solar Utility utility - - I Inverter Meter Disconnect Meter f - n Switch M � Q [ � Q ir How it Works Smart Meter communication over cellular networks Sa � 1{V'� Installation Production data can be stored in the Cloud and Hosting Services A Solar Meter plugs into a number of meter for up to 90 days.The Solar Meter Itron offers a hosted server so that solar As consumers become more environmentally aware of their energy consumption and carbon footprint,the energyindustry-standard ANSI plug-in module provides the solar provider with a providers don't have to worry about adding Y P 9- P rY 9 PURPOSE: interest in and use of solar power is on the rise. Itron's revenue-grade,Solar Meter is ideal for monitoring bases.For most residential installations vast quantity of meter alarms that provide "yet another system"to manage and information about the installation. 5.88 KW SOLAR ARRAY of 200 amps or less,a widely available operate with in-house staff.With our cloud the production of residential and commercial solar photovoltaic(PV)systems and can support bidirectional Standard Form 2S is used.In North Network Connectivity and hosting services,production data is CINDY& RICHARD BRIGGS and net metering.The meter collects, stores and uploads the PV system's production data to the solar America,the meter is designed for a 240 collected and provided via web services or Volt,60 Hz system. Itron Solar Meters are truly"plug and play" ' XML files to the solar providers'in-house solution provider over an existing cellular network link that is fast, reliable and secure. devices that use a cellular connection for Installing the Solar Meter in-line with the data transfer.Using a Solar Meter,the systems or web-portal systems. SITE ADDRESS service panel feed allows the solar provider installer has flexibility to select either AT&T 413 SKUNKNET ROAD Itron's cellular meter adheres,at minimum, expensive than other available monitoring doesn't require entrance into the house to utilize the meter's remote disconnect SPECIFICATIONS or Verizon as the commercial network CENTERVILLE MA,02632. to the stringent ANSI C12.20 5.5.2.5 systems.Using our technology,you can or property capabilities when required. Meter compatibility and specifications of choice to ensure the highest quality accuracy class CA 0.5 standards— benefit from: » Immediate notification of production Ever Solar Meter is enabled to accept available upon request. P Y P network connection available.Our meters measuringinverter production with U t0 - PREPARED FOR: P P » Supports bidirectional and net metering issues through alarms over-the-air firmware upgrades,ensuring use 3G connectivity for high-speed,secure 99.5%accuracy,regardless of inverter or » Revenue-grade meter accuracy » Over-the-air upgrades to ensure your the meter always has the latest updates. and reliable communications.As cellular panel type.Simply put,Itron's Solar Meters » meters have the latest features and data networks incorporate new technology, Atlantic Power Partners, LLC. ANSI certification and the highest level Data Collection are the most accurate and reliable meters of security available(meets federal o functionality,no visits required the Solar Meter will remain backward 586 Strawberry Hill Road available—and are already trusted by All Itron Solar Meters collect interval data(at compatible so your investment remains Centerville, MA 02632 leading electrical utilities around the U.S. security standards) Simple and Reliable intervals typically between 15 minutes and protected for the long term. And because our meters can be installed in » Unparalleled reliability and proven Itron Solar Meters can monitor any type of I hour)as defined by the solar provider. a simple"plug and play"fashion with utility7i architecture deployed by leading utilities solar energy system production with 99.8% DRAWING TITLE: standard installation techniques,installation' » Low-cost,one-piece installation that accuracy regardless of inverter or panel - and activation is streamlined—meters can requires significantly less labor type.Information can be stored for up to report production data to the solar provider » Standard meter connections—no 90 days. Itron is a global technology company.We build solutions that help utilities CORPORATE HEADQUARTERS in as little as 45 minutes. custom parts or wiring Production data is stored on the meter and i:LlJL.:[JJ measure,manage and analyze energy and water.Our broad product portfolio 2111 N Molter Road includes electricity,gas,water and thermal energy measurement and control Liberty Lake,WA 99019 CAD TECH: CHECKED BY: BENEFITS OF CELLULAR » Certified with network carrier for the uploaded automatically over the cellular technology;communications systems;software;and professional services. USA SOLAR MONITORING highest possible reliability and fast data network to the collection system.Solar With thousands of employees supporting nearly 8,000 utilities in more than AC RP transfer with immediate accessibility providers retrieve production data via an 100 countries,Itron empowers utilities to responsibly and efficiently manage Phone: 1.509.891.33 5 In addition to quick and easy Installation, energy and water resources. Fax: 1.509.891.3355 ENGINEER: DATE: q Y » Remote disconnect switch option industry-standard format or secure XML file gy Itron Solar Meters are significantly less helps with non-payment issues and transfer from the collection system. Join us in creating a more resourceful world;start here:www.itron.com. AC 8/10/15 While hron strives to make the content or its marketing materials as timely and accurate as possible,Itron makes no claims,promises,or guarantees about the accuracy,completeness, _ or adOduacy 01,and expressly disclaims liitlilityfor errgrs and omissions in,such materials.No warranty of any kind,Implied,expressed,or statutory,including but not limited to SCALE: the warranties of non-Infringement of third party rights,title,merchantability:and fitness for a particular purpose,is given with respect to vie content of these marketing materials. • • •' • 1DCopynght 2013,Itron.An rights reserved. 101250SP-04 05114 SHEET: 60F 9 00S MSOLAR ROOF ATTACHMENT& L-FEET : M 00000 SOLAR MICROINVERTER 000 ; MOUNT INSTALLATION GUIDE ; PAGE 00 SMMOUNT INSTALLATION GUIDE ; PAGE --------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- 77 .g . k=. s FOR REGISTRY USE Yee Green Seal Environmental,Inc. ROOF PREPARATION: layout and DRILL PILOT HOLES:Center the roof FLAT FLASHING INSTALLATION:Insert INSTALL LAG BOLTS&L FOOT. INSTALL -.MICROINVERTER MOUNT INSTALL MICROINVERTER: -Install INSTALL MICROINVERTER: ALIGN POSITION INDICATOR: Verify 114 State Road,Building B install flashing at rafter locations attachment over the rafter and drill a the Fiat Flashing so the top part is Insert the lag bolt through the L-Foot T-BOLT:Apply Anti-Seize and install microinverter on to rail Engage:with that position indicator on bolt is pc Saganiore Beach,MA 02562 . determined per Design and pilot hole(s)for the Lag bolts) under the next row of shingles and the in the order shown in the illustration. pre-assembled% TORQUE VALUE(See Note on PG 1) rc1:(308)889-6034 Engineering Guide: hole lines up with the pilot hole. Verify proper orientation before into top' rail slot at microinverter 1/4"nut to 10 ft-lbs w/Anti-Seize p` f;0s)ssx-130a /" NOTE:Determine lag bolt size and embedment depth. .. tightening tag bolts. locations.Rotate bolts into position. Q icki u th e pilot nole mravgn[he flat See Unirac Flat Flashing Manual for .. 4 . flashing lag bolt location for easier installation. Additional Details. aeo•mP•.y,,,c„.a :+,,,a r - uw — ompon�Nna o oMa °m,mc ion. or � .1occ SM EQUIPMENT GROUNDING THROUGH ENPHASE MICROINVERTERS ,,,,,,„wa, , m•u..,a°mom a.c,w.•°...0 m.r°sm•.. , - - - - "+',�_• .�, �- The Enphase M215,M250 and C250 microinverters have integrated grounding ""'`°°°• capabilities built in.In this case,the DC circuit is isolated from the AC circuit,and REVISIONS the AC equipment grounding conductor(EGC)is built into the Enphase Engage NO- DATE COMMENT • ,y, - +•" ice; integrated grounding(IG)cabling. via '•..., - - �� '�:� � Aminimum of one Enphase microinverter with integrated ground must be present on a single trunk cable.The microinverter is bonded to the SOLARMOUNT rail via the mounting hardware.Complete equipment grounding is achieved through ••��'- "u -_. -- ° the Enphase Engage cabling with integratedgrounding(IG). No additional EGC grounding cables are required,as all fault current is carried to ground through 2 PIECE ALUMINUM STANDOFF WITH FLASHING&L-FOOT:. TOP MOUNT TILE HOOK&L-FOOT: ,� r .z �' ti I! the Engage cable. • If necessary cut an opening in the roofing material over a rafter to accommodate the Remove or slide up the roof tile,position the roof hook above the roof rafter ♦ a �;,.9rn',-•sttdw flashing riser. Place Tile Hook in the middle of the underlying interlocking tiles valley.Drill 3/16 • Install the standoff,ensuring that both tag bolts are screwed into the raftec inch pilot holes through the underlayment into the center of the rafters.Securely - • Insert the flashing under the shingle above and over the shaft of the standoff, fasten each tite hook to the rafters with two 5/16'x 31A'la screws.Slide down or - (No-CaNk collar does not require seating of the flashing and standoff shaft) re-insert the tite g • Add L-Foot to top with bolt that secures the EPOM washer to the top of the standoff. Attach L Foot to tile roof hook See Standoffs&Flashings Installation Manual 907.2 for Additional Details. See Tile Hook Universal Mount Installation Manual for Additional Information. PURPOSE: �� ; LAR ARRAY SOLAR ATTACH RAiI TO L-FEET oo SOLAR SPLICE & THERMAL BREAK ; U1 CINDY& R C5.88 KW OHARD BRIGGS 000 SM MOUNT INSTALLATION GUIDE ; PAGE 00 MOUNT INSTALLATION GUIDE ; PAGE -- ----- ---- ----------------- ----- -------------------- ----- -------------------- -------- ------ -------- -- ------ ------ ------ ------------------------------- SPLICE INSTALLATION(IF REQUIRED PER SYSTEM DESIGN) SITE ADDRESS Q�' ;:w*f,r „'y" ©,' *"w © 'b, +.: :� y�•+t'} +'':,t.. -#* '.-",t, _ Ifyour installation uses SOLARMOUNT splice bars,attach the rails together before t, r.rt . �. y Jri •" `''� •� s'•"' ��, `,,:4..„ _a „ mounting to the L-feet/footings.Use splice bars only with Rush installations or 413 SKUNKNET ROAD ,y J•,,._ t- ..a„- fi_'•.f '�'+ - those that use low-profile tilt legs.A rail should always be supported by more' e , *3y8"T--bolt - .r � st>" �'-, . ,+ B� �-•r-' � ';�� �.,•,""� than one footing on both sides of the splice.There shouts be a gap between rails, CENTERVILLE MA,02632 {i :« �; - :* : - " "-r ,"A '" •�'c �• .-Tf„ x -`aa• up to 3/16"at the splice connections.T-bolts should not be placed Less than a .=,�....' ..,. mot.; ®. i' * -�' �,��;:: ° -.,cr•��'°'„�;::r distance of 1"from the end of the rail regardless of a splice with the exception of Y s -• - •.,:• ® ® " '� - eZ1' 'J"f�` ,r,x„ the high profile mode installation for the Trim. PREPARED FOR. N �� }is ®. '+-: "" .•+' ` ,,," F t� ! - -` TORQUE VALUE(See Nate on PG.1) + 'w:} +�h, * .�:.-� �•'" +.-� »`^•^'•" r � `s "'* * �� Hex head socket size 5/16"-Do not exceed 10 ft-lbs.Do not use Anti-Seize. - ' O < >� Atlantic Power Partners, LLC. PLACE T-BOLT INTO RAIL:Insert 3/8" SECURE T-BOLT:Apply Anti-Seize to CONNECT RAIL TO L-FOOT: Raise ALIGN POSITION INDICATOR: Hand Rv-- Q: - �' Max length of spliced rail is 40 ft.An expansion joint is required>40 ft. 586 Strawberry HIII Road T-bolt into rail at L-foot locations. bolt.Rotate T-bolt into position rail to upright position and attach tighten nut until rail alignment is �• - - to L-feet to T-bolt with 3/8'Serrated complete.Verify that position indica- »�+r ode ' Centerville, MA 02632 Flange Nut.Use either slot to obtain for on bolt is verticat(perpendicular J ^'" • desired height and alignment. to rail) *" r TORQUE VALUE(See Note on PG.1) ,;{•r a •�,' '. =�, .?,� -" - DRAWING TITLE: 3/8"nut to 30 ft-lbs .,R. - ALIGN RAILS: EXPANSION JOINT USED AS THERMAL BREAK Align one pair of rail ends to.the edge of the installation area.The opposite pair „�..n•'�.� -•�.."`+w. �'-' _ i Expansion joints prevent buckling of rails due to thermal expansion.Splice bars �. of rail ends will overhang installation area.Do not Trim them off until the instal- "'"��_ .u"'x'"-•w"" '•gym _ may be used for thermal expansion joints. To create a thermal expansion joint, tation is complete. If the rails are perpendicular to the rafters,either end of the +*_ - -� slide the splice bar into the footing slots of both rail Lengths.Leave approxi- �. rails can be aligned,but the first module must be installed at the aligned end _ mately ''A"between the rail segments.Secure the splice bar with two screws on CAD TECH: CHECKED BY: one side only.Footings(such as L-feet or standoffs)should be secured normally If the rails are parallel to the rafters,the aligned end of the rails must face the I' � on both sides of the splice.No PV module or mounting hardware component AC RP d Lower edge of the roof.Securelytighten all hardware after alignment is complete. �_ should straddle the expansion joint. Modules must clearly end before the joint !pn -• '" - with mounting hardware(top mount Endclamps)terminating on that rail.T-bolts Mount modules to the rails as soon as possible.Large temperature changes may r _ Y; should not be placed less than a distance of 1'from the end of the rail regard- ENGINEER: DATE: bow the rails within a few hours if module placement is delayed. - ;,, less of a splice.The next set of modules would then start after the splice with '., mounting hardware beginning on the next raiLAthermal break is required every AC 8/10/15 40 K eet of -m°"' - '' � ,�•••. ��� ` on thermal breaks in our specific fi continuously oject,please consult a r Licensed concernsonal ed structu aLengineer. Runs of rail less than 40 feet in length,with more than two pairs spliced together,are an SCALE: ,� •T,�;�.:T. ,�� `` - - acceptable installation for the SOLARMOUNT systems. • •+{'• '—'`'- Bonding connection for splice used as a thermal break.Option shown uses two - ....+ -�""'--•'� _ :-��-.^--'••�--�„'ter ��:.~ Ilsco lugs(Model No.GBL-406T P/N GBL-4D6T-see product data sheet for more • -` ° - • - '" - details)and solid copper wire. SHEET: 70F g �® WEEBLUG ASSEMBLY 00 : S M SOLAR SYSTEM GROUNDING ! I0 a BURNDY" © 00 : 00 ; MOUNT INSTALLATION GUIDE ; PAGE Slide bolt to desired - ---------------- -- ------------------------------------------- Washer, Electrical E ul ment Bond WEEB4eeth towards rail -� ^..position and slip bolt Q p through WEEB-6.7 i '' WEEB INSTALLATION INSTRUCTIONSWEEB-6.7 T : For tronRidge Light&Standard Series Rails Only -^ FOR REGISTRY USE Please read carefully before installing. _. ONE LUG PER OF MODULES' °" *Green Seal Environmental,IncBurndy recommends that the sufficient details of the Installation be t - - y WEEBLUG CONDUCTOR-UNIRAC P/N 008002S: 114 Stale Road,Builc in B submitted to the AHJ for approval before any work is started. Only one lug p of modules is uApply Anti Seize and insert a bolt in the aluminum rail and through the clearance ee Page or'addit t'lu quired for - Sagamore Beach,MA 02562 e n joints. - i hole in the stainless steel flat washes Place the stainless steel flat washer on the bolt, It`p B yax�mt4 m oriented so the dimples wilt contact the aluminu rail.Place the lug portion on the i508>8e8 Ixx bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and t..� cn �" ✓ nut Tighten the nut until the dimples are completely embedded into the rail and lug. _ c TORQUE VALUE 10 ft lbs.(See Note on PG.1) 1, 6a-tag t� I See product data sheet for more details,Model No.WEEB-LUG-6.7 -err n"pa -� GROUNDING LUG MOUNTING DETAILS: • Details are provided for both the WEEB and Ilsco products.The WEEBLug has a WEEB-DMC - - grounding symbol located on the Lug assembly The Ilsco lug has a green colored ® REVISIONS Install WEEBLug-6.7 assembly and set screw for grounding indication purposes.Installation must be in accordance F ' torque fasteners to 10 ft-lb/13.5 N-m with NFPA NEC 70,however the electrical designer of record should refer to the # N0. DATE COMMENT using general purpose anti-seize Latest revision of NEC for actual grounding conductor cable size. - compound on threads. - Required if not using approved integrated grounding microinveters - y / Important note: o LT 1. WEEB-6.7 that sits under the WEEBLug is for SINGLE USE ONLYI GROUNDINGLUG-BO SIZE&DRILLSIZE----- ---- ---- ------- ILSCO LAY-IN LUG CONDUCTOR•UNIRAC P/N 008009P:Alternate Grounding Lug WEEBLug-6.7 WEEB Bonding Jumper-6.7 Ensure position is correct before tightening. GROUND LUG BOLT SIZE DRILL SIZE -Drill and bolt thru both rail walls per table. - 2. The WEEBLug-6.7 may be used with a maximum equipment ground wire WEEBLug 7/16- N/A-Place in Top SM Rail Stot TORQUE VALUE 5 ft lbs.(See Note on PG.1) - Products are tested to UL 467,CAN/CSA-C22.2 No.41t US/Canadian standards of 6 AWG. ILSCO Lug a10-32 7/32• See product data sheet for more details,Model.NO.GBL-4DOT. for safety grounding and bonding equipment. - Torque value depends on conductor size. See product data sheet for torque value. W't Document Number 104-0404-000039-004 .ueee i ® W I 1 Document Number 104-0404-000039-004 y ©2012 BURNDY LLC. \ y ©2012 BURNDY LLC. Page 1 of 14 Page 11 of 14 , PURPOSE: GROUND CONDUCTOR ASSEMBLY WEEB BONDING JUMPER-6.7 ASSEMBLY 00 ; SOLAR BONDING CONNECTION GROUND PATHS : ® 5.88 KW SOLAR ARRAY Q ® 00❑ , CINDY& RICHARD BRIGGSI The flexible WEEB Bonding.Jumper can be mounted on all rail splices including 00 MOUNT INSTALLATION-GUIDE--:-PAGE expansion joints in different ways shown below. _ -- - SITE ADDRESS ^ - Torque to 10 ft-lb/ t Op6�e• oo },.. - 13.5 N-m using general MOo` �g �^ ^i � t f WEEB Bonding 9 g °�'A= ae �j .»' �, 413 SKLINKNET ROAD - Jumper /purpose anti-seize RayF JO w e � SQv�Ee� . S© � 0 Y N � CENTERVILLE MA,02632 f o com und on threads. - • i P.. i PREPARED FOR: RJR A W Por BONDING MIDCLAMP ASSEMBLY ENDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR • RAILTO L-FOOTIN/BONDING T-BOLT Atlantic Power Partners, LLC. Stainless rteel Middamp points,3 per module, 5'errated flange nut bands aWminum Endclamp Stainless steel self drilling screws drill and tap Sertated flange nut removes trfoo[domination 586 Strawberry Hill Road ©pierce module frame —dilation to bond ©tonainio. eeIT-bbll Din—otio,barandrail coaingbondbetween ©to bondL-faortosainlesssteeiT.bolt Centerville, MA02632 module[o module mrough clamp sal.bar am each rail section Serrated T bon head penetrates ra 1—dilat on 5errated T bolt head penetrates ra 1 anodilo on - r ©Serrated flange nut bonds sU,nless steel clamp ©m bond T bolt,nut,am Endclamp m grbundetl Alum non,spl ce bar spans across m 1 gap to ©.to bond T bolt,nut.and L foot to grounded SM \ to stainless steel T bolt SM to 1 ©create ra 1[o ra I bond.Ra I on at leas[one s de ra 1 ©Serrated T bob head penetrates rail anodilation of sal ce will be grounded \ .,to bond TboLL nut.clamp and modules to Note:End clamp does not bom ro module frame. Notes Splice bar and bdUod ooea nnmn ae grounded SM ral no d—L The ,U l bar function I,rail DRAWING TITLE: auq tam bonding Torque to 10 ft-lb/ ' Equipment WEEB Bonding 13.5 Nm using general ground .Jumper �purpose anti-seize - Nou:Only. too odd BONDINGMICRDINVERTER Nurwruenve�Q - conductor / compound on threads. rown Onled MOUNT eyao© Draw n'o�s t q z 1�x CAD TECH: CHECKED BY: Lay in equipment ground conductor and torque bolt to 7 ft-lb/10 N-m. W i ?"..w' © AC -RP s x SEENOTE f — wEEBt G It )� _ ENGINEER. DATE. 7 i f BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND AC 8/10/15 • g BONDING MIL ®Hex nu[witty raptive lock washer bonds metal wEEB washer dlmplea pierce anodized rail td SPLICE BAR r verter range to stainless steel T-bolt O creaccbord'o—eenrailandlug ©[oersted T-bolt nuadaveneva[es a I anod:at on sold copper w to wnneaed to mg: prod to SCALE: bond T-bolt d L-foot to gounded SM ©p,,oe final synom ground connecbon'o Route WEEB Bonding Jumper as shown above if the edge of solarTnodule lands ilsymm9..udlntwdlvraoxingandonaf.= between two splice rails. MILTo�-Fo°r I fig g ed grobndi,in NOTI11am w uo x Ill,1-on-Lind� approved Mapbwortor systems. 9 tan a w/BONDINGT--BOLT See page Hfar debia the side Wthe rail - See page I for details W'�� Document Number 104-0404-000039-004 1 - 1I 1 Document Number 104-0404-000039-004 SHEET: y ®2012 BURNDY LLC. �•/�J \ y ®2012 BURNDY LLC, ,- Page 12 of 14 - Page 13 of 14 HAP 9 a. I LABELING REQUIREMENTS FOR ARTICLE 690 HellermannTt®n f V INEC 690.13(B) Each photovoltaic system disconnecting means shall be permanently marked to identify it as • photovoltaic system disconnect.✓ PHOTOVOLTAIC SYSTEM NEC 690.15, lFC , , 61 energized or xPC690.3K8 LABELI - ans must be grouped and identified. d disconnect means shall be marked. OD REQUIREMENTS. may FOR REGISTRY USE the open position, a warning label shall be mounted on or adjacent to the disconnecting I O i NEC 2014 Article 690 and IFC 2012 reed Green Seal Environmental,Inc. means. 1 14 State Road Building B 'NECANW10.16 ra NFPA 10E ....._.i. _ /OV6 Sagamore Beach MAO 562 Anise UO R[Xn12101 O. �!!!/// • • Photovoltaic I TO:(508)898-034 Panty 558-0038, - • , • R wR_yna kue, . ,, e Fastened Sign 690.31 • 1 • • • • • • Fn.poK,KSK hOC, :.. ,• Adhesive F stened s O- 'NEC Art'u•G9°56(BJI Panty 59600a)a ANSI Z535.4-2011 Product safety signs and labels,provides conductors shall be identified and grouped.The means of identification shall be PER NEC 4081 _ eef_We AYMMt RKpuxV m°rain'l.l.'�• �.wr,s...�1••m°b my wpm°•••°" guidelines for the design and durabliti Of Safety Signs and Pan Na.558-00309 r'€ 9 9 tY Y 9 permitted • separate • • coding, • • • approved labels for application to electrical equipment.NEC 110.21(B)(5) -•�• "° SECOND SERVICE DISCONNECT x H4x`°"'°`"`•'°"°°`°""a."""'°"°"�4uN^"""`"" 'Note Electrical seA4ce eRwpmem maa _ 'NEC nos icxlXB) The label shall be suitable for the environment 690.31 . ,•- ••- • • • nxx r I. be field marked the NEC Code when Pan No.558-0,ai ON NORTH SIDE OF BUILDING . ,,,A.....1..,, °I..Px •.. Ix•E"Sl- per where it is installed.NEC 110.21 _ between it n present in a building DI structure(,the,than -NEC 230.](E),NEC?30.74A)l Pan No.5S800313 - -•• •' • , ,• • , ' •o •, REVISIONS q Y pp - ,xceed 10 •• • N0. DATE COMMENT dwelling der(re, wppDnedbych aseelnan one electricity and service I'' - Where required elsewhere in this code an field applied labels, prwincluie publcmindJsurmationarCeling. Pvsystem). THIS PANEL FED MAX AVAILABLE FAULTCURREW.46.652AMFs warning(s)and markings shall comply with ANSI Z535.4. - labels o - tnls ndllnesArcR(asnapd Informational labeling. - ..+�.. .FROM INVt oATEvs]u NEC 110.21(B)FIELD MARKING 'PER NEC 408 C(B) 'PER NEC 110.24(A)I Pan No 55800313 Pir,-he ?,. , In e° °11�.And1 NitN,ESEN313 Adhesive fastened signs may be acceptable if properly •'1 • •• •- •• • •• • open °,�Ja'",^a�°R°"""pr""`"°^`"an•/e"��°a°a""'° adhered.Vinyl signs shall be weather resistant.IFC 605.11.1.3will be marked , xdma<+rnoa^:rnaaxnn<rro"rx°r'em.�„ a. y g Do Not Disconnect Under Load". NEC Combiner Box/Circuits/Conduit Combiner Box/ 0 EMT/Conduit Raceways 0 Breaker Panel/Pull Boxes 690.35(F) • •• • shall •• labeled • junction •• • • •• or Enclosures/EMT Enclosures •(Ref/ective Material Required) I A yyARNING 0 WARNING and device where energized, be exposed during WARNING A WARNING • • , , , , , C ELECTRICAL SHOCK HAZARD ELECTRICALSHOCKHAZARD 1 ELECTRICAL SHOCK HAZARD ELECTRICAL SHOCK HAZARD -• • NEC 690.4(F) • • up, • • membrane roofing _ DO NOT TOuax TE0.M1xALS NE[690.311Pan Nc.558-00206 NEC 690.41F)IP•t No.55800251 urcaouxoeo cox uca*oxs + EDscsrsrEUARE uxaxouxo[o • ' TERMINALS ON BOTH LINE AND THE°Ca�OVC1ORZ OF T109 re xouxDEO Ax xERaRED ovaA.DM ul➢ LOAD SIDES KaY SHE ENEROVED z*Alc sysTEx ARE uxaaOuxocO NEC fi90.5(CIIPa N.55800498 NEC 69.35111P nNo.558-00588 materials • • •/ ' • •' , , •, •' , • • ovothe ( N ON AHD bur De ENEl zeD .NEC 690.17(E)Part No 5%ON97 NEC 69935(F)I Pan Ne.5960058; ©.Inverter 0 Production/Net Meter A WARNING A WARNING - [-0-W_ ARNIN_G__- © Building/Structure A WARNING A WARNING_ ELECTRICAL SHOCK NAURD SINGLE 120-VOLT SUPPLY ELECTRICAL SHOCK HAZARD ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS DO NOT CONNECT TURN OFF PHOTOVOLTAIC TERMINALS ON BOTH LINE AND • I •• , photovoltaic •• •• • •- cnunoN xPURPOSE: AC DISCONNECT PRIOR TO - �_ LOAD SIDES MAY BE ENERGIZED MULTIWIRE BRANCH LIRCUnS WORKING INSIDE PANEL a uxDR uxoeDI ENERwzeo IEu..R .DEo AND HE—=. INTHEOPENPOSmON- 1 `�+ xAVRE xAr eE NEC6901gC11 Pan Nu 55800591 -• • • • • • • • • - • • • • • • • ••• • • • NEC 110.2](C I S OSHA 1910.1451N1]) ( NEC 690.5(Q I Pan No.596 001 NEC 690 5(O I Pan ND.558 00498 NEC 690.1](E)I Pan Nc.558-0049] • , Pan IN.596-00499 (. 1 := _ 5.88 KW SOLAR ARRAY A WA N O Production/Net Meter result in overvoltage on the equipment. A WARNING RL[6sCrIAX)I`mNo55000244 CINDY& RICHARD BRIGGS NEC 690.5618)I Pan No 5%00350 BIPOLAR PHOTOVOLTAIC ARRAY. —-directional) TURNOFF PHOTOVOLTAIC DISCONNECTION OF NEUTRAL AC DISCONNECT PRIOR TO ACAUTI�ONNEC ••15(C) A labeshallappear on or •• applied by ' OR GROUNDED CONDUCTORS©DC Disconnect/Breaker/Recombiner Box WORKING INSIDE PANEL MAY RESULT IN OVERVOLTAGE ON ARRAY OR INVERTER 1O�i•NEC]05.15(DI(4)d NEC 690.64 SITE ADDRESS i '_SOLAR ELECTRIC rJEC no.ntd80sHA 191o.+as(Mn Pare Do.sse 0osa2 . • •, • ground • indicator • • • location. A_WARNING • • OWARNING DUAL PoWER SWRCE NECIFC 60s.1 i.3.IFC fi05.l1.14,NEC690.I5,NEC ECg10 SOURCE IS PHOi_ONLIAIC SrJTEM _ marked ELECTRICAL SHOCK HAZARD , • • 5 NEffC 69041G+1 Pan No.594-0059° rJECDNO690.15n EC690.OLTAK SYSTEM I , fi99.13,B)dNE.3.IFC14(CI(211Part Na-9F00238 • -r WARNING OUAL6PoWER4 WRCE 5800613 NEC)05 t2(pN48NEC 630 c41 Pan Nu 558-00<95 NEC • 1 52 • •s shall identification terminals leads • 413 SKUNKNET ROAD PHarD�o DMUwESe ERGues. DED Main$e EC69a5a1P,,;Na556.00239 L)WARI Gratings • • label. CENTERVILLE MA,02632 NEC 69054'1 Pen No,59600239NEC EC 690.6 xvexrex ouaxu*coxxgenox.ao xo* ,. NEC 690 351F)I Pan No 5%00583 Pan IN..SEE 004p5 C)l aan YD 558 W599 r .- � NEC]05.I21D NEC 690.53 • 1 • - - A WARNING a r 0 AC Disconnect/Breaker/Points of-Connection _- ELECTRICAL WARNKNGS HAZARD X2 permanent label • • • • power • • shall be,h • • PREPARED FOR: ONOTTOUC ELECTRICAL SHOCK HAZARD • • • 1 •• provided by • installer at • • disconnecting • / L IJE[ect,531 Pan Na.1.0a2a1 • • • W&M TERMINALS ON BOTH LINE AND LOADSIDIE MAY BEENERGIZED NEC 69015 d HEC l"1"11Na 558-00243 Atlantic Power Partners, LLC. wiTAGE o•LUiIFC 6051M IFC East 11A NEC.690.15,FIE( IN THE OPEN POSITON • ' � � •• • •• • • • IS l4rCXLN_C690.13(BIIPanNo.5960023] NEC690JAUIP,, 1,558-0049] CAUTION:SOLAR ELECTRIC • 586 Strawberry Hill Road ��NEC ISM 17(E)I Pan Na s96-0. 96 SYSTEM CONNECTED NEC 6%521 Part No W25) 1- 1 8 I Pn No 5580 13 NEC fi90.ad NEC E90.31) 06 _ _ _ _ _ Centerville MA 02632 y A WARNING •• -• • • • • • • ELECTRICAL SHOCK HAZARD _ W N I ' A AR I 0 Main service Disconnect/ _ _ _ DO NOT TOUCH TERMINALS Utlll Meter •• • • •• A • • • • • ••• • TERMINALS ON BOTH LINE AND • • • • • TURN OFF PHOTOVOLTAIC Ty • IJEC fi90.531 Part Na 59ti-00353 LOIDSIDESMAY BEENERGIZED - 1 - IN THE OPEN POSITION AC DISCONNECT PRIOR TO • • - NEC690.13(6)lIrla.55800239 • • • 1 • - • DRAWING TITLE: ,NARxINGDCBACKUP11SIEM5 NEC-6901](DIPar Re.558.00492 WORKING INSIDE PANEL • •• 1A/WW•He I PnND.5%00210 - '� - • NEC 6905(CI rdNa 8p0499 • • A ION NEC • • 1 • power employing energy storage • • marked T Ilermann.T ton.com t ' • . • f rt Y - �with the maximum operating voltage, including any equalization voltage and polarity of the grounded • • • CAD TECH: CHECKED BY: REQUIREMENTS FOR ELECTRICAL INSTALLATIONS(FIELD MARKING) NEC 690.56(B) Each Rapid Shutdown Switch shall be permanently marked to AC RP NEC 110.16 Electrical equipment that are in other than dwelling NEC 210.5(C)(1)(B)Branch Circuits:The NEC 408.4(B) NEC 705.12(D)(4) NFPA 2012 130.5(C) units shall be field marked to warn qualified persons of a potential identification methods used for conductors All switchboards and panelboards supplied by a feeder in other than Equipment containing Same as NEC110.16 but includes additional identifyas • Photovoltaic Rapid ••wn.The sign or placard •• marked ENGINEER: DATE: Arc Flash hazard. originating within each branch circuit shall be one or two family dwellings shall be marked to indicate the device or overcurrent devices in circuits label information that is required after "PHOTOVOLTAIC •• • • AC 8/10/15 NEC 110.24(A)Service equipment in other than dwelling units documented in a manner that is readily available equipment where the power supply(s).originates. supplying power to a bulbar 913 012 0 1 1.Check latest 2012 NFPA Arc Flash / / • or shall be permanently posted at each branch- or conductor supplied from requirements. shall 6e legibly field marked with the available fault current. NEC 705.1 Z(D)(2)(C)In systems with panelboards connected in a o circuit panelboard or distribution equipment multiple sources shall be • • • •• •• • • • • • • •• SCALE: NEC 110.27(C Entrances to rooms or other guarded locations series,the rating of the first overcurrent device directly connected to the OSHA 1910.145(F)(7) . 1 9 marked to indicate the that contain exposed live arts shall be marked with conspicuous NEC 230.2(E)Where a building or structure output of the utility,interactive inverter(s)shall be used in.calculations Warning tags are used to represent a hazard p p p is supported by more than one service,add a for all busbars and conductors.A permanent label shall be applied to presence of all sources. level between"Caution"and"Danger". • , • warning signs forbidding unqualified persons to enter. • • of • •n shall be • • plaque to denote all other services. the distribution equipment with the following or equivalent wording. _ SHEET: 90F9